Date post: | 05-Jan-2016 |
Category: |
Documents |
Upload: | francine-goodman |
View: | 215 times |
Download: | 0 times |
Project Overview
• RTC Sahara Express Bus Rapid Transit (BRT) Project
• 12-mile BRT corridor Hualapai Way to Boulder Highway
Project Overview
Project Elements• Side-running dedicated bus lanes
• Ticket vending machines
• Solar powered shelters
• High-capacity double deck vehicles
• Enhanced pedestrian sidewalks and ramps • Landscape beautification
Transit Operations and Amenities
Transit Station Amenities
Corridor Enhancements
BEFOREAFTER
Project PartnersFunding Sources
GET INVOLVED
Share your comments, ask questions and get more information:
Online: rtcsnv.com
Via e-mail: [email protected]
By mail: Sahara Express BRT / Mary Polidoro600 S. Grand Central ParkwayLas Vegas, NV 89106