PROJECT OVERVIEW
Northern Walnut Creek Trail Section 2 is a new 1.7 mile-long segment of the Walnut Creek Trail System and will run along the Walnut Creek Greenbelt. This is one of two 2016 Mobility Bond projects within the Walnut Creek Trail System.
The Walnut Creek Trail System is a regional trail network. Once all projects within the system are completed, it will extend from Balcones District Park in Northwest Austin to Govalle Neighborhood Park in Southwest Austin. Project Website:
AustinTexas.gov/WalnutCreekTrail
Walnut Creek Trail System Map
Contact: [email protected]
*Final construction with in Northern Walnut Creek Trail Section 1 is anticipated for completion in Oct. 2019
N
/ATXPUBLICWORKS@AUSTINTEXASGOV@AUSTINMOBILITY
Ferguson Ln
E 51st St
Cam
eron
Rd
Spri
ngda
le R
d
Duval Rd
E Braker Ln
Loyola Ln
N L
amar
Blv
d
Webberville Rd
Yager Ln E
Decke
r Ln
Johnny
Mor
ris
Rd
E Koenig Ln
Govalle Neighborhood Park
Manor Rd
Burn
et R
d
Walnut Creek Metropolitan
Park
Rundberg Ln
Blue Goose Rd
W Parmer Ln
W Howard Ln
Balcones District
Park
Met
ric B
lvd
Cameron R
d
Spri
nkle
Rd
Old Manor Rd
W Anderson Ln
E 12th St
E 7th St
E 1st St
Air
port
Blv
dBe
rkm
an D
r
E Martin Luther King Jr Blvd
Sprinkle Cutoff Rd
35
183
290
1Legend
Southern Walnut Creek TrailGovalle Park to Daffan Lane – Existing Trail
Northern Walnut Creek Trail Section 1Balcones District Park to Walnut Creek Metropolitan Park – Existing Trail*
Northern Walnut Creek Trail Section 2Walnut Creek Metropolitan Park to IH-35 – Proposed Trail
Northern Walnut Creek Trail Section 3 IH-35 to Southern Walnut Creek Trail – Proposed Trail; currently in Preliminary Engineering
PROJECT BACKGROUND
Project Timeline
Planning Design Construction
Project PurposeThis project is part of the Walnut Creek Trail System, a 19-mile high priority regional trail network.
Northern Walnut Creek Trail Section 2 will:
• Expand the existing trail system from Walnut Creek Metropolitan Park through Balcones District Park to IH-35.
• Connect to other existing and planned trails, along with neighborhoods, parks and nearby roadways.
• Provide a safe and accessible trail for people of all ages and abilities.
WE ARE HERE
2013 2017 2022
WINTER 2013• Preliminary Engineering
Report (PER) process begins
SUMMER 2013• PER completed
WINTER 2013/2014• First public meeting held
SPRING 2017• Second public meeting held
FALL 2019• Third public meeting held
SPRING 2020• Trail design completed
FALL 2020• Construction begins
(anticipated)
WINTER 2022• Construction completion
(anticipated)
PROJECT BACKGROUND
• Nature trail lacking accessibility features for people of all ages and abilities (non-ADA compliant)
• Thickly vegetated land along creek
• Project area is near but lacks access to major roadways (N Lamar Blvd and IH-35)
Crossing under N Lamar Blvd
Impassible vegetation near IH-35
Existing path at Walnut Creek Greenbelt
Existing Conditions
Design Considerations
Northern Walnut Creek Trail Section 2 must:
• Provide safe and accessible connections for all trail users from IH-35 to Balcones District Park
• Follow existing nature trails at much as possible to reduce impact and tree removal
• Avoid use of additional land beyond existing COA and TxDOT property
• Follow all City enviornmental codes
• Avoid any increase in creek flood levels up to 500 year storm event
Current roadway conditions affecting people walking and on bikes along N Lamar Blvd
Northern Walnut Creek Trail Section 1 connection (Balcones District Park to Walnut Creek Metropolitan Park)
RECOMMENDATIONSRecommended Route
LegendProject Area
Existing Trail: NWCT Section 1
Planned Trail: NWCT Section 3
H-E-B
TCEQBrentwood
Christian School
Walnut Creek Elementary SchoolMcBee Elementary
School
Recommended Trail Features• 1.7 mi long, ADA-accessible concrete trail
- Width: 12 ft throughout; 8 ft @ Cedarbrook Ct
• 7 elevated boardwalks and 4 bridges for creek
crossings and accessibility
• Connections to nearby existing and planned
trails, neighborhoods, roadways and more
Bridge at NWCT Section 1 Typical section at NWCT Section 1
Planned typical cross-section for Northern Walnut Creek Trail (NWCT) Section 2
W Parmer Ln
E Braker Ln
Kramer Ln
Met
ric
Blv
d
N Lam
ar Blvd
Tech Ridge Blvd
Yager Ln EWalnut Creek Metropolitan Park
N
NEXT STEPS
Anticipated Beginning of Construction
FALL 2020
Anticipated Construction Completion
WINTER 2022
Project Funding
2016 Mobility Bond $2.5M
TxDOT Grant $1.5 M
City of Austin Parks & Recreation Department $1.5 M
City of Austin Urban Trails Program $1.24 M
TOTAL FUNDING REQUIRED (Estimate) $6.74 M
Upcoming Milestones