RAD-3526 - RADCO TEST REPORT Test Report RAD.;3526 Project No. F-4534 Model 59097 %" X 60" Double Helix Ground Anchor With Double 4" Helix Discs Prepared For: TIE DOWN ENGINEERING, INC-. 5907 Wheaton Drive Atlanta, GA 30336 By RADCO Resources, Applications, Designs and Controls, Inc. Listing and Testing Division' 3220 E. 59thStreet Long Beach, CA 90805 Phone: 562-272-7231 Fax: 562-529-7513 ............. \.. WIT LI ~ ..... · . '7, . .. ,~ '~" .. . ~' .- ... 'f;A.· ;s ... \ \CEN... .. -v. .. · ::-<,." U..t-,. r\. : rJ .8 ,... .. \,)",8. . '. . -"'"'"' . . . ~O. : .: No. 6188 4 ~ Z : .. .. ~ \. SiAiEO F i. j O . " .. ~ . "l.. ·~. gtOrTf.~&~..'OR'D~ {v«; ...- s'~ ~ ..- 0NAl E~G.... ............... Submitted by: Prepared by: ~~~ PhilipL.~~n' Staff Enginee j(JMldf Mich~el L. Zieman, P.E. President Issued: October, 2004 RACCO reports are for the exclusive use of the client to whom they are addressed. Permission is granted to reproduce this report provided it is reproduced in Its entirety. The use of the name RADCO, (Resources, Applications, Designs and Controls, Inc.) in any advertising or related material must receive prior written approval from RACCO. Reports apply only to samples tested at the time of testing and are not necessarily indicative of the quality or apparently identical or similar products. This report contains confidential information Intended for the sole use of the addressee. Transmittal by facsimile is prohibited without ttJe express approval and concurrence of the addressee. -
Transcript
Page 1: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement

RAD-3526

-RADCO TEST REPORTTest Report RAD.;3526

Project No. F-4534

Model 59097%" X 60" Double Helix Ground Anchor

With Double 4" Helix Discs

Prepared For:

TIE DOWN ENGINEERING, INC-.5907 Wheaton DriveAtlanta, GA 30336

By

RADCOResources, Applications, Designs and Controls, Inc.

Listing and Testing Division'3220 E. 59thStreet

Long Beach, CA 90805Phone: 562-272-7231

Fax: 562-529-7513.............\.. WIT LI ~.....· . '7, .

.. ,~ '~" ... ~' .- ... 'f;A.·;s ... \ \CEN... .. -v. ..· ::-<,." U..t-,. r\.: rJ .8 ,... .. \,)",8.. '. . -"'"'"'.. . ~O.: .: No.61884 ~ Z :. . . .~ \. SiAiEOF i. jO . " ..

~ . "l.. · ~ .gtOrTf.~&~..'OR'D~ {v«; ...-

s'~ ~ ..-0NAl E~G...................

Submitted by:Prepared by:

~~~PhilipL.~~n'Staff Enginee

j(JMldf

Mich~el L. Zieman, P.E.President

Issued: October, 2004

RACCO reports are for the exclusive use of the client to whom they are addressed. Permission is granted to reproduce this reportprovided it is reproduced in Its entirety. The use of the name RADCO, (Resources, Applications, Designs and Controls, Inc.) in anyadvertising or related material must receive prior written approval from RACCO. Reports apply only to samples tested at the time oftesting and are not necessarily indicative of the quality or apparently identical or similar products. This report contains confidentialinformation Intended for the sole use of the addressee. Transmittal by facsimile is prohibited without ttJe express approval andconcurrence of the addressee. -

Page 2: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement

RAD-3526

APPENDICES

APPENDIXA - TEST DATA RECORDS --

. APPENDIX B - PICTURES

APPENDIX C - SCALE CALIBRATION RECORDS --

APPENDIX 0 - ANCHOR DRAWINGS --------------

A1

B1-B2

C 1-C3

01

. -.. ..

TABLE OF CONTENTS

1.0 INTRODUCTION --- - 1

2.0 GROUNDANCHORDESCRIPTION . " 1

3.0 SITE DESCRIPTION ......... -- 1

4.0 GROUNDANCHORINSTALLATION-------- -- 1

5.0 TESTSETUP 1

6.0 MEASUREMENTS . 2

7.0 TESTLOADS ------ ----.2

8.0 TESTRESULTS . 2

9.0 CONCLUSIONS 2

10.0 CONDITIONS - -- ------- 3

Page 3: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement

. RAD-3526

1.0 INTRODUCTION

At the request of Tie Down Engineering, Inc., Philip Witherington, P.E. witnessed field-testing of the model - 59097 60" ground anchor with 4" double helix discs. The groundanchor was tested in accordance with the Federal Manufactured Home Constructionand Safety Standards (The Standards). The objective of the tests was to determine theanchorage capacity of the ground anchors would withstand the imposed loads as setforth in The Standards.

2.0 GROUNDANCHORDESCRIPTION

The model 59097 ground anchor is a 60" long by %" diameter steel ground anchorgrade 36 with two 4" helix discs located near the bottom of the anchor. The anchor istopped off with a steel U-shaped head welded to the vertical anchor. This headcontains two bolt holes on each vertical face of the "u" to accommodate the bolt(s)required to secure a steel tie down strap to the ground anchor.

3.0 SITE DESCRIPTION

Testing was per Testing was performed in an open grass area across from Tie DownEngineering Inc.'s. production facility in Atlanta, Georgia on August 27,2004. The testsite consisted of primarily clayey soil of varying conditions and soil classifications. Thesoil sampled for this anchor was a 500 ft.-lb. Class 2 soil. Due to considerable rain froma couple of days before, soil conditions were wet, but not muddy

4.0 GROUNDANCHOR INSTALLATION

Three anchors were installed vertically into the ground up to a bottom portion of the U-shaped bracket on top. Each anchor was installed several feet apart from each other soas to not impactthe soil characteristicsof the adjacentanchor .

5.0 TESTSETUP

Each ground anchor was installed so that the head of each anchor wouldline up with awell-established tree located about 20' away. The tree had a diameter at the trunk nearwhere the cable was wrapped of roughly 18" in diameter; therefore, no yielding of thetree would occur during testing. A chain was wrapped around the tree and fed througha come-along winch, which was used to apply the test loads. A steel cable linked thewinch to dynamometer. The dynamometer was fastened to the top of a vertical steeltube. The steel tube was bolted to a steel plate on the ground via a pinned connection.A steel cable was connected with one end secured to the top of the steel tube, and theother end fastened to the ground anchor. The steel cable between the top of the steel

Page 4: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement

- -- ----

RAD-3526

tube and the ground anchor was positioned at a 45-degree angle above the horizontal.See Appendix 0 for a picture of the test apparatus.

6.0 MEASUREMENTS

Both horizontal and vertical measurements were recorded by placing a 2x8 piece ofwood' adjacent to the ground anchor. Horizontal measurements were recorded bymeasuring the difference in separation between the board and the anchor between theunloaded condition, and the loaded condition. Vertical measurements were recorded atthe center of the anchor in relation to the top of the 2x8. Horizontal displacementsgreater than 3" and vertical displacements greater than 2" were considered failure.

7.0 TEST LOADS

Test loads were applied via winch in 500-pound increments. Displacements weremeasured at each load increment. Each load increment was held for a minimum 5-second duration before increasing the load to the next increment. Each ground anchorwas loaded up to 4,725-pounds according to the dynamometer. The positioning of thedynamometer actually yielded stronger loads on the ground anchor than intended.Rather than the 45-degree cable experiencing a 4,725 maximum load as indicated onthe dynamometer, the cable actually experienced an ultimate load of 6,680-pounds.

8.0 TEST RESULTS

All three ground anchors fell within acceptance criteria. Test number 1 yielded a 3"horizontal displacement with a 1" vertical displacement. Test number 2 yielded a 2-1/8"horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3"horizontal displacement with a 1-114"vertical displacement. Since the test loads were'actually 40%. greater than required, it is safe to conclude that the ground anchors fell

. well within the acceptance criteria~

9.0 CONCLUSIONS"

Testing has proved the model 59097 anchors to withstand and exceed the 4725-pound.ultimate loading of the ground anchors with the load being applied at a 45-degree angleabove the horizontal

. -:.

Page 5: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement

RAD-3526

10.0 CONDITIONS

The results of this test are limited to the following conditions:

· Vertical design load of 3,150-pounds· Vertical ultimate load of 4,725-pounds· Horizontal design load of 3,150-pounds· Horizontal ultimate load of 4,725-pounds· Anchor strapping within 40-50 degrees above the horizontal

· Soil conditions which allow for ground anchor to be instal/ed completely

"

. o.:. ."

Page 6: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement

-----..----

RESOURCES.APPLICATIONS.

r::J../1 IJ r: f\'- DESIGNS. &~ Iii W " CONTROLS.INC.

""811.,1111I'1' 3220E. 59thStreet~ Long Beach, CA 90805\!!J .Tel: (562) 272.7231 .

Fax: (562) 529.7513

DATA FOR TIEDOWN ENGINEERING! Inc.

DATE..;REV.

SUBJECT: TEST DATA FOR

REFERENCE: FMHCSS

TEST FOR TIEDOWN DEVICE

TIEDOWN ENGINEERING, Inc.ANCHORMANUFACTURER TESTING lAB

.. 5901 WHEATON DR.. ATl.ANTA, GA 30336ADDRESS . ADDRESS

59097 60" DBL HELIX wI 2 4"MODEL DISCS ClASS OF SOIL

DATEfTIMEOF INSTALlATION

DATEfTIME OF PULL

A.I

Page 7: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement
Page 8: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement
Page 9: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement

. - """" ...

..

INDUSTRIAL S'CALESOF GA.P.Q~ BOX 46'

MABLETON~, ,G.A,.3012.6SALES.sERViCE

TELEPHONB:(170) 941-8'879F~ (77fJ) ,941~8879

SCAL,EINSPECTIONCERTDnCATE"

LOCATION:

_. {)01JJX. eArt4J'~'"

, ,uJ\\ ~lL~~ 1JV\.~~: . .,... . .,. ,

, ~+~,IttA A&h

OWNER:.

~~M9nEL~Qy.ND SERIAL#~TYP~ 0v--MJ-e.

THIS IS TO ,C~llTlFY; WEHAVE THISDAyf[; ~4 ~ . l) ~.TESTEDANDINSPE<:rJillTHISSCA(/8'l]SThJG"2..9,1;)0 LBS.OF STANDARDTESTwm

.

' GHrS AND... A STRMNLOADOFa:.~t)~DLBS. I:EA.YJNGSCALE WJ:rnIN

'~~:~=i;~~~ . LBRfJj~E. LE8.. ..

BY:

r.'-

C.l

Page 10: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement

. '.'. ........ ..'.. ... .. . ~ . ., .;.. . ..~ ,

. '

J1"lJJutS°l".KJAL~CAL.ES OF GA.

P..O. :POX 46 .

MAB:i:.rETON,GA~ 30126SALEs.-8EJtVICE

~EPJiONEf (77/.1)941--8819Fax; (710);941".8879'

oWNER.:

SCALE INS;PE-CTIONCERTIFICA TE

~ r\ f EJ .. a ~,OJ e '~IOu} .IV l:;/¥'~ 1lV ~\J\~'-

._. .LOCATION:

,-.

1\W(E~MODEL~gElUAL#~TY?E ~t/'~~.

. THIS IS TO CERT!~ WEHAVBTFIlSDAY . $"' -:t $ - f) '~ .

TESTED-ANDlNSlPECihD 1B.IS..SCALEUSING. 2-~'(J () LBS. OF STANDARD TEST''':WEIGijTSANt>A STRAINLOADOF~V .~')!)-0 LBS. 'LEAVING SCALE WITHIN

.~~:=SJ~~~rH LB.$.BX:

c..z

Page 11: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement

~ ' .~. . '.' ; " r" " '., . l~' . ." '~'" .'r. .', .......' .. ...

.. .

INDUSTRIALSCALESOF GA..l.O. BOX 4u'

MABL~TON,GA. 30t26SALES~RVICE

TELEPHONE,; (770) ;'41~8879Fax: (770) 941-&879

OWNER:

SCALE INSPECTION C.ERTIFICATE.

'€tfJ~..l"Ae:e ~~ '1.~a .A),../" '\.J L

(jb.

LOCATION:

- MAKE 1).110 Jtl.MbDEL . Dyi1l t) .$ER1AL#~tYPE c;.r4J.I~THIS IS TO CERTIFY; WE HAVE THIS DAY 5.. 2. ~ - ~l '.

TESJ'B]:)ANDINSPECTEDTHISSCALE.USING ~e~ LR8.'oFSTANDMD TEST .-"

WEIGHrs,ANDASTRAIN':LOAD"OF2~ :()~ tJ LBS~L13AVINGSCALBWITHINNATIONALBlJitEAUOF STANDARDS 1£L~B. .

SIMULATORi.rNEARriYTEsTING'TO ')/lff LBS.. .

BY:

C.3

~.

---

Page 12: Project No. F-4534 · 2019. 9. 7. · Test number 2 yielded a 2-1/8" horizontal displacement with a 9/16" vertical displacement. Test number 3 yielded a 3" horizontal displacement

Lt7

1

fp 0.720

~2

2 1

1 1

ITEM QTY.

STEELMILL

STEELIMILL

STEELMILL-MAruFIN.

2MA4A3

2MHI3H

2MR60-PARTNO.

Rev.

~

ASSEMBLY

CD2MR60

59.50

~300

CD 2MMA3

CHISELEDGE

4.000NOMINAL

~t 2.13

~ ---1 PITCH

MILDSTEB. -9 Ga. x 4.0 NOMINAL"

MILD me. - 8 Ga. x 3.00 x 5.38 L

STEELROUND- 23132" x 59.50 L

DESCRIPTION

Detalsx

CD2MHI3H

3/40 THRU

.64SQUARETHRUTYP.-4 PLCS.

NOTE:

1. FINISHAFTERWELDING.BLACKPAINT.

NA UnspecllledTdnnc:es:

FIIIdIons: +1-1T.12

Dedm8I:+1-.ot

DedmII:+'..CJ05 111110:AlVIS: +~O.5"

li TieDownEngineeringh SlDIW,eafllnDrfvI Mania,GeoIgIa30338

FORMEDPART

11.88 G4J~

Xx

314x60 DOUBLEHEUXANCHOR~.

59091 ;0


Recommended