B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 1 OF 19
PROJECT MANUAL
TABLE OF CONTENTS
BIDDER INFORMATION AND DOCUMENTS
00010 TABLE OF CONTENTS
00020 NOTICE TO CONTRACTORS CALLING FOR BIDS
00100 INFORMATION FOR BIDDERS
00200 MULTIPLE BID FORM
00200.01 BID PACKAGE - 1 BID FORM
00200.02 BID PACKAGE - 2 BID FORM
00200.03 BID PACKAGE - 3 BID FORM
00200.04 BID PACKAGE - 4 BID FORM
00200.05 BID PACKAGE - 5 BID FORM
00200.06 BID PACKAGE - 6 BID FORM
00200.07 BID PACKAGE - 7 BID FORM
00200.08 BID PACKAGE - 8 BID FORM
00200.09 BID PACKAGE - 9 BID FORM
00200.10 BID PACKAGE - 10 BID FORM
00200.11 BID PACKAGE - 11 BID FORM
00200.12 BID PACKAGE - 12 BID FORM
00200.13 BID PACKAGE - 13 BID FORM
00200.14 BID PACKAGE - 14 BID FORM
00200.15 BID PACKAGE - 15 BID FORM
00200.16 BID PACKAGE - 16 BID FORM
00200.17 BID PACKAGE - 17 BID FORM
00200.18 BID PACKAGE - 18 BID FORM
00200.19 BID PACKAGE - 19 BID FORM
00200.20 BID PACKAGE - 20 BID FORM
00200.20A BID PACKAGE – 20A BID FORM
00200.21 BID PACKAGE - 21 BID FORM
00200.22 BID PACKAGE - 22 BID FORM
00200.23 BID PACKAGE - 23 BID FORM
00200.24 BID PACKAGE - 24 BID FORM
00300 BID BOND
00400 TRADE CONTRACTOR’S CERTIFICATION REGARDING WORKERS
COMPENSATION
00410 DESIGNATION OF TIER SUBCONTRACTORS
00420 DESIGNATION OF DVBE TIER SUBCONTRACTORS
00430 INFORMATION REQUIRED OF BIDDERS
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 2 OF 19
00440 ASBESTOS-FREE MATERIALS CERTIFICATION
00450 NON-COLLUSION AFFIDAVIT
00450 SITE-VISIT CERTIFICATION
00455 ACKNOWLEDGEMENT OF PROJECT LABOR AGREEMENT
00470 PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
00500 CONTRACT
00505 ASSIGNMENT AND NOVATION AGREEMENT
00600 PERFORMANCE BOND
00610 PAYMENT BOND FOR PUBLIC WORKS
00620 RECYCLED CONTENT CERTIFICATION
00630 DRUG-FREE WORKPLACE CERTIFICATION
00700 GENERAL CONDITIONS
00800 SPECIAL CONDITIONS
00810 SUPPLEMENTAL GENERAL CONDITIONS/ INFORMATION REQUIRED OF
BIDDERS
00930 LEAD BASED PAINT CERTIFICATION
00980 PREVAILING WAGE CERTIFICATION
Bidder Information and Documents Exhibits
Exhibit A – DVBE Program Requirements
Exhibit B – Website for Prevailing Wage Scales
Exhibit C – Payee Data Record Form
Exhibit D – Pre-Bid RFI Instructions
Exhibit E – Master Bid Schedule
Exhibit F – Small Business Certification
Exhibit G – Wage Rate Worksheet
Exhibit H – Substitution Request Form
Exhibit I – GCCCD Academic Calendar (2017-2018)
Exhibit J – GCCCD Campus Map
Exhibit K – Dual Obligee Bond Rider For Payment Bond
Exhibit L – Dual Obligee Bond Rider For Performance Bond
Exhibit M – Builder’s Risk Memorandum of Coverage
TRADE PACKAGES
Exhibit 2.A.1 Dot Matrix
Exhibit 2.A.2 Trade Package Provisions (ALL TRADES)
Exhibit 2.A.3 Trade Packages (BP 1 - BP 24)
PROJECT DRAWINGS
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 3 OF 19
Sheet Index - Volume 1 Sheet Number Sheet Name
Architecture
A0.00 Cover Sheet
A0.01 Sheet Index
A0.02 General Notes
A0.03 Cal Green Code Checklist
A1.01 Campus Site Plan
A1.02 Site Plan - Accessible Path of Travel
A1.03 Site Plan - Fire Access & Hydrants
A1.11 Code Analysis - Orchestra Pit
A1.12 Code Analysis - Level 1
A1.13 Code Analysis - Level 2
A1.14 Code Analysis - Catwalk/Gallery
A2.00 Demo Plan & Elevation
A2.01 Floor Plan - Orchestra Pit
A2.02 Floor Plan - Level 1
A2.03 Floor Plan - Level 2
A2.04 Floor Plan - Catwalk/Gallery/Lower Roof
A2.05 Grid/Mechanical Roof Plan
A2.06 Upper Roof Plan
A2.11 Reflected Ceiling Plan - Orchestra Plan
A2.12 Reflected Ceiling Plan - Level 1
A2.13 Reflected Ceiling Plan - Level 2
A2.14 Reflected Ceiling Plan - Catwalk/Gallery
A2.21 Finish Plan - Orchestra Plan
A2.22 Finish Plan - Level 1
A2.23 Finish Plan - Level 2
A2.24 Finish Plan - Catwalk/Gallery
A3.01 Exterior Elevation
A3.02 Exterior Elevation
A3.11 Building Sections
A3.12 Building Sections
A3.13 Building Sections
A3.14 Building Sections
A3.21 Wall Sections
A3.22 Wall Sections
A3.23 Wall Sections
A3.24 Wall Sections
A3.25 Wall Sections
A3.26 Wall Sections
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 4 OF 19
A4.01 Ticket Booth, Plan Section Elevation
A4.02 Enlarged Plans and Elevations
A4.03 Enlarged Plans and Elevations
A4.11 Enlarged Floor Plan
A4.12 Enlarged Floor Plan
A5.01 Interior Elevations
A5.02 Interior Elevations
A5.03 Interior Elevations
A5.04 Interior Elevations
A5.05 Interior Elevations
A5.06 Interior Elevations
A6.01 Door Schedule
A6.02 Door Details
A6.03 Door Details
A6.04 Window Details
A7.01 Enlarged Plans and Sections - Stair #1
A7.02 Enlarged Plans and Sections - Stair #2
A7.03 Enlarged Plans and Sections - Stair #3
A7.04 Enlarged Plans and Sections - Stair #4
A7.05 Enlarged Plans and Sections - Elevator
A7.06 Enlarged Plans and Sections - Lifts
A7.07 Enlarged Plans and Sections - Grid Stairs
A7.11 Stair Detail
A7.12 Stair Detail
A7.23 Elevator & Lift Details
A8.01 Exterior Details - Roof
A8.02 Exterior Details - Walls
A8.03 Exterior Details - Walls
A8.04 Exterior Details - Walls
A8.05 Exterior Details - Walls
A8.06 Exterior Details - Box Office/Concessions
A8.07 Exterior Details
A9.11 Interior Details - Wall Types
A9.21 Ceiling Details
A9.22 Ceiling Details
A9.23 Ceiling Details
A9.31 Interior Details
A9.32 Interior Details
A9.41 Casework Details
A9.51 Restroom Details
A9.61 Interior Details - Theater
A9.62 Interior Details - Theater
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 5 OF 19
A9.63 Interior Details - Theater
A9.64 Stage and Lift Details
A9.65 Gridiron & Gallery Details
A9.67 Catwalk Details
A9.68 Interior Details - Theater
A9.71 Signage Details
A9.72 Signage Details
Civil
C0.01 General Notes
C1.01 Demolition Plan
C1.02 Demolition Plan
C2.01 Grading Plan
C2.02 Grading Plan
C2.03 Grading Plan
C2.04 Grading Plan
C3.01 Storm Drain Plan
C4.01 Utility Plan
C4.02 Water System Plan
C5.01 Paving, Striping, Signage, and Horizontal Control Plan
C5.02 Paving, Striping, and Signage Plan
C6.01 Erosion Control Plan
C6.02 Erosion Control Plan
C7.01 Details
C7.02 Details
C7.03 Details
Landscape
L0.01 Landscape Notes and Schedules
L0.02 Site Key Plan
L1.01 Landscape Materials Plan
L2.01 Layout Plan
L3.01 Materials and Layout Enlargements
L3.02 Materials and Layout Enlargements
L4.01 Section/Elevation
L4.02 Section/Elevation
L5.01 Construction Details
L5.02 Construction Details
L5.03 Construction Details
L5.04 Construction Details
L6.01 Irrigation Plan
L6.02 Irrigation Legend and Notes
L6.03 Irrigation Details
L6.04 Irrigation Details
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 6 OF 19
L7.01 Landscape Planting Plan
L7.02 Planting Details
Structural
S0.01 General Notes
S0.11 Typical Foundation and Sog Details
S0.12 Typical Foundation and Sog Details
S0.13 Foundation Details
S0.21 Typical Structural Steel Details
S0.22 Typical Metal Decking Details
S0.23 Typical Deck Supporting Details
S0.24 Steel Connection Details
S0.25 Typical Steel Connection Details
S0.26 Steel Details
S0.27 Steel Details
S0.28 Steel Details
S0.31 Typical CMU Wall Elevation and Details
S0.32 Typical CMU Wall Details
S0.33 Typical CMU Wall Details
S0.34 CMU Wall Details
S0.71 Typical Concrete Details
S0.91 Typical Light Gauge Framing Schedules and Elevations
S0.92 Typical Light Gauge Metal Framing Details
S0.93 Typical Light Gauge Metal Framing Details
S0.94 Typical Light Gauge Metal Framing Details
S1.01 Typical Site Details
S2.01 Basement Foundation Plan
S2.02 First Floor Foundation Plan
S2.03 Enlarged Balcony Framing Plan
S2.04 Second Floor Framing Plan
S2.05 Gallery Level Framing Plan
S2.06 Catwalk Level Framing Plan
S2.07 Low Roof Framing Plan
S2.08 Grid Level and Mechanical Platform Framing Plan
S2.09 High Roof Framing Plan
S3.01 CMU Wall Elevations
S3.02 CMU Wall Elevations
S3.03 CMU Wall Elevations
S3.04 CMU Wall Elevations
S4.01 Wall Sections
S4.02 Wall Sections
S4.03 Wall Sections
S4.04 Wall Sections
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 7 OF 19
S4.10 Miscellaneous Sections
S7.01 Enlarged Stair Plans
S7.02 Enlarged Stair Plans
S7.03 Enlarged Stair Plans
S7.11 Typical Stair Framing Details
S7.12 Typical Stair Framing Details
S9.01 Typical Equipment Anchorage Details
Sheet Index - Volume 2
Sheet Number Sheet Name
Architecture
A0.10 Cover Sheet
A0.11 Sheet Index
A0.12 General Notes
Audio - Video
EAV000 AV Infrastructure Symbols and Notes
EAV101 AV Infrastructure Plan - 1st Floor
EAV102 AV Infrastructure Plan - 2nd Floor
EAV201 AV Infrastructure RCP - 1st Floor
AV000 AV Systems Symbols and Notes
AV001 AV Systems Standard Details
AV101 AV Equipment Floor Plan - 1st Floor
AV102 AV Equipment Floor Plan - 2nd Floor
AV202 AV Equipment RCP - 2nd Floor
AV301 Av System Sections and Elevations
AV401 AV System Line Diagram - Signage
AV402 AV System Line Diagram - Art Gallery
AV403 AV System Line Diagram
AV601 AV Plate and Panel Layouts
AV702 AV Plate Locations - 2nd Floor
Electrical
E0.00 Electrical Lead Sheet
E0.01 Electrical Lead Sheet
E0.20 Lighting Control Schedule LCP Schedule
E0.21 Lighting Fixture Schedule
E1.00 Existing Site Electrical Plan
E1.10 New Site Electrical Plan
E1.11 Site Lighting Plan
E1.12 Site Lighting Plan - Photometrics
E2.11 Power Plan - Orchestra Pit
E2.12 Power Plan - Level 1
E2.13 Power Plan - Level 2
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 8 OF 19
E2.14 Power Plan - Catwalk/Gallery/Lower Roof
E2.15 Power Plan - Grid/Roof Plan
E2.16 Power Plan - Upper Roof
E2.21 Lighting Plan - Orchestra Pit
E2.22 Lighting Plan - Level 1
E2.23 Lighting Plan - Level 2
E2.24 Lighting Plan - Catwalk/Gallery/Lower Roof
E2.25 Lighting Plan - Grid/Roof Plan
E2.31 Mechanical Power Plan - Orchestra Pit
E2.32 Mechanical Power Plan - Level 1
E2.33 Mechanical Power Plan - Level 2
E2.34 Mechanical Power Plan - Catwalk/Gallery/Lower Roof
E2.35 Mechanical Power Plan - Grid/Roof Plan
E2.41 Theatrical Power Plan - Orchestra Pit
E2.42 Theatrical Power Plan - Level 1
E2.43 Theatrical Power Plan - Level 2
E2.44 Theatrical Power Plan - Catwalk/Gallery/Lower Roof
E2.45 Theatrical Power Plan - Grid/Roof Plan
E3.21 Theatrical Lighting Plan - Orchestra Pit
E3.22 Theatrical Lighting Plan - Level 1
E3.23 Theatrical Lighting Plan - Level 2
E3.24 Theatrical Lighting Plan - Catwalk/Gallery/Lower Roof
E3.25 Theatrical Lighting Plan - Grid/Roof Plan
E3.31 AV Plan – Orchestra Pit
E3.32 AV Plan – Level 1
E3.33 AV Plan – Level 2
E3.34 AV Plan – Catwalk/Gallery/Lower Roof
E3.35 AV Plan – Grid/Roof Plan
E3.40 Enlarged Electrical/Data Plan and Details
E4.00 Electrical Details
E4.01 Electrical Details
E4.02 Electrical Details
E4.03 Electrical Details
E4.04 Electrical Details
E4.05 Electrical Details
E4.06 Electrical Details
E5.01 Building Single Line Diagram and Load/Feeder Schedule
E6.00 Panel Schedules
E6.01 Panel Schedules
E6.02 Panel Schedules
E6.03 Panel Schedules
E7.00 Energy Compliance Forms
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 9 OF 19
E7.01 Energy Compliance Forms
E7.02 Energy Compliance Forms
Fire Alarm
FA0.00 Fire Alarm Lead Sheet
FA0.20 Fire Alarm Details
FA0.30 Fire Alarm Riser Diagrams
FA0.40 Fire Alarm Battery and Voltage Drop Calculations
FA2.11 Fire Alarm Plan Basement
FA2.12 Fire Alarm Plan - Level 1
FA2.13 Fire Alarm Plan - Level 2
FA2.14 Fire Alarm Plan - Catwalk/Gallery/Lower Roof
Fire Protection
F0.01 Fire Sprinkler General Notes
F1.00 Fire Sprinkler Site Plan
F2.11 Fire Sprinkler - Orchestra Pit
F2.12 Fire Sprinkler - Level 1
F2.13 Fire Sprinkler - Level 2
F2.14 Fire Sprinkler - Roof Level
F3.00 Fire Sprinkler Building Section
F4.00 Fire Sprinkler Details
F5.01 Fire Sprinkler Seismic Brace Components
F5.02 Fire Sprinkler Seismic Brace Calculations
Mechanical
M0.10 Mechanical Legends and General Notes
M0.20 Mechanical Schedules
M0.21 Mechanical Schedules
M0.30 Mechanical Title-24 Forms
M0.31 Mechanical Title-24 Forms
M0.32 Mechanical Title-24 Forms
M2.00 Mechanical Orchestra Pit Floor Plan
M2.01 Mechanical First Floor Plan
M2.02 Mechanical Second Floor Plan
M2.03 Mechanical Catwalk/Lower Roof Plan
M2.04 Mechanical Roof Plan
M3.00 Piping & Controls Orchestra Pit Floor Plan
M3.01 Piping & Controls First Floor Plan
M3.02 Piping & Controls Second Floor Plan
M3.03 Piping & Controls Catwalk/Lower Roof Plan
M3.04 Piping & Controls Roof Plan
M5.01 Existing Building 21 Piping Roof Plan
M6.01 Mechanical Control Sequences and Diagrams
M6.02 Mechanical Control Sequences and Diagrams
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 10 OF 19
M6.03 Mechanical Control Sequences and Diagrams
M6.04 Mechanical Control Sequences and Diagrams
M7.01 Mechanical Details and Diagrams
M7.02 Mechanical Details and Diagrams
M7.03 Mechanical Details and Diagrams
M7.04 Mechanical Details and Diagrams
M7.05 Mechanical Details and Diagrams
Plumbing
P0.01 Plumbing Legend, Abrev., and General Notes
P0.02 Plumbing Schedules
P1.01 Plumbing Site Plan
P2.00A Plumbing Lift and Orchestra Pit
P2.00B Plumbing Underground Plan
P2.01A First Floor Domestic Water Plumbing Plan
P2.01B First Floor Drainage Plumbing Plan
P2.02A Second Floor Domestic Water Plumbing Plan
P2.02B Second Floor Drainage Plumbing Plan
P2.03 Roof Plumbing Plan
P3.01 Enlarged Plumbing Plans
P3.02 Enlarged Plumbing Plans
P3.03 Enlarged Ticket Booth Plumbing Plans
P4.01 Plumbing Details
P4.02 Plumbing Details
Technology
LV0.00 Low Voltage Symbol List
LV2.11 Low Voltage Cable Plan - Orchestra Pit
LV2.12 Low Voltage Cable Plan - Level 1
LV2.13 Low Voltage Cable Plan - Level 2
LV2.14 Low Voltage Cable Plan - Catwalk
LV2.15 Low Voltage Cable Plan - Grid Level
LV4.00 Technology Typical Details
LV4.01 Technology Typical Details/Riser Diagram
LV4.02 Technology Typical Details
LV4.03 Technology Typical Details
LV4.04 Technology Typical Details
LV4.05 Technology Typical Details
Theater
TTE00 Theatre Equipment - Typical Abbreviations, Symbols & Keys
TTE01 Theatre Equipment - Combination Zones
TTE02 Theatre Equipment - Combination Zones
TTE11 Theatre Equipment - Orchestra Pit Level Plan
TTE12 Theatre Equipment - Stage Level Plan
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 11 OF 19
TTE12A Theatre Equipment - Stage Level Orchestra Shell Plan
TTE13 Theatre Equipment - Balcony Level Plan
TTE14 Theatre Equipment - Catwalk/Gallery Level Plan
TTE15 Theatre Equipment - Grid Level Plan
TTE21 Theatre Equipment - Centerline Section
TTE22 Theatre Equipment - Centerline Section-Drapery
TTE22A Theatre Equipment - Centerline Section-Orchestra Shell
TTE23 Theatre Equipment - Transverse Section Towards the House
TTE24 Theatre Equipment - Transverse Section House Curtain
TTE25 Theatre Equipment - Transverse Section Forestage Grid
TTE31 Theatre Equipment - Orchestra Pit Section
TTE32 Theatre Equipment - Orchestra Pit Lift Configurations
TTE33 Theatre Equipment - Orchestra Pit Plans
TTE34 Theatre Equipment - Seating Wagon Details
TTE35 Theatre Equipment - Orchestra Pit Railing Details
TTE36 Theatre Equipment - Orchestra Pit Electrical Riser
TTE41 Theatre Equipment - Platform Details
TTE51 Theatre Equipment - Equipment Details
TTE52 Theatre Equipment - Equipment Details
TTE53 Theatre Equipment - Acoustic Drapery Plans
TTE54 Theatre Equipment - Acoustic Drapery Elevations and Details
TTE55 Stage Drapery Details
TTE61 Theatre Equipment - Equipment Details Orchestra Shell (N.I.C)
TTL01 Theatrical Lighting System - Layout Key and Notes
TTL02 Theatrical Lighting System - Layout Key and Notes
TTL11 Theatrical Lighting System - Box Schedule
TTL12 Theatrical Lighting System - Dimming and Control Riser
TTL13 Theatrical Lighting System - Faceplates
TTL14 Theatrical Lighting System - Faceplates
TTS10 Theatre Seating - Notes, Standard Details & Schedules
TTS11 Theatre Seating - Orchestra Level Plan
TTS12 Theatre Seating - Balcony Level Plan
TTS13 Theatre Seating - Centerline Section
TAV01 Audio/Visual - Typical Notes Symbols & Keys
TAV02 Audio/Visual - ISO Ground Detail
TAV11 Audio/Visual - Box Schedule
TAV12 Audio/Visual - System Overview
TAV21 Audio/Visual - AV Facility Plans
TAV22 Audio/Visual - AV Facility Plans
TAV23 Audio/Visual - AV Facility Plans
TAV24 Audio/Visual - AV Facility Plans
TAV25 Audio/Visual - AV Facility Plans
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 12 OF 19
TAV26 Audio/Visual - AV Facility Centerline Sections - Speakers
TAV27 Audio/Visual - AV Facility Transverse Sections - Speakers
TAV41 Audio/Visual - Details
TAV51 Audio/Visual - Rack and Faceplate Details
TAV52 Audio/Visual - Faceplate Details
TECHNICAL SPECIFICATIONS
General Requirements Subgroup
DIVISION 00 – PROCUREMENT & CONTRACTING REQUIREMENTS
00 01 01 PROJECT TITLE PAGE
00 01 03 PROJECT DIRECTORY
00 01 07 SEALS PAGE
00 01 08 DEFERRED APPROVALS
00 01 10 TABLE OF CONTENTS
00 31 00 AVAILABLE PROJECT INFORMATION
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 20 00 PRICE AND PAYMENT PROCEDURES
01 23 00 ALTERNATES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 30 00.01 REQUEST FOR INTERPRETATION
01 30 00.02 ELECTRONIC DOCUMENT REQUEST CONFIRMATION FORM
01 30 00.03 SUBMITTAL COVER SHEET
01 31 14 FACILITY SERVICES COORDINATION
01 32 16 CONSTRUCTION PROGRESS SCHEDULE
01 35 53 SECURITY PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 41 00 REGULATORY REQUIREMENTS
01 42 19 REFERENCE STANDARDS
01 45 33 CODE-REQUIRED SPECIAL INSPECTONS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 51 00 TEMPORARY UTILITIES
01 52 13 FIELD OFFICES AND SHEDS
01 55 00 VEHICULAR ACCESS AND PARKING
01 56 39 TEMPORARY TREE AND PLANT PROTECTION
01 57 13 STORM WATER POLLUTION PREVENTION
01 57 21 INDOOR AIR QUALITY CONTROLS
01 58 13 TEMPORARY PROJECT SIGNAGE
01 60 00 PRODUCT REQUIREMENTS
01 60 00.01 REQUEST FOR SUBSTITUTION FORM
01 61 16 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01 60 16.01 ACCESSORY MATERIAL VOC CONTENT CERTIFICATION FORM
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 13 OF 19
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 74 19.01 FORM ATTACHMENTS
01 78 00 CLOSEOUT SUBMITTALS
01 78 00.01 WARRANTY FORM LETTER
01 79 00 DEMONSTRATION AND TRAINING
01 84 13 INTERIOR ACOUSTICAL PERFORMANCE
01 91 13 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
Facility Construction Subgroup
DIVISION 03 - CONCRETE
03 01 00 MAINTENANCE OF CONCRETE
03 10 00 CONCRETE FORMING AND ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 35 11 CONCRETE FLOOR FINISHES
03 35 43 CONCRETE FLOOR POLISHING
DIVISION 04 - MASONRY
04 05 11 MASONRY MORTARING AND GROUTING
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 19 POST-INSTALLED CONCRETE ANCHORS
05 12 00 STRUCTURAL STEEL FRAMING
05 12 13 ARCHITECTURALLY EXPOSED STRUCTURAL STEEL
05 31 00 STEEL DECKING
05 40 00 COLD-FORMED STEEL FRAMING
05 50 00 METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 13 PIPE AND TUBE RAILINGS
05 70 00 DECORATIVE METAL
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 00 ARCHITECTURAL WOOD CASEWORK
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 33 FIRE AND SMOKE ASSEMBLY IDENTIFICATION
07 13 00 SHEET WATERPROOFING
07 21 00 THERMAL INSULATION
07 25 00 WEATHER BARRIERS
07 26 16 UNDER SLAB VAPOR RETARDER
07 42 64 METAL COMPOSITE MATERIAL WALL PANELS
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 14 OF 19
07 42 64.10 FIELD ASSEMBLED METAL COMPOSITE WALL PANELS
07 54 00 THERMOPLASTIC MEMBRANE ROOFING
07 62 00 SHEET METAL FLASHING AND TRIM
07 62 70 EXTERIOR PENETRATION FLASHING PANELS
07 72 00 ROOF ACCESSORIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 13 EXPANSION JOINT COVER ASSEMBLIES
DIVISION 08 - OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 34 83 ELEVATOR DOOR COILING SMOKE CURTAINS
08 34 86 OVERHEAD COILING FIRE AND SMOKE CONTAINMENT ENCLOSURE
08 42 36 BALANCED DOOR ENTRANCES
08 43 13 ALUMINUM – FRAMED STOREFRONTS
08 44 13 GLAZED ALUMINUM CURTAIN WALLS
08 56 59 SERVICE AND TELLER WINDOW UNITS
08 56 73 SOUND CONTROL ROOM WINDOWS
08 71 00 DOOR HARDWARE
08 71 00.01 DOOR HARDWARE SCHEDULE
08 80 00 GLAZING
08 87 33 ARCHITECTURAL DECORATIVE WINDOW FILMS
DIVISION 09 - FINISHES
09 05 61 COMMON WORK RESULTS FOR FLOORING PREPARATION
09 21 16 GYPSUM BOARD ASSEMBLIES
09 30 00 TILING
09 30 00.01 TILING APPLICATION CHART
09 51 00 ACOUSTICAL CEILINGS
09 64 53 RESILIENT STAGE WOOD FLOORING
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 68 13 TILE CARPETING
09 72 60 TACKABLE WALL COVERING
09 84 00 ACOUSTIC ROOM COMPONENTS
09 84 16 SOUND DIFUSERS AND REFECTORS
09 84 47 MODULAR METAL WALL SYSTEM
09 91 13 EXTERIOR PAINTING
09 91 23 INTERIOR PAINTING
09 94 00 DECORATIVE FINISHES
09 96 23 GRAFFITI RESISTANT COATINGS
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 15 OF 19
DIVISION 10 - SPECIALTIES
10 11 01 VISUAL DISPLAY BOARDS
10 14 00 SIGNAGE
10 14 53 TRAFFIC AND PARKING SIGNAGE
10 21 13.19 PLASTIC TOILET COMPARTMENTS
10 26 01 WALL AND CORNER GUARDS
10 28 00 TOILET ACCESSORIES
10 44 00 FIRE-PROTECTION SPECIALTIES
10 51 00 LOCKERS
10 56 17 WALL MOUNTED STANDARDS AND SHELVING
10 71 13.43 FIXED SUN SCREENS
DIVISION 11 – EQUIPMENT
11 31 00 APPLIANCES
11 52 13 PROJECTION SCREENS
11 52 16 AV/PROJECTOR MOUNTS
11 61 12 ADJUSTABLE ACOUSTICS – MANUAL
11 61 13 ORCHESTRA ENCLOSURE
11 61 23 THEATRICAL PLATFORMS
11 61 33 THEATRICAL RIGGING
11 61 39 THEATRICAL CHAIN MOTOR CONTROL SYSTEM
11 61 43 THEATRICAL DRAPERIES
11 61 61 THEATRICAL LIFTS (ORCHESTRA PIT)
11 61 63 THEATRICAL SEATING WAGONS
11 61 71 DANCE FLOOR SURFACE
(Membrane on top of stage wood floor per 09 64 53)
11 61 91 THEATRICAL LIGHTING INSTRUMENTS AND ACCESSORIES
DIVISION 12 – FURNISHINGS
12 24 00 WINDOW SHADES
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 61 13 FIXED AUDIENCE SEATING
12 62 11 LOOSE AUDIENCE SEATING
12 93 00 SITE FURNISHINGS
DIVISION 13 – SPECIAL CONSTRUCTION
13 48 13 MANUFACTURED SOUND AND VIBRATION CONTROL COMPONENTS
DIVISION 14 – CONVEYING EQUIPMENT
14 24 00 HYDRAULIC ELEVATOR
14 42 16 VERTICAL WHEELCHAIR (PLATFORM) LIFT
DIVISION 21 – FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEM, CLASS II
21 13 13 AUTOMATIC SPRINKLER
21 30 00 FIREPUMPS
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 16 OF 19
DIVISION 22 – PLUMBING
22 01 30 COMMON WORK RESULTS FOR PLUMBING
22 05 16 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING
22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPING
22 05 48 VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 19 PLUMBING PIPING INSULATION
22 10 05 PLUMBING PIPING
22 10 06 PLUMBING PIPING SPECIALITIES
22 30 00 PLUMBING EQUIPMENT
22 40 00 PLUMBING FIXTURES
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
23 05 00 COMMON WORK RESULTS FOR HVAC
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 05 16 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
23 05 19 METERS AND GAGES FOR HVAC PIPING
23 05 48 VIBRATION ISOLATION AND SIESMIC BRACING FOR HVAC
PIPING AND EQUIPMENT
23 05 53 IDENTIFICATION FOR HVAC PIPNG AND EQUIPMENT
23 05 93 TESTING, ADJUSTING AND BALANCING
23 07 13 DUCT INSULATION
23 07 19 HVAC PIPING INSULATION
23 09 13 INSTRUMENTATION AND CONTROL ELEMENTS
23 09 23 DIGITAL CONTROL EQUPIMENT
23 21 13 HYDRONIC PIPING
23 21 14 HYDRONIC SPECIALTIES
23 21 23 HVAC PUMPS
23 25 00 CHEMICAL WATER TREATMENT
23 31 00 HVAC DUCTS AND CASINGS
23 33 00 DUCTWORK ACCESSORIES
23 33 19 DUCT SILENCERS
23 34 23 HVAC POWER VENTILATORS
23 36 00 AIR TERMINAL UNITS
23 37 00 AIR OUTLETS AND INLETS
23 40 00 AIR CLEANING DEVICES
23 52 33.13 MODULATING WATER-TUBE BOILERS
23 73 18 CUSTOM OUTDOOR AIR–HANDLING UNITS
23 81 27 SMALL SPLIT-SYSTEM HEATING AND COOLING
DIVISION 26 – ELECTRICAL
26 05 01 MINOR ELECTRICAL DEMOLITION
26 05 13 MEDIUM-VOLTAGE CABLES
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 17 OF 19
26 05 34 CONDUIT
26 05 36 CABLE TRAYS FOR ELECTRICAL SYSTEMS
26 05 37 BOXES
26 05 49 NOISE AND VIBRATION CONTROL FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 09 14 ELECTRICAL SENSING AND MEASUREMENTS
26 09 16 ELECTRIC CONTROLS AND RELAYS
26 09 23 LIGHTING CONTROL DEVICES
26 09 24 NETWORK LIGHTING CONTROLS
26 12 00 MEDIUM-VOLTAGE TRANFORMERS
26 22 00 LOW-VOLTAGE TRANSFORMERS
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
26 27 17 EQUIPMENT WIRING
26 27 26 WIRING DEVICES
26 28 13 FUSES
26 28 18 ENCLOSED SWITCHES
26 29 13 ENCLOSED CONTROLLERS
26 32 13 ENGINE GENERATORS
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
26 61 11 THEATRICAL DIMMING AND CONTROLS
DIVISION 27 – COMMUNICATIONS
27 05 00 COMMON WORK RESULTS FOR COMMUNICATION
27 05 26 GROUNDING AND BONDING COMMUNICATION SYSTEM
27 05 28 CABLE TRAY
27 10 00 STRUCTURED CABLING
27 11 16 CABINETS, ENCLOSURES AND RACKS
27 11 23 LADDER RACKING
27 41 16 INTEGRATED AUDIO-VIDEO SYSTEMS AND EQUIPMENT
27 41 16.61 INTEGRATED AUDIO-VIDEO SYSTEMS AND EQUIPMENT FOR THEATERS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 13 00 ACCESS CONTROL
28 16 00 INTRUSION DETECTION
28 23 00 DIGITAL VIDEO SURVEILLANCE SYSTEM
28 31 00 FIRE DETECTION AND ALARM
Site and Infrastructure Subgroup
DIVISION 31 – EARTHWORK
31 10 00 SITE CLEARING
31 22 00 GRADING
31 23 16 EXCAVATION
31 23 16.13 TRENCHING
31 23 23 FILL
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 18 OF 19
31 41 00 EXCAVATION SUPPORT AND PROTECTION
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 01 90 LANDSCAPE MAINTENANCE
32 11 23 AGGREGATE BASE COURSES
32 12 16 ASPHALT PAVING
32 13 13 CONCRETE PAVING
32 13 73 PAVEMENT JOINT SEALERS
32 15 00 DECOMPOSED GRANITE SURFACING
32 17 13 PARKING BUMPERS
32 17 23.13 PAINTED PAVEMENT MARKINGS
32 17 26 TACTILE WARNING SURFACING
32 31 19 TUBE STEEL FENCES AND GATES
32 33 00 ARCHITECTURAL SITE CONCRETE
32 84 00 LANDSCAPE IRRIGATION
32 91 19 LANDSCAPE GRADING
32 93 00 LANDSCAPE WORK
DIVISION 33 – UTILITIES
32 11 16 SITE WATER DISTRIBUTION PIPING
32 13 00 DISINFECTING OF WATER UTILITY DISTRIBUTION
33 31 11 SITE SANITARY SEWER SYSTEM
33 41 11 SITE STORM DRAINAGE SYSTEM
33 46 00 SUBDRAINAGE
CONSTRUCTION DOCUMENTS EXHIBITS
A. As-Builts
Exhibit 5.A.1 As-builts
Exhibit 5.A.2 BLDG 200 & 300 Drawings
Exhibit 5.A.3 BLDG 20 & 23 Drawings
Exhibit 5.A.4 BLDG 21 Drawings
Exhibit 5.A.5 BLDG 22 Drawings
Exhibit 5.A.6 BLDG 24 Drawings
Exhibit 5.A.7 BLDG 25 Drawings
Exhibit 5.A.8 BLDG 26 & 27 Drawings
Exhibit 5.A.9 Central Plant Drawings
Exhibit 5.A.10 BLDG 10 Drawings
B. Geotechnical, HAZMAT, & SWPPP Documents
Exhibit 5.B.1 Geotechnical Report 2004.05.20
Exhibit 5.B.2 Geotechnical Report 2015.12.11
Exhibit 5.B.3 Geotechnical Report Question/Responses 2015.12.22
Exhibit 5.B.4 Theater Site Plan AE Boring Locations
Exhibit 5.B.5 Building 22C Hazardous Material Report 2015.10.09
Exhibit 5.B.6 Building 22C Trailer Hazardous Material Report 2016R.06.28
B17.006–B17.030 (BP-1 – BP-24)
Grossmont College Arts & Communication Complex –
Phase 1 Teaching & Performance Theater
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
PROJECT MANUAL TABLE OF CONTENTS
PAGE 19 OF 19
Exhibit 5.B.7 Buildings 21 24, 25, 26, 27, 28, 29 Hazardous Material Report 2009.02.09
Exhibit 5.B.8 Building 22A Trailer Hazardous Material Report 2016.06.27
Exhibit 5.B.9 Grossmont CC Haz Removal Spec Bldg 22A and 22C 3.28.17
Exhibit 5.B.10 SWPPP Manual
C. Project Labor Agreement (PLA) Documents
Exhibit 5.C.1 PLA - Project Labor Agreement
Exhibit 5.C.2 PLA - Letter of Assent
Exhibit 5.C.3 PLA - Workforce Dispatch Request Form Contractor Core Workforce Form
Exhibit 5.C.4 PLA – SDBT Drug and Alcohol Prevention Policy
Exhibit 5.C.5 PLA - Pre-Job Conference Form
Exhibit 5.C.6 PLA – Workforce Opportunity Letter
Exhibit 5.C.7 PLA – Project List
D. Balfour Beatty Documents
Exhibit 5.D.1 Site Logistics
Exhibit 5.D.2 Construction Schedule
Exhibit 5.D.3 BIM General Conditions Specification
Exhibit 5.D.4 BIM Execution Plan (Grossmont)
Exhibit 5.D.5 BIM Coordination Schedule
Exhibit 5.D.6 Zero Harm S.H.E. Requirements
Exhibit 5.D.7 Zero Harm S.H.E. Submittal Checklist
Exhibit 5.D.8 Bond Review Examples
Exhibit 5.D.9 CM/IOR Trailer Plan
Exhibit 5.D.10 Temp Power Plan
END OF TABLE OF CONTENTS