Senior B.I.M. Consultant
Modern technical world is full
of extensive knowledge
expertise.
Every engineer should bear in
mind that no matter how
complex the project may be,
our mind must remain in the
simplest way of thinking.
This project portfolio of my
professional experience in the
field of B.I.M. engineering
includes structural and steel
detailing skills.
I hope that in the near future
it will be updated to the most.
Recipient
Calatrava Valls SA
Human Resource 3D
Parkring 11
8002 Zürich
Switzerland
PROJECTS CYBARCO OVAL LIMASSOL
ELDORADO METAL AND GOLD INDUSTRY AT OLYMPIAS, HAKIDIKI
ELDORADO METAL AND GOLD INDUSTRY AT SKOURIES, HAKIDIKI
EDISON 421.6 MW COMBINED CYCLE ELECTRICITY PRODUCTION STATION AT THE ‘’THISVI’’ INDUSTRIAL AREA
CONSTRUCTION DESIGN OF PANATHINAIKOS F.C. NEW STADIUM AT VOTANIKOS
NEW PAS GIANNINA F.C. STADIUM
THE EYE OF QATAR
Project
Portfolio
Civil Engineer
Ioannis Angelopoulos
JANUARY 2017
Contact me:
Angelopoulos Ioannis 5th Apollonos str. Athens, GR16343 Mob.+30 9648 895459 [email protected] Visit me on LinkedIn:
https://www.linkedin.com/in/ioannis-angelopoulos-7a752442?trk=hp-identity-name
CYBARCO OVAL LIMASSOL
(PROJECT BUDGET: €30.000.000)
An iconic new building on the Limassol skyline, with uninterrupted views across the Mediterranean, setting new standards in workspace design
Tallest commercial building in Cyprus at 16 floors, with 2 underground parking areas.
Sustainable building with energy performance certificate of ‘A’ rating with low CO2 emissions.
A landmark development designed by internationally acclaimed architects Atkins and developed by Cybarco.
Position:
Senior structural engineer. Production of formwork and reinforcement drawings, bar bending schedules and bills of quantities.
Global modelling of the steel cladding structure in the TEKLA STRUCTURES software.
Support of steel structure factories at the pre-construction phase and of the construction site at the construction phase. Provision of consulting services.
TEKLA Structures 3D Model
OVALL LIMASSOL – Steel Detailing
ELDORADO METAL AND
GOLD INDUSTRY AT
OLYMPIAS, HALKIDIKI
(PROJECT BUDGET: €250.000.000)
Olympias industry is an old-age existing mining factory . ELDORADO ‘s enormous investments in Greece mining industry introduce a very complex project for every aspect of civil and mechanical engineering field in Greece.
The project is divided into two specific phases of design and construction.
The first phase includes all the procedure of renovating existing buildings and updating mechanical equipment installation.
The second phase deals with the totally new part of the industry that will support the existing one . This phase includes brand new platforms, conveyors and steel buildings.
Position:
Senior structural Engineer. Global participation in the modelling of the quarry's individual structures (building facilities, equipment supporting platforms, pipe-racks, conveyor belts) with the TEKLA STRUCTURES software.
Support of steel structure factories at the pre-construction phase and of the construction site at the construction phase. Analytical tables of material reports and production of general shop drawings as appropriate. Global participation in the calculation of the connections of the steel members with the EC.3 PRAXIS and the STEEL CONNECT SOFISTIK softwares.
Collaboration with the MEP engineer of the project (GR ENGINEERING SERVICES). Carry out reviews in the MEP crossings (All in one Modeling Procedure) as a Structural B.I.M. Project Manager
Existing mining structure - Renovation
New mining structure
OLYMPIAS mining industry – Steel Detailing
ELDORADO METAL AND
GOLD INDUSTRY AT SKOURIES,
HALKIDIKI
(PROJECT BUDGET: €900.000.000)
Skouries new mining industry is the biggest and
most environmental friendly factory in Greece. It is a 4.000.000m2 installation of new buildings, platforms, conveyors and geotechnical structures.
The ELDORADO ‘s investment is based on the important factor of recycling all mining products in order to maintain profits from mining process and retain safety rules for the factory ‘s employment and environment itself.
The project is an extremely complexed one not only because of the large scale combination of geotechnical, mechanical and civil structures but also for the factor that the projects has stopped and restart many times because of the ecological sensitivity of the area.
Position:
Senior structural Engineer. Global participation
in the modelling of the quarry's individual structures (building facilities, equipment supporting platforms, pipe-racks, conveyor belts) with the TEKLA STRUCTURES software.
Support of steel structure factories at the pre-construction phase and of the construction site at the construction phase. Analytical tables of material reports and production of general shop drawings as appropriate.
Global participation in the calculation of the connections of the steel members with the EC.3 PRAXIS and the STEEL CONNECT SOFISTIK softwares.
SKOURIES mining industry
‘’ALL IN ONE’’ design process
SKOURIES mining industry – Steel Detailing
EDISON 421.6 MW COMBINED
CYCLE ELECTRICITY
PRODUCTION STATION AT THE
‘’THISVI’’ INDUSTRIAL AREA
(PROJECT BUDGET: €120.000.000)
Combined Cycle Power Plant at Thisvi, Viotia with
maximum capacity 421.6MW running on natural gas,
which also includes a 400KV substation and high
voltage transmission power – line. The plot area is
101.120m2, while the superstructures and
substructures cover approximately 24.000m2.
The detailed construction design was carried out on
behalf of the construction joint venture (EDISON,
AKTOR) and refers to all civil engineering works of
the plant (buildings, foundations, equipment bases
and supports, pipe racks, underground installations
and networks, roads and paving and landscaping.
850 drawings and calculations reports were issued,
while all TEKLA models were prepared in order to
help the fabricator to maintain the best result for its
construction ability.
Position
Senior structural Engineer. Production of formwork
and reinforcement drawings, bar bending schedules
and bills of quantities. Associate project manager,
engagement with cad management in the
AutoCAD software.
Global participation in the modelling of the individual
structures with the TEKLA STRUCTURES software.
Support of steel structure factories at the pre-
construction phase and of the construction site at
the construction phase. Analytical tables of material
reports and production of general shop drawings as
appropriate.
Global participation in the calculation of the
connections of the steel members with the EC.3
PRAXIS software. Active participation in the structural
modelling and analysis with the STAAD Pro software.
“THISVI” industrial area 3D modeling
THISVI power plant– Steel Detailing
PANATHINAIKOS F.C.
NEW STADIUM
(PROJECT BUDGET: €82.000.000)
Panathinaikos F.C. new stadium has a
capacity of 40.000 spectators, and the total of the grandstands is covered by
the roof. The buildings housing and the
auxiliary installations are made of
concrete and bear the stands’ system,
comprising of cast–in-situ beams and
precast reinforced concrete stands. At
each of the 4 corners, concrete pylons
bear the roof which is also supported on
the perimeter columns of the
grandstands’ buildings.
The stadium has a circular shape with
externak diameter 211m. The steel roof
consists of 4 statically independent parts,
each one resting on a simply supported
main space-truss beam and on the
perimeter columns. Each space-truss
beam is supported on the concrete
pylon.
The span of the large beam is 160m and
of the small 110m. The pylons are
founded on piles while the concrete
buildings have a strip foundation.
Position:
Senior structural engineer. Production of
formwork and reinforcement drawings,
bar bending schedules and bills of quantities. Participation in the modelling
of the full structure in the TEKLA
STRUCTURES software.
TEKLA Structures 3D Model
PANATHINAIKOS F.C. new stadium - Steel Detailing
PAS GIANNINA F.C.
NEW STADIUM (PROJECT BUDGET: €50.000.000)
Pas Giannina F.C. new stadium has a
capacity of 20.000 spectators, and the total of the grandstands is covered by
the roof. The whole project is a sports
complex with a football stadium in the
core.
A modern training center, an athletic
and a water park fulfill the total sporting
facilities update of the specific area in
the city of Giannina.
The project was under tender procedure.
Position:
Graduate structural engineer. Production
of formwork and reinforcement drawings,
bar bending schedules and bills of
quantities. Participation in the modelling
of the full structure in the TEKLA
STRUCTURES software.
3D Rendering Model
PAS GIANNINA F.C. new stadium - Steel Detailing
THE EYE OF QATAR
(PROJECT BUDGET: USD127.000.000)
The Eye of Qatar is a one of kind
marvelous building, unique in colour, design, location and usage ability. This
building itself shows of Qatar’s new vision
of design and luxuriousness. It is a visually
pleasing building with unaccountable
amounts of benefits. The location is near
the airport and is right beside the Banks
Street, while also close to many tourist
attractions such as Souk Waqif, and the
Corniche, walkway on the seaside.
The building is built on 8 floors and divided in a very systematic manner and
has an amazing amount of space
allowing it to be a multipurpose building;
the building is also equipped with smart
elevators.
Built up area: 51.100m2
Position:
Senior steel detailer. Participation in the
modelling of the full structure in the TEKLA
STRUCTURES software. Creation of shop
and erection drawings.
TEKLA structures 3D Model
THE EYE OF QATAR– Steel Detailing
Special thanks to the firms that give me the chance to collaborate with them in these projects.
Design and Application Engineers S.A.
Ilektras 2, Marousi Athens Web page: http://www.dae.gr
Metal Solutions Consult
Kordeliou 2-6, Vyronas Athens Web page: http://www.mscon.eu