A. Gantt or Bar ChartB. Network Plan/Diagram C. Script 5. BAR CHART (simple) 6. BAR CHART (complex) 7.
8.
9. Gantt Chart terms: Dependant Activity: - can only be carried out after another activity is completed Critical Activity: - an activity whose duration affects the duration of the entire project (noslacktime) Position Line: - shows a snap shot of the progress (i.e. today) ASAP ALAP(e.g. spending money) 10.
11. Step-By-Step Plan for drawing a Network Diagram(Grit) Step 1:Start from the table of activites Step 2:Draw a rectangle for every activity Step 3:Starting from the circle, draw an arrow toeach of the activities Step 4:Draw rectangles for all other milestonesand connect them to the preceding activitywith an arrow 12. Step-By-Step Plan for drawing a Network Diagram(Grit) Step 5:Indicate the code (A, B, etc.) in all circlesand rectangles Step 6:Indicate the duration of the activity abovethe arrows (7 days, 1 month, etc.) Step 7:Determine The Critical Path by checkingthe duration of each paths.The longest path =The Critical Path 13. Step-By-Step Plan to derive a Bar Chart from a Network Diagram(Grit) Step 1:Draw a horizontal time scale (slightlylonger than actual durationStep 2:Draw strips or bars for each activityalong The Critical Path longer duration = longer strip The Critical Path = darker strips = top left to bottom rightStep 3:Add bars for the other activities, includingdependent activitiesStep 4:Indicate slack with dotted lines Step 5:Indicate dependencies with vertical lines 14. Step-By-Step Plan for a Bar Chart(Verhaar)Step 1:Determine the start and end date Step 2:Divide into phases Step 3:Find logical groupings of tasks Step 4:Construct a preliminary overview of activities 15.
Verhaar (events): Grit (general): Initiative Phase Concept Preparation Phase Definition Development Phase Design (Production Phase) Preparation Performance Phase Execution Evaluation Phase Aftercare 16. Step-By-Step Plan for a Bar Chart(Verhaar)Step 5:Put an overview of activities in the plan (general, detailed, or a mix) Step 6:Determine who will do what Step 7:Determine the calendar scale Step 8:Estimate time frame of each activity Step 9:Mark milestones & deadlines 17. Step-By-Step Plan for a Bar Chart(Verhaar)Step 10:Introduce relationships and determine.The Critical Path Step 11:Close the planning Step 12:Make the plan definite Step 13:Establish progress control 18.
19. Read : Verhaar, Chapters 2,3,4, (10 & 11 recommended) Grit, Chapters 2,3 Write 2 questions with answers from each chapter, due week 5 Project group 1: Verhaar, Chapter 1,2,Grit, Chapter 10, 11, 12 Project group 2: Verhaar, Chapter 3,4, 6 Grit, Chapter 8, 9 Project group 3: Verhaar, Chapter 7, 8, 9 Grit, Chapter 6, 7 Project group 4: Verhaar, Chapter 11, 12, 13 Grit, Chapter 4,5 For next week: 20. Read : Verhaar, Chapters 2,3,4, (10 & 11 recommended) Grit, Chapters 2,3 Write 2 questions with answers from each chapter, due week 5 Project group 1: Verhaar, Chapter 1, 2Grit, Chapter 10, 11, 12 Project group 2: Verhaar, Chapter 3, 4,Grit, Chapter 7, 8, 9 Project group 4: Verhaar, Chapter6, 7, 8 Grit, Chapter 5, 6 For next week (IMEMB): 21. Read : Verhaar, Chapters 2,3,4, (10 & 11 recommended) Grit, Chapters 2,3 Write 2 questions with answers from each chapter, due week 5 Project group 5: Verhaar, Chapter 10, 11 Grit, Chapter 3, 4,Project group 6: Verhaar, Chapter 12, 13 Grit, Chapter 1, 2 For next week: