PROJECT OVERVIEW Northern Walnut Creek Trail Section 2 is a new 1.7 mile-long segment of the Walnut Creek Trail System and will run along the Walnut Creek Greenbelt. This is one of two 2016 Mobility Bond projects within the Walnut Creek Trail System. The Walnut Creek Trail System is a regional trail network. Once all projects within the system are completed, it will extend from Balcones District Park in Northwest Austin to Govalle Neighborhood Park in Southwest Austin. Project Website: AustinTexas.gov/WalnutCreekTrail Walnut Creek Trail System Map Contact: [email protected] *Final construction within Northern Walnut Creek Trail Section 1 is anticipated for completion in Oct. 2019 N /ATXPUBLICWORKS @ AUSTINTEXASGOV @AUSTINMOBILITY Ferguson Ln E 51st St Cameron Rd Springdale Rd Duval Rd E Braker Ln Loyola Ln N Lamar Blvd Webberville Rd Yager Ln E Decker Ln Johnny Morris Rd E Koenig Ln Govalle Neighborhood Park Manor Rd Burnet Rd Walnut Creek Metropolitan Park Rundberg Ln Blue Goose Rd W P a r m e r L n W H o w a r d L n Balcones District Park Metric Blvd C a m e r o n R d Sprinkle Rd Old Manor Rd W Anderson Ln E 12th St E 7th St E 1st St Airport Blvd Berkman Dr E Ma r t i n Lut her Ki ng J r B l v d S p r i n k l e C u t o f f R d 35 183 290 1 Legend Southern Walnut Creek Trail Govalle Park to Daffan Lane – Existing Trail Northern Walnut Creek Trail Section 1 Balcones District Park to Walnut Creek Metropolitan Park – Existing Trail* Northern Walnut Creek Trail Section 2 Walnut Creek Metropolitan Park to IH-35 – Proposed Trail Northern Walnut Creek Trail Section 3 IH-35 to Southern Walnut Creek Trail – Proposed Trail; currently in Preliminary Engineering
Transcript
Page 1: PROJECT OVERVIEW · Trail Section 2 is a new 1.7 mile-long segment of the Walnut Creek Trail System and will run along the Walnut Creek Greenbelt. This is one of two 2016 Mobility

PROJECT OVERVIEW

Northern Walnut Creek Trail Section 2 is a new 1.7 mile-long segment of the Walnut Creek Trail System and will run along the Walnut Creek Greenbelt. This is one of two 2016 Mobility Bond projects within the Walnut Creek Trail System.

The Walnut Creek Trail System is a regional trail network. Once all projects within the system are completed, it will extend from Balcones District Park in Northwest Austin to Govalle Neighborhood Park in Southwest Austin. Project Website:

AustinTexas.gov/WalnutCreekTrail

Walnut Creek Trail System Map

Contact: [email protected]

*Final construction with in Northern Walnut Creek Trail Section 1 is anticipated for completion in Oct. 2019

N

/ATXPUBLICWORKS@AUSTINTEXASGOV@AUSTINMOBILITY

Ferguson Ln

E 51st St

Cam

eron

Rd

Spri

ngda

le R

d

Duval Rd

E Braker Ln

Loyola Ln

N L

amar

Blv

d

Webberville Rd

Yager Ln E

Decke

r Ln

Johnny

Mor

ris

Rd

E Koenig Ln

Govalle Neighborhood Park

Manor Rd

Burn

et R

d

Walnut Creek Metropolitan

Park

Rundberg Ln

Blue Goose Rd

W Parmer Ln

W Howard Ln

Balcones District

Park

Met

ric B

lvd

Cameron R

d

Spri

nkle

Rd

Old Manor Rd

W Anderson Ln

E 12th St

E 7th St

E 1st St

Air

port

Blv

dBe

rkm

an D

r

E Martin Luther King Jr Blvd

Sprinkle Cutoff Rd

35

183

290

1Legend

Southern Walnut Creek TrailGovalle Park to Daffan Lane – Existing Trail

Northern Walnut Creek Trail Section 1Balcones District Park to Walnut Creek Metropolitan Park – Existing Trail*

Northern Walnut Creek Trail Section 2Walnut Creek Metropolitan Park to IH-35 – Proposed Trail

Northern Walnut Creek Trail Section 3 IH-35 to Southern Walnut Creek Trail – Proposed Trail; currently in Preliminary Engineering

Page 2: PROJECT OVERVIEW · Trail Section 2 is a new 1.7 mile-long segment of the Walnut Creek Trail System and will run along the Walnut Creek Greenbelt. This is one of two 2016 Mobility

PROJECT BACKGROUND

Project Timeline

Planning Design Construction

Project PurposeThis project is part of the Walnut Creek Trail System, a 19-mile high priority regional trail network.

Northern Walnut Creek Trail Section 2 will:

• Expand the existing trail system from Walnut Creek Metropolitan Park through Balcones District Park to IH-35.

• Connect to other existing and planned trails, along with neighborhoods, parks and nearby roadways.

• Provide a safe and accessible trail for people of all ages and abilities.

WE ARE HERE

2013 2017 2022

WINTER 2013• Preliminary Engineering

Report (PER) process begins

SUMMER 2013• PER completed

WINTER 2013/2014• First public meeting held

SPRING 2017• Second public meeting held

FALL 2019• Third public meeting held

SPRING 2020• Trail design completed

FALL 2020• Construction begins

(anticipated)

WINTER 2022• Construction completion

(anticipated)

Page 3: PROJECT OVERVIEW · Trail Section 2 is a new 1.7 mile-long segment of the Walnut Creek Trail System and will run along the Walnut Creek Greenbelt. This is one of two 2016 Mobility

PROJECT BACKGROUND

• Nature trail lacking accessibility features for people of all ages and abilities (non-ADA compliant)

• Thickly vegetated land along creek

• Project area is near but lacks access to major roadways (N Lamar Blvd and IH-35)

Crossing under N Lamar Blvd

Impassible vegetation near IH-35

Existing path at Walnut Creek Greenbelt

Existing Conditions

Design Considerations

Northern Walnut Creek Trail Section 2 must:

• Provide safe and accessible connections for all trail users from IH-35 to Balcones District Park

• Follow existing nature trails at much as possible to reduce impact and tree removal

• Avoid use of additional land beyond existing COA and TxDOT property

• Follow all City enviornmental codes

• Avoid any increase in creek flood levels up to 500 year storm event

Current roadway conditions affecting people walking and on bikes along N Lamar Blvd

Northern Walnut Creek Trail Section 1 connection (Balcones District Park to Walnut Creek Metropolitan Park)

Page 4: PROJECT OVERVIEW · Trail Section 2 is a new 1.7 mile-long segment of the Walnut Creek Trail System and will run along the Walnut Creek Greenbelt. This is one of two 2016 Mobility

RECOMMENDATIONSRecommended Route

LegendProject Area

Existing Trail: NWCT Section 1

Planned Trail: NWCT Section 3

H-E-B

TCEQBrentwood

Christian School

Walnut Creek Elementary SchoolMcBee Elementary

School

Recommended Trail Features• 1.7 mi long, ADA-accessible concrete trail

- Width: 12 ft throughout; 8 ft @ Cedarbrook Ct

• 7 elevated boardwalks and 4 bridges for creek

crossings and accessibility

• Connections to nearby existing and planned

trails, neighborhoods, roadways and more

Bridge at NWCT Section 1 Typical section at NWCT Section 1

Planned typical cross-section for Northern Walnut Creek Trail (NWCT) Section 2

W Parmer Ln

E Braker Ln

Kramer Ln

Met

ric

Blv

d

N Lam

ar Blvd

Tech Ridge Blvd

Yager Ln EWalnut Creek Metropolitan Park

N

Page 5: PROJECT OVERVIEW · Trail Section 2 is a new 1.7 mile-long segment of the Walnut Creek Trail System and will run along the Walnut Creek Greenbelt. This is one of two 2016 Mobility

NEXT STEPS

Anticipated Beginning of Construction

FALL 2020

Anticipated Construction Completion

WINTER 2022

Project Funding

2016 Mobility Bond $2.5M

TxDOT Grant $1.5 M

City of Austin Parks & Recreation Department $1.5 M

City of Austin Urban Trails Program $1.24 M

TOTAL FUNDING REQUIRED (Estimate) $6.74 M

Upcoming Milestones