ProjectProgressReport
FortheMENATransitionFund
ANNEXITOTHEMAINREPORT
(Egypt,JordanandLibya)
AsofJune30,2015
TableofContents
EgyptProjects..............................................................................................................................................................................................4
GreenGrowth:IndustrialWasteManagementandSMEEntrepreneurshipHub .................................... 5
SupporttoMSMEinOrganicClusterProject ............................................................................................ 11
SupporttoParliament:BuildingCapacity&MainstreamingInclusiveGrowth&Decentralization .... 17
StrengtheningRuleofLaw:Effective&TransparentDeliveryofJustice&Rule‐making ..................... 22
EgyptianCentralBankClearing&SettlementDepositarySystemforGovernmentSecurities ............ 32
MSMESupportProgrammeinEgyptandtheSocialFundforDevelopment ......................................... 39
LogismedSoftRegionalProject:EgyptActivities ..................................................................................... 49
PromotingFinancialInclusionviaMobileFinancialServices:EgyptActivities ..................................... 57
RegionalIntegrationthroughTradeandTransportCorridors:EgyptActivities ................................... 65
LeveragingRegulatoryReformstoAdvanceFinancialInclusioninEgypt ............................................. 72
InclusiveandOpenGovernments:PromotingWomen’sParticipationinParliamentsandPolicy‐MakinginEgypt ............................................................................................................................................................. 76
EnhancingtheInvestmentClimateinEgypt,throughEqualAccessandSimplifiedEnvironmentforInvestmentandFosteredInvestmentPolicy,LegalandInstitutionalFramework .................................................... 83
EnergySocialSafetyNetsSectorReformsTechnicalAssistanceProject ................................................ 90
InclusiveRegulationsforMicrofinance ..................................................................................................... 99
JordanProjects......................................................................................................................................................................................104
NationalCenterforInnovation,HigherCouncilforScienceandTechnology ...................................... 105
ReliableQualityWaterforJordan ............................................................................................................ 115
PromotingFinancialInclusionviaMobileFinancialServices:JordanActivities ................................. 122
SMEGrowthProgramme .......................................................................................................................... 128
RegionalIntegrationthroughTradeandTransportCorridors:JordanActivities ............................... 137
IntegratedInspectionManagementSystem ............................................................................................ 142
LeveragingRegulatoryReformstoAdvanceFinancialInclusioninJordan ......................................... 147
Towardsinclusiveandopengovernments:Promotingwomen’sparticipationinparliamentsandpolicy‐makinginJordan ....................................................................................................................................... 151
JordanCompetitivenessandInvestment ................................................................................................ 158
SupporttoBuildingActiveLaborMarketProgram ................................................................................ 166
EnhancingGovernanceandStrengtheningtheRegulatory&InstitutionalFrameworkforMSMEs .. 173
NationalUnifiedRegistryandOutreachWorkerProgram .................................................................... 178
VirtualMarketPlacesfortheDevelopmentofExportSME:JordanActivities ..................................... 184
LibyaProjects.........................................................................................................................................................................................192
SMEDevelopmentStrategyforLibya ...................................................................................................... 193
LeadingtheWay:ALeadershipCapacityBuildingPilotProject ........................................................... 205
EnergySectorReformTechnicalAssistance ........................................................................................... 212
FinanceandPrivateSectorDevelopmentTechnicalAssistance ........................................................... 217
EgyptProjects
GreenGrowth:IndustrialWasteManagementandSMEEntrepreneurshipHub
A. BasicProjectInformationActivityName:GreenGrowth:IndustrialWasteManagementandSMEEntrepreneurshipHubinEgypt
CountryName:Egypt NameofImplementationSupportAgency(ies):AfricanDevelopmentBank
NameofISAProjectLeader:GehaneElSokkary EmailofISAProjectLeader:[email protected]
RecipientEntity:IndustrialCouncilforTechnology&Innovation/EgyptianNationalCleanerProductionCenter
Eng.HananElHadary,Chairperson,[email protected]
Eng.AliAboSena,[email protected]
TotalAmountApprovedbytheTransitionFund(US$):2,000,000
AdditionalFundsLeveragedandSource(s),ifany(US$):inkindcontributionbyRecipient
TotalAmountDisbursed(DirectandIndirectinUS$):252,500
SteeringCommitteeApprovalDate:
5/15/2013
ProjectImplementationStartDate:12/19/2013
ProjectClosingDate:
9/30/2016
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): CompetitivenessandIntegrationEnhancingEconomicGovernanceInclusiveDevelopmentandJobCreation
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:Theproject’sobjectiveistodevelopasustainableandintegratedindustrialwasteexchangesysteminthepilotareapositionedasaGreenEntrepreneurshipHublinkingindustrialwastesgenerators,potentialusersandrecyclerstoimprovecross‐industryresourceefficiency,promotethedevelopmentofnewinnovativeSMEs,creategreenjobopportunities,reducetheenvironmentalimpactofindustrialwasteandimprovethelivesofEgyptiancitizens.
Ratingforprogresstowardsachievementofobjective: Satisfactory
Ratingforoverallimplementationprogress: ModeratelySatisfactory
BriefSummaryofProjectImplementationStatus:Aftersomeinitialsetupdelays,projectactivitieshavestartedprogressingsmoothly.HowevertheprojectremainsburdenedasittriestofollowboththegovernmentandtheBank’srulesandobtainingdualclearances.Continuousdiscussionsareheldonthiswiththevariousstakeholders,butitisbeyondthecontroloftheproject.Thisisthemainreasonanextensionoftheprojectisanticipated.ArequestwillbesubmittedinOctober2015,followingtheguidelinesoftheMENATF.Thebelowarethemainhighlightsduringthisreportingperiod:0. AlaunchingworkshopwassuccessfullyorganizedinCairo,withtheattendanceofnearly180persons.Theobjective
wastoraiseawarenessontheprojectand itsactivitiesaswellasseekbuy‐inofstakeholdersandcompanies intheprojectarea.Theworkshoppresentedtheoutcomesoftwostudiescommissionedundertheproject(BestpracticesonIndustrialWasteManagement,andReviewofCurrentstatusandPracticesinindustrialwastemanagementinEgypt)aswellaswitnessedthesignatureofanMoUwiththeSouthAfricanCleanproductioncenter,fortransferofknowledgeandincreasedpartnership.Asmallerworkshopwillbeorganizedinthe10thofRamadancity,thegeographicalcoverageareaoftheproject,afterthesummer.
1. Introductionoftwonewsub‐activities:Duringthesupervisionmissionthesub‐activitieswerereviewedanditwasagreed that awebsite/portalwould be important to establish, aswell as a study on legal andbusinessmodels forindustrialwastemanagement.Thesetwonewsub‐activitieswillbeintroducedintheappropriatecomponentsinthe
revisedprocurementplandueendofthemonth.Are‐allocationofexpenseswillensureavailabilityoffundingforthesenewsub‐activities.
2. Disbursement:AfirsttranchedisbursementforUSD252,500wassubmittedtotheBankonJune5,2014,andprocessed
withvaluedate8July2014.ByQ32015,theprojectshouldbeeligibleforaseconddisbursementrequestofaboutUSD250,000,bringingthetotaldisbursementstoabout25%ofthetotalgrantproceeds.
3. Missions:InadditiontothelaunchingmissiononFebruary11,2014,asupervisionmissionwasconductedonJune28,2015.
4. Procurement:
TheGeneralProcurementNotice(GPN)waspostedontheUNDBandtheBank’swebsiteonMay27,2014. ArevisedprocurementplanisanticipatedtobesubmittedtotheBankforapprovalbyendJuly2015. Projectmanagement: Due to health reasons, the project manager resigned and was replaced by a new
consultant,Mr.AhmedAbdelBasset,whojoinedtheprojectonMay15,2015.Thependingrecruitmentsarefor2juniorengineers,ofwhichoneisanticipatedtoberecruitedforAugust/Sept2015.
5. Goods:TheBankclearedtheevaluationreportforaspecificvehicle;howeverthepurchasinghasbeenputonholduntiltheprojectmobilizesresourcesforthepaymentoftaxes/customs.TheprojecthasinitiatedcontactwiththeMinistryofFinanceonthatmatter.Expendituresfortheworkshophavebeenincorporatedundergoods.
C. ImplementationStatusofComponentsComponent1:MappingoftheindustrialwasteattheenterpriselevelintheselectedpilotareaPreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):300,000Sub‐component1.1&1.2werecombined:Conductinginformationcollectionanddataanalysisoftheindustrialwasteintheidentifiedpilotarea+developinganinventorydatabaseoftheindustrialwasteStatusofImplementation:Thebiddingprocessstarted:expressionsofinterestwerereceived,therequestforproposalsweresenttotheshort‐listedfirms,thepre‐bidconferencewasheldtoclarifypendingissueswiththecontractors,andtheproposalsweresubmittedonApril23,2015.OnJune11,2015thetechnicalevaluationwasconductedandsubmittedtotheBankforclearance.Afteraninitialreview,furtherdocumentationwasrequiredandprovidedbytheproject.AwardofthecontractisexpectedendofJuly/earlyAugust2015.Component2:PolicyRecommendationstowardsanenablingenvironmentforindustrialwasteexchange(activitywasdisaggregatedinto3sub‐activities)PreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):140,000Sub‐component2.1:ReviewingexistingregulationsandlegislationsStatusofImplementation:CVsarebeingcompiledfortheassignment,forwhichToRshavebeencleared.ActivityexpectedtobeconductedduringQ3of2015.Sub‐component2.2:CompilingBestPracticesStatusofImplementation:Assignmentcompleted.Sub‐component2.3:Awarenessraisingseminars&productionofpolicybriefsStatusofImplementation:ExpectedtobeconductedduringQ42015uptoQ22016.Component3:RaisingAwarenessandcapacitybuildingofstakeholdersonIWEXPreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):680,000Sub‐component3.1:DisseminationworkshoponnationalandlocallevelsStatusofImplementation:TheLaunchingworkshopwasheldonMay12,2015.Theworkshoppresentedthefindingsoftwostudiesfinalized:“BestPracticesinIndustrialWasteManagement”aswellas“ReviewofStatusandActualpracticesinIndustrialWasteManagementinEgypt.”Inaddition,theNationalCleanProductionCenterofSouthAfricawasinvitedtoattendtheworkshopandanMoUbetweentheEgyptianandSouthAfricancenterswassigned,pavingthewayforfurthercollaboration.Asecondsmallerworkshopisexpectedtobeorganizedin10thofRamadanCitytowardsSeptember2015.Arrangementsareunder‐way.Sub‐component3.2:Developandlaunchamarketingcampaign (activitywillbedividedinto2sub‐activities,oneforlaunchandonetodisseminatetheoutcome.)StatusofImplementation:ToRsareunderpreparationforthisassignment,andwillincorporatetheestablishmentofawebsite/portal.Sub‐component3.3:StudyTour
StatusofImplementation:TheconceptnoteforthefirsttourtobeheldinSouthAfrica,tentativelyplannedformid‐August,hasbeencleared.Preparationsareunderway,includingfinalizationofascheduleofeventswiththeSouthAfricancounterparts.ThesecondSTisplannedfor2016inBrazil.Component4:Implementationof3DemonstrationProjectsinIndustrialWasteExchangeinPilotAreaPreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$)280,000Sub‐component4.1Identifypilot
StatusofImplementation:Completed:10thofRamadanIdentified.MoUwithBusinessAssociationsigned.Alocalworkshopisbeingplannedin10thofRamadan.Sub‐component4.2:Conductrapidtechnicalassessmentofgeneratorsandrecyclersofindustrialwaste(In‐kind)StatusofImplementation:Underimplementation.Sub‐component4.3:Preparetechnicalandfinancialfeasibilitystudyforsystemof3pilotsStatusofImplementation:ToRstobepreparedinQ2/Q3of2016,oncethemappingexerciseiscompleted.Sub‐component4.4:RecruitTechnicalsupportconsultantonretainerbasisfor6monthsStatusofImplementation:ToRplannedforQ22016.Component5:ProjectManagementPreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$)540,000Sub‐component4.1:Recruitmentsofstaff:projectmanager,chieftechnicaladvisor,seniorexpert,2juniortechnicalengineers,anaccountant,procurementofficer,adriverStatusofImplementation:Fourkeyconsultantshavebeenrecruited.1juniortechnicalengineerisunderrecruitment.Thesecondwillberecruitedbyend2015.Sub‐component4.2:Purchasingofcomputers,equipment,andvehicle
StatusofImplementation:RFQforvehiclefinalizedandbidssubmitted.Theprojectissolvingtheissueoftaxandcustomspayment.RestofitemstobeprocuredinQ3of2015.Sub‐component4.3:ConductindependentexternalauditStatusofImplementation:Undertendering.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
1,940,000 0 1,940,000
AmountReceivedfromTrustee(b):
1,940,000 0 1,940,000
ActualAmountDisbursed(c): 252,500 0 252,500
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2014 0 252,500 252,5002015 0 250,000 250,0002016 300,000 500,000 800,0002017 500,000 137,500 637,500Total 800,000 1,140,000 1,940,000
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)0 60,000 60,000
G. ResultsFrameworkandMonitoring
ProjectDevelopmentObjective:DevelopasustainableandintegratedindustrialwasteexchangesysteminthepilotareaspositionedasaGreenEntrepreneurshipHub,linkingindustrialwastesgenerators,potentialusersandrecyclerstoimprovecross‐industryresourceefficiency,promotethedevelopmentofnewinnovativeSMEs,creategreenjobopportunities,reducetheenvironmentalimpactofindustrialwasteandimprovethelivesofEgyptiancitizens.
PDOLevelResultsIndicators*
UnitofMeasure
Baseline
CumulativeTargetValues** Frequency
DataSource/
Methodology
ResponsibilityforDataCollection
Description(indicator
definitionetc.)
Dec2013‐Dec2014A
Jan2015–Dec2015A
Jan2016–Dec2016F
Jan2017‐Sept2017
F
IndicatorOne:Establishmentofindustrialwasteexchangesysteminpilotareathatisutilized
Binary Noexistingsystem
1(F) Thirdyear Projectcompletionreports
ENCPC‐ ProjectManagementUnitundertheIndustrialCouncilforTechnologyandInnovation
Systemisrunningandisutilizedbyregisteredindustrialestablishments
IndicatorTwo:CreatingaGreenEntrepreneurshipHubforjobcreationinthepilotarea.
Binary Noexistinggreenentrepreneurshipenvironment
1(F) Thirdyear Projectcompletionreports
ENCPCPMU Agreenentrepreneurshipiscreatedinthepilotareafacilitatedbyanenablingenvironment.
INTERMEDIATERESULTS
IntermediateResult(ComponentOne):Inventoryofindustrialwastesdevelopedinpilotarea
IntermediateResultindicatorOne:Acomprehensivesurveyformappingindustrialwastesin
Binary Inadequatemappingofindustrialwastes
0 1Inprocess
Secondyear
Projectprogressreport
ENCPCPMU
pilotareaconductedIntermediateResultindicatorTwo:Integratedinventoryofindustrialwastesinpilotareadevelopedinadatabase
Binary Noinventoryofindustrialwastes
1Inprocess
Secondyear
Projectprogressreport
ENCPCPMU Structureisestablished
IntermediateResult(ComponentTwo):PolicyrecommendationstowardsanenablingenvironmentforindustrialwasteexchangeinEgypt
IntermediateResultindicatorOne:Policymeasuresforregulatingandmonitoringthemarketforindustrialwasteexchangeformulatedandadopted.
Qualitative Insufficientpolicymeasures
1studyidentifyingPolicymeasures
1studywithPolicy
measuresdrafted(F)
Policymeasuresadopted(F)
Annual GapanalysisofpolicyrequirementsConsultationsw/stakeholder
ENCPCPMU
IntermediateResult(ComponentThree):capacitybuildingandraisingawarenessregardingtheindustrialwasteexchangeprogram
IntermediateResultindicatorOne:numberoftraineesfromstakeholdersandsupportinstitutions
Number 0 30(F)12Inprocess(A)
50(F) 70(F) Annual Projectreports
ENCPCPMU
IntermediateResultindicatorTwo:numberofstakeholdersparticipatinginawarenessraisingactivities
Number 0 150(A)
120(F) 150(F) Annual Projectreports
ENCPCPMU
IntermediateResultindicatorThree:numberofparticipantsofthecapacitybuildingprogramengagedinfurtheractivitiesoftheproject.
Number 50(F)0(A)
60(F) 80(F) Annual Projectreports
ENCPCPMU
IntermediateResult(ComponentFour):Implementationofdemonstrationprojectsinindustrialwasteexchangeinpilotarea
IntermediateResultindicatorOne:Numberofcost‐effectivepilotprojectsrealizedandimplementedin3differentwasteexchangeareas.
Number 0 1(F) 3(F) third&fourthyear
Projectreports
ENCPCPMU
IntermediateResultindicatorTwo:NumberofdirectandindirectgreenjobscreatedSMEs
Number 0 20direct60indirectjobs(F)
50direct150indirectjobs(F)
Thirdandfourthyear
Projectreports
ENCPCPMU
SupporttoMSMEinOrganicClusterProject
A. BasicProjectInformationActivityName:SupporttoMicro,SmallandMediumEnterprisesinOrganicClusters
CountryName:Egypt NameofImplementationSupportAgency(ies):AfricanDevelopmentBank
NameofISAProjectLeader:GehaneElSokkary EmailofISAProjectLeader:[email protected]
RecipientEntity:EgyptSocialFundforDevelopment MsSohaSoliman,ManagingDirectorofSFD
TotalAmountApprovedbytheTransitionFund(US$):2,000,000
AdditionalFundsLeveragedandSource(s),ifany(US$):inkindcontribution
TotalAmountDisbursed(DirectandIndirectinUS$):397,700
SteeringCommitteeApprovalDate:
2/20/2013
ProjectImplementationStartDate:
5/29/2013
ProjectClosingDate:6/30/2016
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): InclusiveDevelopmentandJobCreation
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:Theproject’sobjectiveistocreateanoverallenablingenvironmentforMicro,Small,andMediumEnterprises(MSMEs)operatingoutoforganicclustersandincreasetheircontributiontowardseconomicgrowthandemployment.TheoutcomeofthisprojectwillfeedintothelargerpolicyframeworkfortheMSMEwhichisunderdevelopmentandcurrentlyledbytheSFD
Ratingforprogresstowardsachievementofobjective: ModeratelySatisfactory
Ratingforoverallimplementationprogress: ModeratelyUnsatisfactory
BriefSummaryofProjectImplementationStatus:Therehasbeenadelayinimplementationlargelyduetoweakcapacitiesandsomechangesinpolicyatthemacro‐levelthatisaffectingsomeoftheprojectactivities.Forexample,theestablishmentofanewMinistryforMSMEshasbeenannouncedandhence there seems tobehesitancy inmoving forwardwith thedevelopmentof anMSME strategy at this stage andpostponingituntiltheMinistryisformedandtakesownershipofit.Furthermore,clusterdevelopmenthasrecentlybeenannouncedasoneofthegovernmentpriorities,andtheimplementingagencyisseekinghowtoalignthisprojectwiththisnewdevelopment.ConsultationsbetweentheBank,theGovernmentandtheSFDareon‐goingtoidentifyhowbesttomoveforwardgiventhesenewmacrodevelopments.1. Disbursement:AfirsttranchedisbursementforUSD397,700wasprocessedwithvaluedateFeb5,2014.Asecond
trancheisexpectedtoberequestedfordisbursementbySeptember2015.
2. Missions:Todate,3missionshavebeenconductedbytheAfDBasfollows:(i)LaunchingMission,September29,2013;(ii)SupervisionMission,30‐31March2014;(iii)Secondcombinedsupervisionmission,March16‐26,2015.
3. Procurement:
TheGeneralProcurementNotice(GPN)waspostedontheUNDBandtheBank’swebsiteonOct2,2013. Theprojectisintheprocessofrevisingitsprocurementplaninlinewiththeprojectrequirements. Projectstaffrecruitments:
‐FulltimeProjectManagerrecruitedFebruary15,2014.‐AdminOfficer:recruitedinSeptember2014._TheM&Epart‐timeofficerresigned,andistobereplacedwithanotherstaffwhowillhelpexpediteactivities.
Computerandequipmentwerepartiallypurchasedfortheproject.
4. ImplementationofActivities:Policy:Thiscomponentisunderreviewforalignmentwiththenewmacro‐leveldevelopments.Identificationofclusters:GiventhetimeithastakentoprocurethemappingoforganicclustersinEgypt,theprojecthasbeenoperatingaccordingtoatwo‐tracksystem:pre‐mappingtrackandpost‐mapping.Underthepre‐mappingtrack,itwasagreedthattheHand‐MadeCarpetclusterwouldbeselectedforsupportbytheproject.Selectionwasbased on a set of criterion including: employment generation capacity; export potential; gender perspective;comparativeadvantageofthesector.TheMappingassignmentendedearlyJuly2015;hencethesecondclusterisexpected to be identifiedwithin the coming days.Meanwhile, at themacro‐level, the furniture cluster has beenflaggedasapriorityforthegovernment.AllthiswillbetakenintoconsiderationastheidentificationofthesecondclusterisfinalizedTrainingofStakeholdersbyUNIDO:UNIDOhasrevertedbackwithanewcontractproposalthatisbeingreviewedbytheBank.AdecisionshouldbetakenaroundendJulyontheprocurementmodetofollowunderthisactivity.Extension:TheprojecthassubmittedarequestforextensionthatisbeingreviewedbytheBankbeforeitssubmissiontotheMENATF.TheBankwouldliketoensurethattheworkplanpreparedfortheextensionisfeasibleandwillachievetheoutcomesoftheproject..
C. ImplementationStatusofComponents
Component1:PolicyRecommendationtowardsanenablingenvironmentforthedevelopmentofMSMEsinOrganicClusters.PreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):644,220(upfrom505,000)
Sub‐component1.1:Sub‐component1.1:Informationgatheringanddataanalysiswhichwillspecificallyinclude:a. MappingofOrganicclusters,reviewingandanalyzingexistingnationalprogramssupportingthem;b. CompilingResearchonBestPractices;andc. PotentialGrowthAssessmentof3selectedOrganicClustersandtheirvalue‐chainanalysis.
StatusofImplementation:
a. MappingofOrganicclusters:Assignmentcompleted,andthefinaldeliverablesubmittedonJuly1,2015isunderreviewbytheproject.
b. CompilingResearchonBestPractices:Assignmentcompleted.c. PotentialGrowthAssessmentof3selectedOrganicClusters:ToRsareunderformulationinviewofthe
outcomeofthemappingassignment.TenderingforthisactivityisanticipatedtobelaunchedinAugust2015.Sub‐component1.2:DraftPolicyRecommendationsforInclusioninnationalstrategies.Thissub‐activityisunderreviewgiventhemacro‐leveldevelopments.Theoutputwillbearesultofthefollowingactivities:
a. Multi‐stakeholdervalidationworkshops;b. DevelopmentofMSMENationalStrategy;andc. EstablishmentofSupportInformationSystems.
StatusofImplementation:a. ValidationWorkshop:Oneworkshopisanticipatedtobeconductedbeforeendof2015.b. NationalMSMEStrategy:TheToRsarereadytobevettedbythenewauthoritythatisbeingestablishedforMSME
developmentinEgypt.Itisthereforetemporarilyonhold.c. SupportInformationSystems:Disseminationofknowledgeistheobjectiveofthissub‐component,toensureaccess
of all stakeholders to the wealth of information gathered and produced on clusters andMSMEs. ToRs for theassignmentareunderdevelopment.
Component2:Institutional&OperationalCapacityBuildingforKeySupportInstitutionsandSFDPreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):370,780(upfrom330,000)
Sub‐component2.1:Enhancethecapacityofgovernmentalandnon‐governmentalsupportinstitutionswithregardstothepilotclusterthough:
a. In‐depthstakeholderanalysisofsupportinstitutionsb. Conductworkshopsandround‐tablediscussionstoraiseawarenessofstakeholders:c. Buildcapacitiesofstakeholders,includingSFDandkeysupportinstitutionstowardsimprovedcluster
identificationandmanagement.ThisconsistsoftrainingthatwillbeoutsourcedtoUNIDOgiventheirdistinctexpertiseinthisarea.
d. Studytour:Twostudytoursforamaximumof6personsfromatleast3stakeholderseachwillbeorganizedtoviewhowclustermanagementisconducted.IndiaandBrazilhavebeenidentifiedforthesetoursastheybothhavedifferentexperiencestoshare.
Statusofimplementation:
a. StakeholderAnalysis:GiventhatthemappingassignmentwasdeliveredinJuly2015,thisassignmentisnowanticipatedtobelaunchedduringQ3of2015.
b. Workshops/RoundtableforAwarenessRaising:AneventtodisseminatetheoutcomesofthemappingandBPassignmentswillbeheldduringQ3/Q4of2015.
c. StakeholderCapacityDevelopment:ThecontractualarrangementswithUNIDOareunderreview.ByendofJuly,itwillbeclearifthisassignmentistoproceedthroughUNIDOoranotherentity.
d. StudyTour:InFebruary2014,thefirststudytourwasfieldedtoIndiatoattend“ChangingParadigmsofClusterDevelopment‐LearningfromGlobalExperience"organizedinNewDelhibyTheMSMEFoundationincollaborationwithUNIDOandotherstakeholders.TwoothersSTareanticipatedtobeheldin2016.
Sub‐component2.2:Establishasustainablemanagementmethodology/systemby:a.Identifysuitableclustermanagementgovernancesystemsandconductafeasibilitystudy.b.CreationofaBDSpricingsystem
StatusofImplementation:
a. FeasibilityStudy:TobetenderedtoafirmduringQ4of2015.b. BDSpricingsystem:tobetenderedduringQ2of2016.
Component3:Component3:IncreaseMSMEcontributiontomanufacturingvalue‐added(pilot)Twopilotswillbeconducted,onepriortothemappingassignmentundercomponent1,andonepost‐mappingassignmentbasedontheassignmentoutput.Underthepre‐mappingtrack,theclusteridentifiedforsupportistheHand‐madecarpetcluster.PreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):490,000(downfrom710,000)
Sub‐component3.1:Developaclusteractionplanfortheselectedpilotnamely:a. In‐depthdiagnosticstudyofthespecificclusteridentified;andb. Clusterstakeholderconsultations
StatusofImplementation:a. DiagnosticStudy:
Forpre‐mappingcluster:Assignmentcompleted.Forpostmappingcluster:AssignmentexpectedtobetenderedduringQ3of2015.ClusterConsultations:Forpre‐mappingcluster:ThisactivityisexpectedtobeconductedinQ3of2015,basedontheoutcomeofthediagnosticstudythatwassuccessfullycompleted.Forpostmappingcluster:ThisisexpectedtobeconductedinQ4of2015.
Sub‐component3.2:EnhanceBDSandfinancialservicesintheidentifiedpilot:a. DevelopandprovidetailoredBusinessDevelopmentServicestrainingtoMSMEsinorganicclusters:Itisenvisaged
thatthistrainingwillberequiredinawidevarietyoffields,suchasresearchanddevelopment,counselingandtraining,legalandaccounting,designandqualityandprototyping,businesslinkages,testingandmeasurementandcontrol,exportservices,financialservicesandresourcemobilization,etc.
b. Developmentofaspecificloanproductfortheidentifiedcluster.Thisassignmentwillbeundertakentoidentifyandaddressthefinancingneedsofthemicroandsmallenterprisesinthisparticularcluster,sothattheycanhaveincreasedaccesstofinancefortheirproperexpansionandformalization
StatusofImplementation:a. BDSTraining:onceinitiatedthisactivityisexpectedtobeon‐goingtillprojectclosure
Forpre‐mappingcluster:ThiswillbereviewedbasedonthediagnosticstudyandwillbelaunchedasofQ3for2015..
Forpost‐mappingcluster:AplanisexpectedtobedesignedinQ3of2015forimmediateimplementation.
b.DevelopmentofLoanProduct: Forpre‐mappingcluster:activitytobelaunchedinQ3of2015 Forpost‐mappingcluster:activitytobelaunchedinQ1/Q2of2016
Component4:ProjectManagementPreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):348,000(downfrom395,000)
Sub‐component4.1:Recruitmentoffulltimeprojectmanager,afulltimeprojectofficerandapart‐timeM&Eofficer.StatusofImplementation:
ProjectManagerrecruited AdminOfficerrecruited. Otherrecruitmentsareenvisagedtoassistintheexpediencyofprojectimplementation.
Sub‐component4.2:Purchasingofcomputersandequipment.– on‐goingSub‐component4.3:ProjectCompletionAssessment – tobetenderednearprojectcompletion
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
1,940,000 0 1,940,000
AmountReceivedfromTrustee(b):
1,940,000 0 1,940,000
ActualAmountDisbursed(c): 397,700 0 397,700
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2014 397,700 0 397,7002015 0 200,000 200,0002016 500,000 500,000 1,000,0002017 342,300 342,3002018 2019
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)0 60,000 60,000
G. ResultsFrameworkandMonitoring
ProjectDevelopmentObjective(PDO):CreateanoverallenablingenvironmentforMicro,Small,andMediumEnterprises(MSMEs)operatingoutoforganicclustersandincreasetheircontributiontowardseconomicgrowthandemployment.
PDOLevelResultsIndicators*
UnitofMeasure
Baseline
CumulativeTargetValues**
Frequency
DataSource/Methodolo
gy
ResponsibilityforDataCollection
Description(indicatordefinitionetc.)
Jun2013‐Jun2014A
Jul2014‐Jun2015A
Jul2015‐Jun2016F
(Jun2016‐Jun2017)F
IndicatorOne:Regulationandlawsadoptedbygovernmentrelatedtointegrationoforganicclusterinthedevelopmentplans
Qualitative
Noregulationexist
Policyoptiondeveloped
EndofProject
Qualitativeresearch
SFD/AfDB Projectcontributestoformulationofnewpolicies
IndicatorTwo:Unemploymentrate
% 13 12.8 12.6 12.4
Annual
INTERMEDIATERESULTS
IntermediateResult(ComponentOne):PolicyrecommendationstowardsanenablingenvironmentforthedevelopmentofMSMEsinorganicclustersIntermediateResultindicatorOne:Policyframeworkfororganicclusterdevelopmentdraftedandadvocated
Binary NoFramework
1 1 Annual Policyframeworkavailableanddisseminated
SFD/AfDB
IntermediateResultindicatorTwo:studiessupportingcluster's,policydecisionmakingconducted
Number
0 0 (A)2 4 0 Annual Projectannualreports
SFD/AfDB
IntermediateResult(ComponentTwo):InstitutionalcapacitybuiltforkeysupportinstitutionsandstakeholdersworkingwithorganicMSMEclusters
IntermediateResultindicatorOne:numberofstakeholderstrainees
Number 0 10(F)3(A)
30(F) 50(F) Quarterly
Projectreports
Project
IntermediateResultindicatorTwo:numberofinstitutionsparticipatedinstudytoursandroundtables
Number 0 2(F)1(A)
Annual Projectreports
Project
IntermediateResult(ComponentThree):MSMEcontributiontomanufacturingvalueaddedincreasedinpilot
IntermediateResultindicatorOne:No.ofBDSservicesprovidedtoMSMEsinclusterssupported(genderdisaggregated)
Number 0 0 10(A)1
20 30 Annual Projectreports
Projectcompletionreport
IntermediateResultindicatorTwo:NoofloansprovidedtoMSMEsinclusterssupported(genderdisaggregated)
Number 0 0 2(A)0
10 10 Annual
Projectreports
Project
IntermediateResultThree:Noofjobscreated(genderdisaggregated)
Number 0 0 5(A)0
20 50 Annual Projectreportsandevaluation
Project
**Indicate‘A’for‘Actual’and‘F’for‘Forecast’
SupporttoParliament:BuildingCapacity&MainstreamingInclusiveGrowth&Decentralization
A. BasicProjectInformation
ActivityName:SupporttoParliament:BuildingCapacityandMainstreamingInclusiveGrowthandDecentralizationinEgypt
CountryName:Egypt NameofImplementationSupportAgency(ies):AfricanDevelopmentBank
NameofISAProjectLeader:GehaneElSokkary EmailofISAProjectLeader:[email protected]
RecipientEntity:AfricanDevelopmentBank DirectorNorthAfrica,JacobKolster
TotalAmountApprovedbytheTransitionFund(US$):2,920,000
AdditionalFundsLeveragedandSource(s),ifany(US$):
TotalAmountDisbursed(DirectandIndirectinUS$):0
SteeringCommitteeApprovalDate:
6/11/2014
ProjectImplementationStartDate:
TBC(expectedJanuary2016)
Clickheretoenteradate.
ProjectClosingDate9/30/2017
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
EnhancingEconomicGovernance
SecondaryPillar(s): CompetitivenessandIntegrationInclusiveDevelopmentandJobCreationInvestinginSustainableGrowth
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective: Theobjectiveof theproject is to enhance theperformanceof theEgyptianParliamenttowardsincreasedefficiencyandeffectivenessinresponsetothedemandforimprovedsocialjustice.Ratingforprogresstowardsachievementofobjective:
NotApplicable
Ratingforoverallimplementationprogress: NotApplicable
BriefSummaryofProjectImplementationStatus:Duetosomechallengesintheelectoraldistrictlawanditson‐goingrevision,electionsfortheEgyptianParliamenthavebeenpostponedtillendof2015.Meanwhile,theSecretaryGeneralappointedinOctober2014,servesastheExecutingDirectorofParliament.TheBankcorrespondedwiththeGovernmentinSeptember2014proposingadateforthelaunchoftheProject.Aworkingsessionwith theSecretaryGeneralofParliamentwasarranged through theMinistryof InternationalCooperation, onApril 26, 2015; and soon thereafter the Bank received a response to its letter of Septemberconfirmingthecontinuedinterestintheproject. However,thereseemstobesomehesitancyinlaunchingtheprojectactivitiesbeforetheParliamentaryelectionsareheld.TheBankrecentlycorrespondedwiththeMinistryofInternationalCooperationtoobtainfurtherclarifications.ShouldthefinaldecisionbetopostponethelaunchoftheprojectuntilParliamentconvenes,anextensionistobeenvisaged.Meanwhile,theBankhadstartedtheprocesstorecruitconsultantsfortheproject.Anadvertwasplacedinthenewspapers forthe3positions,andCVswereobtained.A long‐list isbeingprepared.However, theprocess isexpectedtobeputonholduntilfurtherclarificationsareobtainedontheanticipatedstartdate.
InlinewithMENATFprocedures,theprojectisISAexecuted.
GrantApprovalDate June11,2014GrantClosingDate 30September2017GrantAmount USD2,920,000(incl.ISAcharges)
C. ImplementationStatusofComponents
Component1:CapacityBuildingofParliament’sPermanentStaff,withafocusonstaffersinvolvedinCommittees:PreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):500,000Sub‐component1.1:CapacityneedsassessmentStatusofImplementation:ToRswillbedraftedbytheimplementationteamoncerecruitedandtheprojectlaunched.Sub‐component1.2:CapacitybuildingprogramsStatusofImplementation:ToRtobedraftedoncetheprojectislaunched.Sub‐component1.3:FieldvisitsStatusofImplementation:Programtobeestablishedbasedonneeds.Component2:InstitutionalDevelopmentPreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):1,500,000Sub‐component2.1:OrganizationalStructureStatusofImplementation:TBDSub‐component2.2:ITupgradeStatusofImplementation:TBDSub‐component2.3:Introducingthee‐votingsystemtoincreaseefficiencyandenhancetransparencyStatusofImplementation:TBDComponent3:Casestudy:MainstreamingSocialInclusionandDecentralisationPreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):270,000Sub‐component3.1:DevelopmentofadedicatedtrainingprogramStatusofImplementation:Sub‐component3.2:Implementationoftheprogram,throughaseriesofinter‐activeworkshopsStatusofImplementation:Sub‐component3.3:StudyTourfor12personsStatusofImplementation:2tourswillbeorganizedinsimilarcontextcountriestobeidentifiedduringprojectimplementationComponent4:ProjectManagementPreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$)470,000Sub‐component4.1:Recruitmentsofstaff:technicaladvisor,programcoordinator,andprojectofficer
StatusofImplementation:ToRshavebeenfinalized;adverthasbeenpublishedinthepaper;CVswerereceivedandreviewed.Longlistisunderpreparation.Sub‐component4.2:Purchasingofofficeequipment
StatusofImplementation:Tobeprocureduponprojectlaunch.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities
Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
2,740,000 2,740,000
AmountReceivedfromTrustee(b):
0 0
ActualAmountDisbursed(c): 0 0
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2015 0 0 02016 300,000 500,000 800,0002017 500,000 500,000 1,000,0002018 500,000 440,000 940,000Total 1,300,000 1,440,000 2,740,000
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)0 180,000 180,000
G. ResultsFrameworkandMonitoring
Project Development Objective: Enhance the performance of the Egyptian Parliament towards increased efficiency and effectiveness in response to the demand for improved social justice.
PDO Level Results Indicators* Unit of Measure Baseline
Cumulative Target Values**
Frequency Data Source/ Methodology
Responsibility for Data Collection
Description (indicator definition etc.)
Dec 2014 - Dec 2015
F
Jan 2016- Dec 2016
F
Jan 2017 - Sep 2017
F
Development Impact: Improved performance of Parliament
Proxy indicator:
1. Wastefulness of govt spending
2. Perception of trust in natl govt
Value 2.1, ranked 135/148 in 2013/14 63% yes (2007-2011)
Value 2.2 65%
Value 3 70%
Third year
Global Competitiveness Report UNDP Human Devt Report
AfDB project team AfDB project team
Perception by business community, conducted through the Executive Opinion Survey of the World Economic Forum. % of those responding “yes” to the Gallup World Poll (2012) question: In this country do you have confidence in the national government?
Outcome Indicator One: Performance of Parliament Staffers improved
Qualitative TBD following baseline survey
- - Increase 1st year & last year
Baseline survey conducted upon project launch and project closure
AfDB project team
Outcome Indicator Two: Social Inclusion and Decentralization concepts mainstreamed
No of social inclusion and/or decentralization related briefs developed and presented
0 in 2013/4 - 2 6 Third year Project completion reports & parliament deliberations
AfDB project team
Briefs developed that favor social inclusion and decentralization, presented for discussion in Committees
INTERMEDIATE RESULTS
Intermediate Result (Component One): Capacity Building of Parliament’s Permanent Staff
Intermediate Result indicator One: Dedicated and tailored capacity-building programs established based on skill gaps identified
Qualitative Large gaps in skills exist
Needs assessment conducted Baseline Performance
Technical and Administrative Training programs implemented
800 persons trained (40% women)
Annual Project progress report
AfDB project team
survey conducted
Intermediate Result indicator Two: Awareness raised on local development issues
Quantitative & qualitative
Desk work forms basis of knowledge. Weak linkages with realities on the ground.
2 field visits organized
4 field visits organized
6 field visits organized Performance survey conducted
Annual Satisfaction survey conducted & Project progress report
AfDB project team
Intermediate Result (Component Two): Institutional Development
Intermediate Result indicator One: Organizational structure with clear roles and responsibilities fine-tuned and circulated
Qualitative Structure reviewed by CAOA
Fine-tuning of 1 structure ToRs for functions of 5 specialized committees developed
20 Job Descriptions developed ToRs for functions of 18 specialized committees developed
54 Job Descriptions developed
Annual Project progress report
AfDB project team
Intermediate Result indicator Two: Improved coordination and staff performance due to use of IT equipment
Quantitative Large IT requirements, no website;
Rapid IT assessment Performance survey
IT equipment purchased and operational
Website operational & Performance survey conducted
Annual Project progress report & comparison of performance surveys
AfDB project team
Intermediate Result indicator Three: Improved transparency through use of e-voting system
Quantitative Limited electronic voting system
E-voting assessment reviewed
E-voting system operational
Annual Project progress report
AfDB project team
Intermediate Result (Component Three): Case Study: Mainstreaming Social Inclusion and Decentralization
Intermediate Result indicator One: Social Inclusion and Decentralization Mainstreaming Program developed and concepts used
Number of trainees; Use of concepts
No program exists Program developed
25trained; 2 briefs developed
50 trained; 4 briefs developed
Annual Project reports AfDB project team
Intermediate Result indicator Two: Awareness on Best Practices from other countries raised through Study tours
Number of tours; qualitative
No program exists - 1 tour for 6 persons
2 study tours for 12 persons; recommendations made following tours
Annual Project reports AfDB project team
StrengtheningRuleofLaw:Effective&TransparentDeliveryofJustice&Rule‐making
A. BasicProjectInformation
ActivityName:StrengtheningtheRuleofLaw:Effectiveandtransparentdeliveryofjusticeandrule‐makinginEgypt
CountryName:Egypt NameofImplementationSupportAgency(ies):OECDandAfDB
NameofISAProjectLeader:
OECD:MiriamAllam
AfDB:SamuelIjeh/PrajeshBhakta
EmailofISAProjectLeader
OECD:[email protected]
AfDB: [email protected]; [email protected]
RecipientEntity:NabeelSadek,ChiefJustice,CourtofCassation,MinistryofJusticeandCourtofCassationMaguedSobhy,Judge,MemberofLegislationDept.MinistryofJustice
EmailofRecipientEntity:[email protected] [email protected]
TotalAmountApprovedbytheTransitionFund(US$):4.121.000
AdditionalFundsLeveragedandSource(s),ifany(US$):
Countryco‐financing:2.000.000andin‐kindcontributions
Otherco‐financing:320.000
TotalAmountDisbursed(DirectandIndirectinUS$):
AfDB:0
OECD:348,175
SteeringCommitteeApprovalDate:
6/11/2014
ProjectImplementationStartDate:
9/1/2014
ProjectClosingDate:
8/31/2017
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): EnhancingEconomicGovernanceChooseanitem.Chooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:TheProjectaimsatcontributingtoconsolidatingtheruleoflawandsupportinganenablingbusiness environment through (i) enhancing efficiency and effectiveness in thedelivery of justice and (ii) strengtheningtransparencyandeffectivenessintherule‐makingprocess.
Thefirstobjectiveaddressestheneedtoimprovethedeliveryofjustice,bystrengtheningruleoflaw‐whichisaddressedattheleveloftheCourtofCassation.TheProjectwillaimtodesignandimplementanautomatedcasemanagementsystemfortheCourtofCassation,buildcapacityofCourtofCassationstafftousenewsystems,andreducecasedelaysandimprovetheprovisionofjudicialservicestothepublic.
ThesecondobjectiveislinkedtothebroaderagendaoftheGovernmentonensuringgreatereffectivenessoftherule‐makingprocess.TheProjectwillworkwiththeMoJtobuildcapacitiesinlegislativedraftingandstrengthenmechanismsforbetterregulation.
Ratingforprogresstowardsachievementofobjective: ModeratelySatisfactory
Ratingforoverallimplementationprogress: ModeratelySatisfactory
BriefSummaryofProjectImplementationStatus:
Asregardstotheoverallimplementationofactivitiesofthisproject,noticeabledevelopmenthasbeenachieveddespiteareshufflingofthegovernmentthataffectedtheMinistryofJustice.ActiveandcredibleengagementfromMinistryofJusticeandCourtofCassationprovidedasuitableframeworkforexploitingthepotentialofprojectimplementation.SincethelastreportingroundinJanuary,thestatusoftheprojectimplementationhassteadilyprogressed.InparticularthecomponentsunderOECDexecutionwhereasthepaceoftheimplementationoftheAfDBGovernmentexecutedactivitieswiththeCourtofCassationhaveencounteredsignificantdelayduetocapacityconstraintswithintheCourtofCassationwithregardtoprojectmanagementandprocurement.TheAfDBundertookamissiontoEgyptinJune2015tospecificallyresolveprojectimplementationissuesandreachanagreementonthewayforward.TheprojecthasalsoexperiencedmanychangesoftheprojectimplementationteamsintheMinistryofJusticeandtheCourtofCassation,whichhasrequiredadditionalattentiontoensuringstrongcommunicationandcoordinationtomitigatedisruptionstoprojectimplementation..Inthisregard,theOECDandtheAfDBhasorganizedaseriesofcoordinationmeetingswiththeLegislativeDepartment,MinistryofJusticeandtheCourtofCassationinFebruary,March,AprilandJune.Themainobjectivesofthemeetingsweretodiscuss(a)theimplementationmechanismsfortheprojectwiththerespectivestakeholders,(b)agreeonthemainframeworkofprojectimplementation,(c)thecoordinationbetweentheOECD,AFDB,MinistryofJustice,CourtofCassation,MinistryofInformationandTelecommunicationsandMinistryofPlanningandInternationalCooperation.Mainachievementsinclude:‐Agreementreachedonprojectimplementationplans,withclearexecutiontimelineswithbothMinistryofJusticeandCourtofCassation‐HighLevelPeer‐to‐peerlearningfacilitatedwithOECDcountriesonlegislativedraftingbefittingtheMinistryofJusticeandtheCourtofCassation(subcomponent1.5)‐Mappingexerciseonlegislativedepartmentscapacitybuildingneedscompleted(subcomponent2.1)‐CoordinationassuredwithotherDPsinvolvedinJusticeSector,inparticularEUJusticeprojectTo ensure continued coordination, the project has been reported to the OECD External Relations Committee, PublicGovernance Committee and discussed at various regional meetings organised in the framework of the MENA‐OECDGovernanceProgramme‐aprogrammethatprovidesaforumforthecoordinationofcountry‐anddonor‐ledactivitiesattheregionalandnationallevel.Inaddition,theOECDandAfDBcoordinateverycloselywiththeothermaindonorsworkinginthefieldofjusticeinstitutions(i.eEUprojecton“AdministrationofJustice”andtheAmericanBarAssociationRuleofLawprogrammesinEgypt).TheOECDandAfDBrecognizethatthecomplementaritybetweenprojectactivitiesishigh.Themonthlydonor’scoordinationmeetings,inadditiontoOECD&AfDBregularmeetingswithdonors,areexcellentexamplesofdevelopingaconsortedapproachofmanaging the implementation process without duplication or overlap between activities. Moreover, it also providesadministrators in each recipient entity with tools of better management without falling in a clamor of conflictingcommitmentsgiventheongoingchangesinrolesandresponsibilities.
C. ImplementationStatusofComponentsComponent1:Thiscomponentfocusesonimplementingkey ITreforms,buildingcapacitiesandestablishingsystemsforanautomatedcasemanagementsysteminthecourtofcassation,withtheviewtosignificantlyreducetheprocessingtimespentoneachcase,reducethecurrentbacklogofcasesandenableamoreefficientresearchandopenaccesstocourtfilesandjudgmentsPreviousRating:NotApplicable CurrentRating:Moderately
SatisfactoryCost(US$): 2.397.000
Sub‐component1.1:PreparingandImplementingaReformActionPlanoftheCourtofCassation StatusofImplementation:TheOECDconductedtwoconsultationsmeetingsinMarchandAprilwiththeCourtofCassationasafollowuptotheSeminarofSeptember2014andtodiscusstheupdateoftheimplementationstatusofthe44recommendations.Themeetingon27Apriladvancedinthediscussiontofindamutuallyagreeddateforthedeliveryoftheseminar,studyvisitandapprenticeship.Themeetingresultedinagreementontheimplementationplanforthenext12months.ThenextseminarwilltakeplaceinNovember(duetotheCourt'stightscheduleresultingfromtheendoftheJudicialyearandJudges'recess)inCairo.Theseminar,withobjectivetoequiptheCourtofCassationwiththenecessaryskillsofdesigningandimplementingtheactionplan,underthiscomponentwillfocusonautomatedcasemanagementsystemsincomparativeenvironmentsandwillbecloselycoordinatedwiththeEUtocreatesynergiesbetweenboth
projects.ThedraftprogrammewassubmittedtotheCourtofCassationon27April2015fordiscussion.ThestudyvisitwilltentativelytakeplaceinMarch2016andtheApprenticeshipoftwoweeksinlate2016.Theobjectiveoftheapprenticeshipwillbetofosterafirsthandexchangeofpracticalinformationandviewsonsimilarreformprocessesofthecourtsinotherjurisdictionsandtheirapplication.ThecomponentisexpectedtobecompletedbySpring2017.Sub‐component1.2:TechnicalassistancetodesignanintegratedmodernautomatedcourtmanagementsystemStatusof Implementation:As theCourtofCassationhasnopreviousexperienceon implementingAfDBprojects, ithasexperiencedsignificantchallengesinmeetingcriticalstepsrequiredtoensurethestartofactivities,includingtheopeningofspecial accounts to receive the project funds; preparing procurement notice and terms of reference for the first sets ofprocurements, in particular for the recruitment of theproject support staff‐ includingprocurement officer and financialassistant.During anAfDBmission in June2015, agreementwas reachedonnew implementation arrangements,withanenhancedroleoftheMinistryofInternationalCooperation,whichhasthecapacityandexperiencerequiredtoexecuteAfDBprojects.ItwasalsoagreedthattheMoICTshallprovidesupportonthetechnicalspecificationsgiventheirexperienceandknowledgeofautomatedsystems,aswellastheiroverallcoordinatingroleontechnicalissuesofe‐governance.Sub‐component1.3:Implementationoftheintegratedcourtmanagementsystem StatusofImplementation:N/A–thiscomponentwillbeimplementedaftersub‐component1.2Sub‐component1.4:CapacitybuildingandtrainingofusersforthenewsystemStatusofImplementation:N/ASub‐component1.5:Disseminationtostakeholders,dialoguewithprivateandNGOsectorStatusofImplementation:TheprojectobjectivesweredisseminatedtomajorstakeholdersduringtheprojectlaunchinSeptember2014.Todesignthecommunicationstrategy,ameetingwiththeITteamoftheCourtofCassationwasorganizedon27April2015.Itisevidentfromthediscussionsthatthecourthasmadeastridingprogressindevelopingacommunicationstrategy.ThewebportalofJudicialServicesofthecourthasbeenupgraded.Theportalisconnectedtointernaldatabaseofarchivetocivilandcriminalcases.Theportalprovidesonlineservicesforcitizenstoinquireandtracktheprogressoftheircases.Theportalalsoprovidesstatisticsforstakeholders.Thenextphasewillbetoconnecttheportalwiththedatabasesystemwithothercourtsin/outsideCairo.Thecourtheldvariousconsultationmeetingswithstakeholders(MinistryofInformationandCommunication,TheBarassociation,andPrivatesector).Communicationsprioritiesandtime‐tableoftherolloutofthestrategyarefurthertobediscussedwiththeCourtofCassationinordertocompletethesub‐componentbySpring2017.TheOECDandAfDBattendedthemonthly“RuleofLaw–Donorscoordinationmeeting“inFebruary,MarchandApril.Themeetingdiscussedthestatusofimplementationforeachprojectandexploredareasofsynergisticcollaborationsbetweendonors.TheOECDandAfDBisalsocoordinatingcloselywiththenewlyapprovedprojectactivitiesledbytheEUComponent2:Transparentandeffectiverule‐making.Thiscomponentwillfocusonimplementingnewprocessesandapplyinginternationalgoodpracticesfortransparentandeffectiverule‐makingintheMinistryof Justice.Thecomponentincludes thepilotingof thenewprocedures and techniques todraft thenecessary legislation tomodernize theCourt ofCassationandotherprioritylegislationinlinewiththenewconstitution.Thecomponentthusfocusesontheprocesses,toolsandskillstodraftgoodlegislation.PreviousRating:NotApplicable CurrentRating:Moderately
SatisfactoryCost(US$):1.151.000
Sub‐component2.1:Implementationplanforparticipatoryandtransparentrule‐making.StatusofImplementation:MonthlycoordinationmeetingsinJanuary,February,MarchandAprilwiththeMinistryofJusticeandDeputyMinisterofJusticetookplacetopreparetheimplementationofthisactivitywhichwillstartinSeptember2015.Inaddition,1advisorysessionontheOECDRegulatoryPolicyRecommendationandtheOECDworkonJusticeInstitutionswithexpertsfromtheGovernanceReviewsandPartnershipsDivisionandtheRegulatoryPolicyDivisiontookplaceonthe03rdFebruary,2015.Incarryingoutthisexercise,theOECDintroducedavailabledataandcurrenttrendsinOECDcountrieson access to justice, justicemanagement structures and performance aswell as in alternative dispute settlement (ADR)mechanisms.ThedialoguehelpedtoexplaininpracticetheOECDpeer‐reviewmethodologytotheMinistryofJustice,andOECDandEgyptianpeersdiscusseddifferenttoolstoconsultondraftlaws.Themappingexercisethenstartedon28AprilwiththeDepartmentforLegislationandtheOECD.TheobjectivesofthemappingexerciseistoA)provideabackgroundreport forconsiderationofpossible reformsby theLegislativeDepartment;b)provideanoverviewofandreferences tointernationalpracticesandprocedures,establishedfordraftinglegislationinOECDcountries;c)providesomepreliminaryheadingsforaManualandneedsassessmentsonatraininganddevelopmentprogramme.ThisexercisereliesprimarilyontheinformationreceivedfromtheMinistryofJustice,theOECDiscurrentlypreparingthemappingandwillbefinalizedinthenext3months.Thesub‐component2.1isthusexpectedtobecompletedbyAugust2015.
Sub‐component2.2:Capacitybuildingtoimprovetransparentrule‐makingStatusofImplementation:Thecapacitybuildingactivities,includingtheseminarsandthestudyvisitstoOECDcountries,
suggestedbytheMinistryofJusticeareexpectedtostartinSeptember2015.Theprogrammeofthestudyvisitandpossible
formatofthevisitswerepresentedinJune2015.ThefirststudyvisitwilltakeplaceinFranceinSeptember2015.Thisstudy
visitwillbefollowedbyaseriesof5furthercapacitybuildingactivitiesexpectedtobecompletedbyJune2016.Theentire
componentwillbefinalizedbyJune2017.
Sub‐component2.3:Implementingprocessesandtoolsforeffectiveandtransparentrule‐makingStatusofImplementation:Sub‐component2.3.isexpectedtostartinearly2016andbefinalizedbyJune2017Sub‐component2.4:ProvideimplementationsupporttodraftnewlegislationStatusofImplementation:Sub‐component2.4willbediscussedduringtheimplementationofsub‐component2.2Sub‐component2.5:DatabaseoflegislationandbestpracticesinlegislativedraftingStatusofImplementation:N/AAFDBtoprovideinformationontheprocurementnote.Component3:Projectmanagement,coordinationandmonitoringThiscomponentwillentailsupporttoensuringallprojectactivitiesandtasksareexecuted,coordinationamongallactorsinvolved in project implementation, fulfilling and monitoring procurement and fiduciary requirements and audits, andmonitoringandevaluationofprojectoutcomesandintermediaryresults.[AFDB]PreviousRating:Not Applicable CurrentRating:Moderately
UnsatisfactoryCost(US$):222.000
StatusofImplementation:UnderthiscomponenttheprojectwastorecruittherequiredsupportstafffortheProjectImplementationTeamswithinCoCandMoJtoensureadequateprojectmanagement.However,duetosignificantdelaysinofficiallyappointingprojectcoordinators,openingthespecialaccountsandensuringthatthefirstprocurementsarelaunchedfortherequiredsupportstaff,thePITsarenotyetfunctioning.DuringamissioninJune2015,toaddressimplementationissues,itwasagreedthatprojectexecutionwouldbeassuredbytheMinistryofInternationalCoordination,whichhastherequiredcapacitytodealwithprojectmanagement.ThecourtofcassationandtheMinistryofJusticewillremainresponsiblefortechnicalinputsandqualityassurance,butwillnotneedtomanageprocurementandfinancialreporting.ItisexecutedthatthiswillsignificantlycontributetounblockingthelackofprogressonthiscomponentandtheGovexecutedpartoftheproject.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
2,406,000 OECD:1,500,000USD 3,906,000
AmountReceivedfromTrustee(b):
0 OECD:72,916USD 72,916
ActualAmountDisbursed(c): 0 OECD:247,312USD 247,312
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2015 OECD:275.711
AfDB:115.000OECD:275.711AfDB:115.000
2016 OECD:300.000AfDB:
OECD:250.000AfDB:1,566.000
OECD:550.000AfDB:1,566.000
2017 OECD250.000AfDB:
OECD:150.000AfDB:725.000
OECD:400.000AfDB:725.000
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)
OECD:100,863USDAfDB:0
OECD:137USDAfDB:114,000
OECD:101.000AfDB:114,000
G. ResultsFrameworkandMonitoring
Project Development Objective (PDO): The proposed project development objective is to strengthen the application of rule of law and an enabling business environment through enhancing effective
and transparent delivery of justice and inclusion in the rule‐making process.
PDO Level Results Indicators* Unit of
Measure Baseline
Cumulative Target Values**
Frequency Data Source/
Methodology
Responsibility for
Data Collection
Description
(indicator
definition etc.) Sep 2014 –
Sep 2015
F
Oct 2015 ‐
Sep 2016
F
Oct 2016 ‐
Sept 2017
F
Indicator 1: Automation of the Court
of Cassation
Quantitativ
e
Not automated
n/a yes System in place
once Project
progress
reports
Project
Implementation
Team (PIT). CC
System
designed,
equipment and
IT installed
Indicator2: System designed that
allows for effective and consistent
stakeholder engagement and input
into law drafting
Quantitativ
e
n/a yes System in place
annually Project
Progress
Reports,
Website
verification
PIT, MoJ Stakeholder
consultation
process in rule
making
elaborated
Indicator 3: Legislation drafted
according to International good
practices
Quantitativ
e
none n/a yes Four Second and third
year annually
Project
progress
reports
PIT, MoJ Number of hits
on the platform
Indicator4 : Capacity Built:
Number of Staff trained in IT
system use
Number of MoJ Staff trained in
drafting legislation
Number of peer review
exchange programmes
Number of modules and toolkits
developed
Number of secondments, OECD,
CC etc
Quantitativ
e
none
n/a
20
7 study
visits
3 seminars
10 Toolkits
1000 on IT
system use
50 on
legislative
draft.
6 toolkits
Annually Project
Monitoring
Unit
PIT Total number of
beneficiaries
benefitting from
capacity building
for all
components of
the project
combined
INTERMEDIATE RESULTS
Component 1: Supporting the efficient and effective delivery of justice by the Court of Cassation
Indicator 1: Automated court
management system designed
Quantitativ
e
Not automated
System
designed
n/a n/a
Once Project
progress report
PIT, CC Design of
automated court
management
system
Indicator 2: Work flow of the Court of
Cassation automated
Qualitative Rudimentary case recording system not linked
n/a n/a System established
once Project
progress report
PIT, CC Business
processes
automated and
linked
Indicator 3: Archiving system for the
Court of Cassation developed
Quantitativ
e
Paper archive
n/a n/a All new cases archived elecronically
once Project
progress report
PIT, CC Electronic
archive for CC in
place
Indicator 4: Dynamic and Interactive
Website for the CC
Qualitative Website
not
dynamic or
interactive
n/a yes Judgements
by CoC
available on
line
Annually Project
Implementatio
n Reports
PIT, CC Type and
volume of
information
accessible on
website, number
of hits
Indicator 5: Legislation for
automation enacted
Quantitativ
e
Draft legislation to be reviewed
n/a yes n/a once Legislative
reports, Project
progress
reports
PIT, MoJ Legislation to
allow electronic
signatures and
authentication
of electronic
documents
Component 2: Support Transparent Rule‐Making in the Ministry of Justice
Indicator1: Guidelines and Toolkits
developed
Quantitativ
e
None 6 n/a n/a once Project Progress Reports
PIT Number of tool kits developed
Indicator 2: Staff trained on
participatory rule making and impact
assessment
Quantitativ
e
Capacity
not good
yes yes Yes Annually Project Implementation Reports
PIT Number of staff trained in legislative techniques /Number of trainings held
Indicator 3:Pilot legislation
drafted/reviewed according to
international best practices
Quantitativ
e
n/a yes Yes Annually Project Progress Reports
PIT, MoJ Legislation drafted
Indicator 4: User‐friendly e‐
consultation platform established
Quantitativ
e/Qualitati
ve
none n/a yes Yes Second and third
year annually
Website
verification,
project
progress
reports
PIT, MoJ Number of users
on the platform
Indicator 5: Workshops and staff
assignment to OECD
Quantitativ
e
None yes yes Yes Annually Project
Progress
Reports
PIT, OECD Number of staff
assignment and
workshops
INTERMEDIATE RESULTS
Component 1: Supporting the efficient and effective delivery of justice by the Court of Cassation
Indicator 1: Automated court
management system designed
Quantitativ
e
Not automated
System
designed
n/a n/a
Once Project
progress report
PIT, CC Design of
automated court
management
system
Indicator 2: Work flow of the Court of
Cassation automated
Qualitative Rudimentary case recording system not linked
n/a n/a System established
once Project
progress report
PIT, CC Business
processes
automated and
linked
Indicator 3: Archiving system for the
Court of Cassation developed
Quantitativ
e
Paper archive
n/a n/a All new cases archived electronically
once Project
progress report
PIT, CC Electronic
archive for CC in
place
Indicator 4: Dynamic and Interactive
Website for the CC
Qualitative Website
not
dynamic or
interactive
n/a yes Judgments by
CoC available
on line
Annually Project
Implementatio
n Reports
PIT, CC Type and
volume of
information
accessible on
website, number
of hits
Indicator 5: Legislation for
automation enacted
Quantitativ
e
Draft legislation to be reviewed
n/a yes n/a once Legislative
reports, Project
progress
reports
PIT, MoJ Legislation to
allow electronic
signatures and
authentication
of electronic
documents
Component 2: Support Transparent Rule‐Making in the Ministry of Justice
Indicator1: Guidelines and Toolkits
developed
Quantitativ
e
None 6 n/a n/a once Project Progress Reports
PIT Number of tool kits developed
Indicator 2: Staff trained on
participatory rule making and impact
assessment
Quantitativ
e
Capacity
not good
yes yes yes Annually Project Implementation Reports
PIT Number of staff trained in legislative techniques /Number of trainings held
Indicator 3:Pilot legislation
drafted/reviewed according to
international best practices
Quantitativ
e
n/a yes yes Annually Project Progress Reports
PIT, MoJ Legislation drafted
Indicator 4: User‐friendly e‐
consultation platform established
Quantitativ
e/Qualitati
ve
none n/a yes yes Second and third
year annually
Website
verification,
project
progress
reports
PIT, MoJ Number of users
on the platform
Indicator 5: Workshops and staff
assignment to OECD
Quantitativ
e
None yes yes yes Annually Project
Progress
Reports
PIT, OECD Number of staff
assignment and
workshops
EgyptianCentralBankClearing&SettlementDepositarySystemforGovernmentSecurities
A. BasicProjectInformation
ActivityName:EgyptianCentralBankClearing&SettlementDepositarySystem(CSD)forGovernmentSecurities
CountryName:Egypt NameofImplementationSupportAgency(ies):EuropeanBankforReconstructionandDevelopment(EBRD)
NameofISAProjectLeader:HannesTakacs/HughFriel EmailofISAProjectLeader:[email protected];[email protected]
RecipientEntity:
CentralBankofEgypt
NameandEmailofRecipientEntityContact:SalwaAyoub,SeniorITProjectManagerE‐mail:[email protected]
TotalAmountApprovedbytheTransitionFund(US$):3,851,900
AdditionalFundsLeveragedandSource(s),ifany(US$):3,220,000
1,220,000fromAfDB1,000,000fromEBRD’sSEMEDMulti‐DonorAccount1,000,000fromCBE
TotalAmountDisbursed(DirectandIndirectinUS$):120,300
SteeringCommitteeApprovalDate:
6/11/2014
ProjectImplementationStartDate:
7/1/2014
ProjectClosingDate:
9/1/2017
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
EnhancingEconomicGovernance
SecondaryPillar(s): InvestinginSustainableGrowthInclusiveDevelopmentandJobCreationChooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
Project Development Objective: The proposed project has three key strategic objectives which are: i) to reducesubstantially the accumulation of potential systemic risks related to payment systems and settlement; ii) to enable theintroduction and pricing of new instruments; iii) to allow for better pricing of government securities and creation of abenchmarkyieldcurvewhichwillfacilitatethegrowthofthecorporatebondmarket.
Ratingforprogresstowardsachievementofobjective: ModeratelySatisfactory
Ratingforoverallimplementationprogress: ModeratelySatisfactory
BriefSummaryofProjectImplementationStatus:Theprojectprogressedsignificantlyduring the6‐monthreportingperiod.TheEBRDproject teamconductedoneon‐sitemissionandorganizedanumberofconferencecalls tocoordinateproject implementationandmonitorprogress.Theco‐operationbetweenCBEandEBRDworksverywell.Duringtheon‐sitemissioninFebruary2015tri‐lateralprojectmeetingsbetweenCBE,EBRDandAfDBtookplace to fine‐tuneproject timelines,responsibilitiesandprocurementprocesses.CBEexpressed theneed to re‐allocate someof theproject fundsprovidedbyAfDB toallow for theprocurementofaProjectManager(PM)whichwillmanagetheCSDimplementationwithinCBE.EBRDcoordinatedwiththeAfricanDevelopmentBank(AfDB)toaccommodateCBE’srequesttoallocatefundssuppliedbyAfDBtotheprimaryauctionsystemandtoafull‐timePMwhichwillsupportCBEinternallyinimplementingtheproject.AnofficialrequestwasreceivedbytheAfDBallowingthemtocommencewiththeirinternalapprovalprocesses.AfDBdraftedTermsofReferencefortheprocurementofthePMandputitforwardforAfDBBoardapprovalinJune2015.AGeneral ProcurementNotice has beenpublishedonEBRD’swebsite and theprocurementof twoproject components,namelyfor(a)YieldCurveModellingand(b)ScopingandImplementationSupportweresuccessfullylaunchedinDecember2014.TheprojectcomponentswereprocuredfollowingtheEBRDprocurementrules.IntegratedTermsofReference(TOR)forthescopingandimplementationsupportconsultantweredraftedandapprovedbyCBEinDecember2014aswellastheTORfortheYCM.ItwasagreedwithCBEthatthescopingandtheimplementationsupportadvisoryserviceswillbeprocured
as one project component to ensure consistency in project implementation. Even though the procurement started inDecember2014asplannedsomedelaysintheprocurementwereexperiencedbasedontheendofyearandspringholidaysinthevariouscountriesandthedeadlineforthesubmissiondeadlineforExpressionofInteresthadtobeextendedtoensureasufficientnumberofprojectapplications.Afterasuccessfultenderprocessthesub‐component2.4YieldCurveModelling(YCM)projectwasawardedtoOGResearch(Czech Republic) by CBE and implementation commenced in May 2015. The final version of the Inception Report wassubmitted in June2015. It is expected that theYCMprojectwill end inOctober2015with thesubmissionof theagreeddeliverablesandthefinalreport.Thetenderprocessforthecomponent1project“Scopingandimplementationsupport”(USD600,000)wasfinalizedaswellastheevaluationofthefinancialproposalsbyCBEinJune2015,wheretheprocesswasslightlyaffectedbythemonthofRamadanandEaster.Contractnegotiationswith the first rankedcompany, “BourseConsult (UK)”,will commenceat thebeginningofJuly2015.ItisexpectedthatthecontractwillbesignedinJulywithprojectkick‐offinAugust2015.Itisplannedthatthetenderdocumentforthecoresystemcomponentswillbereadyattheendof2015/January2016andthatthetwo‐stageprocurementprocesswillstartimmediatelyafterwards.Asfarasdisbursementsareconcerned,asexplainedtotheSteeringCommitteeonpreviousoccasions,majordisbursementsundertheprojectwerenotexpectedinthefirst12‐18monthsofimplementation.Thisisduetoaround80percentofthebudgetbeinglinkedtocoresystemcomponentswhichareplannedtobedeliveredatalaterstageofprojectimplementation.Havingsaidthat,disbursementsareenvisagedtostartacceleratingalreadyinthesecondhalfof2015,asoutlinedbelowinsectionE.
C. ImplementationStatusofComponentsComponent1:ScopingphaseandImplementationSupportGiven the complexities involved in developing the various streams related to a functioning Clearing, Settlement andDepository(CSD)systemattheCBE,asuitablyqualifiedexpertwillbetaskedwithscopingandimplementationsupportforthisCSDproject.Thescopingconsultantwillberequiredtopreparetenderdocumentsfortheselectedprojectcomponentsaspresented.PreviousRating:ModeratelySatisfactory
CurrentRating:ModeratelySatisfactory
Cost(US$):600,000(100,000+500,000)
StatusofImplementation:IntegratedTORforthescopingandimplementationsupportwasdraftedandapprovedbyCBEon3December2014.On5Decemberthe two‐stagebiddingprocessstarted.Basedonthe lownumberofexpressionsofinterests (EoI) receivedbefore thesubmissiondeadline itwasdecided toextend thedeadline.This led toadelay in theprocurementprocess.InJune2015thefinalevaluationoftheproposalswasconcludedandnegotiationswiththefirstrankedconsultingcompanyBourseConsultwillcommenceinJuly2015.ThescopingandimplementationsupportwasprocuredatoncetoensureconsistencyandtimelinessinprojectimplementationasagreedwithCBE.Phase2ProjectManagementandimplementationsupportwillonlystartafterthedeliverablesofprojectPhase1ScopingareapprovedbyCBE.ImplementationisexpectedtostartinAugust2015.Component2:CoreSystemComponentsPreviousRating:ModeratelySatisfactory
CurrentRating:ModeratelySatisfactory
Cost(US$):4,450,000
Sub‐component2.1:PrimaryMarket(AuctioningSystem)StatusofImplementation:n/aSub‐component2.2:SecondaryMarket(CSD&CollateralManagementSystem)StatusofImplementation:n/aSub‐component2.3:RepoAuctionStatusofImplementation:n/aSub‐component2.4:YieldCurvePricingModelStatusofImplementation:UnderimplementationsinceMay2015.Sub‐component2.5:TradingPlatformStatusofImplementation:n/aComponent3:InterfacewithotherSystems
PreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):430,000Sub‐component3.1:InterfacewithMCDR&EGXStatusofImplementation:n/aSub‐component3.2:ClearStreamandEuroclearInterfaceStatusofImplementation:n/aSub‐component3.3:BondDealerInterfaceStatusofImplementation:n/aComponent4:DataWarehouses&InformationDisseminationPlatformPreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):100,000StatusofImplementation:n/aComponent5:Legal&RegulatoryFrameworkReformPreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):50,000StatusofImplementation:n/aComponent6:HardwarePreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):1,000,000StatusofImplementation:hardwarewillbein‐kindcontributionfromCentralBankofEgypt
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
3,510,000 0 3,510,000
AmountReceivedfromTrustee(b):
600,000 0 600,000
ActualAmountDisbursed(c): 15,000 0 15,000
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2014 ‐ 0 02015 15,000 405,000 420,0002016 640,000 1,080,000 1,720,0002017 700,000 770,000 1,370,0002018 0 0 02019 0 0 0
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$) 107,150 234,750 341,900
G. ResultsFrameworkandMonitoringProject Development Objective (PDO):
PDO Level Results Indicators* Unit of
Measure Baseline
Cumulative Target Values**
Frequency
Data
Source/
Methodol
ogy
Responsibil
ity for Data
Collection
Descriptio
n
(indicator
definition
etc.)
Jul 2014 ‐
Jun 2015
A
Jul 2015 –
Jun 2016
Jul 2016 –
Jun 2017
Aug 2017 ‐
Sept 2017
Indicator One: Transaction
efficiency increase (volume of
trading)1
% Project
Start
+15% +20% Semi‐
Annual
Central
Bank of
Egypt
Implementa
tion
Manager
Percentag
e increase
in trading
volume of
governme
nt
treasuries
compared
to pre‐
project
levels.
Indicator Two: Settlement
efficiency increase (% of trades
settled automatically) 2
% Project
Start
60% 80% Semi‐
Annual
Central
Bank of
Egypt
Implementa
tion
Manager
Percentag
e of
trades
settled
automatic
ally
Indicator Three: Uniform
access to market by
participants (minimum
number of bond dealers with
direct access) 3
No. Project
Start
0 ‐ 2 2 Semi‐
Annual
Central
Bank of
Egypt
Implementa
tion
Manager
Number
of players
other than
banks,
granted
direct
access to
the
1 Systems will not be in place before end‐2016, so impact can only be assessed after the implementation of the fully electronic system components 2 Systems will not be in place before end‐2016, so impact can only be assessed after the implementation of the fully electronic system components 3 Systems will not be in place before end‐2016, so impact can only be assessed after the implementation of the fully electronic system components
system
compared
to pre‐
project
Indicator Four: Secondary
market trading of treasury
bonds 4
% Project
Start
15% +20% Semi‐
Annual
Central
Bank of
Egypt
Implementa
tion
Manager
Percentag
e increase
in trading
of
treasury
bonds in
the
secondary
market
Indicator Five: Transparency
and Dissemination (publish
yield curve and website with
debt trading statistics) 5
Project
Start
Monthly Weekly Semi‐
Annual
Central
Bank of
Egypt
Implementa
tion
Manager
Frequency
of
Publicatio
n
INTERMEDIATE RESULTS
Intermediate Result indicator One:6
Automated
Primary
Market
Auction
System 50%
complete
Automated
Primary
Market
Auction
System fully
completed
Central
Bank of
Egypt
Implementa
tion
Manager
Intermediate Result indicator Two: 7
Automated
Secondary
Market
Clearing and
Collateral
Management
System 50%
completed
Automated
Secondary
Market
Clearing and
Collateral
Management
System fully
completed
Central
Bank of
Egypt
Implementa
tion
Manager
4 Systems will not be in place before end‐2016, so impact can only be assessed after the implementation of the fully electronic system components 5 Systems will not be in place before end‐2016, so impact can only be assessed after the implementation of the fully electronic system components 6 Procurement will not be finished before Q2/2016 7 Procurement will not be finished before Q2/2016
Intermediate Result indicator Three:
Yield curve
methodology
analysis for
Egyptian
market
complete
Yield Curve
generation
Central
Bank of
Egypt
Implementa
tion
Manager
Intermediate Result indicator Four: 8
Trading
platform
analysis for
optimal design
complete
Trading
platform for
government
securities
operational
Central
Bank of
Egypt
Implementa
tion
Manager
Intermediate Result Indicator Five: 9
Analysis of
optimal
linkages
Local market
linkages
operational
Central
Bank of
Egypt
Implementa
tion
Manager
Intermediate Result Indicator Six: 10
Design of
warehouse
and website
Data
warehouse
and debt
capital
markets
website
operational
Central
Bank of
Egypt
Implementa
tion
Manager
Intermediate Result Indicator Seven:11
Analysis of
legal and
regulatory set
up
Recommendati
ons for change
Legal and regulatory requirements are consistent across all modules
Central
Bank of
Egypt
Implementa
tion
Manager
8 Procurement will not be finished before Q2/2016 9 Procurement will not be finished before Q2/2016 10 Procurement will not be finished before Q2/2016 11 Analysis of legal and regulatory set‐up is depending on planned market design
MSMESupportProgrammeinEgyptandtheSocialFundforDevelopment
A. BasicProjectInformation
ActivityName:MSMESupportProgrammeinEgyptandtheSocialFundforDevelopment
CountryName:EgyptNameofImplementationSupportAgency(ies):
EuropeanBankforReconstructionandDevelopment(EBRD)
NameofISAProjectLeader:
ReemElSaady
EmailofISAProjectLeader:
RecipientEntity:SocialFundforDevelopmentofEgyptNameandEmailofRecipientEntityContact:AyaAbou‐Hadid
TotalAmountApprovedbytheTransitionFund(US$):
2,936,080
AdditionalFundsLeveragedandSource(s),ifany(US$):
EUR625,000(equivalentofUS$812,500)fromEBRD’sSEMEDMulti‐DonorAccount
TotalAmountDisbursed(DirectandIndirectinUS$):
586,401
SteeringCommitteeApprovalDate:
2/20/2013
ProjectImplementationStartDate:
4/1/2013
ProjectClosingDate:
4/1/2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar: InvestinginSustainableGrowth
SecondaryPillar(s):InclusiveDevelopmentandJobCreation
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:
TheProject’sobjectiveistostrengthenthecapacityoftheSocialFundforDevelopmenttosupporttheMSMEsectorinEgyptwithaparticularfocusonpromotingwomenentrepreneurship.
Ratingforprogresstowardsachievementofobjective: Satisfactory
Ratingforoverallimplementationprogress: Satisfactory
BriefSummaryofProjectImplementationStatus:
Sincethelastprogressreport,activitiesunderthisprojecthavecontinuedattherequiredpace.Inparticular,themajorityofconsultantstobeinvolvedunderComponent1havenowbeenretainedandallofthemnowhavedeliveredthefirstsetofdeliverablesaspertheTermsofReferences(seebelowforfurtherdetail).Component2isontrack.ThejointteamoftheSocialFundforDevelopment(SFD)andEBRDhasassisted55womenentrepreneursresultingin64advisoryprojects.Itisworthnotingherethattheoriginallyagreeduponobjectivewastoimplement60projects;however;duetotheincreasingdemand on advisory services and the smaller size of the average project cost, the teamwas capable to overshoot andimplementtodate64projects,andexpecttoreach70projectsbyApril2016,usingthesameallocatedbudget.Inaddition,85womenreceivedentrepreneurshiptrainingsinvarioustopics;2beneficiariesarecurrentlyengagedincoachingprojectsand4areengagedinmentoring.Furthermore,marketdevelopmentactivitieswereimplemented,outreachingtomorethan330womenentrepreneurs,aswellas30consultantsindifferentgovernoratesinordertoincreaseawareness,visibilityandsupply&demandonadvisoryservices.AspartoftheKnow‐Howtransfer,EBRDhasbeenprovidingcapacitybuildingtoSFDthroughon‐the‐jobtrainingtoitsstaff.
WithregardstoComponent3,aconsultanthasnowbeenhiredtoexecutetheassignmentandworkhasbegunonthefirstphaseoftheproject(envisioningandplanning).
C. ImplementationStatusofComponents
Component1:“LegalandregulatoryreformtostrengthenSFDadvocacyandpolicyformulationcapacitytosupporttheMSMEsector”(SFD‐executed):
TheComponent’sobjectiveistoprovideSFDwithtechnicalassistanceandadvicetoallowittofulfilapolicyandadvocacyroleintheMSMEsectorinEgypt.
PreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):919,000
Sub‐component1.1:DevelopinganationalstrategyforenhancingthelegalandregulatoryenvironmentofMSMEsandpromotinganadvocacyandpolicyfunctionwithintheSFD
StatusofImplementation:TheSeniorPolicyAdvisorwashiredtoprepareananalysisofthelegalandregulatoryobstaclesforMSMEdevelopment.ThiswillfeedintotheNationalStrategyfortheMSMEsectorthattheSFDispreparing.AdraftofthePolicyPaperwaspreparedandcirculatedwithintheSFDandEBRD.ThereportrequiresfurtherworkinordertofullyaddressthelegalandregulatoryframeworkgoverningSMEsandtoidentifyrelevantobstaclesandbottlenecks.Inthatconnectionadecision has been taken to obtain targeted legal advice to address thesematters and complete the report. Consultationworkshopswill be scheduled to present the final proposed findings and recommendations to both local authorities anddonors. An International Consultant has been retained, whose role consists of advising the SFD on the internationalexperienceofregulationoftheMSMEsectorandtocomplementtheSeniorPolicyAdvisor’sPolicyPaperwithacomparativeperspective.The InternationalConsultantproducedapolicypaperonhowMSMEsector isgoverned, inparticularat thelegislativelevel.Finally,effortsarenowbeingundertakentohireaPolicyAdvisor, toworkcloselywiththeSFDPolicyUnitontheaboveactivities.
Sub‐component1.2:Reviewing thePresidentialDecreeN.40of1991establishing theSFDand the lawon SmallEnterprise(Law141/2004)toclarifySFD’smandate
StatusofImplementation:Thissub‐componenthasbeenputonholdasthepoliticalcontextfortheMSMEsectorisstillunclear(theMinistryofIndustryandTradehasbeengiventheMSMEportfoliothissummer,althoughmanybelievethatthisisonlytemporaryandthatanewMinistryofMSMEcouldbecreatedafterthenextparliamentaryelections).TheSFDthusbelievesthatitisprematuretotrytoamendthelawanddecreewhenthereisnomuchuncertaintyatthemacro‐level.
Sub‐component1.3:ImplementingrecommendationsforabetteroperationalenvironmentforMSMEs
StatusofImplementation:TheLegalandRegulatoryConsultantinchargeofthiscomponenthasstartedtheassignmentsinceOctober2014.TheConsultanthaspreparedanddeliveredadetailedcommentaryontheOneStopShops,togetherwithcertainpreliminaryrecommendations.TheConsultanthasalsopresentedamodelofhowthevariousOSSsinEgyptcouldoperateinaunifiedfashion.TheproposedmodeltakesintoaccountnationalandinternationalexperienceandidentifieshowtheproposedmodelwillbenefitMSMEs.Thisdocumenthasbeen thesubjectofcomments fromtheSFDandEBRD.ThecombinedcommentsofbothSFDandEBRDhavebeendiscussedinameetingheldinCairoon24thand25thMay2015.
Inaddition,anActionPlanhasbeendeveloped,thekeyobjectivesofwhichwereagreedfollowingastrategicmeetingwithSFDmanagementinCairoinJanuary2015.
Component2:Promotionofwomenentrepreneurship(EBRD‐executed)
Theimplementationofthetwoyearpilotprojecttopromotewomenentrepreneurshipiscurrentlywellunderway;theteamhasimplemented64projectsoutof60planedandsupported420womenintrainingorvisibilityevents.
PreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):1,625,000
Sub‐component2.1:Implementthreeyearpilotprojecttopromotewomenentrepreneurship
StatusofImplementation:Theprojectimplementationisontrackhavingexceededtheoriginaltarget.Implementationhasbeenespeciallysuccessfulindeliveringresultsintermsofnumberofwomensupportedviaadvisoryprojectsorengagedintrainings and networking events while at the same time engaging SFD staff in project delivery; transferring on‐the jobknowledgeandskillsinalllevelsofimplementationoftheprogramme.ThejointSFDandEBRDteamsuccessfullyassisted55womenentrepreneursoutofatargetof60carryingout64advisoryprojectswithlocalconsultants,outofwhich36havebeensuccessfullycompletedand3havebeenevaluated.85womenhavebeentrainedundertheprogrammeandtheteam
hassuccessfullyengagedwitharound330womenacrossthecountryinMarketDevelopmentActivitiespromotingaccesstoadvisoryservices.
BusinessAdvisoryServices(BAS)projects:Todatetheprogrammehassuccessfullystarted64BASprojectssupporting55womenentrepreneurs.TheprogrammehelpedwomenaccesstherequiredKnow‐Howtogrowtheirbusinessbyraisingtheirunderstandingofthepotentialbenefitsofadvisoryservices.Outofthe64projects,24werelocatedintheDeltaregionnamelyGharbiaGovernorateand4wereinUpperEgyptregion,namelyAssiutandSohag.MostofthebusinessadvisoryservicesimplementedwereinthefieldofmanagementimprovementthroughtheimplementationofEnterpriseResourcePlanningandManagementInformationSystems.Improvingmarketingperformancewasalsoapriorityanditwasprovidedthroughadviceondevelopingon‐linemarketingstrategies,creatingwebsitesand improvingmarketingskillsamongstemployees.Improving financialmanagementwas also requested by a number ofwomen entrepreneurs and local consultantswerecontractedtodevelopcomputerizedfinancialcontrolsystemsaswellasfinancialpoliciesandproceduresmanuals.Theteamhasmanagedtoidentifyandregister30newconsultantsfromCairo,Assiut,SohagandGharbiaengagingtheminBASprojects.Theteamisalsoworkingondevelopingthesupplyandqualityoftheconsultancymarket;2trainingcourseswillbedeliveredduringthethirdandfourthquartersof2015tohelpconsultantsimprovetheirskillsandreachnewMSMEclients.
Inaddition,throughitsNon‐FinancialServicesdepartment,SFDhasmanagedtofacilitatebusinessopportunitiesforwomenentrepreneursimprovingtheiraccesstomarkets:
o 16marketingopportunitiesthroughlocalexhibitionswereprovided.o 2marketingopportunitythroughinternationalexhibitionwasprovided.o 3opportunitiestoparticipateingovernmentalbiddingswerefacilitated.o 2servicesforbar‐codingofproductswereprovidedwith50%discount.o 5matchmakingopportunitieswasprovidedtolinkagewomenproductswithotherwomenclientsorNGOs
OngoingAdvisorySupport(Coaching): totheteamstartedtwoon‐goingcoachingprojectsoutof10.Ongoingbusinessadvisorysupport/coachingisanewSBSinstrumentdesignedforselectedbeneficiariesoftheWiBinitiative.Itisdevelopedtoaddresstheestablishedneedformedium‐termgeneralbusinesscoachingutilizinglocalconsultants,asafollowonorinadditiontostandardtask‐specificBASprojects.
Mentoringprogramme:theteamhasbuiltonexistingEBRDsynergieswiththeCherieBlairFoundation(CBF)tocreateapartnershipunder thisprogrammetoprovide internationalmentoring toaround10mentees;preferablywomen leadinglargerSMEs,whospeakEnglishandwhowouldbeneficiate fromexposure to internationalmarkets.CBFstartedpairingcouplesofmentees,where4womenentrepreneurshavebeenengagedwithCBFasafirstintaketoreceivetheirinternationalmentoring.OntheotherhandandinordertoprovidementoringopportunitiestowomenwhodonotmastertheEnglishlanguage, theprogram is currently preparing a localmentoring contractwithEndeavour Egypt. This is a leading localmentoringorganizationthathelpentrepreneursunleashtheirpotentialthroughlinkingthemwithehbestlocalmentoringnetwork.
Entrepreneurship training courses: in order to enhance the entrepreneurial skills and technical capacities ofwomenentrepreneurs,theprogrammehasdesignedanddeliveredthreecoursestrainingformorethan85womenasfollows:
‐ FashiondesignandPatternMakingTraining: the training’smainobjectivewas to improve the technical skillsofwomenentrepreneursworking in the fieldofreadymadegarmentsmanufacturingand trading.ThetrainingwasdeliveredinJune2014,for10womenentrepreneursinTanta.ThechoiceofTantacitywasbasedonthefactthatmostofthesmallsizedreadymadegarmentsindustriesareconcentratedinGharbiaGovernorateandspecificallyinTantaandMahalacities.Thetrainingwassuccessfulandtrainees’feedbackwasverypositive;manyofthemhaveaskedtotakeafollow‐uptraining:“AdvancedFashionandPatternMakingTraining”.Mostofthetraineesstatedthatthetrainingtheyhavereceivedwillpositivelyimpactthequalityoftheirproductionandwillincreasetheirexportcapabilities.
‐ Digital Strategy and Online Marketing Training: the training’s main objectives were to increase local women‐entrepreneursknowledgeof internetmarketing,e‐businesscommerce,e‐marketingtools(SEO,GoogleAdWords,Googleanalytics)andSocialmedia;toenhancetheonlinepresenceoflocalwomen‐owned/managedSMEsandfinallytoprovide localwomen‐owned/managedSMEswith theknow‐howtoattractnewclients, increasesales,buildabrand,increasemarketpresenceviaonlinetools.ThetrainingwassuccessfullydeliveredinSep2014to21womenentrepreneurs in Cairo. As a result, a number of trainees started applying the online tools acquired during thetraining and a considerable number requested advisory services in the field of on‐linemarketing andweb sitedevelopment.
‐ FundamentalsofFinancialManagement:thetraining’smainobjectivesweretoequipwomenentrepreneurswithbasicaccountingandfinancialmanagementskillstoenablethemtousefinancialinformationtomakebetterbusinessdecisions. Understanding financial information and its implications on business operations will allowmanagers/ownerstomakebetterdecisionsandstayaheadoftheircompetitors.Thetworoundsweresuccessfullydeliveredto54womenentrepreneurs,withthefirstinJanuary2015followedbythesecondinmarch2015inCairoand Tanta.Most of the trainees stated that the training they have receivedwillmake themmore familiarwithfinancialissuesandratios.
LinkingwithSFDpartnerfinancialinstitutions:ThroughtheFinancialDepartmentofSFDandincooperationwiththeEBRDteam,2roundtablediscussionsattendedby17womenentrepreneurswereheldatSFDHQpremisestodiscussthefinancialgapsandeligibilityofwomenclientstogetloansthroughSFD.ThemeetingswereattendedbySFDrepresentatives,partnerfinancialinstitutions’creditofficers,headofthecentraldepartmentoffinancialserviceforSMEs,aswellasEBRDrepresentatives.AsadirectresultoftheseactivitiesandofBASprojects;5womenclientshavemanagedtogetloansthroughSFDforacumulativeloanamountof5.5MillionEGP;4inCairoandoneinGharbia.
NetworkingandVisibilityEvents:Visibility,networkinganddisseminationactivitiesorMarketDevelopmentActivities(MDAs)areconsideredforbothEBRDandSFDasinteractiveplatformstoshowcasebestpracticesandsuccessfulstoriesofwomenentrepreneurs.TheseactivitiesarealignedwithSFD’seffortstocreateaheightenedpublicawarenessoftheroleofwomeninentrepreneurialactivityandthecontributiontheymaketotheeconomyandtosocietyingeneral,andpromotionofentrepreneurshipasaviableandfeasibleemploymentopportunityforwomen.21MarketDevelopmentActivitiesincluding“roundtablediscussions,networking&visibilityeventsandgroupmeetings”havebeenconductedtoincreasethevisibilityoftheprogrammeamongstthebusinesscommunity.TheseMDAswereattendedbyalmost330womenentrepreneursasfollow:
3MeetingsandworkshopswiththegraduatesoftheWELprogramme(womenleadershipprogramme)implementedbytheAmericanUniversityinCairoandGoldmanSachs,thisresultedinengaging(10)womenentrepreneursintheprogramme.
4RoundtabletablediscussionswithSFDstaffand17potentialwomenentrepreneursattheSFDpremises VisibilityeventatthePremisesofSFDinGizaregionalofficetoattract6womenentrepreneursandlocalconsultants. 2VisibilityeventsatthePremisesofSFDinDeltaregionaloffice–Kalubia‐toattract13womenentrepreneursand
localconsultants Visibility event/ presentation conducted at the premises of the National Council for Women in Tanta Gharbia
Governorateandwasattendedby20womenentrepreneursandlocalconsultants Visibilityevent/presentationconductedatthepremisesoftheNationalCouncilforWomeninAssuitGovernorate,
UpperEgyptandwasattendedby17womenentrepreneursandlocalconsultants 2Visibilityevents/presentationconductedatthepremisesoftheSocialFundforDevelopmentintheregionaloffice
ofSohaginUpperEgyptandwasattendedby23womenentrepreneurs 2RoundtablediscussionattheSocialFundforDevelopmentofficeinCairowith10potentialwomenentrepreneurs Roundtable discussion with local consultants and women entrepreneurs as well as SFD staff in Tanta Gharbia
GovernorateinUpperEgyptattendedby6womenentrepreneurs. Onthejobtrainingsessionfor10SFDstaffworkingontheprojectonpromotingtheprogrammeandattractingnew
clients–thetrainingwasconductedbySBSstaff. Anetworkingeventattendedby80womenentrepreneurswhichwascoveredbyregionalandnationalmedia.The
networkingeventwasconductedincollaborationwiththeBusinessWomenAssociation21aswellaswiththeUNIDOprogrammeforSMEsandtheSFD.
Anetworkingandvisibilityevent:“InnovationFundamentals”wasorganizedinDecember2014incollaborationwithSFD.TheeventwasattendedbyMs.SohaSolimanSFDManagingDirectorwellasby90womenentrepreneursandstakeholders.Duringtheeventashortpresentationabouttheimportanceofinnovationinbusinesswasconductedbyaprominentspeakerinthefieldofinnovationanditwaswellperceivedbytheattendees.
Visibilityeventwasconducted incooperationwithDeltaTechnopreneursAssociation(DTA).DTAisanon‐profitorganizationthatworksasahubforITbusinessconsultantscommittedtodevelopacultureofEntrepreneurshipandInnovationandsupportthedevelopmentofanITIndustryintheregionoftheNileDeltaofEgypt.DTAaimstopromoteandincreasethesupplysideofconsultancyservicesencouragingtheestablishmentofICTconsultancyfirmsinDeltagovernorates.TheeventwashostedbyDTAandattendedby30ICTconsultants.
WithintheframeworkofaNational3days’Workshopfor“SuccessfulBusinessWomen”implementedundertheauspicesofMinistryofTourismandTheArabLeagueinthreemainlocations“Cairo,LuxorandAswan”respectively.EBRDWiBEgyptorganizedonedayoutofthisthreedays’workshopwhichtookplaceinLuxorcityinUpperEgypton 08th of Feb 2015. The other two days of the workshopwere organized and financed through the Egyptian
AssociationofBusinessWomen “BWEgypt21” aswell as other Internationaldonors suchas the ILOand theUNWomen .Themainobjectiveof theworkshop is topromoteaccess toknow‐how,advisory services, financeandmarketforWomeninBusiness;specificobjectivesincluderaisingawarenessamongstwomenabouttheimportanceofadvisoryservices,aswellasincreasingWiBvisibility.MorefocuswasgiventotheachievementsoftheEBRDWiBpilotprogrammecurrentlybeingimplementedinpartnershipwithSFD.
An important visibility eventwas organized on 26 Feb 2015 under the title of “SupportingWomen in BusinessForum” to highlight the program achievement, lesson learned and best practiceswithmore focus on successfulstories.TheeventwasattendedbyMs.CharlotteRuheDirector,SmallBusinessSupport,EBRD,Ms.SohaSolimantheheadofSFD.inadditiontorepresentativesofinternationalorganizationsanddonorsaswellasgovernmentalbodiesandSMEsinEgypt.
Inaddition,theteamengagescloselywithlocalstakeholdersandinternationaldonors’community,includingbutnotlimitedtoactivebusinesswomenassociations,theNationalCouncilforWomen,theUNWomenprogrammeandtheILO. TheseeffortsaregearedtowardsseekingcomplementarilyandsynergywithotherexistingdonorfundedprogrammestoavoidduplicationandmaximizeimpactonSMEs.
BuildingtheSFDCapacity:Theobjectiveofthisactivity istobuildthecapacityoftheSFDinamannerthatenablestheinstitutiontosustaintheimplementationoftheadvisoryservicesactivitiesinthefutureandtomaximizethebenefitsgainedfrom the transfer of the EBRD Small Business Support team (SBS) knowledge. The activity is currently on‐going andembeddedinalloftheactivitiesthroughsuccessfuljointimplementationofprojectsscreening,diagnostics,monitoringbutalsointhedesignandimplementationofthetrainingsandnetworkingevents.EBRDisalsoworkingwithSFDondevelopingSFDadvisoryservicesspecificguidelinesandprocedureswiththeobjectiveofdesigninganOperationalManualbeforetheendofthepilotprogramme.Inaddition,basedontheresultsoftheSFDskillsneedsassessmentcarriedoutin2014.EBRDisplanningto implementspecifictrainingsforSFDstaff intheareaofbusinessdiagnostic includingassessmentofbusinessneedsfocusingoncommunicationskills.TheTORofthisspecifictrainingwasdraftedandtheconsultantwasselected.ThetrainingisplannedtostartatQ3of2015forthe31SFDnon‐financialofficers
Sub‐component2.2:Extensionofthepilotanditsfurtherimplementationoveranadditionaltwoyearperiod
StatusofImplementation:Implementationwillstartuponasuccessfulcompletionofthepilotprogramme.
Component3:StrengtheningSFD’sdataanalysistoenhancetargetingandmonitoringmechanisms(SFDexecuted)
ThiscomponentaimstoleveragetheexpertiseofEBRD’sOfficeoftheChiefEconomisttoassisttheSFDinstrengtheningdatacollectionandanalysistofurtherenhanceitsabilitytotargetandmonitoritsloans,BDSdeliveryandtheirimpactontheidentifiedvulnerabletargetgroups(inparticular:womenandyouth).ThiswillalsoguidetherecommendationsforenhancingSFD’soperating environment in theMSMEsectorbyproviding thenecessary evidenceneeded forpolicy formulation. Inaddition, the collection and provision of better‐segmented data will serve to enhance the promotion of womenentrepreneurship(seeComponent2)byimprovingmonitoringofthepilotandguidingitsextension.
Sincetheinceptionoftheproject,thenatureandsubstanceofcomponent3havechangedinsubstantialways.EBRDandSFDhavejointlyrecognizedtheneedtorefocusthescopeofthecomponentandrestructureitinawaythattakesintoaccountsimilarworkalreadycommissionedby theSFD;namely theworkcarriedoutby theUSAID‐fundedconsultantandotherdonor‐fundedstudies.
In this regard, the SFD and EBRD agreed on a new structure and terms of reference for Component 3 to make itcomplementarytoexisting/ongoingwork,whilstmaintainingthebudgetatUSD200,000.AconsultantwashiredinMayandworkonexecutingtheassignmentcommencedinJune.
PreviousRating:ModeratelySatisfactory
CurrentRating:ModeratelySatisfactory
Cost(US$):200,000
Sub‐component3.1:Enhancingtargetingandmonitoringmechanisms
Status of Implementation: The consultant has been hired and is now in the envisioning and planning phase of thissubcomponent,whichinvolvesdevelopingSFD’sinformationsystemsforthemanagementofresults‐basedmonitoringdataanddevelopinganautomatedenterprisemanagementsystem.Theconsultantwillberequiredtodesignandimplementapilotdatawarehouseandbusinessintelligencetoolstohelpgenerate,integrate,trackandextractdata.
Sub‐component3.2:StrengtheningSFD’sdataanalysis
Status of Implementation: The consultant has been hired and is now in the envisioning and planning phase of thissubcomponent.
Theautomatedmanagementsystemwill includeadatabaseofoutcomeandimpact indicatorstobetrackedandusedformonitoringprogramresults.TheconsultantwillassistinbuildingsuchadatabaseandlinkingvariablesalreadypresentinSFDdatabasetoexpandvariablescopeandmaximizeanalysiscapacity.
Anassessmentoftheresearchdepartment’spersonnelintheSFDwillbeconducted,withareviewofthecurrentanalysisundertaken,suggestingactionstostrengthenevidence‐basedanalysistechniques.Inaddition,arosterforbusinessserviceproviderswillbedeveloped,helpingtheSFDmovefrombeingaservicedeliveryvehicleforBDSintoafacilitatorrole.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities
Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)Total(US$)
ApprovedAmountforDirectProjectActivities(a):
1,119,000 1,625,000 2,744,000
AmountReceivedfromTrustee(b):
1,119,000 812,500 1,931,500
ActualAmountDisbursed(c): 72,585 387,034 459,619
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)
Year Jan‐June Jul‐Dec TotalbyYearEnd2013 0 0 02014 64,042 171,732 235,7742015 223,845 400,000 623,8452016 475,000 475,000 950,0002017 400,000 400,000 800,0002018 139,252 134,3812019
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)
126,782 65,298 192,080
G. ResultsFrameworkandMonitoring
Project Development Objective (PDO): Strengthen the capacity of the SFD to support the MSME sector in Egypt with a particular focus on promoting women entrepreneurship
PDO Level Results Indicators* Unit of
Measure Baseline
Cumulative Target Values**
Frequency Data Source/
Methodology
Responsibility
for Data
Collection
Description
(indicator
definition etc.) Apr
2013 –
Mar
2014
A
Apr
2014 –
Mar
2015
A
Apr
2015 –
Mar
2016
F
Apr
2016 –
Mar
2017
F
Apr
2017 –
Apr
2018
F
Indicator One:
Strengthened SFD advocacy and
policy formulation capacity to
support the MSME sector as seen
by
‐ Revision of the Presidential
Decree N. 40 of 1991 and
amendments to the Law
141
‐ Action Plan on the
operational environment
for MSME endorsed by all
stakeholders (including
public administrations
concerned)
‐ Recommendations of
the Action Plan on the
operational
environment for MSME
Binary
Binary
Binary
0
0
0
0
0
0
0
0
0
1
1
25%
Once
Once
Once
Official
Journal or
other official
governmental
/presidential
decree source
SFD Policy
Unit Reports
And
Consultant
Reports
SFD Policy
Unit Reports
SFD
SFD
SFD
Reports should
describe the
consultation
process and
outcomes
Reports should
list and describe
the
implemented
measures in
detail
are implemented for at
least 25%.
And
Consultant
Reports
Indicator Two:12
Impactful business advisory services for MSMEs delivered by the SFD as seen by: Improved performance of 60 assisted women owned/managed enterprises as seen by:
% of assisted enterprises to increase turnover/productivity after completion of the project
% of assisted enterprises to increase employment after completion of the project
% of assisted enterprises to access finance after completion of the project
% of assisted enterprises to engage external advisory services independently after completion of the project
%
0
0
0
0
NA
NA
NA
NA
50
40
10
24
Ongoing
Ongoing
Ongoing
Ongoing
SFD/EBRD
SFD/EBRD
SFD/EBRD
SFD/EBRD
EBRD
EBRD
EBRD
EBRD
INTERMEDIATE RESULTS
Intermediate Result (Component One): Legal and Regulatory Reform to Strengthen SFD Advocacy and Policy Formulation Capacity to support the MSME sector
Intermediate Result indicator
‐ Proposed amendments to
the Presidential Decree
‐ Proposed amendments to
the Law 141
‐ Presentation of a Strategy
for enhancing the legal and
Binary
Binary
0
0
0
0
0
0
1
1
Once
Once
SFD
SFD
SFD
SFD
12 Impact on MSME performance such as increase in number of employees, turnover, access to finance and engagement with external advisory services are measured one year after the completion of the project at evaluation stage, so far no projects have been evaluated.
regulatory environment for
MSMEs to main
stakeholders.
‐ Draft Action Plan on the
operational environment
for MSME
‐ A Policy Unit established
within the SFD comprising
at a minimum two full‐time
staff.
Binary
Binary
Binary
0
0
0
0
0
0
1
1
1
0
0
0
Once
Once
Once
SFD
SFD
SFD
SFD
SFD
SFD
Intermediate Result (Component Two):Strengthened women entrepreneurial activity and strengthened capacity of the SFD to support and promote women entrepreneurship
Intermediate Result indicator One: Women entrepreneurs
assisted with targeted advisory
services, ongoing business
advisory support and mentoring
Number
0
24
64
80i
Ongoing
SFD/EBRD
EBRD
Intermediate Result indicator Two: Women trained in advanced
entrepreneurial skills
0 10 85 150 Ongoing SFD/EBRD EBRD
Intermediate Result indicator Three: Local business advisers trained to support women
entrepreneurs
0 15 Ongoing SFD/EBRD EBRD
Intermediate Result indicator Four: SFD personnel trained on the job to facilitate the provision
of business advisory services to
women entrepreneurs
0 10 10 Ongoing SFD/EBRD EBRD
Intermediate Result indicator Five: Creation of a manual for SFD
personnel documenting the pilot
project
No In process
Yes
Intermediate Result (Component Three):Enhanced targeting and monitoring mechanisms of the SFD for Service Delivery
Intermediate Result indicator One: Linkage and integration of better data analysis and
Qualitative
No
Yes
Annual
Project reports, SFD
EBRD
reporting in the overall SFD service delivery strategy
departments’ reports, and annual plans
Intermediate Result indicator Two: Data system analysis institutionalized in the SFD
Number and qualitative research
No, and 0 staff trained
Yes, and 2 staff trained
SFD/EBRD
EBRD
LogismedSoftRegionalProject:EgyptActivities
A. BasicProjectInformation
ActivityName:LOGISMEDsoftproject–Regionalproject– ActivitiesinEgypt
CountryName:Egypt NameofImplementationSupportAgency(ies):EuropeanInvestmentBank
NameofISAProjectLeader:PasqualeStaffini EmailofISAProjectLeader:[email protected]
RecipientEntity:MinistryofTransport/GeneralAuthorityforLandandDryPorts
NameandEmailofRecipientEntityContact:
Dr.MohamedAliIbrahimmohamed55o@hotmail.comTotalAmountApprovedbytheTransitionFund(US$):1,565,403.00
AdditionalFundsLeveragedandSource(s),ifany(US$):
EUR3mfromtheEuropeanCommissionfor5countriesincludingEgypt(AgreementfinalizedbetweenECandEIBinNovember2013)
TotalAmountDisbursed(DirectandIndirectinUS$):
191,975
SteeringCommitteeApprovalDate:
2/20/2013
ProjectImplementationStartDate:
7/31/2013
ProjectClosingDate:
12/11/2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
CompetitivenessandIntegration:Logistics
SecondaryPillar(s): InvestinginSustainablegrowthInclusiveDevelopmentandJobCreationEnhancingeconomicgovernance
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:TheobjectiveofLOGISMEDistosupporttheenhancementoflogisticplatformcapacitiesinEgypt,MoroccoandTunisiaaswellasthecreationofacollaborativenetworkbetweentheselogisticplatformsinordertoimprovecountrycapacitiesandtoattractforeigninvestments,affectingdirectlycountryandcitizensdevelopment.
Ratingforprogresstowardsachievementofobjective:
ModeratelyUnsatisfactory
Ratingforoverallimplementationprogress: ModeratelyUnsatisfactory
BriefSummaryofProjectImplementationStatus:Logismedhastwocomponents:(i)LogismedHardand(ii)LogismedSoft.TheoverallobjectiveofLogismedHardistopromotethroughtechnicalassistancesuchasfeasibilitystudiestheestablishmentoflogisticsplatformsinthe Mediterranean region. For Logismed Soft, the general objectives are: (i) to facilitate thecoordination/cooperationbetweenthedifferentplayersinthelogisticssectoroftheMediterraneanregion,(ii)toenhance training within the various professional disciplines in the logistics sector and (iii) to establishobservatoriestoconductsectorperformanceanalysesandproducecorrespondingindicators.In2013,LogismedSoftwaslabelledandlaunchedbytheSecretariatoftheUnionfortheMediterranean(UfM).
InordertoimplementLogismedSoft,fundshavebeensecuredfromtheMENATransitionFundandtheEuropeanCommission.
InJune2014,EIBsignedaservicecontractwiththeCETMO(Centred'ÉtudesdesTransportspourlaMéditerranéeOccidentale)forthedaytodaymanagementandimplementationoflargepartsoftheseactivities.CETMO’steamforLogismedSoftwillbeledbyMr.SakiAcimanBeharasprojectdirector(chefdelamission)andMr.AlbertoPalaciosCobetaastechnicalteamleader(responsabletechnique).
Asaresult,adraftCooperationAgreement(CA)wassharedbyEIBwiththeEuromedNationalCoordinatorson2June2014.TheCAregulatesthecooperationbetweentheBankandaPromoterfortheimplementationofatechnicalassistance(TA)project.PromotersneedtosignaCAwiththeBankbeforeconcreteTAactioncanstartintheirrespectivecountry.Fortheinceptionphaseoftheproject,CETMOhadpreparedanimplementationplan,whichwasattached to the lastprogress report.Thisplan includesanumberof criticalpath items,whichareessential to address rapidly in order to remainwithin the overall timeframe of the project. This includes forexampletheupdatingofthetrainingneedsassessmentandthepreparationofdetailedtermsofreferenceforthetrainingactivitiestobecarriedoutbyspecializedconsultantsthatstillneedtobeprocured.AdvancingonkeycriticaltasksrequireCAsignature;countryvisitsareonhold,includingtheestablishmentofcontactswithkeyplayers in thecountryand thepreparationofdetailed termsof reference for the trainingactivities.TheBankreceivedon28 Juneconfirmation that theEgyptianMinistryof InternationalCooperation is ready tosign theCooperationAgreementforthisproject.
C. ImplementationStatusofComponents
Component1:LOGISMEDCoordinationPreviousRating:ModeratelyUnsatisfactory
CurrentRating:Unsatisfactory Cost(US$):314,387
Sub‐component1.1:PromotionofLOGISMEDprojectStatusofImplementation:TermsofReferenceforthiscomponentpreparedandcontractsignedwithCETMO.Thissub‐componentwasforeseentobelaunchedinJuly2014,butthesignatureoftheCAisneededtostartimplementingit.Firstactivitytobecarriedout,onceCAsigned,isavisittoEgypt,inordertomeetrelevantauthoritieschargedoflogisticsdevelopmentandtolookintotheprogressoflogisticsdevelopmentstrategy.Sub‐component1.2:DefinitionofLOGISMEDplatformnetworkStatusofImplementation:TermsofReferenceforthiscomponentpreparedandcontractsignedwithCETMO.Thissub‐componentwasforeseentobelaunchedinJuly2014,butthesignatureoftheCAisneededtostartimplementingit.Atthismomentaproposaloftheexpectedcontentofthereportthatshoulddefinethecharacteristicsandservicesoftheplatformsofthenetworkandalsotheconfigurationofthenetworkhasbeenelaborated.ForeseenfinalizationdataofthisreportisNovember2015.ImmediateactivitiesforComponent1include:
ListofLogisticsplatformscandidatestobeincorporatedintoLogismednetworkandthereforereceivetraining.Untiltheendof2014,EIBhadbeenincontactwiththeEgyptianauthoritiesinordertoprepareTechnicalAssistanceforthedevelopmentofthelogisticsplatformat6thofOctober,whichalsohadbeenanacceptedpriorityprojectofEuromed‐Transportproject,hadreceivedasizeablegrantallocationundertheMENATFTranstracproject,andwouldhavebeenaninterestingcandidateforinclusionintheLogismednetwork.Towardstheendof2014,however,theEgyptianauthoritiesinformedtheEIBthattheywillbeaimingatarapidprivatisationofthe6thofOctoberlogisticszoneprojectanddonolongerrequireTechnicalAssistancefromEIBinthatregard.InsteadtheyrequestedthatEIBwillfocustheirTechnicalAssistanceonthe10thofRamadanlogisticszoneproject.EIBiscurrentlyexploringthisoption.
Identificationofneedsofeachofthelogisticsplatformsselected.Component2:LOGISMEDTrainingActivitiesPreviousRating:ModeratelyUnsatisfactory
CurrentRating:ModeratelyUnsatisfactory
Cost(US$):491,660
Sub‐component2.1:LOGISMEDCountryTrainingActivitiesStatusofImplementation:TermsofreferenceforthemonitoringofthiscomponentpreparedandcontractsignedwithCETMO.CETMOwillbeinchargeofthepreparationofthetermsofreferenceandwillparticipateintheselectionoftheTraininginlogisticsconsultantgroupincooperationwithEIBthatwillbeinchargeoftheimplementationofthiscomponent.TheToRforthetrainingconsultanttobefinancedoutoftheECgranthavenowbeenpreparedandagreedwiththefivecountriesconcerned,andthetenderingisabouttostart.Theintentionistohavecontractedthetrainingconsultantbyend2015.TheideaistousetheDeauvillefundsforasecondwaveoftraining,oncethefirstwavehassufficientlyadvancedandlessonslearnedfromthatareavailable.
Sub‐component2.2:LOGISMEDPlatformTrainingActivitiesStatusofImplementation:TermsofreferenceforthemonitoringofthiscomponentpreparedandcontractsignedwithCETMO.Thisactivitywillbepartoftheworkofthetrainingconsultanttobehiredasdescribedundersub‐component2.1.Futureimplementationofthissub‐componentisrelatedtotheselectionofthelogisticsplatformcandidatetoreceivetraining(Subcomponent1.2).Component3:LOGISMEDObservatoryPreviousRating:ModeratelyUnsatisfactory
CurrentRating:ModeratelyUnsatisfactory
Cost(US$):617,047
Sub‐component3.1:ActionPlanforLOGISMEDObservatoryStatusofImplementation:TermsofReferenceforthiscomponentpreparedandcontractsignedwithCETMO.Thissub‐componentwasforeseentobelaunchedinJuly2014,butthesignatureoftheCAisneededtostartimplementingit.Nevertheless,duetothedelayintheCAsignature,adraftoftheActionPlanhasbeenpreparedinaregionalapproach.AdaptationstothisdraftinordertoincludeEgyptspecificneedswillbeincorporatedafterCAsignatureandspecificworkwithcountry’sauthoritiescouldbelaunched.Sub‐component3.2:ObserveandanalyzeregionaldevelopmentsStatusofImplementation:TermsofReferenceforthis componentpreparedandcontractsignedwithCETMO.Thissub‐componentwasforeseentobelaunchedinJuly2014,butthesignatureoftheCAisneededtostartimplementingit.However,afirstproposalofthematicareasandindicatorsoftheregionalObservatoryhasbeendesigned.Thisproposalwillbeadaptedinordertoincludecountryrequestsandtoharmonizewithstatisticsdataexistingorabletobeproducedinthecountry.ThesignatureoftheCAisneededtocarryonthiswork.Sub‐component3.3:PromotingtheemergenceofnationalobservatoriesoflogisticsandtransportsStatusofImplementation:TermsofReferenceforthiscomponentpreparedandcontractsignedwithCETMO.Thissub‐componentwasforeseentobelaunchedinJuly2014,butthesignatureoftheCAisneededtostartimplementingit.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution
(US$)(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
0 1,423,094 1,423,094
AmountReceivedfromTrustee(b):
0 1,423,094 1,423,094
ActualAmountDisbursed(c): 0 49,666 49,666
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2013 2014 26,000 26,0002015 32,500 230,357 262,8572016 232,237 218,547 450,7842017 243,860 241,590 485,4502018 198,003 198,0032019 1,423,094
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)142,309 0 142,309
G. ResultsFrameworkandMonitoring
ProjectDevelopmentObjective(PDO):
Tosupporttheenhancementofplatformcapacitiesaswellasthecreationofacollaborativenetworkbetweentheseplatforms.
PDOLevelResultsIndicators*UnitofMeasure
Baseline
CumulativeTargetValues**
Frequency
DataSource/
Methodology
ResponsibilityforDataCollection
Description(indicator
definitionetc.)Jul2013‐Jun2014
A
Jul2014–Jun2015
A
Jul2015‐Jun2016
F
Jul2016‐Jun2017
F
Jul2017‐Dec2018
F
IndicatorOne:
LogisticsPerformanceIndex(LPI)
unit 2.98 n/a 2.97 ‐ 3.4 ‐Each2years
WBLPIreport
EIB
LogisticsPerformanceIndex(LPI)measuresthelogistics
"friendliness"of155
countries
IndicatorTwo:
Labourforceemployedbythetransportandlogisticssector
%4.7
(2010)
7.1(2013)
n/a2014datanotyetavailable
5.05 5.30 5.55Onceperyear
Nationalstatisticinstitutes
EIB
PercentageoftheNumberofemployeesworkingonthetransportandlogisticssector.
IndicatorThree:
Tonesandvalueoftheintra‐Mediterraneanexternaltrade
Millionstones
10.5(2008data)
12.5(2013)
n/a2014datanotyetavailable
11.8 12.4 13.6Onceperyear
COMTRADE(UnitedNations)
EIB
VolumeandvalueoftheexportsandimportsamongtheMENA
countries.
INTERMEDIATE RESULTS
Intermediate Result:
ComponentI:LOGISMEDcoordination
SCI.1:PromotionoftheLOGISMEDproject
SCI.2:DefinitionoftheLOGISMEDplatformnetwork
PDO Level Results Indicators* Unit of
Measure Baseline
Cumulative Target Values**
Frequency
Data Source/
Methodology
Responsibility
for Data
Collection
Description
(indicator
definition etc.) Jul2013‐Jun2014
Jul2014–Jun2015
Jul2015‐Jun2016
Jul2016‐Jun2017
Jul2017‐Dec2018
Intermediate Result indicator One: Number of platforms that
study the opportunity to be
part of the LOGISMED
network # platforms 0 0 0 2 2 4 Once per
year
Forms asking
for information
about
procedures
Consortium leader
The promotion of
the LOGISMED
project try to
disseminate the
need to upgrade
logistics and
transport sector
and also to
implement
logistics platforms
under the
LOGISMED
standards
Intermediate Result indicator Two: Number of platform
infrastructures promoted by
the national authorities
# platforms 0 0 0 3 4 5 Once per
year
Country
planification /
Projects
launched
Ministry of
transport and
equipment
National
structures are
involved in the
promotion of the
Logistic platform
offer
IntermediateResult:
ComponentII:LOGISMEDTrainingActivities
SCII.1:LOGISMEDcountryTrainingActivities
SCII.2:LOGISMEDplatformTrainingActivities
PDO Level Results Indicators* Unit of Measure
Baseline
Cumulative Target Values**
Frequency Data Source/
Methodology
Responsibility for Data Collection
Description (indicator
definition etc.) Jul2013‐Jun2014
Jul2014–Jun2015
Jul2015‐Jun2016
Jul2016‐Jun2017
Jul2017‐Dec2018
Intermediate Result indicator One: Number of national logistics associations in place
# assoc. 0 0 0 1 1 1 Once per year
Ministry of
transport and equipment
Continuity and sustainability of the project and of
the logistic promotion comes from a powerful sector asking for their needs. This indicator measure the number of
national associations working
Intermediate Result indicator Two: Number of people participating in training (general public) # persons 0 0 0 100 120 120
Once per year
Participants in the training sessions
Consortium leader
This indicator measure the capacity of the project to generate sufficient capacity in countries to provide independently a consolidated training offer.
Intermediate Result indicator Three: Number of platform workers trained # workers 0 0 0 150 200 250
Once per year
Participants in the training sessions
Consortium leader
This indicator measure the capacity of the project to
generate the human resources to operate the platforms
IntermediateResult(ComponentThree):
ComponentIII:LOGISMEDObservatory
SCIII.1:ActionPlanfortheLOGISMEDObservatory
SCIII.2:Observeandanalyzetheregiondevelopmentsinlogistic&transport
SCIII.3:Promotiontheemergenceofnationalobservatoriesoflogistics&transports
PDO Level Results Indicators* Unit of Measure
Baseline
Cumulative Target Values**
Frequency Data Source/
Methodology
Responsibility for Data Collection
Description (indicator
definition etc.) Jul2013‐Jun2014
Jul2014–Jun2015
Jul2015‐Jun2016
Jul2016‐Jun2017
Jul2017‐Dec2018
Intermediate Result indicator One: Number of quality indicators in the database
# records 0 0 0 8 12 20 Once per year
LOGISMED database
Consortium leader
Number of quality indicators in the
database describing the evolution of the transport and logistics sector
Intermediate Result indicator Two: Number of national observatories in place or in progress to be set up # observ. 0 0 0 1 2 2
Once per year
Ministry of transport
Consortium leader
The continuity of the project
depends on the country capacity to generate the statistics and indicators to
analyse themselves their transport and logistics system.
PromotingFinancialInclusionviaMobileFinancialServices:EgyptActivities
A. BasicProjectInformationActivityName:PromotingfinancialinclusionviamobilefinancialservicesintheSouthernandEasternMediterraneancountries–activitiesinEgypt
CountryName:Egypt
NameofImplementationSupportAgency(ies):EuropeanInvestmentBank
NameofISAProjectLeader:TimothyWinters EmailofISAProjectLeader: [email protected]
RecipientEntity:CentralBankofEgypt NameandEmailofRecipientEntityContact:
AhmedFaragallah,[email protected]
TotalAmountApprovedbytheTransitionFund(US$):USD891,000
AdditionalFundsLeveragedandSource(s),ifany(US$):USD80,000–co‐financingsupportinkindexpectedfromCentralBankofEgypt
TotalAmountDisbursed(DirectandIndirectinUS$):USD56,000
SteeringCommitteeApprovalDate:
12/5/2013
ProjectImplementationStartDate:
12/1/2015
ProjectClosingDate:
01/31/2017
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
EnhancingEconomicGovernance
SecondaryPillar(s): InvestinginSustainableGrowthInclusiveDevelopmentandJobCreationCompetitivenessandIntegration
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:ThisprojectobjectiveistopromoteaccesstofinancethroughthedevelopmentofacountrywidestrategytodevelopmobilefinancialservicesandretailpaymentinfrastructureinEgypt.
Ratingforprogresstowardsachievementofobjective: NotApplicable
Ratingforoverallimplementationprogress: NotApplicable
BriefSummaryofProjectImplementationStatus:TheBankreceivedon28JuneconfirmationthattheEgyptianMinistryofInternationalCooperationisreadytosigntheCooperationAgreementforthisproject.OriginalswillbedispatchedtoEgyptforsignatureassoonasEIBManagementCommitteeapprovalisreceived,expectedw/b20July.Theprocurementprocesswaslaunchedon9May.Enddatewasrevisedto01/31/2017inlinewiththedelayedstartdate,whichisaresultofthefactthatmoretimethanexpectedhasbeenrequiredtopreparetermsofreferenceandengagetheprocurementprocedurefortheproject.AlthoughEgyptisnotformallypartoftheapplicationforUnionfortheMediterraneanlabellingoftheEIB’sregionalmobilefinancialservicesproject,theCentralBankofEgyptisexpectedtoattendthesecondUfMworkshoponmobilefinancialservices,scheduledtotakeplaceinearlySeptember.
C. ImplementationStatusofComponentsComponent1:DevelopinganactionplanwithimplementableactionsfortheCBEtodevelopRetailPaymentsinEgyptforthecoming5years.
PreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):USD200,000StatusofImplementation:Aspreviouslyreported:Theworkforthiscomponentwillbecarriedoutasproposed,butwithadelayasoutlinedabove.ThetenderingforComponents1,2,3and4willbedoneasonesingleprocedure,basedontheunifiedtermsofreferencedocumentreferredtointhesummaryabove.Theexpectationisthattheselectedconsultantwillproposeateamwhichwillworkonthe4componentssimultaneously,meaningthatworkonall4maincomponentswillbeginassoonascontractingwiththeselectedconsultantiscomplete. Component2:Developingadatacollectionandanalysismethodologytobetterunderstandthemarkettrendsandpropertiesandenableadequatemonitoringofthesystem.PreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):USD150,000StatusofImplementation:Aspreviouslyreported:Theworkforthiscomponentwillbecarriedoutasproposed,butwithadelayasoutlinedabove.ThetenderingforComponents1,2,3and4willbedoneasonesingleprocedure,basedontheunifiedtermsofreferencedocumentreferredtointhesummary,above.Theexpectationisthattheselectedconsultantwillproposeateamwhichwillworkonthe4componentssimultaneously,meaningthatworkonall4maincomponentswillbeginassoonascontractingwiththeselectedconsultantiscomplete.Component3:DevelopinganactionplanforimprovingefficiencyofbankremittancesinflowstoEgypt.PreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):USD150,000StatusofImplementation:Aspreviouslyreported:Theworkforthiscomponentwillbecarriedoutasproposed,butwithadelayasoutlinedabove.ThetenderingforComponents1,2,3and4willbedoneasonesingleprocedure,basedontheunifiedtermsofreferencedocumentreferredtointhesummary,above.Theexpectationisthattheselectedconsultantwillproposeateamwhichwillworkonthe4componentssimultaneously,meaningthatworkonall4maincomponentswillbeginassoonascontractingwiththeselectedconsultantiscomplete.Component4:Developinganactionplantargetingfinancialinclusion,definingandprioritizingrequiredactionstopromotetheinclusionofthepoorandthiswithoutaccesstobankingservicesinthefinancialsystem.PreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):USD200,000StatusofImplementation:Aspreviouslyreported:Theworkforthiscomponentwillbecarriedoutasproposed,butwithadelayasoutlinedabove.ThetenderingforComponents1,2,3and4willbedoneasonesingleprocedure,basedontheunifiedtermsofreferencedocumentreferredtointhesummary,above.Theexpectationisthattheselectedconsultantwillproposeateamwhichwillworkonthe4componentssimultaneously,meaningthatworkonall4maincomponentswillbeginassoonascontractingwiththeselectedconsultantiscomplete.Component5:Knowledgesharingworkshop.PreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):USD35,000StatusofImplementation:Aspreviouslyreported:TheBankhasproposedtotheEgyptianauthoritiesthatthiscomponentbeincludedinthemainconsultancycontractunderprocurementbytheEIB,inordertostreamlineimplementation.Aspreviouslyindicated,thiscomponentwilltakeplaceonlyaftertheworkforComponents1‐4&6hasbeencarriedout.ItisexpectedthattheUnionfortheMediterraneanwillplayaroleinensuringthattheeventsconsistinanintegralpartofthecapacitybuildingfunctionoftheproject.Component6:SettinguptheimplementationoftheactionplanswithintheCBE.PreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):USD100,000StatusofImplementation:Aspreviouslyreported:Theworkforthiscomponentwillbecarriedoutasproposed,butwithadelayasoutlinedabove.Component7:ProjectManagement,Coordination,MonitoringandEvaluation.PreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):USD80,000
(estimationofthein‐kindcontributionofCBEstafftimeduringtheproject)
StatusofImplementation:Aspreviouslyreported:Thisactivity– whichiscountry‐executedbytheCentralBankofEgypt–intermsofcoordinatingtheprojectinternallywillbeginoncethecoreconsultancycontracthasbeenawarded.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities(US$) Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
0 835,000 835,000
AmountReceivedfromTrustee(b):
0 0 0
ActualAmountDisbursed(c): 0 0 0
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2013 0 0 02014 0 0 02015 0 360,000 360,0002016 0 475,000 475,0002017 n/a n/a n/a2018 n/a n/a n/a2019 n/a n/a n/a
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)56,000 0 56,000
G. ResultsFrameworkandMonitoring
NB:thisistheresultsframeworkassubmittedwiththeprojectproposal.Noupdateshavebeenmade,astheprojectimplementationhasnotyetcommenced.
PDO Level Results Indicators* Unit of
Measure Baseline
Cumulative Target Values**
Frequency Data Source/
Methodology
Responsibility
for Data
Collection
Description
(indicator
definition etc.) Jan
2015
– Dec
2015
F
Jan
2016
– Mar
2016
F
YR3
F
YR 4
F
YR5
F
Indicator One: Increase in access
metrics (number of active
accounts per
Number To be
determined
at project
start
+ 5% +10% +15
%
20% 25% Annual Reporting to
CBE
CBE Increase in
number of
active accounts
Indicator Two: Per capita
cashless transactions
Number To be
determined
at project
start
+ 5% +10% +15
%
20% 25% Annual Reporting to
CBE
CBE Per adult (>15)
number of
cashless
transactions
both inter‐
institution and
intra‐institution
Indicator Three: Infrastructure
metrics
Number To be
determined
at project
start
+ 3% +6% +9% 12% 15% Annual Reporting to
CBE
CBE Agents, ATMs
and POS
terminals per
1000
inhabitants
Indicator Four: Reduction in Cost
of Cash deposit and withdrawal,
considering inflation.
Number To be
determined
at project
start
+ 0% 0% 5% 10% 15% Annual Reporting to
CBE
CBE The fees for
deposit and
withdrawal
Indicator Five: Percentage of
payment instructions received
through electronic means
% To be
determined
at project
start
0% 0% 0.5
%
1% 1.5% Annual Reporting to
CBE
CBE Number of
payment
instructions
received
through
electronic
means respect
divided by the
total number of
payment
instructions
Indicator Six: Percentage of
government payment
transactions made through
electronic payment mechanisms
% To be
determined
at project
start
+ 10% +20% +30
%
40% 50% Annual Reporting to
CBE
CBE Number of
government
payment
transactions
made both as a
payee and a
payer using
electronic
payment
mechanisms
divided by the
total number of
government
payments
Indicator Seven: Reduction in
cost for a domestic remittance
between parties with accounts in
different institutions
% To be
determined
at project
start
0% 0% 2% 4% 6% Annual Reporting to
CBE
CBE The total cost
(for the sender
and for the
receiver) of
making a
domestic
remittance
between parties
maintaining
accounts in two
different
institutions
using the
available
payment
mechanisms
and channels
Divided by the
amount sent
Indicator Eight: Cost to maintain
specific payment product
Number To be
determined
0% 0% 5% 10% 15% Annual Reporting to
CBE
CBE Cost for the
consumer to
accounts by institution type, with
focus on accounts targeting
Financial Inclusion.
at project
start
maintain
specific
payment
product
accounts
INTERMEDIATE RESULTS
Intermediate Results:
Intermediate Result 1:
Developing a strategy for Retail
Payments in Egypt for the coming
5 years, considering market
needs and resources
Report n/a 1 n/a n/a n/a n/a Once, 6
months
after
project
start
Reporting to
the CBE, EIB
Consultants,
CBE
Developed an
implementable
action plan for
retail payments
in Egypt for the
coming 5 years,
considering
market needs
and resources to
be completed
four months
after
commencement
of the
operations and
presented to
the EIB and the
CBE.
Intermediate Result 2:
Developing a data collection and
analysis methodology to better
understand the market trends
and properties
Report n/a 1 n/a n/a n/a n/a Once, <8
months
after
project
start
Reporting to
the CBE, EIB
Consultants,
CBE
Developed a
data collection
and analysis
methodology to
better
understand the
market trends
and properties
to be completed
six months after
commencement
of the
operations and
presented to
the EIB and CBE.
Intermediate Result 3:
Developing an action plan
targeting the family remittances
inflow to Egypt.
Report n/a 1 n/a n/a n/a n/a Once, <12
months
after
project
start
Reporting to
the CBE, EIB
Consultants,
CBE
Developed an
action plan
targeting the
family
remittances
inflow to Egypt
to be completed
eight months
after
commencement
of the
operations and
presented to
the EIB and CBE.
Intermediate Result 4:
Developing an action plan
targeting financial inclusion,
explaining required actions to
promote the inclusion of the poor
in financial system
Report n/a 1 n/a n/a n/a n/a Once, <12
months
after
project
start
Reporting to
the CBE, EIB
Consultants,
CBE
Developed an
action plan
targeting
financial
inclusion,
explaining
required actions
to promote the
inclusion of the
poor in the
financial system
to be completed
twelve months
after
commencement
of the
operations and
presented to
the EIB and CBE.
Intermediate Result 5: Workshop
for sharing of knowledge
Workshop n/a 0 1 n/a n/a n/a Once, at
project
completion
Reporting to
the EIB
CBE Successful
completion of a
workshop to
enable
knowledge
sharing of
country
experience
between
countries
participating in
the program.
Intermediate Result 6:
Establishing an implementation
structure in the CBE
Report n/a 2 3 n/a n/a n/a Six monthly
during
implement
ation and
once at
completion
Consultants/C
BE reporting
to the CBE,
EIB based on
observed
progress in
implementati
on unit
Consultants,
CBE
Establishment
of an
implementation
structure within
the central bank
Intermediate Result 7: Project management team will have
been operating for the project
Report n/a 1 2 n/a n/a n/a Twice,
once
halfway
through
project
implement
ation and
once at
completion
CBE reporting
to the EIB
based on
observed
progress in
implementati
on unit
CBE A report
detailing the
activites of the
CBE in managing
and
implementing
the project will
be shared with
the EIB.
RegionalIntegrationthroughTradeandTransportCorridors:EgyptActivities
A. BasicProjectInformationActivityName:RegionalIntegrationthroughTradeandTransportCorridors(TRANSTRAC)–EgyptActivities
CountryName:Egypt NameofImplementationSupportAgency(ies):EuropeanInvestmentBank
NameofISAProjectLeader:PasqualeStaffini EmailofISAProjectLeader:[email protected]
RecipientEntity:MinistryofTransport NameandEmailofRecipientEntityContact:
TotalAmountApprovedbytheTransitionFund(US$):4,230,000.00
AdditionalFundsLeveragedandSource(s),ifany(US$):0.00
TotalAmountDisbursed(DirectandIndirectinUS$):230,000
SteeringCommitteeApprovalDate:
5/15/2013
ProjectImplementationStartDate:
10/31/2014
ProjectClosingDate:
12/31/2016
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): InclusiveDevelopmentandJobCreationCompetitivenessandIntegrationChooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:TheobjectiveofTRANSTRACistopromotethereductionoftradeandtransportbarriersalongtheprioritytradecorridorsofEgyptandinrelatedbordercrossings.
Ratingforprogresstowardsachievementofobjective: ModeratelyUnsatisfactory
Ratingforoverallimplementationprogress: ModeratelyUnsatisfactory
BriefSummaryofProjectImplementationStatus:
‐ Issues that impact on the delivery of Transtrac in Egypt range from a lack of clear communication lines and decision making to changes of priorities, as well as hazardous situations in project areas (Libyan border).
‐ A key blocking issue for the advancement of those TA components has been the lack of a signed Cooperation Agreement between Egypt and EIB for the Transtrac TA programme. EIB sent a draft Cooperation Agreement in October 2014. Following the May 2015 Steering Committee, Egypt committed to signing the CA shortly. In this context, the authorities (MOIC, MOT) informed EIB on 28 June 2015 they would sign the CA.
‐ Component #1 contains regional activities – covering all TRANSTRAC countries. Services are supposed to
start after Cooperation Agreements are signed by all beneficiary countries. However following the May 2015 Steering Committee meeting, it was suggested to EIB and beneficiary countries that such regional activities could start without waiting for all country signatures. a) Road Safety Action Programme, the ToR was completed and agreed with all relevant country authorities including Egypt in mid-2014. This is a Regional TA to be procured in one Lot together with the actions in Jordan, Morocco and Tunisia. Procurement is done and the consultant was selected. b) TA to transportation activity : by end 2014 ToR had been completed and agreed with all countries including the Egyptian authorities. This is a Regional TA to be procured in one Lot together with the actions in Jordan, Morocco and Tunisia.
‐ Component #2.1 :Preparation of the Suez-Port Said corridor. No progress. The Egyptian Government chose not to pursue and in close cooperation with the relevant authorities, other projects are being explored.
‐ Component #2.2 : EIB was asked by the authorities to focus its TA on another Logistics Centre, called 10th of Ramadan. EIB offered to explore this case, and is awaiting further information from the promoter.
‐ Component #2.3: Border crossing at El Salloum (Libya): no new development.
‐ Component #3: project management unit (PMU): by end 2014 ToR had been completed and agreed with the Egyptian authorities. Procurement will start after Cooperation Agreement with Egypt is signed.
C. ImplementationStatusofComponentsComponent1:Institutionalandcapacitybuildingforregionaltradeframeworkimprovement(region‐widecomponent)PreviousRating:Not Applicable CurrentRating:Moderately
SatisfactoryCost(US$):600,000
Sub‐component1.1:TAtotransportation(region‐widecomponent)StatusofImplementation:
TA to transportation activity in Egypt: Establishment of a PPP unit with the Ministry of Transport, including setting up staffing, operating procedures and documents to be prepared, defining a medium term action plan including identifying potential projects and following up implementation of at least one pilot project. This is a Regional TA to be procured in one lot together with the actions in Morocco, Jordan and Tunisia. Procurement will start after all Cooperation Agreements are signed by all countries. However following the May 2015 Steering Committee meeting, it was suggested to EIB and beneficiary countries that such regional activities could start without waiting for all country signatures. By end 2014 ToR had been completed and agreed with all countries including the Egyptian authorities.
Sub‐component1.2:Preparationofroadsafetyassessmentandactionplan(region‐widecomponent)StatusofImplementation:
MENA Region: Road Safety Action Programme, ToR completed and agreed with all relevant country authorities in mid-2014. This is a Regional TA to be procured in one lot together with the actions in Morocco, Jordan and Tunisia. However following the May 2015 Steering Committee meeting, it was suggested to EIB and beneficiary countries that such regional activities could start without waiting for all country signatures. Procurement is done and consultant selected. Services will start after all Cooperation Agreements are signed by all countries.
Component2:PreparatorystudiesforinfrastructureimprovementsoftheprioritycorridorsPreviousRating:Not Applicable CurrentRating:Unsatisfactory Cost(US$):3,000,000Sub‐component2.1:PreparationoftheSuez‐PortSaidcorridorStatusofImplementation:
The Egyptian Government chose not to pursue. In close cooperation with the relevant authorities, other projects are explored for the rail subsector as the Aswan-Alexandria Railway line. The Steering committee will be informed of progress made and the eventual need for restructuring. Alternatively, the development of efficient railway transport corridors linking the Mediterranean and Red Sea ports passing through different Logistics Centers should be envisaged: Alex./Dekhelia Sea Ports to 6 Oct. Logistic Center; Port Said/Sokhna Sea Ports to 10th of Ramadan Logistics Center; or Railway Link between 6 Oct. and 10th of Ramadan Logistic Centre.
Sub‐component2.2:PreparationofselectedactivitiesfortheInternationalTransportcorridorStatusofImplementation:
Intermodal Corridors under which a particular emphasis was foreseen for the 6th of October Logistics Centre, EIB had carried out a detailed fact finding mission to Egypt (Cairo and Alexandria) during calendar week 26 of 2014 in order to structure a coherent TA package. This TA package and a concrete action plan were set out in a project fiche and submitted to the Egyptian authorities (a copy was submitted with the last progress report to the MENA TF).
In the second part of 2014, the Egyptian authorities informed the EIB that given the urgency of the 6th of October Logistics Centre project, which they would like to present at an investors conference in March 2015, there was not enough time to perform the TA that EIB had suggested and that therefore the project would be promoted without further TA. Instead, EIB was requested to focus its TA on another Logistics Centre, called 10th of Ramadan. EIB offered to explore this case, and is awaiting further information from the promoter.
Sub‐component2.3:TAforpreparationofupgradingandexpansionofBordercrossingfacilitiesSatisfactoryStatusofImplementation:
El Salloum Libya Border Crossing: Master Plan and Final Design, by mid 2014 ToR were completed and agreed with the Egyptian authorities. Procurement of the related consultancy services was launched but suspended due to security concerns in the area. Procurement could be re-launched after Cooperation Agreement with Egypt is signed, depending on the environment. Restructuring will otherwise be required.
Component3:ProjectPreparation,Management,Coordination,MonitoringandEvaluationPreviousRating:Not Applicable CurrentRating:Moderately
SatisfactoryCost(US$):400,000
StatusofImplementation:A project management unit (PMU) will be established within the lead Ministry to monitor and coordinate implementation of the TAs. By end 2014 ToR had been completed and agreed with the Egyptian authorities. Procurement will start after Cooperation Agreement with Egypt is signed.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities(US$) Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
700,000 3,300,000 4,000,000
AmountReceivedfromTrustee(b):
850,000(slightincreaseintheplannedbudgetforCountry‐executedactivitiesduetotheincreaseofplannedbudgetforComponentB(c)toUS$700,000,includingUS$300,000movedfromComponentB(a)) MinoradjustmentstothebudgetaredescribedinTechnicalDescriptionofTAs&ImplementationPlan)
500,000 1,350,000
ActualAmountDisbursed(c): 0 0 0
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2013
2014
2015 500.000 500.000
2016 1.500.000 1.000.000 2.500.000
2017 700.000 300.000 1.000.000
2018 2019
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)230,000 0 230,000
G. ResultsFrameworkandMonitoring
Project Development Objective (PDO): Theobjectiveoftheproposedprojectistopromotereductionoftradeandtransportbarriersalongtheprioritytradecorridorsofthecountryandinrelatedbordercrossings.
PDO Level Results Indicators* Unit of Measure Baseline
Cumulative Target Values**
Frequency Data Source/
Methodology
Responsibility
for Data
Collection
Description
(indicator definition
etc.) Jan‐
Dec
2015
Jan‐
Dec
2016
Jan‐
Dec
2017
F F F
Indicator One:
About100transportstaff(fromdifferentsub‐sectors:roads,maritimetransport,railways,ports,logistics)trainedin:PPPaspectsandtechniques,roadsafetyanalysisandmanagement,maritimetransportandlogistics,technicalcontrolandsupervisionofworks,managementoffleetofconstructionequipment,andconstructionprojectmanagement.
#ofparticipants
0 10 40 100 Bi‐annually
Reports PMCUandFocalPoints
Quantitative–numberofparticipantswhohavesuccessfullycompletedthetraining
Indicator Two:
Studiescompleted:(i)preparatoryandfeasibilitystudyforSuezcorridorcompleted;(ii)pre‐feasibilitystudy6thOctoberlogisticscentercompleted;(iii)pre‐feasibilitystudyforbordercrossingcompleted;(iv)roadsafetyactionplancompleted.
Percentageprogressand#ofstudies
00
15%1
75%2
100%4
Bi‐annually
ReportsStudiesproduced
PMCU,FocalPointswithEIBinput
Numberofstudiescompletedandapproved
INTERMEDIATE RESULTS
Intermediate Result (Component One): InstitutionalandcapacitybuildingforregionaltradeframeworkSub‐componentA.1:TAtoTransportationSub‐componentA.2:Roadsafetyassessmentandactionplan
Intermediate Result indicator One: TAtotransportation(i)trainingfortechniquesforplanningandfinancingoflogisticsfacilities;(ii)trainingofalltransportsagenciesindifferentPPPaspectsandtechniques;(iii)analysisofoptionsforimplementationofroadassetmanagementinRoadAuthorityandtraininginprojectandconstructionfleetmanagement.
Percentageprogressand#ofstudies#ofparticipants
00
10
50%50
100%100
Bi‐annuallyBi‐annually
ReportsStudiesproducedReports
PMCU,FocalPointswithEIBinputPMCUandFocalPoints
Qualitystudiescompletedandapproved
Qualitative‐numberofparticipantswhohavesuccessfullycompletedthetraining.
Intermediate Result indicator : Roadsafetyassessmentandactionplancompleted
Percentageprogressandactionplancompleted
0 10 50% 100%3‐months
Reports PMCU,FocalPointswithEIBinput
Qualitystudyandactionplanproducedandapproved
Intermediate Result (Component Two): PreparatorystudiesforinfrastructureimprovementsoftheprioritycorridorsSub‐componentB.1:PreparationoftheSuezCanalcorridorSub‐componentB.2:PreparationofselectedactivitiesofIntermodalcorridorSub‐componentB.3:Preparationofupgradingandexpansionofbordercrossingfacilities
Intermediate Result indicator One: PreparationoftheSuez‐PortSaidcorridor:studyofoptionsfortransportmeansandalignmentsalongthecorridorandpre‐feasibilitystudyofselectedalignment
Percentageprogressandstudiescompleted
03‐months
Reports PMCU,FocalPointswithEIBinput
Qualitystudiesproducedandapproved
Intermediate Result indicator Two: PreparationoftheIntermodalTransportcorridor:
Percentageprogressand
0 50% 100%3‐months
Reports PMCU,FocalPointswithEIBinput
Qualitystudyproducedandapproved
studycompleted
Intermediate Result indicator Three: Pre‐feasibilitystudyoftheexpansionanddevelopmentofSalloumlandport(borderwithLibya)
Percentageprogressandstudycompleted
0 10 50% 100%3‐months
Reports PMCU,FocalPointswithEIBinput
Qualitystudyproducedandapproved
Intermediate Result (Component Three): ProjectPreparation,Management,Coordination,MonitoringandEvaluation
Intermediate Result indicator: QualityreportingTimebased
0 33% 60% 100% 3‐months
Reports PMCUandEIB
Qualityreporting,M&E
LeveragingRegulatoryReformstoAdvanceFinancialInclusioninEgypt
A. BasicProjectInformationActivityName:LeveragingRegulatoryReformstoAdvanceFinancialInclusioninEgyptCountryName:Egypt NameofImplementationSupportAgency(ies):International
FinanceCorporationNameofISAProjectLeader:NahlaElOkdah EmailofISAProjectLeader:[email protected]:N/A NameandEmailofRecipientEntityContact:N/A
TotalAmountApprovedbytheTransitionFund(US$):950,000
AdditionalFundsLeveragedandSource(s),ifany(US$):0.Butanestimated1,126,500isplanned
TotalAmountDisbursed(DirectandIndirectinUS$):0
SteeringCommitteeApprovalDate:18May2015
ProjectImplementationStartDate:Notyeteffective
ProjectClosingDate:30June2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar(selectonlyone): InclusiveDevelopmentandJobCreationSecondaryPillar(s)(selectasmanyasapplicable):
InvestinginSustainableGrowth
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:TheobjectiveofthethisprojectistoleveragechangesinmicrofinanceregulationsinEgyptto supportkeymicrofinance serviceproviders,prepare them for,and transform them into for‐profit entitiesand furtheradvancefinancialinclusion.Theprojectwillworkwith3MFIstohelpthemrespondtothechangingregulatoryframework.Ratingforprogresstowardsachievementofobjective: Not ApplicableRatingforoverallimplementationprogress: Not ApplicableBriefSummaryofProjectImplementationStatus:TheTransitionfundproposalwasonlyapprovedinMay2015.OurfinanceteamisnowintheprocessofcreationoflocalTrustFund,butthefirsttrancheofTransitionfundinghasnotyetbeenreceived.Thus,whileformalimplementationofprojectactivitieshasnotyetcommenced,theprojectteamhasalreadybeenindiscussionwithexistingandprospectiveMFIpartnersinEgyptandarepreparingprojectscopesandassemblingateamtobeginimplementationinthecomingperiod.Thus,itisfullyexpectedthatbytheendofthenextreportingperiod(December2015),someoftheactivitiesundereachofthecomponentsoftheprojectwillbeginasoutlinedfurtherinsectionC.
C. ImplementationStatusofComponents
Component1:RiskManagementPreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):427,500(thisamount
representsdirectcostsfundedonlythroughtheTransitionFund).
Sub‐component1.1:AssistingMFIsinEgypttodevelopor strengthentheriskmanagementfunctions.StatusofImplementation:‐IFCwillworkwithAlTadamun,amicrofinanceinstitutionbasedinEgyptthatwashard‐hitbythe2011revolution,onanewprojectmodulefocusedonRiskManagement.IFChadpreviouslyconductedariskmanagementdiagnosticwithAlTadamun,includingadetailedassessmentreportwithfindingsandrecommendationsandaworkplanoutliningnextstepsforimplementationwasdeveloped.Inthecomingperiod,anIFCexpertteamwillbeginimplementationofthenewriskmanagementmodulewhichwilltackletherecommendationsandgapshighlightedinthediagnostic,andhelptheMFItodevelopanoverallriskframeworkandintroduceoftoolsforthemanagementcreditrisk,operationalriskandliquidityrisk.
‐Duringthecomingperiod,IFCwillalsocontinuediscussionswithLeadFoundationinEgypt,andpossiblyinitiatediscussionwithotherbanks/MFIs(includingpotentialgreenfieldsorbanksubsidiaries),inordertoagreeonaprojectscope,andsetatimelineforexpectedriskmanagementortransformation‐relatedadvisorysupport.
Component2:TransformationPreparedness,TransformationandEstablishmentofGreenfieldsPreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):190,000(thisamount
representsdirectcostsfundedonlythroughtheTransitionFund).
Sub‐component2.1:AssistingMFIstopreparefortransformationStatusofImplementation:‐IFCwillworkwithDBACD,aleadingmicrofinanceinstitutioninEgypt,onanewmodulefocusedontransformation/commercializationandthecapacitybuildingnecessarytotaketheinstitutiontothenextlevel.Aspartofthismodule,IFCwillarrangeastudytour(inNovember)forateamofDBACDstafftovisitACLEDABankinCambodia,anMFIwhichhasalreadysuccessfullytransformed.Thiswillallowforaknowledgeexchangeontheprocessoftransformationincludingitsbenefits,opportunitiesandchallenges.Furthermore,underTransformationreadinesspreparation,IFCwillbeginworkwithDBACDtoupgradeitsHumanResourceManagementand,timepermitting,mayalsoinitiateaprocessmappingexercisetohelptheMFIfurtherstreamlineprocessestoenhanceefficiencyandreduceriskinthecomingperiodaswell.
Component3:ConsumerProtectionPreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):142,500(thisamount
representsdirectcostsfundedonlythroughtheTransitionFund).
Sub‐component3.1:AssistingMFIsobtaintheSmartCampaignCertificationStatusofImplementation:‐TheaimofthiscomponentistoassistMFIsinEgyptdemonstratingthehighestlevelsofclientprotectionbyobtainingtheSmartCampaigncertification.Already,IFChasbeenindiscussionwiththeSmartCampaign,SocialPerformanceTaskForceandSanabel(theregionalmicrofinancenetwork)toagreeonascopeofwork.Inthecomingperiod,theIFCteamaimstoformalizethispartnership,andaswelltodevelopand(internally)approveanewregionalprojectconcept,includingaspecificfocusonpilotingthecertificationwithselectMFIsinEgyptduringthefirstphase.Ithopestobeginimplementationofthesamebythebeginningof2016,butmayalsotrytoleveragetheupcomingSanabelregionalconferenceinEgypt(October2015)toannouncethenewinitiative.Component4:KnowledgeManagementPreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):142,500(thisamount
representsdirectcostsfundedonlythroughtheTransitionFund).
Sub‐component4.1:Sector‐wideworkshopsandpublicationsStatusofImplementation:REGIONALWORK(alsomentionedinJordanprogressreport)‐Overthecomingperiod,IFCexpectsto:
WorkwithSanabel(theregionalMFnetwork)toorganizetheannualSanabelconferencetobeheldinEgyptandincludeMFIparticipantsaroundtheregion.IFCwillplayastrongroleinshapingtheconferenceagendaandbringingspeakerstoshareitsglobalandregionalexpertise.TheconferenceisexpectedtoincludesessionsonthesubjectshighlightedintheTFproposal,includingnewregulations,transformationandriskmanagement,aswellaspotentiallyClientProtection/SmartCampaign.
PublishanddisseminateaReportsummarizingresultsofasurveyaboutriskdistributedamongMFIstakeholdersintheMENAregion,anddevelopedjointlybyIFC‐Sanabel
Conductaworkshop(inconjunctionwithSanabel)withMFIpartnersandstakeholdersontopicsrelatedtotransformation/commercialization,suchasmovinguptoservethegapinthemarketandtheneedtoforsupporttodevelopnewproducts(includingverysmallenterpriselending)andenhancecapacityinkeyareas
CompleteafirstdraftofthefindingsofasurveyonVerySmallEnterpriselendingintheregion,currentlybeingadministeredjointlybyIFCandSanabel.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
DirectCostforISA‐Execution(US$)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
0 902,500 902,500
AmountReceivedfromTrustee(b):
0 0 0
ActualAmountDisbursed(c):
0 0 0
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)
Year Jan‐June Jul‐Dec TotalbyYearEnd2015 N/A 65,000 65,0002016 100,000 125,000 225,0002017 150,000 175,000 325,0002018 287,500 N/A 287,5002019
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed Available Total0 47,500 47,500
G. ResultsFrameworkandMonitoring
13 IFC captures results after project closure
Project Development Objective (PDO):
PDO Level Results Indicators*
Unit of Measure
Baseline
Cumulative Target Values**
Frequency
Data Source/ Responsibility for Data Collection
Description (indicator definition
etc.) Jul 2015‐Jun 2016 (F)
Jul 2016‐Jun 2017 (F)
Jul 2017‐Jun 2018 (F)
YR 4 (F)13 YR5 Methodology
Businesses received business support/advisory services or financial investment
Number 0 2 3 3 3 Annual IFC IFC
INTERMEDIATE RESULTS
Intermediate Result: Risk Management and Transformation, Transformation Preparedness and Establishment of Greenfields
Business loans provided or guaranteed Number N/A
325,500 678,000 1,062,500 1,490,000
Annual MFIs IFC
Value of micro loans disbursed USD N/A
99,889,705 211,052,705 333,469,705 469,146,705 Annual MFIs IFC
Number of micro loans outstanding (non‐cumulative)
Number 307,308 325,500 352,500 384,500 427,500
Annual MFIs IFC
Outstanding microfinance loan portfolio of supported institutions (non‐cumulative)
USD
55,337,300 62,180,000 68,600,000 75,420,000 84,200,000
Annual MFIs IFC
Intermediate Result: Facilitating Knowledge‐Sharing Across the Microfinance Sector
Number of workshops, training events, seminars and conferences
Number 0 1 2 3 4 Annual IFC IFC
TowardsInclusiveandOpenGovernments:PromotingWomen’sParticipationinParliamentsandPolicy‐MakinginEgypt
A. BasicProjectInformationActivityName:Towardsinclusiveandopengovernments:Promotingwomen’sparticipationinparliamentsandpolicy‐making
CountryName:Egypt NameofImplementationSupportAgency(ies):OECD
NameofISAProjectLeader:
OECD:AndreasSchaal/TatyanaTeplova
EmailofISAProjectLeader
OECD:[email protected];[email protected]
RecipientEntity:NationalCouncilforWomen
Name:AmbassadorMervetTallawy,
PresidentoftheNationalCouncilforWomenOrganizationandAddress:15MohamedHafezStreet,Dokki,Cairo,EgyptTelephone:+2(02)37603518‐37603529Email: [email protected](US$):633,333.00
AdditionalFundsLeveragedandSource(s),ifany(US$):
Countryco‐financing:
Otherco‐financing:
TotalAmountDisbursed(DirectandIndirectinUS$):0
SteeringCommitteeApprovalDate:
5/19/2015
ProjectImplementationStartDate:
9/1/2015
ProjectClosingDate:
8/31/2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
EnhancingEconomicGovernance
SecondaryPillar(s): InvestinginSustainableGrowthCompetitivenessandIntegrationInclusiveDevelopmentandJobCreation
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:TheprojectwillsupporttheeffortsofMENAcountriesintransitioninfosteringinclusivegrowth and good governance by leveraging open government policies and mainstreaming gender perspectives inparliamentaryoperationstomaximisewomen'sintegrationinpubliclifeandpolicy‐makingprocess.Morespecifically,theprojectaimsto“Promotewomen’sparticipationinparliamentsandpolicy‐making”by
1) Makinglegislaturestransparent,equitableandgender‐sensitiveand;2) Empowering(potential)womenparliamentariansandstrengtheningtheircapacityandskillsatthenational
andlocallevelsand;3) Improvingpublicconsultationcapacityofparliamentsandwomen’sCSOsinlaw‐makingprocesses.
Thiswillbecomplementedbyregularregionalpolicydialogueasanintegralpartofthisproject. Thisdialogueisacross‐cuttingelementforthecontinuityoftheknowledgesharingprocessforimplementationofreformsandtransformationontheground.Inthiscontext,“feedbackloops”or“learningloops”willofferamulti‐levelmechanismforinteractionandnewpolicyapproachesamongparliamentariansandpolicymakersintheregion.
Ratingforprogresstowardsachievementofobjective: NotApplicable
Ratingforoverallimplementationprogress: NotApplicable
BriefSummaryofProjectImplementationStatus:
CoordinationmeetingswithstakeholdersareplannedtotakeplaceduringJulytodiscuss(a)theimplementationmechanismsfor the project with the respective stakeholders, (b) the development of an overall project design, (c)the coordinationbetweeninternationaldonororganizations.
ThroughoutthevariousconferencecallsheldsincetheprojectwasapprovedonMay,theNationalCouncilforWomenhasdemonstratedstrongengagementandownershipintheprocess.ItisforeseenthatprojectinaugurationwilltakeplaceinSeptember2015.ItisalsoplannedtostarttherecruitmentprocessforandsetupoftheProjectImplementationUnitteaminSeptember.ThisdependsontheresultsofthecapacityassessmentofeachrecipiententitytobecarriedoutinJuly&Augustoftodeterminetherequiredpersonnelforsuccessfullaunchandimplementationoftheproject.Furthermore,theOECDincooperationwiththeNationalCouncilofWomeniscoordinatingcloselytoidentifythefocalcontactsinpartnerinstitutions.InJune2015,backtobackwiththeOECDWeek,theOECDorganisedabilateralcoordinationmeetingwithrepresentativesof the Women in Parliament Global Forum to discuss the next steps of implementation and coordination. AnothercoordinationmeetingwithUSAID‐JordantookplaceduringtheOECDWeek,wherepartiesagreedtocoordinatecloselyontheimplementationoftheproject.TheOECDisalsocoordinatingwithUNWomenanditisplannedtoholdacoordinationmeetinginJuly.Atthesametime,theOECDisplanningtoholdcoordinationmeetingswithDFIDandNDItolearnabouttheirexperiencesandbuildontheachievementoftheirpreviousprojectsinthefield.ThisprojecthasbeenreportedtotheOECDPublicGovernanceCommitteeandExternalRelationsCommitteeanddiscussedatvariousregionalmeetingsorganised in the frameworkof theMENA‐OECDGovernanceProgramme;aprogrammethatprovidesaforumforthecoordinationofcountry‐anddonor‐ledactivitiesattheregionalandnationallevel.
C. ImplementationStatusofComponentsComponent1:Makinglegislaturestransparent,equitable,andgender‐sensitive.ThiscomponentwilladdressinternalandexternalfunctionsoftheParliament,bothasanemployerandalaw‐makerbyfocusingonensuringthegendersensitivityoftheparliamentaryworkplacepoliciesandelectionandparliamentaryprocessesPreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):200,105.00Sub‐component1.1:Mappingandanalysisofparliamentaryelectoralandworkplaceoperations,processesandpolicyframeworksthroughagenderlens,includinginselectedlocalelectioncouncils.StatusofImplementation:TheOECDisplanningtokickofftheprojectinSeptemberandstartthemappingexercisewithafactfindingmissionwithpeersfromOECDcountries.ThepurposeofthefactfindingmissionwillbetocollectdataontheparliamentaryprocessesandtoconductinterviewswithParliamentsecretariat,seniorpublicofficials,formerparliamentariansandinternationaldonororganization.Themappingexercisewillalsoincludethedisseminationofquestionnaireongendersensitiveworkplaceoperations,processesandpolicyframeworks.ThemappingexercisewillbuildonthekeyfindingsoftheOECD‐CAWTARreport“WomeninPublicLife:Gender,LawandPolicyintheMiddleEastandNorthAfrica”ontheopportunities,challengesandbarriersforpromotingWomen’sparticipationinPublicLife.Sub‐component1.2:Providingcountry‐basedcapacitybuildingactivitiestoparliamentarians,selectedlocalelectoralcommitteesandsecretariatsStatus of Implementation: The parliamentary elections in Egypt are envisaged to take place on September/October,depending on the security situation in the country. The OECD plans to hold the first capacity building activity forparliamentariansinDecember.Component2:Strengtheningcapacityandskillsofwomencandidates forparliament.Thiscomponentwilladdressbarriers facingwomen in theirpoliticalcareerandwillbuildon theaccumulatedknowledgeandgoodpractices tobuildcapacitiesofwomencandidateswiththerequiredsetofskillstoassumetheirrepresentativeroleeffectively.Itwillalsoaimtodevelopcapacitiesandstrengtheneffectivenessoffuturefemaleparliamentarians’responsetothegrowingexpectationsofthevoters.PreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):223,642.00Sub‐component2.1:Conductingcountry‐basedassessmentoftheexistingopportunitiesandthecurrentchallengesfacedbywomencandidatesStatusofImplementation:Thissubcomponentwillbeimplementedinparalleltothesub‐component1atoaligntheoutputswiththecapacitybuildingneedsassessmentforthetrain‐the‐trainermodules.TheassessmentisscheduledtostartinSeptember.TheassessmentwillbuildonthekeyfindingsoftheOECD‐CAWTARreport“WomeninPublicLife:Gender,LawandPolicyintheMiddleEastandNorthAfrica”ontheopportunities,challengesandbarriersforpromotingwomen’sparticipationinpubliclife.TheOECDisalsodeveloping“2015OECDRecommendationoftheCouncilonGenderEqualityinPublicLife”.ThedraftRecommendationaimstoapplytoinstitutionsatrelevantlevelsofgovernment.Itisintendedto
provideusefulguidelinesforallMembersandnon‐MembersadheringtothedraftRecommendationseekingtoaddresschallengesandidentifygoodpracticesrelatedtofosteringgenderdiversityinpubliclife.Itoffersvaluableguidanceandinternationallyrecognisedbenchmarksongenderequality.Sub‐component2.2:Buildingwomen’scapacitiestoparticipateinelectionsandparliamentaryoperationsatnationalandsub‐nationallevelsStatusofImplementation:TheOECDiscoordinatingwiththeNCWtoconductitsfirstcapacitybuildingseminar“Runningsuccessfulcampaigns:CampaignfundraisingandfinancialintegrityofMP”inSeptember/October.TheNCWiscoordinatingwithpoliticalpartiesandindependentcandidatestoagreeonthelistofparticipants.Component3:Strengtheningpublicconsultationcapacityofparliamentsandwomen’sCSOsinlaw‐makingprocessesThiscomponentwillfocusonbuildingcapacitiesofbothParliamentandcivilsocietytoeffectivelyengagewitheachotherinthe lawdraftingprocess, in response to the calls forgreateropenness, andgender responsivenessofpublic institutions,includingparliaments.Theseactivitieswillreinforcetheactivitiesproposedaspartthesub‐component2bonstrengtheninggender‐sensitivelawmakingcapacitiesPreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):119,004.00StatusofImplementation:Activitiesofthiscomponentisscheduledtostartin2018.
Component4:regionalpolicydialogueThe regional policy dialogue meeting is an integral part of this project. The regional policy dialogue will provide anopportunity to exchange lessons learned and good practices on leveraging open government to strengthen women’sparticipationinparliaments,makeparliamentsmoreopenandgender‐sensitiveandenhancewomen’sparticipationinthepolicy‐makingprocessandpromotenetworkingamongfemaleparliamentariansintheregionandOECDcountries
PreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):50,682.00StatusofImplementation:Theannualregionalmeeting“Gendermainstreaming:towardsinclusivegendersensitivepolicies”ofMENA‐OECDWomeninGovernmentPlatformwilltakeplaceinDecember2015withtheparticipationofMENAtransitionandOECDcountries,whichincludesrepresentativesofgovernments,parliaments,courtsandcivilsociety,aswellastheGlobalNetworkofWomenParliamentarians.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
593,433 593,433
AmountReceivedfromTrustee(b):
0 0 0
ActualAmountDisbursed(c): 0 0 0
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2015 98,905.00 98,905.002016 98,905.00 98,905.00 197,811.002017 98,905.00 98,905.00 197,811.002018 98,905.00 98,905.00
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$) 39,900 39,900
G. ResultsFrameworkandMonitoring
Project Development Objective (PDO): Towards inclusive and open governments: Promoting women’s participation in parliaments and policy‐making
Indicators by Component Unit Baseline Cumulative Target Values Frequency Data Source/Methodology
Responsibility for Data Collection
Description (Indicator
Definition, etc) Jul 2015 –
Jun 2016
F
Jul 2016 –
Jun 2017
F
Jul 2017 – Aug
2018
F
Indicator 1: No. of assessments and
guidelines completed and approved
Quantitative Existing yes yes yes once Project progress
reports
Project
Implementation Team
(PIT).
Assessments,
reports, action
plans, roadmaps,
models of good
practices or
frameworks
designed to
enhance the
enabling
environment
Indicator 2: No. of internal regulations
and policy proposals endorsed
Quantitative Existing yes yes yes annually Project progress
reports Project
Implementation Team
(PIT).
Internal
parliamentary
operations,
parliamentary
secretariat
Indicator 3: No. of programs and projects
designed and implemented to promote
more gender sensitive and equitable
allocation of government resources
Quantitative none yes yes yes annually Project progress
reports Project
Implementation Team
(PIT).
Programmes and
projects that
support reform of
government
safety net
systems, subsidy
policies and other
related programs
and thereby
promote more
efficient and
equitable
allocation of
resources
Indicator4 : No. of public institutions
(Parliament, Government Bodies and
institutions) received support to conduct
mapping exercise of the current situation
Quantitative
none
20
40
160
annually Project progress
reports Project
Implementation Team
(PIT).
Government
bodies,
institutions and
local government
units received
support services
aimed at
increasing their
capacity to
delivery public
services to
constituents
Indicator5 : No. of trained
representatives of parliamentary
secretariat, parliamentarians, local
elected officials and women candidates
Quantitative none Yes Yes Yes annually Project progress
reports Project
Implementation Team
(PIT).
Public sector staff
received training
in various
thematic areas to
improve their
capacity for better
public service
delivery
Indicator 6: No. of CSOs, women or youth
groups engaged and empowered at the
central and local level
Quantitative Existing Yes Yes Yes annually Project progress
reports Project
Implementation Team
(PIT).
Number of CSO’s
involved in public
consultations and
Number of
awareness
campaigns, hits on
the website and
regional meetings;
communication
strategies;
electoral
commissions and
parliamentary
secretariat
INTERMEDIATE RESULTS
Component 1: Making legislatures transparent, equitable, and gender‐sensitive
Indicator 1: Parliament,
Government Bodies and institutions
received support to conduct
mapping exercise of the current
situation
Qualitative yes n/a n/a
Once Project
progress report
PIT Mapping exercise for
gender sensitive
parliamentary and
electoral operations,
processes and policy
frameworks
Indicator 2: No. of trained
representatives of parliamentary
secretariat, parliamentarians and
local elected officials
Quantitative 40 80 100 Annually Project
progress report
PIT Number of training
seminars, advisory
sessions, toolkits and
guidelines
Component 2: Strengthening capacity and skills of women candidates for parliament
Indicator 3: Studies, assessment,
reports, action plans, roadmaps,
models of good practices or
frameworks endorsed
Quantitative yes yes n/a Once in 1st and 2nd year Project
progress report
PIT set of targeted policy
recommendations,
supported by a
communication
strategy
Indicator 4: Women candidates for
parliamentary elections, youth
groups trained, engaged and
empowered to participate in public
life
Quantitative 40 80 160 Annually Project
progress report
PIT training materials for
the trainers
developed during the
workshops, training
sessions, feedback
from the training
session
Component 3: Strengthening public consultation capacity of parliaments and women’s CSOs in law‐making processes
Indicator 5: CSOs, women or youth
groups engaged and empowered at
the central and local level
Quantitative yes yes yes Annually Project
progress report
PIT CSOs, women or
youth groups engaged
and empowered at
the central and local
level aimed at
increasing the
involvement of these
groups in public
policies
Indicator 6: Parliament and local
elected institutions received support
Quantitative Yes Yes Yes Annually Project
progress report
PIT Parliament and local
elected institutions
services to develop their
engagement capacities
received support
services aimed at
increasing their
capacity to engage
stakeholders,
including women’s
groups and
mainstream gender
sensitive principles
Component 4: regional policy dialogue
Indicator 7: improved enabling
environment and institutional
capacity across the region
Quantitative 1 2 3 Annually Project Progress Reports
PIT Number of models of good practices
Indicator 8 : Documents produced
and endorsed at the regional level
Quantitative Yes Yes Yes Annually Project Progress Reports
PIT Studies, assessments, reports, action plans, roadmaps, models of good practices or framework
EnhancingtheInvestmentClimateinEgypt,throughEqualAccessandSimplifiedEnvironmentforInvestmentandFosteredInvestmentPolicy,Legaland
InstitutionalFramework
A. BasicProjectInformationActivityName:EnhancingtheInvestmentClimateinEgypt, throughEqualAccessandSimplifiedEnvironmentforInvestment(EASE)andFosteredInvestmentPolicy,LegalandInstitutionalFramework
CountryName:Egypt NameofImplementationSupportAgency(ies):WorldBankGroupandOECD
NameofISAProjectLeader:
OECD:AndreasSchaal/NicolaEhlermann‐Cache/Marie‐EstelleRey
WB:SherifBahigHamdy/NabilaAssaf
EmailofISAProjectLeader:
[email protected]; nicola.ehlermann‐[email protected]; marie‐[email protected]
[email protected];[email protected]
RecipientEntity:NameandEmailofRecipientEntityContact
TheGeneralAuthorityforInvestment&FreeZones(GAFI)
Name:Mr.AlaaElDinOmer,ExecutiveDirector,Telephone:+20224055464,Email:[email protected]
TheIndustrialDevelopmentAuthority(IDA) Name:Eng.IsmailGaber,Chairman,Telephone:+201006852840,Email:[email protected]
EgyptianRegulatoryReformandDevelopmentActivity(ERRADA)
Name:TarekHamza,ExecutiveDirector,Telephone:+201005600099,Email:'[email protected]'
TotalAmountApprovedbytheTransitionFund(US$):
7,043,400
AdditionalFundsLeveragedandSource(s),ifany(US$):
TotalAmountDisbursed(DirectandIndirectinUS$):0
SteeringCommitteeApprovalDate:
5/18/2015
ProjectImplementationStartDate:
7/1/2015
ProjectClosingDate:
7/1/2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): InclusiveDevelopmentandJobCreationEnhancingEconomicGovernanceCompetitivenessandIntegration
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:
ToimprovetheregulatoryenvironmentforinvestorsthroughsimplifiedindustriallicensingandtransparentlandallocationprocessesandtosupportthegovernmentofEgyptindesigninganewinvestmentpolicyandlegalframework,andinstrengtheningitsinternationalinvestmentregime.
Ratingforprogresstowardsachievementofobjective: NotApplicable
Ratingforoverallimplementationprogress: NotApplicable
BriefSummaryofProjectImplementationStatus:Giventhestartingdateoftheproject(7/1/2015),noactivitieshavebeencarriedoutyet.However,planningofthefirststepsisbeingdiscussedbetweenthetwoISAsandincoordinationwiththegovernmentcounterparts.
Withaviewtokick‐starttheimplementationofcomponent4,theOECDwillundertakeamissiontoCairointhesecondhalfof September. The OECD is alreadyworking onwork plan and activities’ sequencing in consultationwith the Egyptiancounterparts,andstaffarrangements.TheSeptembermissionwillallowtoholdthefirstProjectSteeringCommittee(undertheauthorityoftheMinisterofInvestment),agreeontheworkplan,launchfirstactivitiesandmeetwithmaindonorsactiveintheareatoensuresynergies.TheWorldBankGroup(WBG)componentsoftheprojecthavenotyetbeenapprovedbytheRegionalVicePresident(RVP)andmadeeffectiveduetoadelayinconfirmingtheNegotiationsdatewiththecounterpart.TheWBGiscurrentlyawaitingthe Ministry of International Cooperation’s (MOIC) confirmation of the Negotiations date. Meanwhile, to prepare forimplementation,theWBGisworkingwiththeprojectclientstoestablishthetwoprojectimplementationunits;oneinGAFIandtheotherinIDAandtofinalizetheprojectoperatingmanual.TheProjectTeamhasalsofinalizedthedocumentsneededforNegotiationsandsharedthemwithMOIC,GAFIandIDA.
C. ImplementationStatusofComponentsComponent1:Facilitatingaccessibleandtransparentinvestorservices(GAFI)WBG‐supportedcomponentPreviousRating:Chooseanitem. CurrentRating:Not Applicable Cost(US$):2,250,000.00Sub‐component1.1:DevelopandImplementOnlineSystemforInvestorServicingatGAFIStatusofImplementation:NotapplicableSub‐component1.2:GAFICapacityBuildingandICTUpgradingStatusofImplementation:NotapplicableSub‐component1.3:ProjectManagementStatusofImplementation:NotapplicableComponent2:IndustrialSectorRegulatoryReform(IDA)WBG‐supportedcomponentPreviousRating:Chooseanitem. CurrentRating:Not Applicable Cost(US$):2,250,000.00Sub‐component2.1:Processre‐engineeringandautomationofindustriallicensingStatusofImplementation:NotapplicableSub‐component2.2:ImplementingaNewApproachtoIndustrialLandManagementandanOnlineLandAllocationSystemStatusofImplementation:NotapplicableSub‐component2.3:IDACapacityBuildingandICTUpgradingStatusofImplementation:NotapplicableComponent3:Capacitybuildingformanagingregulatoryreforms(ERRADA)WBG‐supportedcomponent PreviousRating:Chooseanitem. CurrentRating:Not Applicable Cost(US$):500,000.00Sub‐component3.1:StatusofImplementation:NotapplicableSub‐component3.2:StatusofImplementation:NotapplicableSub‐component3.3:StatusofImplementation:NotapplicableComponent4:SupportthegovernmentofEgyptindesigninganewinvestmentpolicyandlegalframeworkandinstrengtheningitsinternationalinvestmentregimeOECD‐supportedcomponentPreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):NotapplicableSub‐component4.1:InvestmentpolicyandlegalregimeStatusofImplementation:Notapplicable
ConsultationswiththeEgyptianauthoritiesallowedtodiscussprioritiesoftheproject.AstheMinistryofEgypthaslaunchedtheconductofaninvestmentmapping,theOECDwillsupporttheprocessthroughastocktakingandpreliminaryanalysisoftheinvestmentpolicy(activity4.1.2)Sub‐component4.2:Business‐relatedlaws,jurisdictionsofinvestmentinstitutionsandlegalcoherenceStatusofImplementation:NotapplicableInordertoconductcomponent4.2,theOECDwilllaunchanoverviewofthebusiness‐relatedlawsandtheirrevisionstatusaccordingtogovernmentpriorities.Sub‐component4.3:InternationalinvestmentagreementsStatusofImplementation:NotapplicableItwasagreedthatthisactivitywillstartnextyear.Sub‐component4.4:InvestmentdisputesettlementStatusofImplementation:NotapplicableItwasagreedthatthisactivitywillstartnextyear.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
5,000,000 1,484,000 6,484,000
AmountReceivedfromTrustee(b):
0 0 0
ActualAmountDisbursed(c): 0 0 0
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2015 ‐ OECD:247,000
WB:250,000497,000
2016 OECD:247,000WB:250,000
OECD:247,000WB:750,000
1,494,000
2017 OECD:247,000WB:750,000
OECD:247,000WB:1,000,000
2,244,000
2018 OECD:247,000WB:1,000,000
OECD:000WB:500,000
1,747,000
2019 OECD:000WB:500,000
OECD:000WB:,000
500,000
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)0 OECD:100,000
WB:459,400OECD:100,000WB:459,400
G. ResultsFrameworkandMonitoring
PDO: To improve the regulatory environment for investors through simplified licensing and transparent industrial land allocation processes and to support the government of Egypt in designing a new investment policy and legal framework and in strengthening its international investment regime.
MENA Transition Fund Cross Pillar 5 Indicators
Unit of Measure
Baseline
Cumulative Target Values
Frequency Data Source/ Methodology
Data Collection Responsibility
Description Jul 2015 – Jun 2016 F
Jul 2016 – Jun 2017 F
Jul 2017 – Jul 2018 F
YR4 Target
Output 5.1.1: Documents Produced and Endorsed # 0 111 267 501 501 Annually Progress Report PIU
Number of roadmaps, frameworks, procedures, licensing requirements, regulatory reform documents produced or endorsed designed to enhance the business enabling environment
Output 5.1.2: Decrees Issued or Structures Established
# 0 2 12 24 24 Annually Progress Report PIU
Number of laws, policies, or regulations endorsed and number of units and systems established through capacity building or TA activities to enhance the business enabling environment
Output 5.1.3: Staff Trained # 0 25 95 145 145 Annually Progress Report PIU
Number of public sector staff receiving training in the client agencies to improve capacity for enhanced service delivery to investors
PDO Indicators Unit of Measure Baseline
Cumulative Target ValuesFrequency Data Source/
Methodology Data Collection Responsibility
Description YR1 YR2 YR3 YR4 Target
Av. Duration of Licensing Process Day 320 250 180 75 75 Annually Progress Report PIU
Corresponds with Transition Fund Outcome Indicator 5.1 “Improved enabling environment and government capacity”
Number of land allocation requests processed through the reformed land allocation system
# 0 0 750 2000 2000 Annually Progress Report PIU
Corresponds with Transition Fund Outcome Indicator 5.1 “Improved enabling environment and government capacity”
Effective investment policy, legal and institutional framework and sound international investment regime
# # no no yes N/A Annually Progress Report PMU
Corresponds with Transition Fund Outcome Indicators 3.1 “improved good governance in the public sector” and 5.1 “Improved enabling environment and government capacity”
Intermediate Results Indicators
Component 1 (WB) ‐ Facilitating Accessible and Transparent Investment Services (GAFI)
Mapping/Simplification of Entry procedures completed
Y/N ‐ Y ‐ ‐ Y Annually Progress Report PIU
Corresponds with Transition Fund Output 5.1.1 “Documents produced and endorsed”; (Yes is equivalent to 1 roadmap)
CRM Platform Operational in OSSs # 0 0 2 5 5 Annually Progress Report PIU Corresponds with Transition Fund Output 5.1.2 “Structures established”
Sectors licensing requirements consolidate/published on GAFI Portal
# 0 100 250 479 479 Annually Progress Report PIU Corresponds with Output 5.1.1 “Documents produced and endorsed”
Capacity Building workshops for GAFI OSS staff completed
# 0 2 5 10 10 Annually Progress Report PIU
Number of GAFI OSS staff trained in workshops
# 0 10 35 50 50 Annually Progress Report PIU Corresponds with Transition Fund Output 5.1.3 “Staff trained”
Component 2 (WB) – Industrial Sector Regulatory Reform (IDA)
Mapping/Simplification of Licensing sub‐processes completed
# 0 4 4 4 4 Annually Progress Report PIU
Corresponds with Transition Fund Output 5.1.1 “Documents produced and endorsed”
Risk based approach for industrial technical evaluation applied
Y/N ‐ Y ‐ ‐ Y Annually Progress Report PIU
Corresponds with Transition Fund Output 5.1.1 “Documents produced and endorsed”; (Yes is equivalent to 1 Risk based framework endorsed)
Industrial Licensing System (ILAS) Deployed in IDA Branches
# 0 2 5 10 10 Annually Progress Report PIU Corresponds with Transition Fund Output 5.1.2 “Structures established”
Online industrial land allocation system designed/deployed
Y/N ‐ ‐ Y ‐ Y Annually Progress Report PIU
Corresponds with Transition Fund Output 5.1.2 “Structures established” (Yes is equivalent to 1 system established)
Industrial Developer land allocation framework designed and deployed
Y/N ‐ ‐ Y ‐ Y Annually Progress Report PIU
Corresponds with Transition Fund Output 5.1.1 “Documents produced and endorsed”; (Yes is equivalent to 1 land allocation framework deployed)
Capacity building workshops for IDA branches staff completed
# 0 2 5 10 10 Annually Progress Report PIU
Number of IDA staff trained in workshops
# 0 10 35 50 50 Annually Progress Report PIU Corresponds with Transition Fund Output 5.1.3 “Staff trained”
Component 3 (WB) – Capacity Building for Managing Regulatory Reform (ERRADA)
Regulatory reforms proposed # 0 5 10 15 15 Annually Progress Report PIU
Corresponds with Transition Fund Output 5.1.1 “Documents produced and endorsed”
Private Sector consultation on regulatory reform mechanism applied
# 0 5 10 15 15 Annually Progress Report PIU
Capacity building workshops for ERRADA staff completed
# 0 2 5 10 10 Annually Progress Report PIU
Number of ERRADA staff trained in workshops
# 0 5 10 15 15 Annually Progress Report PIU Corresponds with Transition Fund Output 5.1.3 “Staff trained”
Component 4 (OECD) – Support to the government in designing a new investment policy and legal framework and in strengthening its international investment regime
Reliable FDI statistics, compliant with international recommendations
Y/N ‐ no yes yes N/A Annually Progress Report PMU
Adoption by the government of a new investment policy and a revised investment law
# # no no yes N/A Annually Progress Report PMU
Corresponds with Transition Fund Output 5.1.2 “Decrees issued”; (Yes is equivalent to 1 law/policy adopted)
FDI restrictions revised and improved ranking in the OECD FDI Restrictiveness Index
# # no no yes N/A Annually Progress Report PMU
Corresponds with Transition Fund Pillar 4 “improved competitiveness and integration”
Business‐related laws harmonized with Investment Law, jurisdiction of investment‐related institutions approved
# 7 0 4 3 7 Annually Progress Report PMU
Corresponds with Transition Fund Output 5.1.2 “Decrees issued”;
Number of workshops/consultations # 7 3 3 1 7 Annually Progress Report PMU Corresponds with Transition Fund Output 5.1.3 “Staff trained” (unit: events)
BIT network and dispute settlement bodies and procedures assessed
Y/N ‐ no yes yes N/A Annually Progress Report PMU
Number of Egyptian officials trained in negotiating BITs and in preventing and managing investment disputes in workshops
# 30 0 15 15 30 Annually Progress Report PMU
Corresponds with Transition Fund Output 5.1.3 “Staff trained”
Number of investor‐State dispute settlement cases reduced
# # no no yes N/A Annually Progress Report PMU
EnergySocialSafetyNetsSectorReformsTechnicalAssistanceProject
A. BasicProjectInformationActivityName:EnergySocialSafetyNetsSectorReformsTechnicalAssistanceProjectCountryName:Egypt NameofImplementationSupportAgency(ies):WorldBankNameofISAProjectLeader:AshishKhanna/MohabHallouda
EmailofISAProjectLeader:Ashish Khanna <[email protected]>/ [email protected]
RecipientEntity:MinistryofElectricityandRenewableEnergy
NameandEmailofRecipientEntityContact:Eng.AmiraElMalah,AmiraElMallah<[email protected]>
TotalAmountApprovedbytheTransitionFund(US$):7,097,200
AdditionalFundsLeveragedandSource(s),ifany(US$):0
TotalAmountDisbursed(DirectandIndirectinUS$):744,930.66
SteeringCommitteeApprovalDate:May15,2013
ProjectImplementationStartDate:November25,2013
ProjectClosingDate:December30,2016
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar(selectonlyone): EnhancingEconomicGovernanceSecondaryPillar(s)(selectasmanyasapplicable):
InvestinginSustainableGrowthInclusiveDevelopmentandJobCreationChooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:The proposed project will strengthen the Government of Egypt’s capacity to (i) design a comprehensive fuel subsidy reform strategy, (ii) establish concrete measures for improved financial viability of key energy sector actors and (iii) identify households that would be most vulnerable to the impacts of the fuel subsidy reformRatingforprogresstowardsachievementofobjective: ModeratelyUnsatisfactory
Ratingforoverallimplementationprogress: ModeratelyUnsatisfactory
BriefSummaryofProjectImplementationStatus:TheprojectwassuspendedinternallybyGovernmentofEgyptinJanuary2015,duetoaninternalcomplaintonfollowingWorldBankproceduresinsteadofEgyptianprocurementrules.TheLoanAgreementfortheTransitionFundwasclearonWorldBankprocurementrulestobefollowedfortheproject,buttheprojectwentintosuspensionwithnoactivityonconsultancycontractevaluationordisbursementtillApril2015.WorldBankgavealettercitingitsnoobjectiontocontractsawardedtilldate,basedonwhichandinternalevaluation,eventuallytheprojectresumeditsoperationfromApril2015.HoweverfourmonthswerelostinanalreadydelayedTAprogram,becauseofwhichtheprojecthasbeendowngradedtomoderatelyunsatisfactorystatusonachievementofobjectiveandimplementationprogress.SinceJune,progressonprocurementofconsultancycontractshaspickedupagainandimplementationstatusmeetingwasconvenedonJuly8withheadofsteeringcommittee.AsubsequentreviewmissionisproposedforendSeptemberbywhenalotofcomponentareexpectedtoawarded(hencecommitted).Theratingwouldberevisitedsubsequently.
Implementationsummaryofeachcomponentundertakenduringthereviewperiodissummarizedbelow:Consultancy Services from Consulting firms for Sub‐Components 1.1, 2.1, 2.2, 3.1
Final Evaluation reports for SubCs1.1, 2.1 sent to the WB and WB no‐objection received.
First round of Contract Negotiation took place for sub‐components 1.1 &2.1.
Evaluation of technical proposals for SubC2.2 is under review andis expected to be sent to WB for no‐objection during July ,2015
ToR for the consultancy services of establishing UNR system for Subc3.1 reviewed and approved by the WB ,SPN prepared ,approved by the WB and announced.
Consultancy Services from Individual Consultants for Sub‐Component 3.1
Contract for Lead Consultant for SubC3.1 renewed for one year till November 30,2015
Contracts for the two consultants,”Data Base Developer” &”Operation Officer” for SubC 3.1 signed and became effective.
Selection of Senior Data Analyst for SubC3.1 finalized, evaluation report approved by WB.
ToRs for hiring Network specialist, System Administrator and Quality assurance Consultants finalized and WB approval received
Consultancy Services from Individual Consultants for Sub‐Component 3.3
Contracts for Lead M&E, MIS, Director of field operation &financial management and Director of field operation and results monitoring for “Takaful and Karamah” projects were signed and became effective.
Selection of (Takaful and Karamah) Quantitative research consultant finalized, evaluation report approved by the WB and waiting for initialized contract from the Consultant.
IT office Equipment and Software
Financial management software for SC1.4: o WB approved the evaluation report and Supply order and the Contract well be initialized soon. o Contract is pending for signature.
IT office Equipment for SCs 1.4 &3.1 o Supply orders and the Contracts well be initialized soon.
C. ImplementationStatusofComponentsComponent1 Power Sector Institutional Development and Financial Viability Sub‐component1.1:Electricity Utilities Financial Management and GovernanceThis subcomponent will include a comprehensive analysis and assessment of the current structure of the public sector power utilities (EEHC and affiliated companies) including organizational, governance, financial and accounting management, and performance monitoring and evaluation. The assessment will propose options for the power utilities to improve their organization and corporate structure, financial management and governance structure.StatusofImplementation:
Financialenvelopeswereopenedin28/12/2014,andfinancialevaluationistakingplace. PMT sent the WB in 18/1/2015 to ask for noobjectionto extend validity of proposals till Mar.5th,2015
Finalandsignedevaluationresultstookplaceandsenttothebank No‐objectionfromWBreceivedonApril19,2015 ContractNegotiationexpectedtobecompletedbyJuly15,2015 CommencementofservicesbyAugust15,2015
Sub‐component1.2:Fuel to Power Strategy AsteeringcommitteemeetingofthetransitionfundagreedtochangetheprocurementplantoswitchthestudyfromFueltoPowertoRestructuringandstrengtheningEgyptianElectricityTransmissionCompany,asrequiredbythenewElectricityLawthatbecameeffectiveinJuly2015.TheconsultantforthesameforthiscomponentwouldberecruitedbyJanuary2016.StatusofImplementation:TOR has been finalized for the activity and SPN expected to be issued in July 2015. Sub‐component1.3:Action Plan for the Establishment of an Energy Efficiency Unit at the Ministry of Electricity and EnergyThis subcomponent will support the development of an action plan to establish an energy efficiency unit that could be housed at MOEE which would have as its primary objective the implementation of the National Energy Efficiency Action Plan (NEEAP) for the electricity sectorStatusofImplementation:
Financialenvelopeshavebeenopened. PMT sent the WB to ask for noobjectionto extend validity of proposals till Mar.5th,2015
Award by August 2015
Sub‐component 1.4: Implementation Support to the PMT: This subcomponent will provide support to the Project Management Team (PMT) in implementation of the project. The support will be limited to consultancy services to build the capacity of the PMT in undertaking its responsibilities and for the preparation of the required project annual audit reports. PMT received procurement training from the Bank specialist.
StatusofImplementation:o PMT Consultant was hired in June 2014 to support procurement activities, PMT received training on procurement with
members of affiliated subcomponents. o Hiring the project financial auditor: o ToR was prepared o After getting WB noobjection, RFP has been sent to five well known consulting auditor firms in 28/8/2014 o Three of them submitted their technical and financial offers in 13/10/2014 o PMT evaluated the technical offers and sent the technical evaluation in 3/11/2014 for IBRD noobjection o After getting IBRD noobjection, PMT opened financial envelopes in 24/11/2014 and undertook the financial evaluation o PMT sent a notice to World Bank to the final result of evaluation on 1-12-2014 o Contract negotiation took place on 17-12-2014 o Contract is being prepared o Procurement of the project financial Software: o ToR was prepared and sent to five software companies o Three companies submitted their proposals in 20-10-2014. o PMT evaluated the offers and sent the evaluation report to World Bank for IBRD noobjectionin 18-11 o . IBRD noobjectionwas received in 20-11-2014. o Contract is being prepared o Procurement of Goods for PMT (PCs, Lap tops, Printers,..): o Technical specifications and quantities needed are sent to shops o Three technical and financial proposals were received in 21-10-2014 o PMT evaluated the offers and sent the evaluation report to World Bank for IBRD noobjectionin 19-11-2014 o IBRD noobjectionwas received in 20-11-2014 o Contract is being prepared Award of all packaged by August 2015
Component2:Energy Pricing and Fuel Switching Reform Technical AssistanceSub‐component2.1:Energy Pricing and Fuel Switching Reform StrategyThis subcomponent will develop a comprehensive strategy to phase out fuel subsidy including assessment of the effects of such strategy on the economy, specifically on GDP, inflation, employment, including any gender considerations, as appropriate as well as sectorial multipliers.StatusofImplementation:
SPNwaspublishedforthesubcomponentin30‐12‐2013 fifteeninterestedfirmsrespondedtotheSPNin24‐3‐2014 Sixfirmswereshort‐listedin2‐4‐2014 ToRandRFPwerepreparedandsenttoWorldBankfornoobjectionin21‐7‐2014. SendingRFptoshortlistedfirmsin30–7‐2014. Receivingoffersin11‐9‐2014. FinalizingthetechnicalevaluationandsendingittotheWorldBankfornoobjectionin29‐12‐2014. Contractnegotiationsnearlyover Assignment award in August and initiation in September 2015
Sub‐component2.2:Development of a Communication Strategy for Fuel ReformThissubcomponentwilldeliveracommunicationstrategyandcommunicationsroad‐maptosupportimplementationofthefuelsubsidyreformstrategy.StatusofImplementation:
SPNwaspublishedforthesubcomponent30‐12‐2013 finalizingshortlistconsultingfirmsin2‐4‐2014RFPwaspreparedandworldbanknoobjectionwasreceivedin9‐
10‐2014 Submissionofoffersin15‐12‐2014 Technicalevaluationistakingplace. AssignmentawardexpectedinSeptember2015
Component3:Strengthening Social Safety Nets Technical Assistance Sub‐component3.1:Support the Establishment of the Database of the Poor and VulnerableOne of the main objectives of the project is to support the Government of Egypt to better target the poor and thereby to mitigate the adverse impact of subsidy reform. The activities under this subcomponent will support the development of a database of the poor and vulnerableStatusofImplementation:In building the Unified National Registry (UNR), the Ministry of State for Administrative Development (MSAD) will integrate the Family Card System database, as the largest database, with administrative data from other databases. Accordingly, MSAD has to coordinate with different ministries to ensure the smooth sharing and sustainable exchange of the data required. Request for Expression of Interest (REOI) for consulting firms was prepared and Bank noobjectionwas provided for its publication. Bank issued no objection for the TOR and selection of a Sr. Technical Officer for MSAD’s Component 3.1 to begin
working on the Unified Registry team under the supervision of the Smart Card Manager. Bank awaits contract from PMT. HiringconsultingFirmforDatabasedeveloping
IssuingSPNin24‐7‐2014 RFPisdevelopedandwassenttoworldbankin1‐12‐2014fornoobjection ThebanktechnicalteamisreviewingtheRFPforchanges.
HiringtheindividualConsultant(TechnicalOfficer) WorldBankNoObjectionwasreceivedtothecontractin20‐8–2014. Thecontractwasrenewedfortheyear2015.
Hiringthetwoindividualconsultants(operationOfficerandDatabasedeveloper) WorldbankNoObjectionforthehiringwasreceivedin25‐11‐2014. Contractsarewaitingtobesinged
ProcurementofgoodsWorldbankNoObjectionwasreceivedin2‐12‐2014.
Sub‐component3.2:Baseline Survey of Beneficiary FamiliesThis sub‐component’s objective is to undertake the design and collection of a nationally representative baseline survey data to gauge the impact on efficiency in social service delivery and on the beneficiaries of the ongoing and planned reform programs, including the introduction of the smart card system, the planned cash transfer scheme, re‐targeting of fuel subsidies, re‐targeting of the bread subsidy, social health insurance for the poor and so on. The proposed survey will establish a baseline for monitoring and evaluating the medium‐term and long‐term impacts of these reform initiatives. StatusofImplementation:Thebaselinesurveyisstillunderdesign.Thetargetingmethodologytobeusedforthesurveyisinprogress.Sub‐component3.3:Establishment of Technical Working Unit to Support SSN ReformThe main objective of this sub‐component is to support establishing and financing a technical working unit(TWU) of 3‐4 professionals. The TWU will support the committee in charge of overseeing the preparation and introduction of the Cash Transfer Program and developing a medium term social protection strategy and vision.StatusofImplementation:TheEconomicJusticeUnit,attheMOF,wasestablishedandmandatedwiththecoordinationofSocialSafetyNetProgramswithdifferentministries.ThemembersoftheTWU,fortargetingmethodologyandcashtransferprogram,arebeinghiredbytheEJU.BankprovidednoobjectiononSixindividualconsultants.Contractsweresigned Ministry Of social solidarity has been included as beneficiary since 1‐8‐2014. There are four consultants to be hired till now : Program Manager ( World Bank No Objection was received in 25‐ 11‐ 2014 ) and the contract in the process of singing MIS advisor the hiring documents were sent to the World Bank for No Objection since 1‐12‐2014 and waiting for the bank response The Other two individual consultants PMT is reviewing the Hiring Documents to be send to the world Bank for no Objection .
D. DisbursementsofFundsforDirectProjectActivities Country‐Execution
(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
6,500,000 6,500,000
AmountReceivedfromTrustee(b):
6,500,000 6,500,000
TOTALActualAmountDisbursed(c):
376,369.66 376,369.66
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)
Year Jan‐June Jul‐Dec TotalbyYearEnd2014 226,370 226,3702015 81,000 1,000,000 1,810,0002016 2,000,000 2,463,000 4,464,0002017
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)368,561 228,639 597,200
G. ResultsFrameworkandMonitoring
Annex 1: Results Framework and Monitoring
Country: Egypt, Arab Rep
Project Name: EGYPT Energy/Social Safety Nets Sector Reforms Technical Assistance (P144305)
Results Framework
.
Project Development Objectives
.
PDO Statement
The proposed project will strengthen the Government of Egypt's capacity to (i) design a comprehensive fuel subsidy reform strategy, (ii) establish concrete
measures for improved financial viability of key energy sector actors and (iii) identify households that would be most vulnerable to the impacts of the fuel subsidy
reform.
These results are at Project Level
.
Project Development Objective Indicators
Cumulative Target Values Data Source/ Responsibility for
Indicator Name Core Unit of
Measure Baseline
Nov 2013 ‐
Oct2014
Nov 2014
‐ Oct 2015
Nov 2015
– Oct 2016
Nov 2016
– Dec
2016
End Target Frequency
Methodology Data Collection
Direct project
beneficiaries
Number 0.00 0 (A) 250.00 350.00 500.00 500.00 Semi‐
Annually
Progress
Reports,
Implementati
on Support
Reports
PMT and World
Bank Team
Female
beneficiaries
Percentage
Sub‐Type
Supplemental
0.00 0 (A) 35.00 35.00 35.00 35.00 Semi‐annually
Progress
Reports,
Implementati
on Support
Reports
PMT and World
Bank Team
Reform options
analyzed to
improve the
financial viability
and governance of
EEHC is prepared.
Yes/No No No (A) No Yes Yes Yes Semi‐
Annually
Progress
Reports,
Implementati
on Support
Reports
PMT, and World
Bank Team
A long term
strategy for the
fuel supply to
power generation
is prepared.
Yes/No No No (A) No Yes Yes Yes Semi‐
Annually
Progress
Reports,
Implementati
on Support
Reports
PMT, and World
Bank Team
An action plan is
prepared for the 1)
establishment of
an Energy
Efficiency Unit at
the Ministry of
Electricity and 2)
for at least two of
the energy
efficiency projects
in NEEAP.
Yes/No No No (A) No No Yes Yes Semi‐
Annually
Progress
Reports,
Implementati
on Support
Reports
PMT, and World
Bank Team
A comprehensive
energy pricing and
fuel switching
strategy for Egypt
including detailed
Yes/No No No (A) No No Yes Yes Semi‐
Annually
Progress
Reports,
Implementati
PMT, World Bank
Team
action plans for
compensatory
measures to
mitigate the
impact of subsidy
removal is
developed.
on Support
Reports
A communication
strategy for fuel
subsidy reform
including public
consultation is
prepared.
Yes/No No No (A) No Yes Yes Yes Semi‐
Annually
Progress
Reports,
Implementati
on Support
Reports
PMT, and World
Bank Team
A database of the
poor and
vulnerable is
developed with 10
million households
registered in the
new poverty
database.
Yes/No No No (A) No No Yes Yes Semi‐
Annually
Progress
Reports and
Implementati
on Support
Reports
PMT, and World
Bank Team
.
Intermediate Results Indicators
Cumulative Target Values Data Source/ Responsibility for
Indicator Name Core Unit of
Measure Baseline YR1 YR2 YR3 YR4 End Target Frequency
Methodology Data Collection
EEHC Capacity
building program
in financial and
governance is
developed and
number of training
workshops/events
for EEHC.
Yes/No No No (A) Yes Yes Yes Yes Semi‐
Annually
Progress
Reports,
Implementati
on Support
Reports
PMT, and World
Bank Team
Ministry of
Petroleum and
Ministry of Energy
established
coordinating
committee to
develop and
implement fuel to
power.
Yes/No No
Yes (A‐
Coordinati
on exist)
Yes Yes Yes Yes Semi‐
Annually
Progress
Reports,
Implementati
on Support
Reports
PMT, and World
Bank Team
Inter‐ministerial
coordination is
established and
maintained to
facilitate and
implement energy
subsidy and
communication
strategies and
social safety nets
program.
Yes/No Yes (A) No Yes Yes Yes Yes Semi‐
Annually
Progress
Reports,
Implementati
on Support
Reports
PMT, and World
Bank Team
InclusiveRegulationsforMicrofinance
A. BasicProjectInformationActivityName:InclusiveRegulationsforMicrofinance
CountryName:TheArabRepublicofEgyptNameofImplementationSupportAgency(ies):
TheWorldBank
NameofISAProjectLeader:GhadaIsmail EmailofISAProjectLeader:[email protected]
RecipientEntity:TheEgyptianFinancialSupervisoryAuthority
NameandEmailofRecipientEntityContact:
TotalAmountApprovedbytheTransitionFund(US$):4,505,000
AdditionalFundsLeveragedandSource(s),ifany(US$):
TotalAmountDisbursed(DirectandIndirectinUS$):601,435.92
SteeringCommitteeApprovalDate:
6/11/2014
ProjectImplementationStartDate:
8/1/2014
ProjectClosingDate:
10/31/2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): InclusiveDevelopmentandJobCreationInvestinginSustainableGrowthChooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:Theprojectdevelopmentobjective(PDO)istostrengthentheregulatoryandinstitutionalframeworkofthemicrofinancesectorinEgypt.
Ratingforprogresstowardsachievementofobjective: ModeratelySatisfactory
Ratingforoverallimplementationprogress: Satisfactory
BriefSummaryofProjectImplementationStatus:
TheProjecthasbeenapprovedforfundingundertheMENATransitionFundbytheTransitionFundSteeringCommitteeonJune11,2014.ThenegotiationsfortheproposedprojectwereconductedandconcludedonJune30,2014inCairo,Egypt.The Grant agreement was signed on August 26, 2014 and became effective as of September 28, 2014. The project isprogressingwell.Alistofsomeachievementssinceeffectivenessinclude:(i)issuanceofPresidentialDecreeNo.141of2014on regulating microfinance activity was published in the Egyptian Gazette; (ii) issuance of related decisions and rulesnecessarytoregulatetheactivityanddeterminelicensingrequirementsforthecompaniesandNGOs;(iii)theestablishmentof microfinance unit in EFSA to supervise civil associations and NGOs microfinance activities with a competent headappointedandappointingkeystaff;(iv)issuanceofdirectiveNo.159of2014regulatingthefunctionsofthemicrofinanceunit;(v)theBoardoftrusteeshasbeenformedwithrepresentationfromallkeystakeholdersincludingTheCentralBankofEgypt,TheSocialFundforDevelopment,MinistryofSocialSolidarity,NGOsandotherrelevantbodies.TheBoardofTrusteesmeetsregularlytofollowupontheactivities;and(vi)AdministeringtheprocessforestablishingtheEgyptianMicrofinanceUnionincorporatingallmicrofinanceplayersinEgypt.
C. ImplementationStatusofComponents
Component1:Developingtheregulatoryframeworkformicrofinance. Thiscomponentwillsupporttheestablishmentofaregulatoryframeworkthatisconducivetogrowthandstabilityofthenon‐bankfinancialinstitutions(NBFIs)inEgypt.CriticaltothesuccessofthedraftMicrofinanceLawaretheexecutiveregulationsthatshouldberobustandcomprehensiveandprovide clear guidelines forNGOMFIs, finance companies, andothermarketplayers to easily complywith thenewsupervisory framework. The new regulations will adopt light prudential requirements, with a focus on fit and properrequirements,stronggovernancerules,consumerprotection(especiallytransparency,disclosure),andinternalandexternalcontrols.
PreviousRating:Not Applicable CurrentRating:Satisfactory Cost(US$):1.5million
Sub‐component1.1:Technical assistance to EFSA in finalizing the Microfinance Executive regulations and supervision manuals. StatusofImplementation:Done. On 13 November, Presidential Decree no.141 of 2014 on regulating microfinance activity was published in the Egyptian Gazette (issue no. 46). The Law was referred EFSA’s Board of Directors (BOD) to issue the necessary detailed decisions. The Authority issued related executive decisions and rules necessary to regulate the activity and determine licensing requirements for the companies and NGOs. These decisions include the following: identifying areas of microfinance, its value, licensing requirements for companies to practice the activity, capital adequacy standards and rules of supervision and control. Also, EFSA’s BOD shall identify the basis set for calculating allocations in light of credential, financial and operational risks light, disclosure rules and the data to be published. Noted that the return on debt (ROD) paid by the company, other means of finance and allocations are deductible costs upon determining the net taxable revenue, that is according to the criteria set by EFSA and what is approved by the company's auditor. Micro-credit Loans and other forms of microfinance are exempted from taxes, fees and stamp duty.
Sub‐component1.2: Technical assistance in forming the NGO Oversight Board and drafting and finalizing its Directives StatusofImplementation:EFSA Board of Directors issued resolution No. 160 /2014 dated 12.03.2014 to form the Board of Trustees to supervise civil associations and NGOs microfinance activity. The Board of Trustees include in its membership all key stakeholders including The Central Bank of Egypt, The Social Fund for Development, Ministry of Social Solidarity, NGOsandotherrelevantbodies.TheBoardofTrusteesmeetsregularlytofollowupontheactivities.TheBoardofTrusteesconvenedfourtimessinceinception.
Sub-component 1.3: Conducting study tours on legal and regulatory framework for Microfinance Institutions StatusofImplementation:Following the complete formation of the microfinance unit. Sub-component 1.4: Advisory services to strengthen the regulatory framework for NBFIs, aiming at enhancing financial inclusionStatusofImplementation:Willstartsecondhalfof2015.TechnicalassistancetoamendtheExecutiveRegulationsoftheLawNo.10oftheyear1981toallowfortheestablishmentandregulationofspecializedmedicalinsurancecompaniestocoverprivatemedicalinsuranceactivityandTPAs,caterfornewtechnologychanges,allowformicro‐insurance,andaddresstheshariaacompliantformofinsurance(Takaful);(ii)amendingtheleasinglaw
Component2:EstablishingandoperationalizingtheMicrofinanceUnitatEFSA.TheobjectiveofthiscomponentistoensurethattheMicrofinanceUnitadoptsinternationalbestpracticesanddevelopsthecapacitynecessarytoimplementthelawandassociatedexecutiveregulationseffectivelysoastosupportthegrowthoftheoverallmicrofinancesectorinEgypt.ItwillsupportEFSAthroughtheprovisionoftechnicalassistanceandadvisoryservicesinestablishingandequippingtheMicrofinanceUnit,whichwouldberesponsibleforoperationalizingtheexecutiveregulationsandpolicy,enforcingrules,ensuringcompliance,andsupervisingMFIs.ThiswillhelpEFSA toestablishappropriateon‐siteandoff‐sitemonitoringsystemsandprocedures,adviceonenforcementmechanismsandtrainingontheoperationalizationoftheMicrofinanceLawanditsexecutiveregulations.TheITsystemwillalsoallowthecompilationofsectoraldatatomonitormacroprudentialindicators,whichwouldallowadequateandtimelymonitoringoftheperformanceandsoundnessofmicrofinancesectorandNBFIs.Thesystemwillalsohelpinidentifyingfinancialinclusionbarrierscreatedbysomefinancialinstitutions(suchasminimumbalanceamountsforopeningabankaccount).
PreviousRating:Not Applicable CurrentRating:Moderately Satisfactory
Cost(US$):1.5million
Sub‐component2.1: Establishing the Microfinance Unit, and capacity building and training of key staffStatusofImplementation:EFSAIssueddecisionno.179of2014tocreateamicrofinanceunitinEFSAtosupervisecivilassociationsandNGOsmicrofinanceactivities.Theunitisestablishedwithacompetentheadappointedasperdirectiveno.1097of2014.Moreover,EFSAissueddirectiveno.159of2014regulatingthefunctionsofthemicrofinanceunit.KeystaffareappointedandCapacitybuildingandtrainingofkeyappointedstaffwillfollow.Sub‐component2.2:Strengtheningtheinstitutionalinfrastructure,withtherequiredequipmentandIT,bothsoftwareandhardware.
StatusofImplementation:Notyet.Willbeconductedthirdquarter2015
Component3:Promotingaccountability,governanceandconsumerprotection.ThiscomponentwillsupportEFSAinenhancing accountability and governance, as well as developing a robust consumer protection capacity within the
microfinanceindustry,andindevelopingfinancialliteracyamongsttargetpopulationgroups.ThetasksrelatedtoconsumerprotectionwillbehandledbyEFSA’sPMU.
PreviousRating:Not Applicable CurrentRating:Satisfactory Cost(US$):1million
Sub‐component3.1:Enhancing Consumer protection, financial literacy, and public awareness campaigns
StatusofImplementationMorethan10differentworkshopstargetedNGOsinvariousgovernoratestoincreasetheirreadinesstocomplywithbasicconsumerprotectionpractices,withmorethan600attendees.
Sub‐component3.2:Conducting study tours StatusofImplementation: Planned second half of 2015 Sub‐component3.3: Training and capacity building of the Microfinance Oversight BoardStatusofImplementation: Planned second half of 2015
D. DisbursementsofTransitionFundFundsforDirectProjectActivities
Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
4,000,000 4,000,000
AmountReceivedfromTrustee(b):
0 0
ActualAmountDisbursed(c): 500,000 500,000
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2014 2015 500,000 800,000 1,300,0002016 600,000 500,000 1,100,0002017 500,000 500,000 1,000,0002018 300,000 300,000 600,000
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)101,435.92 354,009.08 455,445
G. ResultsFrameworkandMonitoring
PROJECT DEVELOPMENT OBJECTIVE: The project development objective (PDO) is to strengthen the regulatory and institutional framework of the microfinance sector in Egypt
PDO Level Results Indicators
Cor
e Unit of Measure
Baseline
Cumulative Target Values Frequenc
y Data Source/ Methodology
Responsibility for Data
Collection
Aug 2014 – Jul 2015
A
Aug 2015 –
Jul 2016 F
Aug 2016 –
Jul 2017
F
Aug 2017 –
Oct 2018
F
New regulatory framework effective for MFIs, including NGOs-MFIs Yes/No No Yes Yes Yes Yes Annual EFSA EFSA
Number of MFIs licensed by EFSA under the Microfinance Law Number 0 440 480 520 560 Annual EFSA
EFSA
Number of NGOs engaged in microfinance activities (reported by the Microfinance NGOs Oversight Board) Number 0 450 490 530 570 Annual EFSA
EFSA
Number of microfinance beneficiaries under the Microfinance Law Number 0 1,521,000 1,550,000
1,580,000
1,600,000 Annual EFSA EFSA
Female MFI beneficiaries of microfinance loans Percentage 0 0 27 30 35
Annual
EFSA
EFSA
INTERMEDIATE RESULTS
Component I: Developing the Regulatory Framework for Microfinance
Issuance of the Microfinance Executive Regulations by EFSA Yes/No No Yes Yes Yes Yes Annual EFSA EFSA
Frequency of meetings of the Microfinance NGOs Oversight Board Number 0 4 6 12 16 Annual EFSA EFSA
Component II: Establishing and Operationalizing the Microfinance Unit at EFSA
Microfinance Unit established and operational at EFSA Yes/No No Yes Yes Yes Yes Annual EFSA EFSA
Number of staff of MFIs trained Number 0 0 6 12 16 Annual EFSA EFSA
Microfinance sector reports disclosed by EFSA Number 0 0 1 3 7 Annual EFSA EFSA
Number of training programs for Microfinance Unit staff Number 0 0 8 11 13 Annual EFSA EFSA
Component III: Promoting accountability, governance and consumer protection
Number of staff and clients trained—workshops, study tours, and capacity building events Number 0 400 450 500 600 Annual EFSA EFSA
Number of awareness and consumer protection initiatives launched and implemented by EFSA Number 0 9 12 14 16 Annual EFSA EFSA
JordanProjects
NationalCenterforInnovation,HigherCouncilforScienceandTechnology
A. BasicProjectInformationActivityName:NationalCenterforInnovation,HigherCouncilforScienceandTechnology
CountryName:Jordan NameofImplementationSupportAgency(ies):EuropeanBankforReconstructionandDevelopment(EBRD)
NameofISAProjectLeader:HildegardGacek EmailofISAProjectLeader: [email protected]
RecipientEntity: HigherCouncilforScienceandTechnology
NameandEmailofRecipientEntityContact: [email protected]
TotalAmountApprovedbytheTransitionFund(US$):2,600,430
AdditionalFundsLeveragedandSource(s),ifany(US$):N/A
TotalAmountDisbursed(DirectandIndirectinUS$):N/A
SteeringCommitteeApprovalDate:
5/18/2015
ProjectImplementationStartDate:
6/1/2015
ProjectClosingDate:
10/31/2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): EnhancingEconomicGovernanceInclusiveDevelopmentandJobCreationChooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:Createaninstitutionalenvironmentfornewandexistinginnovation‐focusedentitiestoimprovecollaborationandadoptinnovationpractices
Ratingforprogresstowardsachievementofobjective: NotApplicable
Ratingforoverallimplementationprogress: NotApplicable
BriefSummaryofProjectImplementationStatus:TermofReferenceiscurrentlybeingfinalizedandanExpressionofInterestwillbeissuedtoassignconsultantsinordertopreparethefull“NCIMappingStudy”todefineNCI’skeyresponsibilities,tasks,targets/KPIsandactivities,draft4yearbudget,needforconsultancysupportetc.
C. ImplementationStatusofComponentsComponent1:EstablishingtheNCIITPlatformPreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):1,310,000Sub‐component1.1:DevelopmentofproprietaryITPlatformStatusofImplementation:NA
Component2:EstablishmentoftheCenter(Information,ReferralMonitoring&Evaluation,Legal&Policy)‐ LaborCostsPreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):489,610Sub‐component2.1:NCIDirectorStatusofImplementation:NASub‐component2.2:ReferralManagerStatusofImplementation:N/ASub‐component2.3:MonitoringandEvaluationsManagerandtechnicianStatusofImplementation:N/ASub‐component2.4:InformationManagerStatusofImplementation:N/A
Component3:EstablishmentoftheCenterInformation,ReferralMonitoring&Evaluation,Legal&Policy)‐OverheadsPreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):103,200Sub‐component3.1:Procurement(serves,laptops,technicalequipment…etc.)andstafftrainingStatusofImplementation:N/A
Component4:InnovationMarketing/Education/TrainingInitiativeacrossallstakeholders,sectorsandgeneralpopulationPreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):80,000Component5:ConsultantEngagementsPreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):287,500Sub‐component5.1:ForNCIinceptionmappingstudy,systemdesign,implementationsupport,bi‐annualauditofoperations,ProjectClosurewithMENATFStatusofImplementation:N/ASub‐component5.2:LegalandPolicyUnit:Forlegalregulatoryaudits:analysisofexisting lawstosupportinnovationStatusofImplementation:N/ASub‐component5.3:ForMonitoring&Evaluationdesignset‐up,implementationandauditsStatusofImplementation:N/ASub‐component5.4:Fordesignandsupportintheexecutionofbaselineand annualnationalsurveysintargetregionsandcentersofproductivity.StatusofImplementation:N/ASub‐component5.5:ForthescopinganddevelopmentofSectorSkillsCouncils(orsimilarmechanisms)inrelevantsectorsfortheengagementwiththeeducationauthoritiesStatusofImplementation:N/AComponent6:Initiativetoadvanceskills/vocationaltrainingthroughoutJordanPreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):60,000Sub‐component6.1:InnovationManagementTrainingtoSMEsStatusofImplementation:NASub‐component6.2:Mappingsector‐skillsrequirementswithprivatesectorComponent7:ProjectcontingenciesPreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):100,000
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
2,430,310 0 2,430,310
AmountReceivedfromTrustee(b):
0 0 0
ActualAmountDisbursed(c): 0 0 0
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2013 ‐ ‐ ‐2014 ‐ ‐ ‐2015 N/A 80,000 80,00014
2016 N/A N/A N/A2017 N/A N/A N/A2018 N/A N/A N/A2019 ‐ ‐ ‐
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)0 170,120 170,120
14 Disbursement forecast for the remaining period will be established once the “NCI Mapping Study” is complete.
G. ResultsFrameworkandMonitoring
MENA TRANSITION FUND ‐ ENHANCED STATUS QUO RESULTS FRAMEWORK
LEVELOFEXPECTEDRESULTS
TYPEOFEXPECTEDRESULTS
PILLARINDICATOR
PILLARINDICATORDESCRIPTION
PROJECTINDICATORSMAPPEDTOPILLAR
INDICATOR
BASELINE
ACHIEVEDRESULTS
FREQUENCYOFDATA
COLLECTION
DATASOURCE
RESPONSIBLE
ENTITYFORDATACOLLECTI
ON
2015 2016 2017 2018
JuneA
Dec June Dec June Dec June Dec
FundDevelopmentObjective:Toimprovethelivesofcitizensintransitioncountries andtosupportthetransformationcurrentlyunderwaybyprovidinggrantsfortechnicalcooperationtostrengthengovernanceandpublicinstitutionandtofostersustainableandinclusiveeconomicgrowthbyadvancingcountry‐ledpolicyandinstitutionalreforms
CrossPillar5DevelopmentObjective/Impact:Resultsproducedintheformofdocumentsproducedandendorsed,decreesissued,structuresestablishedandpublicsectorstafftrainedacrossthefourpillars
Output5.1.1
Documentsproducedandendorsed
Studies,assessments,reports,actionplans,roadmaps,modelsofgoodpracticesorframeworksendorsed
Studies,assessments,reports,actionplans,roadmaps,modelsofgoodpracticesorframeworksdesignedtoenhancetheenablingenvironmentacrossallpillarareasandendorsed
MappingandscopingstudytosettheprioritiesoftheNCIAnnualNCIreportsonrecommendationstoenhancethedevelopmentofaninnovationbasedsocietyAnnualNCIActionsPlans(includingannualbudgets)
Completedmappingstudy
0 3 5 7 9
Onceinthelifeoftheproject(theMappingstudy)Annually(AnnualNCIreports)
MappingstudyreportNCIrecords
Mappingconsultantandotherprojectconsultants
Outputs5.1.2
Decreesissuedorstructuresestablished
Regulationsorlawsendorsedorentities,unitsorsystemsestablished
Regulationsorlawsendorsedorentities,unitsorsystemsestablishedthroughcapacitybuildingactivitiesortechnicalassistanceinordertoimprovetheenablingenvironmentforvarioussectors
EstablishtheNationalInnovationCenterthroughHCSTdecree
CompleteHCSTdecree
0 1 Onceinthelifeofaproject
Boardresolution/Royalapproval
GeneralSecretaryandBoard
ProjectDevelopmentObjective(PDO):Createaninstitutionalenvironmentfornewandexistinginnovation‐focusedentitiestoimprovecollaborationandadoptinnovationpractices
PDOLevelResultsIndicators*
UnitofMeasure Base
CumulativeTargetValues** Frequency DataSourceResponsibilityforDataCollection
Description
(indicatordefinitionetc.)
Phase12015
Phase22016
Phase32017
Phase42018
IndicatorOne:EstablishingtheNCI
Ammanofficeinfrastructure
CompleteAmmanofficeset‐up
0 YES May‐2015BoardapprovalofNCIDirector
NCIDirector Project
IndicatorTwo:EstablishInformationUnit
a) Assistincommercializationofappliedresearch&tech
Outreachtoresearchcenters,PartnerwithResearchFunds
0 YES Bymonth30One‐on‐onecommunication
InformationManager Project
b) Connectstakeholders;trainingin‘innovationmanagement’tolocalandinternationalstakeholders
Connectstakeholders;InnovationMgmttraining;
0 BEGIN ONGOING ONGOINGBeginbymonth6throughlifeofproject
Personal&MarketingtoIndustryAssoc,BizAssoc,University,Intlpartners,Governorates,Governmententities
InformationManager Project
c) Education&promoteVocationaltraining/workforceproductivity
Vocationaltraining/Workforceproductivity
0 BEGIN ONGOINGBeginbymonth20throughlifeofproject
UtilizeVTC,ETVAT,EJABI,INJAZ,otherlocalNGOs
InformationManageroverseesVocationalTrainingOfficer
Process
d) DevelopproprietaryITPlatform
DevelopITPlatform 0 BEGIN END Completebymonth7includingtesting
UtilizeDesignConsultant&ProgramConsultant
InformationManageroverseesITManager
Project
IndicatorThree:EstablishMonitoringandEvaluationUnit
a) Manageinnovationsurveys
Mgmtinnovationsurveys
0 BEGINONGOING
ONGOING ONGOINGEveryPhasepreparefornextsurvey,everyotherPhaseexecute
Utilizeconsultanttodesignsystem
M&EManager,Consultant,DepartmentofStatistics(MOPIC)
Process
b) TrackSMEdevelopmentprogressthroughnetwork
TrackSMEsinbizdevelopmentservicesnetwork
0 BEGIN ONGOING ONGOINGBeginPhase2,everymonthperformanalysis
PersonalcommunicationwithLocalbizdevelopmentserviceconsultants,SMEsindividually
M&EManagerworkswithReferralManager
Process
c) Economicindicators
Measurementofeconomicindicators
0BEGINBASELINE
LOW‐SCALEREASSESSMENT
EstablishmentCensus
Baselineprepmonth0‐1,beginmonth4‐6,resultsbymonth10;Processrepeatedmonth13,PrepareformajorCensusmonth25,Resultsmonth36
Industryandfirm‐levelsurveysconductedondataset,useofotherannualindices;
M&EManager,Consultant,DepartmentofStatistics
Process
d) Innovationadoption/adaptation
Measureinnovationadoption/adaptation
0BEGINBASELINE
LOW‐SCALEREASSESSMENT
EstablishmentCensus
Every6monthreportingwithlargerresultsbyendmo.6,18and36
Industryandfirm‐levelsurveysconductedondataset,University/R&DCtrs,ITPlatformData
M&EManagerworkswithInformationManager
Process
IndicatorFour:EstablishReferralUnit
a) Matchappliedresearch&techwithprivatesectorandvice‐versa
ConnectR&Dwithprivatesector
0 BEGIN ONGOING ONGOING ContinuousProcess
One‐on‐one,partnerwithResearchFunds,UnivCenters,ResearchCenters.Businesses(includingSMEs)
ReferralManager Process
b) CreatenetworkoftechnicalcooperationbetweenSMEserviceproviders,accesstofinanceandvocationaltrainingorworkforceproductivityenhancement
Buildtechnicalcooperationnetwork
0 BEGIN ONGOING ONGOING ContinuousProcess
One‐on‐onewithlocalconsultants,marketing,NGOpartnerships,national&internationalprograms
ReferralManager Process
IndicatorFive:EstablishLegalandPolicyUnit
toserveasafeedbackvehiclebetweenprivatesectorandgovernmentlegal/regulatorypolicyenvironment
CompleteOfficeestablishment
0
BEGIN Hireandofficeestablishedby2017
Variousministries,chambersofcommerce/industry
NCIDirector Project
INTERMEDIATERESULTS*
IntermediateLevelResultsIndicators*
UnitofMeasure
Base CumulativeTargetValues**
FrequencyData
Source/ResponsibilityforData
Collect
Description(indicator
definitionetc.) Phase12015
Phase22016
Phase32017
Phase42018
IntermediateResult(ComponentOne):
Createaninstitutionalenvironmentfornewandexistinginnovation‐focusedentities(publicsector,privatesector,universitiesandresearchcenters)toimprovecollaborationandadoptinnovationpracticesthroughoutvaluechains.
IntermediateResultindicatorOne: Jordanianowned
PrivateSectorContributorstothe
Capital
156,593
10%increase
1x
2011EstablishmentCensus,2016Census
DeptofStatisticsQuantitativeAnalysis
Changesinsizeofformaleconomy‐newregisteredbusinessesinformaleconomy.
IntermediateResultindicatorTwo:
Jordanianownedbyeconomicactivity
156,593
3‐10%dependentonactivity
1x
2011EstablishmentCensus,
2016Census
DeptofStatisticsQuantitativeAnalysis
Newbusinessessetupintargetindustries/sectors.Evaluatebyeconomicactivity
Draftresults‐ willbedefinedduringthemapping/scopingphaseandpresented totheFundaspartofreporting
IntermediateResultindicatorThree:
n/a 0BEGINBASELIN
E
ONGOING
ONGOINGEveryPhase
Baselinemo.0‐6survey,
reoccurringsurveys
NCIDirector,M&EMgr,InformationMgr
QualitativeAnalysis
Qualitativeassessmentonattitudestowardsinnovation.
IntermediateResult(ComponentTwo):
EstablishInformationUnit
IntermediateResultindicatorOne:
Financial
0
BEGINBASELIN
E
LOW‐SCALE
REASSESSMENT
15%increase
4x
Ministries,R&D
Centers,Internatio
nalPrograms
InformationManagerQuantitativeAnalysis
AmountofnationalinvestmentinR&Dknowledgeandtechnologytransfertomarkets.
IntermediateResultindicatorTwo:
NumberfromBaseline
0
BEGINBASELIN
E
LOW‐SCALE
REASSESSMENT
5%increase 4x
R&DCenters,innovationsurveys
InformationManagerQuantitativeAnalysis
Numberofnewlinkagesorimprovementstoexistinglinkagesbetweenfirmsandpublicresearchinstitutions:co‐patents
IntermediateResultindicatorThree:
NumberfromBaseline
0
BEGINBASELIN
E
LOW‐SCALEREASSESSMENT
5%increase 4x
R&DCenters,innovationsurveys
InformationManagerQuantitativeAnalysis
Numberofnewlinkagesorimprovementstoexistinglinkagesbetweenfirmsandpublicresearchinstitutions:co‐publications
IntermediateResultindicatorFour:
NumberfromBaseline
0
BEGINBASELIN
E
LOW‐SCALEREASSESSMENT
20% 4x
R&DCenters,innovationsurveys
InformationManagerQuantitativeAnalysis
Numberofnewlinkagesorimprovementstoexistinglinkagesbetweenfirmsandpublicresearchinstitutions:Numberofnewpartnershipagreementssigned
IntermediateResultindicatorFive:
Number 0 BEGINQuarterl
yQuarterlyreporting
TOTALVALUE
16xInformationUnit,
InformationManager,ReferralManager
QuantitativeAnalysis
Numberandtypeofnationalandinternationalstakeholdersthatbecomeinterconnected.
reporting
ReferralUnit
IntermediateResultindicatorEight:
Description
0
BEGIN Accumulatio
n12x
InformationUnit
InformationManager,,JVC,ETVAT,INJAZ,other
NGOs
QualitativeAnalysis
Typeofvocationalorskillenhancementtrainingsconducted.
IntermediateResult(ComponentThree):
EstablishMonitoringandEvaluationUnit
IntermediateResultindicatorOne:
NumberandDescription
0
BEGINCountandnarrative
8xM&EUnit,ReferralUnit
M&EManager,ReferralManager,,Univ,R&D
centers
QualitativeAnalysis
Participationratesandengagementtypesofoutlyinguniversityandresearchcenters
IntermediateResultindicatorTwo:
NumberandDescription
0
BEGINQuarterlyreporting
Countandnarrative
8xM&EUnit,ReferralUnit
M&EManager,ReferralManager,,Univ,R&D
centers
QualitativeAnalysis Participationratesand
engagementtypesofprivatesector
IntermediateResultindicatorThree:
NumberandDescription
0
BEGINQuarterlyreporting
Countandnarrative
8xM&EUnit,ReferralUnit
M&EManager,ReferralManager,Univ,R&D
centers
QualitativeAnalysis
ParticipationratesandengagementtypesofAmman‐baseduniversityandresearchcentres
IntermediateResultindicatorFour:
NumberandDescription
0
BEGINQuarterlyreporting
Countandnarrative
8xM&EUnit,ReferralUnit
M&EManager,ReferralManager,Univ,R&D
centers
QualitativeAnalysis
ParticipationratesandengagementtypesofAmman‐basedprivatesectorwithHQinnovationcenter.
IntermediateResultindicatorFive:
NumberandDescription
0
BEGINQuarterlyreporting
Countandnarrative
8xM&EUnit,ReferralUnit
M&EManager,ReferralManager,Univ,R&D
centers
QualitativeAnalysis
Participationratesaton‐campusUniversityandResearchCenterInnovationFacilities.
IntermediateResultindicatorSix:
Description 0ONGOING
ONGOING ONGOINGEveryPhase
Baselinemo.0‐6;
M&EMgr,ReferralMgr,InformationMgr
QualitativeAnalysis
Changeinuptakeofinnovationactivitiesatthefirmlevelfrombaseline(innovationadoptioninproducts‐neworchangestoexisting,processorproduction,marketingandorganizationalsystems,expendituresoninnovations(capital)).
BEGINBASELIN
E
innovationsurveys;one‐on‐one
communication
IntermediateResultindicatorSeven:
Number
0
BASELINE
Assessment
10,000;3,000
4x M&EUnitDeptofStatisticsandMinistryofLabor
QuantitativeAnalysis
Numberofnewskilled‐laborjobscreatedandfilledbyJordanians;numberofnon‐skilledlaborjobscreatedandfilledbyJordanianandnon‐Jordanianpopulations.
IntermediateResultindicatorEight:
Number
0
BASELINEFROM2013
Assessment
Assessment
Assessment 4x M&EUnitMinistryof
Industry/Trade;DeptofStatistics
QuantitativeAnalysis
Numberofnewbusinessesregistered(trackriseorfallinstart‐uprates).
IntermediateResult(ComponentFour):
EstablishReferralUnit
IntermediateResultindicatorOne:
Numberanddescription
0 QuarterlyReport
QuarterlyReport
QuarterlyReport
12xReferralUnit
ReferralUnit,M&EUnitQuantitativeandQualitativeAnalysis
NumberandtypeofnationalandinternationalstakeholdersthatbecomeinterconnectedthroughReferralUnit.
IntermediateResultindicatorTwo:
Number
0
BEGINMonthly
Monthly Monthly Monthly 48xReferralUnit
ReferralUnitQuantitativeAnalysis
NumberSMEsservedthroughservicereferralnetwork.
IntermediateResultindicatorThree:
Description0
BEGINMonthly
Monthly Monthly Monthly 48xReferralUnit
ReferralUnitQualitativeAnalysis Typesofreferredservices
utilizedbySMEs.
IntermediateResultindicatorFour:
Number
0
BEGINMonthly
Monthly Monthly Monthly 48xReferralUnit
ReferralUnitQuantitativeAnalysis
Amountofgrowthcapitalintheformofgrant,debtorequity,extendedtoSMEsthroughnetworkservices.
IntermediateResultindicatorFive:
Description0
BEGINMonthly
Monthly Monthly Monthly 48xReferralUnit
ReferralUnitQualitativeAnalysis Qualitativeimpactof
referralservicesonSMEs.
IntermediateResultindicatorSix:
Description0
BEGINMonthly
Monthly Monthly Monthly 48xReferralUnit
ReferralUnitQualitativeAnalysis Qualityratingsofreferral
servicesprovidedtoSMEs.
IntermediateResultindicatorSeven:
Numberanddescription
0
QuarterlyReport
QuarterlyReport
QuarterlyReport
12xReferralUnit
ReferralUnit,M&EUnitQuantitativeandQualitativeAnalysis
NumberandtypeofeducationalandtrainingservicesthattransferinternationalknowledgeandexpertiserelatedtoinnovationmanagementtobroaderJordanianaudiences.
IntermediateResultindicatorEight:
Numberanddescription
0
QuarterlyReport
QuarterlyReport
QuarterlyReport
12x
InformationUnitReferralUnit
ReferralUnit,M&EUnit,InformationUnit,
QuantitativeandQualitativeAnalysis
Numberandtypeofparticipantsininnovationmanagementeducationandtraining.
IntermediateResult(ComponentFive):
Establishlegalandpolicyunit
Description
0
Begin
FullAssessmentofchangesbymonth36
AsneededLegal
consultantLegalconsultant Qualitative
IntermediateResultindicatorone:Buildgovernmentalcapacitytoprotectinnovationandbolsterprivatesectorgrowth.
IntermediateResultindicatorTwo:Reductioninbarrierstoinnovationwithinthebusinessandregulatoryenvironments.
Description 0 Being
FullAssessmentofchangesbymonth36
AsneededLegal
consultantLegalconsultant Qualitative
ReliableQualityWaterforJordan
A. BasicProjectInformationActivityName:ReliableQualityWaterforJordan
CountryName:HashemiteKingdomofJordan NameofImplementationSupportAgency(ies): EuropeanBankforReconstructionandDevelopment(EBRD)
NameofISAProjectLeader:HeikeHarmgart EmailofISAProjectLeader: [email protected]
RecipientEntity:MinistryofPlanningandInternationalCooperation,HashemiteKingdomofJordan
NameandEmailofRecipientEntityContact:[email protected]
TotalAmountApprovedbytheTransitionFund(US$):1,545,000
AdditionalFundsLeveragedandSource(s),ifany(US$):N/A
TotalAmountDisbursed(DirectandIndirectinUS$):274,895.57
SteeringCommitteeApprovalDate:
12/11/2012
ProjectImplementationStartDate:
1/31/2013
ProjectClosingDate:
12/31/2016
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): EnhancingEconomicGovernanceChooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:TheProjectObjectiveistobuildsustainabletechnicalcapacityforreliablequalitywaterfortheWaterAuthorityinJordan(WAJ)andfortheYarmoukWaterCompanythroughtheestablishmentofaUnitofExcellenceatWAJ;andtolaythefoundationfortheinvolvementoftheprivatesectorintheoverallmanagementofwaterservicesinJordan.
Ratingforprogresstowardsachievementofobjective: Satisfactory
Ratingforoverallimplementationprogress: Satisfactory
BriefSummaryofProjectImplementationStatus:TheUnitforExcellence(component1.1)startedinFebruary2015.TheestablishmentoftheUnitandtheinputprovidedbytheConsultantshasprovidedmoreinformationonthespecificrequirementstoincreaseWAJ’scapacitytomanageprivatesectorparticipationinthewatersector.Inresponsetheremainingcomponentsarebeingenhancedtoensurethattheprojectrespondstothecurrentsituationandmeetstheoverallobjectiveoftheproject.Theoveralldisbursementfigureforthisprojectremainslowtodate,andtheamountsindicatedinpreviousreportswillnotbeachieved.This isdue inpart tothestructureof theprojectandthecomponents;EBRDwillnotdisburseuntilspecificdeliverablesofeachcomponentarecompletedtothesatisfactionoftheboththeclient,inthiscasetheWaterAuthorityofJordanandMoPIC,andtheEBRD.Therefore,disbursementsaremadeafterservicesareprovidedandthis,combinedwiththedelaysinsigningtheumbrellagrantagreement,hasforcedanadjustmentofthedisbursementforecast.Overall,despitetherelativelyslowstarttotheimplementationoftheproject,theteamremainconfidentthattheoriginalobjectiveswillbemet.Toensurethattheprogressoftheprojectasawholeismaintainedandevenfast‐tracked,theEBRDaremovinganexistingstaffmembertoJordantooverseethenext6monthsofactivities.
C. ImplementationStatusofComponentsComponent1:EstablishmentofaUnitofExcellencewithintheWaterAuthorityinJordaninordertoimprovemonitoringoftheoverallwaterquality.PreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):940,000Sub‐component1.1:(i)TheestablishmentofaUnitofExcellencetroughincreasingtechnicalcapacityandbuildingupateamwithanadditionalseniorwaterexpertandajuniorwaterconsultantatWAJ;(ii)Increasingthefrequencyofwatertestingandundertakingselectedlaboratorytraining;and,(iii)Introducingwaterqualitymanagementprinciplesthroughaseriesofworkshopsandtrainingsessions.
StatusofImplementation:TheUnitwasestablishedinFebruary2015afterakickoffmeetingheldinAmmanonFebruary9,attendedbyallrelevantstakeholders. Theoriginalobjectives,as follows,areexpectedtobemet: (i)ensure improvedoverall quality and reliability of water and wastewater services; (ii) promote sub‐sovereign financial solutions andproactivelyengagewithbothpublicutilitiesandprivatesectorparticipantstoidentifyopportunitiesforfuturePublicPrivatePartnership(“PPP”)investmentsaswellastoassistthePMUindesigning,structuringandimplementingsuchprojects;and(iii)improvetheoverallmonitoringofwaterstandardsandservicesinJordan,TheoverallpurposeoftheassignmentistosupportthePMUtobuildsufficientandsustainabletechnicalcapacityinordertohelpitachievetheaforementionedthreeobjectives.TheconsultantshavebeenworkingwithWAJtoidentifyanappropriateandeffectiveworkingstrategyfortheassignmentandhaveinitiatedastakeholderregister,whichwillbethebaseforestablishmentoftheUoEwhichwillbetaskedwithvariousissuesrelatedtoformulation,preparationandimplementingmajorinvestmentprojectsinwatersector.ThecasestudyPPPproject,As‐SamraWWTP,hasbeenstartedandtheconsultantcontinuestosupportWAJtomanagetheprocesseffectively.Thecase‐studywillformpartofthePPPGuidelines,toserveasatoolapplicableforalargenumberofprojects,asitisexpectedthatsuchdocumentshallserveassecuringinstitutionalmemorywithinPMUforanynewcomingstaff.TheseguidelineswilltakeintoconsiderationJordan’sPPPlawandEBRD’sprocurementguidelines;aswellastheroleandfunctionsofthenewPPPUnitattheMinistryofFinance.Thelaboratorytestingcomponenthasbeenrevisedfollowingareviewofthecurrentequipmentandpractices.Therearetwoimportantareaswheredetailedinterventionswouldbebeneficialineasingthewaterresource problems of Jordan, these are: control of trade effluents andmunicipalwaste‐water discharges. Therefore theconsultantwillproceedby:makingthefrequencyofwater(andwastewater)testingmoreeffectivebyfocusingonidentifiedrisks;purchasingrelevantadditionallaboratoryandfieldequipmentforwaterandwastewater;and,establishingaWaterQualityManagementScheme.Sub‐component1.2:(i)Promotingdatasharingthroughtheestablishmentofcloserworkingrelationsamongthefullrangeofpublic andprivateorganizations that collectwater‐quality information related to theYarmoukwater source; and, (ii)Designingandimplementingapublichealthcampaign.StatusofImplementation:TheUnitforExcellencewillassistthePMU/WAJlabstocoordinatedatasharingthroughtheestablishmentofcloserworkingrelationsamongthefullrangeofpublicandprivateorganizationsthatcollectwater‐qualityinformationrelatedtotheWAJsystem.However,thefullscopeofthissubcomponentisnotcurrentlywithinthescopeoftheUnit.Therefore,followingtheapprovaloftheinceptionreportfortheUnitinJuly2015thissub‐componentwillbefinalizedandaddedtothescopeoftheUnittofacilitatecoordinationandconsistencybetweenrelevantstakeholders.Component2:Will focus on improving the overall regulatory framework and on strengthening national standards forwastewater discharged from industries and for discharging industrial effluents in the domestic sewer network throughbroaderpolicydialogue.PreviousRating:Moderately Satisfactory
CurrentRating:Moderately Satisfactory
Cost(US$):300,000
Sub‐component2.1:(i)BroaderpolicydialoguewiththeGovernmentanddifferentstakeholdersregardingimprovementstotariff‐settinglegalandinstitutionalframeworks;and,(ii)ManagementandFinancialManagementtrainingbasedonbestpracticesfromtheEBRDTransitionRegionStatusofImplementation:Since inceptiontheEBRDhavehadseveralhigh leveldiscussionswiththeMinisterofWaterincludingtwomissionsfromEBRD’sManagingDirectorforInfrastructuretoAmmantodiscusstariffsettingwithavarietyofstakeholders(Ministry,Utilitycompanies,bilateralandmulti‐lateralpartners).TheBankcontinuestocommunicatedirectlywithotherinvolvedparties,includingOECD,ISSP,UfMandotherstoensurethecomplementarityofthecomponenttoworkundertakenandongoing.Inparticular,toensurealignmentwiththeNationalReportforJordan‐Governance&Financingforthe Med Water Sector Project. The Terms of Reference are being redefined currently given the added emphasis onManagement andFinancialManagement training that has been identified by theUnit for Excellence. To ensure that thetrainingisalignedwiththecapacitybuildingandthePPPGuidelinesproducedbytheUnitforExcellence,ithasbeenidentifiedthatthetrainingwouldbemosteffectiveifundertakenaspartoftheUnit’sscopeofwork.Thus,sub‐component2.1willbedividedalongthelinesindicatedintheabovebox.Sub‐component2.2: Engaging public and private stakeholders in a broader policy dialogue in the area served by theYarmoukWaterCompanywiththeaimofstrengtheningstandards.StatusofImplementation:ACWUAwereselectedtoimplementthecontractandstartedinNovember2014.ThefocusoftheassignmenthasbeenadjustedtothecurrentsituationinYarmouk,theWaterAuthorityofJordanandotherWaterCompanies.Theassignmentisfocusingonthestrengtheningofstandardsfortradeeffluentdischargedfromindustries(JS202/2007),inparticular with respect to Total Dissolved Solids, heavy metals, and other toxic organic materials; and to improve the
regulationrelatedtodischargingindustrialeffluentsinthedomesticsewernetwork.ThepurposeofthisassignmentistoupdatetheinventoryforsourcesoftradeeffluentsinJordanandfacilitatethedialogueworkshopbetweenrelevantpartnerswiththeoverallobjectivetodevelopandimplementastructuredproposaltoestablishaclearandpredictableregulatoryframeworktofosterefficiencyandprofessionalismfordischargestandardsinthewastewatersector.Component3:TwinningJordanwithRomania,buildinguponthe“TransitiontoTransition”InitiativesponsoredbyEBRD.ItalsoaimsatpromotingcooperationintheArabCountrieswaterUtilityAssociations,alsobysharinglessonslearnedfromJordan.PreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):200,000
Sub‐component3.1:(i)TwinningJordanwithRomania;and,(ii)AdvancingCollaborationwithintheArabCountriesWaterUtilityAssociations.StatusofImplementation:Supportwasprovidedfortheattendanceof7membersofACWUAattheSecondArabWaterWeekin2013.Consequently,representativesfromthewaterregulatorsfromEgypt,AbuDhabi,PalestineandJordancreatedanew(Regulators)membershipcategorywithintheACWUAmembershipportfoliotoinvitewaterregulatorstocontributetodialoguewithwaterutilitiestowardsimprovementinwaterandsanitationservicesintheregion.RepresentativesoftheWater Regulators now communicate regularly and to consolidate this practice and the achievementsmade to date, theattendanceofafurthergroupofregulatorswassupportedtopartakeinaworkshopoftheregulatorycategoryattheArabWaterWeek2015,whichtookplaceinJanuary.TheregulatoryframeworkinmanycountriesintheArabRegion,includingJordanandEgypt,iseitherextremelyweakornon‐existent.Theworkshopwillfacilitatetheexchangeofexperiencesandpromotedialogueamongutilitiesandrespectiveregulatoryauthorities.Itwillreviewcurrentpracticesanddeterminewhatstepsneedtobetakeninordertoapplycorrectbusinesspractices,promote infrastructurepolicydevelopment, etc.This isparticularly important in the lightof Jordan'scurrentexerciseofreviewingitsownregulatorysetupsothattherightapproachbasedontheexperiencesofotheradvancedmarketsistherefromthestart.Giventhefocusalreadygiventotheimportanceoftheregulatoryfunction,thetwinningassignmentwillcontinuetosupportthisdirection.Thiswill includeexamples,eitherbyvisit,orconference facilities,ofanumberof internationalregulators,includingforexample,Romania,UK,Australia,Californiaandotherwaterscarecountries.Thecomponentandassociatedvisits/collaborationwillbefinalisedbytheendof2015.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
1,440,000 0 1,440,000
AmountReceivedfromTrustee: 1,440,000 0 1,440,000ActualAmountDisbursed(c): 229,228.34 0 229,228.3415
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)
Year Jan‐June Jul‐Dec TotalbyYearEnd2013 13,561.11 0 13,561.11
2014 0 25,000 25,000
2015 192,500.00 300,000.00 492,500.00
2016 300,000.00 300,000.00 600,000.00
2017 308,938.90 ‐ 308,938.90
2018 2019
15 Slow disbursement does not correctly reflect project progress. Out of US$ 1,440,000 approved by the MENA TF for direct project costs, till date the EBRD has signed contracts totaling US$ 940,000. However, under applicable EBRD rules and policies, only small, if any, down‐payments are allowed in respect of consultancy contracts, and payments are typically done upon submission of agreed deliverables.
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)45,667.23 59,332.77 105,000
G. ResultsFrameworkandMonitoring
Project Development Objective (PDO):
PDO Level Results Indicators* Unit of
Measure Baseline
Cumulative Target Values**
Freq
uenc
y
Data Source/
Methodology
Responsibility for
Data Collection
Description
(indicator
definition etc.) Jan
2013 –
Dec
2013
A
Jan
2014 –
Dec
2014
A
Jan
2015 –
Dec
2015
F
Jan 2016
– Dec
2016
F
Indicator One:
Increased awareness of water
quality issues in lagging areas
served by the company16.
Number of
people
reached in
lagging
areas
through
the public
health
campaign.
0 0 50,000 500,000 Yearl
y
Data will be directly
collected by the
YWC and by EBRD
EBRD [Municipal
Environmental
Infrastructures
(MEI)/Office of
the Chief
Economist (OCE)]
Number of
exchanges on
water quality
(including
workshop)
Indicator Two: Increased
opportunities for transition
through improved regulatory
frameworks and shared best
practice (twinning with Romania
and ACWUA).
Number of
people
trained
0 0 200 300 500 Yearl
y
Data will be
directly collected by
the WAJ and
by EBRD
EBRD
[MEI/OCE]
Number of
officials
trained on
regulatory
frameworks
and on best
practices
Indicator Three: Additional
private sector participation in
one of the three Water
Companies in Jordan
Number of
private
sector
entities
0 0 0 1 1 Yearl
y
Data will be
directly collected
by the WAJ and
by EBRD
EBRD
[MEI/OCE]
Number of
private Sector
entities
involved in the
water sector
16 The Feasibility Study undertaken by ATKINS highlights that there are lagging areas where the Company is unable to test for water quality. It was indicated that lack of resources and equipment prevents them from covering the whole service area. The public health campaign will be targeted to these lagging areas.
INTERMEDIATE RESULTS
Intermediate Result (Component One): Water Quality issues are understood and monitored with increased frequency
Water quality monitoring plan submitted by the Unit of Excellence within the first year of operation
Number 0 0 1 1 Yearly Data will be
directly
collected by
the YWC and
by EBRD
WAJ
and EBRD
(OCE –
MEI)
2 workshops on water quality undertaken within the second year of operation.
Number 0 0 2 2 6 monthly Evidence will
be directly
collected by
the YWC and
by EBRD and
will include
agenda,
summary of
minutes and
attendance.
EBRD
(OCE)
YWC laboratory accreditation by the end of the project17
Text 0 1 Yearly Evidence will
be directly
collected
by the YWC
and by EBRD
WAJ, YWC
and –EBRD
(MEI)
Intermediate Result (Component Two): Dialogue on water tariff and water standards ongoing
Number of stakeholders participating in policy dialogue on water tariffs
Number of
stakehold
ers from
Public and
Private
Sector
None 0 1 tbc 6 monthly Data will be
directly
compiled by
the YWC, WAJ
and by EBRD
EBRD
(MEI/OCE)
1 workshop on standards for wastewater discharged from
Text None 0 1 Yearly Data will be YWC‐OCE
17 The Yarmouk Water Company laboratory is currently not accredited.
industries and on domestic recycling of water organized and Implemented
directly
compiled by
the YWC,
WAJ and by
EBRD
1 public health campaign designed and implemented
Text None 0 1 Yearly Data will be
directly
compiled
by the YWC,
WAJ and by
EBRD
OCE
Intermediate Result (Component Three): Ongoing partnership with twinning country, resulting in increased training opportunities for Public Sector Officials
Number of Jordanian officials that participated in training opportunities through twinning with Romania
Number 0 0 0 125 100 Yearly Data will be
directly
compiled by
the YWC,
WAJ, ACWUA
and EBRD.
This will
include
reports on
attendance
and
participation.
WAJ, YWC‐OCE
ACWUA 1 workshops and 1 benchmarking exercise organized and delivered.
Number 0 1 1 2 Yearly Evidence will
be directly
compiled by
YWC, WAJ,
ACWUA and
EBRD. This
will include
agenda,
summary of
minutes and
attendance.
ACWUA, OCE
PromotingFinancialInclusionviaMobileFinancialServices:JordanActivities
A. BasicProjectInformationActivityName:PromotingfinancialinclusionviamobilefinancialservicesintheSouthernandEasternMediterraneancountries–activitiesinJordan.
CountryName:Jordan
NameofImplementationSupportAgency(ies):EuropeanInvestmentBank
NameofISAProjectLeader:TimothyWinters EmailofISAProjectLeader:[email protected]
RecipientEntity:CentralBankofJordan NameandEmailofRecipientEntityContact:MahaBahou
TotalAmountApprovedbytheTransitionFund(US$):
USD426,000(includingindirectcosts)
(originallyUSD891,000;updatedasperrestructuringmemorandumofMay2015)
AdditionalFundsLeveragedandSource(s),ifany(US$):USD80,000–co‐financingsupportinkindexpectedfromCentralBankofJordan
USD32,000(EUR28,000)–commitmentfromUnionfortheMediterraneanforUfMlabelledproject(totalcommitment,coveringJordanandMorocco,of2workingsessionsatEUR28,000each)
TotalAmountDisbursed(DirectandIndirectinUS$):
USD56,000
SteeringCommitteeApprovalDate:
12/5/2013
ProjectImplementationStartDate:
12/1/2015
ProjectClosingDate:
6/30/2016
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
EnhancingEconomicGovernance
SecondaryPillar(s): InvestinginSustainableGrowthInclusiveDevelopmentandJobCreationCompetitivenessandIntegration
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:ThisprojectaimstoimprovefinancialinclusioninJordanthroughtheprovisionofinnovativemobilefinancialservices,targetingparticularlylow‐incomeJordanianswhodonotusebankingservices.
Ratingforprogresstowardsachievementofobjective: NotApplicable
Ratingforoverallimplementationprogress: NotApplicable
BriefSummaryofProjectImplementationStatus:Allapprovals(EIBandJordan)havebeenreceivedforthesignatureoftheCooperationAgreementandtheoriginalsofthedocumentweresenttoJordanforsignatureon2July.Theprocurementprocedureisunderway,andthefirstshortlistingmeetingsarescheduledduringw/b13July.Thefulltenderevaluation(attheendofwhichanawardwillbemade)isscheduledforw/b26October2015.ArestructuringmemorandumwassubmittedtotheSteeringCommitteeinMay2015toformalizethemodificationstotheprojectwhichhadbeenreportedintheprevious6‐monthlyreport.BuildingonfromtheOctober2014workshopinBarcelona,afurtherworkshopisbeingorganizedattheUfMheadquartersatwhichrepresentativesfromfourMediterraneancentralbanks(Jordan,Egypt,MoroccoandTunisia)willbepresenttodiscusstheoptionsforimplementingmobilefinancialservicesthroughpartnershipswith,forinstance,microfinanceinstitutions.
C. ImplementationStatusofComponents
Component1:CapacitybuildingandsupportforadaptingtheregulatoryframeworkforretailpaymentserviceprovidersandenhancingtheoversightfunctionofCBJfrompracticalandfunctionalperspective.PreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):USD335,000Sub‐component1.1:CapacitybuildingfortheoversightfunctionStatusofImplementation:Aspreviouslyreported:TheCentralBankofJordan hasinformedtheEIBthatpartoftheactivitiesproposedforthiscomponentarealreadybeingcarriedoutunderadifferentoperationfundedbytheWorldBank.Onthisbasis,onlytheremainingelementswillbecarriedoutunderthepresentMENATransitionFundoperation.Thefollowingpresentstheupdatedlistofpointstobeaddressedunderthiscomponent.• AssistanceindesigningaPFMImethodologythatsuitsJordananditsrelevantinstitutions;• Assistanceindevelopingalegalframeworkthatprovidesarobustlegalbasefortheoversightprogram;• Developingadisclosureframeworktoensuredisclosureofrelevantdatabyallrelevantparticipantsandjurisdictions;• Developingabalancedscorecard,andassistinginimplementation;• Assistanceinthedevelopmentandimplementationofariskmanagementplan,andstresstestingprocedures;• VisitsbyJordanianofficialstoforeigncentralbanksthatapplybestpracticesinoversightovermobileandretailpayment
systemsandfollowaPFMImethodologytoseehowitisconducted;• TwinningwithothercentralbankstoobservebestpracticesandgiveexposuretoCBJpersonnelonhowbestpracticesare
carriedout.Sub‐component1.2:DevelopingamethodologyinprocessingstatisticalreportsanddatatoproduceconcisereportsinordertoexecuteactionsStatusofImplementation:Theworkforthiscomponentwillbecarriedoutasproposed,butwithadelayasoutlinedabove.Sub‐component1.3:Developmentofpublicawareness/financialinclusioneducationstrategyStatusofImplementation:Aspreviouslyreported:DuringtheprocessofpreparingtheTermsofReference,theCentralBankofJordaninformedtheEIBthattheirinterestinthiscomponentwasnolongerthepreparationofthestrategy,butrathertheimplementationofthisstrategyviatheproductionofmaterials,engagementofpublicrelationsteams,etc.AstheEIBdoesnotfeelthatitisbestplacedtooverseetheprocurementofsuchgoodsandservices,ithasbeendecidednottoincludethiscomponentinthemainconsultancycontractforwhichtheEIBiscurrentlypreparingTermsofReference.Inthecasethatnoothersolutionisfound,itislikelythatthiselementoftheprogramwillberemoved,leadingtoacorrespondingreductionintheoverallbudget.FulldetailswillbecommunicatedtotheSteeringCommitteeassoonaspossible.Component2:KnowledgesharingworkshopPreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):USD35,000StatusofImplementation:Aspreviouslyreported:TheEIBhasproposedtotheJordanianauthoritiesthatthiscomponentbeincludedinthemainconsultancycontractunderprocurementbytheEIB,inordertostreamlineimplementation.Aspreviouslyindicated,thiscomponentwillbeinstigatedonlyaftertheworkforComponent1hasbeencarriedout.ItisexpectedthattheUnionfortheMediterraneanwillplayaroleinensuringthattheeventsconsistinanintegralpartofthecapacitybuildingfunctionoftheproject.Component3:ProjectManagement,Coordination,MonitoringandEvaluationPreviousRating:Chooseanitem. CurrentRating:Chooseanitem. Cost(US$):USD80,000
(estimationofthein‐kindcontributionofCBJstafftimeduringtheproject)
StatusofImplementation:Aspreviouslyreported:Thisactivity– whichiscountry‐executedbytheCentralBankofJordan–intermsofcoordinatingtheprojectinternallywillbeginoncethecoreconsultancycontracthasbeenawarded.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities(US$) Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
0 370,000 370,000
AmountReceivedfromTrustee(b):
0 0 0
ActualAmountDisbursed(c): 0 0 0
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2014 0 0 02015 0 148,000 148,0002016 222,000 0 222,000
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)56,000 0 56,000
G. ResultsFrameworkandMonitoring
NB:thisistheresultsframeworkassubmittedwiththeprojectproposal.Noupdateshavebeenmade,astheprojectimplementationhasnotyetcommenced.
PDO Level Results Indicators* Unit of Measure
Baseline
Cumulative Target Values**
Frequency
Data Source/
Methodology
Responsibility for Data Collection
Description (indicator
definition etc.) Jan 2015 – Dec 2015 F
YR 2 F
YR3 F
YR 4 F
YR5 F
Indicator One: Increase in
access metrics
Number 430.8 per 1000 as of 30‐6‐2013
+5% +10% +15% +20% +25% Annual Reporting to CBJ
CBJ Increase in number of accounts
Indicator Two: Per capita
cashless transactions
Number 66.5 Per Capita as of Sept‐2009
+10% +20% +30% 40% 50% Annual Reporting to CBJ
CBJ Per adult (>15) number of cashless transactions through debit and credit cards
Indicator Three: Infrastructure
metrics
Number 3.5 ATMs and POS per 1000 inhabitant 0.13 branch per capita as of Dec 2012
+5% +10% +15% 20% 25% Annual Reporting to CBJ
CBJ Agents, ATMs and POS terminals per 1000 inhabitants and number of branches 1000 per capita
Indicator Four: Transactions
per acceptance infrastructure
Number 12043 transaction per POS as of Dec. 2012
+10% +20% +30% 40% 50% Annual Reporting to CBJ
CBJ Number of transactions per POS
Indicator Five:
Increased safety and efficiency
of the Payment System
Survey Low Low Medium‐High
High Annual Global Payment Systems Survey, WB, every two years
CBJ Legal and Regulatory Score
Large Value Payment Score
Retail Payment Score
Oversight Score
Indicator Six:
Number of private sector
actors having created new,
innovative payment
products/services (as a
measure of the success of
creating a conducive legal and
regulatory framework, allowing
innovations in retail payments)
Number 0 1 5 Annual CBJ CBJ Number of
institutions
offering
innovative
payment
services
targeting at low
income,
unbanked
segments
Indicator Seven:
Strengthened laws and
supporting regulations enacted
Legal and Regulatory Score
low low Low‐medium
medium
Medium‐high
high Annual Global
Payment
Systems
Survey, WB
CBJ
CBJ Commitment from Government to implement the adopted NPS Strategy
INTERMEDIATE RESULTS
Project Intermediate Result:
Intermediate Result 1: Periodical
progress reports from program of
capacity building for adapting the
regulatory framework for retail
payment service providers and
enhancing the oversight function
of CBJ from practical and
functional perspective
Report n/a As
define
d with
consul
tants
n/a n/a n/a n/a Periodical
during
implement
ation
(2014)
Reporting to
the EIB
Consultants, CBJ See section 14
Intermediate Result 2: Workshop
for sharing of knowledge
Workshop n/a 0 1 n/a n/a n/a Once, at
project
completion
Reporting to
the EIB
CBJ Successful
completion of a
workshop to
enable
knowledge
sharing of
country
experience
between
countries
participating in
the program.
Intermediate Result 3:
Establishing an implementation
structure in the CBJ
Report n/a 2 n/a n/a n/a n/a Six‐
monthly
during
implement
ation
CBJ reporting
to the EIB
based on
observed
progress in
implementati
on unit
CBJ Establishment
of a
management
team within the
central bank
SMEGrowthProgrammeA. BasicProjectInformation
ActivityName:Jordan’sSMEGrowthProgrammeCountryName:Jordan NameofImplementationSupportAgency(ies):
EuropeanInvestmentBankNameofISAProjectLeader:DavidDemulier EmailofISAProjectLeader:[email protected]:JordanEnterpriseDevelopmentCorporation(JEDCO)
NameandEmailofRecipientEntityContact:HanaUraidi,CEOofJEDCO,[email protected]
TotalAmountApprovedbytheTransitionFund(US$):3,850,000
AdditionalFundsLeveragedandSource(s),ifany(US$):/
TotalAmountDisbursed(DirectandIndirectinUS$):780,000**
SteeringCommitteeApprovalDate:May15,2013
ProjectImplementationStartDate:20April2015
ProjectClosingDate:20April2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar(selectonlyone): InvestinginSustainableGrowthSecondaryPillar(s)(selectasmanyasapplicable):
EnhancingEconomicGovernanceInclusiveDevelopmentandJobCreationCompetitivenessandIntegration
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:TheprojectobjectiveistosupportandsustainStartupsandMSMEs‐withparticularfocusonhigh‐valuegrowthenterprises‐toincreaseproductivityandcompetitivenessthroughadoptingandapplyinginnovation.Ratingforprogresstowardsachievementofobjective:
Satisfactory
Ratingforoverallimplementationprogress:
Satisfactory
Brief Summary of Project Implementation Status: The Cooperation Agreement has been signed,tenderingiscompletedandtheprojecthasnowbeguntheimplementationphase.ProgressisfollowingtheschedulepresentedintheupdatesenttotheTransitionFundinDecember2014.TheprocurementevaluationcommitteemadethefinalchoiceofcandidateinthesecondweekofFebruary.HanaUraidi,CEOatJEDCO,participatedintheprocess.Thecontractwassignedbythewinningconsortiumon16April2015, followedimmediatelybythekick‐offmeeting inAmman,on20April2015.ContractvalueisEUR2.623.400(approximatelyUSD2,940,000).TheBankreceivedtheInceptionReporton14Mayandthefirstmonthlyprogressreporton19June.DuetoRamadanandsummerbreak,thefirstSteeringCommitteewillbeorganizedend‐Augustorearly‐September 2015. The Steering Committee is already in place, comprised of members from JEDCO’sExecutiveCommitteeasperBoardofDirectors,aswellasrepresentativesoftheEUDelegationandtheBritishEmbassy.RelationsbetweentheexpertsandJEDCO’steamareverypositive.TheexpertsareinvolvedandintegratedinwhatisgoingonatJEDCOandthefirstnon‐keyexpertsarebeinghired.Specificactivitiesduringthefirst2monthsofimplementationareasfollows:
‐ Workhascommencedacrossallworkpackagesonpreparingoperationalandorganizational
documentationrequiredforprojectimplementation,particularlyjobdescriptionsforthepositionofGrowthManagersandcoaches,proceduraldocumentsforcoachselectionandrecruitmentandTermsofReferenceforProgrammebodiessuchastheSteeringCommittee,theProgrammeAdvisoryBoardandtheObservatoryAdvisoryBoard.AllofthisdocumentationhasbeensubmittedtoJEDCOforconsiderationandapproval.
‐ InsupportofthisanumberofToR’shavebeenpreparedfornon‐keyexperts(NKEs),experts
identifiedandRequestsforApprovalpreparedforsubmissiontoEIB.Thefirstofthese,aRequestforApprovaltoengagetwoexpertstoCustomiseSMEdiagnostictoolsforuseinJordanhasalreadybeensubmittedandthiswillbecloselyfollowedbyRequestsforApprovalforaSelection,RecruitmentandTrainingofGrowthManagersassignment,aBusinessCoachTrainingAssignment,aRegionalPromotionPlan,anInternationalAccreditationBodyScopingStudyandanObservatoryScopingAssignment.
C. ImplementationStatusofComponentsComponent1*:Identifying,diagnosingandrecruitingStartupsandSMEswithgrowthpotentialmotivatedandcommittedtoinvestindevelopmentandinnovationPreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):500,000Sub‐component1.1:Identifying,diagnosingandrecruitingStartupsandSMEswithgrowthpotentialmotivatedandcommittedtoinvestindevelopmentandinnovationStatusofImplementation:ThemethodologytosupportSMEsisbeingdevelopedandprocessesandrolesrequiredtodeliverthissuccessfullyisbeingdefined.Sub‐component1.2:TrainingJEDCOStaffStatusofImplementation:Anumberofmeetingshavetakenplacewithkeystakeholderstodefinetherequirementsinthelightofcurrentaims,objectivesandrevisedstructureatJEDCO. JobDescriptionandToRsofBusinessGrowthManagerExpertinselection,RecruitmentandTrainingofGrowthManagershavebeenprepared.Component2*:ProvidingandTraininginternationallyrecognizedandaccredited,monitoredandspecializedbusinesscoachingserviceprovidersinareasofsustainablegrowth,productivityenhancementandcompetitiveness,technology,innovationandexportsdevelopmentPreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):760,000Sub‐component2.1:Identify,recruit,train,qualifyandpromotebusinesscoachingserviceprovidersStatusofImplementation:Themethodologytorecruitanddevelopcoachesisbeingdefined,withmostofthecoachrecruitmentdocumentationdefined. Sub‐component2.2:EstablishBusinessCoachRosterandadvancedMatchmakingcorrelationsandothermonitoringsupportfeaturesdatabase.ThismaybeanonlineandinteractivetoolStatusofImplementation:ProcessunderwayComponent3*:Exclusivelyselectandsupporthigh‐growth(definedasabeinginaphaseinwhichthebusinessisachievingaminimumof20%increaseinturnoverorstaffinthreeconsecutiveyears)companies(andwithpotentialforgreatergenuineandrapidsustainablegrowth),byimplementinganexclusivelyadvancedintensivecoaching,training,certificationsandgrantcontributionAcceleratorprogrammethatistailoredtodeliverthestrategicinterventiontosupporttheaspirationsofthisexclusivegroupofbeneficiarycompaniesPreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):1,700,000Sub‐component3.1:ExclusiveStartups&SMEBeneficiarySelectionProcessImplementation
StatusofImplementation:ThemethodologyforStart‐up/SME,CATA/BclassificationhasbeendevelopedbasedonGrowthCCODE,alongwiththeidentificationofcommonissuesfacingSMEs.Theclientapplicationprocesshasbeendefined.Sub‐component3.2:Provisionofsophisticatedtailoredservices,grantsandaftercareservicestoselectedbusinessesStatusofImplementation:ProcessunderwayComponent4*:EstablishingaStartupsandMSMEsGrowthObservatoryatJEDCOPreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):500,000Sub‐component4.1:EstablishandEquiptheObservatorywiththenecessaryhardandsoftwaretoestablishaserviceportalandenableoperationStatusofImplementation:ThebroadscopeandoutlineoftheObservatoryoperationhasbeendefinedandtheplantoimplementtheObservatoryisbeingdeveloped.DetailofobservatoryneedstobeagreedwithJEDCOtointegratewiththeirnewstructure.Sub‐component4.2:Recruitandtrain3‐5newspecializedJEDCOstafftomanage/operatetheservice.StatusofImplementation:JobDescriptionsandToRs ofITExpert–Databasedesign,procurement,documenthandlingandportalandExpertinBusinessGrowthObservatory arebeingpreparedComponent5*:Providingapositive,supportedandcredibledealflowtoexistingandfuturenewFundsand/orotherinvestorsPreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):190,000Sub‐component5.1:UndertakeduediligenceservicesofidentifieddealflowtotheexistingandnewFundsand/orotherinvestorsStatusofImplementation:Outlineplanhasbeendevelopedandstakeholderengagementplanbeingdefined.Jobdescriptionfordealflowexperthasbeendeveloped. Sub‐component5.2:MonitorthedealflowtotheexistingfundsandprovideadvisorysupportontheduediligenceservicesStatusofImplementation:Processunderway*IncludingUSD5,000eachforsteeringcommitteemeetingparticipationbyJEDCO.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution
(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
3,460,000* 190,000 3,650,000
AmountReceivedfromTrustee(b*):
3,460,000* 190,000 3,650,000
ActualAmountDisbursed(c):
580,000** 0 580,000**
*whileEIBshallprocurethenecessaryexpertsinaccordancewithitsownprocurementrules,asJEDCOisbeingconsultedandprovidessupportateachstageoftheselectionprocess,theinitialallocationbetweenISAvsCountryexecutionismaintained.**includesprefinancingofEUR524,680orapproximatelyUSD580,000(asof30June2015) initiatedbyEIBinMay2015,awaitingprefinancinginvoicebyconsultant.
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)(30June2015Exchangerate)
Year Jan‐June Jul‐Dec TotalbyYearEnd2014 ‐ 0 02015 580,000** 345,000 925,0002016 345,000 345,000 1,615,0002017 345,000 345,000 2,305,0002018 635,000 710,000*** 3,650,000
***remainingfundsforadditionalactivitiestobedeterminedinthecourseoftheproject.
F. DisbursementsofFundsforIndirectCosts(US$)Disbursed Available Total
200,000 0 200,000
G. ResultsFrameworkandMonitoring
PleasenotethattheresultframeworkwillberevisedinlinewiththefinalToRsProjectDevelopmentObjective(PDO):SupportingandsustainingStartupsandSMEs‐withparticularfocusonhigh‐valuegrowthenterprises–toincreaseproductivityandcompetitivenessthroughadoptingandapplyinginnovation.
PDOLevelResultsIndicators*
UnitofMeasureBaselin
e
CumulativeTargetValues**
Frequency
DataSource/Methodology
ResponsibilityforData
Collection
Description(indicatordefinitionetc.)
April2015–April2016F
April2016–April2017F
April2017–April2018F
YR4F***
YR5F***
IndicatorOne:a)Identifying,diagnosingandrecruitingStartupsandSMEswithgrowthpotentialmotivatedandcommittedtoinvestindevelopmentandinnovation.b)No.ofJEDCOStaff(AccountManagers)trained
a)No.OfStartups&SMEs
0 100 175 250 300 350
Quarterly
StartupsandSMEsJEDCOContractor
Contractor&JEDCO
b)No.ofStaffTrained
0 5 10 15 25 25
JEDCO
IndicatorTwo:Providinginternationallyrecognizedandaccredited,monitoredandspecializedbusinesscoachingserviceprovidersinareasofsustainablegrowth,competitiveness,technology,innovationandexportsdevelopment.
a)No.OftrainedBusinessCoachesandServiceProviders.
0 25 50 75 100 100
Quarterly
JEDCOContractorServiceProvidersInternationalServiceCertificationBodiesStartupsandSMEs
Contractor&JEDCO
b)GrowthImpactofServicesDeliveredonBusinesses.
0
10% 20% 50% 65% 75%
c)DatabaseatJEDCO
0 1 1 1 1 1
IndicatorThree:Exclusivelyselectandsupporthigh‐growthcompanies,byimplementinganexclusivelyadvancedandintensivecoachingAcceleratorprogrammetosupporttheaspirationsofthisexclusivegroupofbeneficiarycompanies.
a)No.ofexclusivehighgrowthStartups&SMEsselected.
0
25 50 100 135 175
Quarterly
JEDCOContractorProvidersInternationalServiceCertificationBodiesStartupsandSMEs
Contractor&JEDCO
b)Varietyoftailoredservices/CoachingDaysobtained.
0 10 20 30 40 50
IndicatorFour:EstablishingaStartups&SMEsGrowthObservatoryatJEDCO
Observatory3‐5TrainedStaff
0
1
1 1 1 1 Quarterly
JEDCO
Contractor&JEDCO
0 3 5 5 5 5
IndicatorFive:Providingapositive,supportedandcredibledealflowtotheexistingandfuturenewfundsand/orotherinvestors.
No.ofDueDiligenceStudiesandgeneratedDealflows
0
No.willbeestablishedbythe2ndYearofprojectimplementation.Provisionallyitwouldaimatsupporting10%ofthehighgrowthSMEsthatwillbenefitfromtheProgramme.
Quarterly
JEDCO/EIBJordanCapitalforGrowthFundBadiaImpactFund&/orotherinvestors.
Contractor&JEDCO/EIB
0
N.BAnoptiontoincludeanindependentevaluationoftheprojectshouldbeconsideredtoaudittheresultsclaimedbythecontractor.
INTERMEDIATERESULTS
IntermediateResult(ComponentOne):a)Identifying,diagnosingandrecruitingStartupsandSMEswithgrowthpotentialmotivatedandcommittedtoinvestindevelopmentandinnovation.b)No.ofJEDCOStafftrained
IntermediateResultindicator1:ContractorRecruitedandMobilized
Within3months NA Bymonth3
1.Callforproposaltoidentifycontractor.2.EvaluationCommitteeReportson
Contractor&JEDCO
SelectionProcess.3.ContractSignedbetweenJEDCOandContractor.Paymenttransfersforservicesrendered.
IntermediateResultindicator2:MarketingcommunicationcreatedandJEDCOwebsiteupdated
Within3months NA Bymonth3
1.JEDCOMarketingCommunicationStrategy.2.JEDCOWebsite
Contractor&JEDCO
IntermediateResultindicator3:ContractorDeliveryofficeandJEDCOimplementationUnitestablished
Within3months NA Bymonth3
UnitEstablishment,staffingandoperationsatJEDCO.
Contractor&JEDCO
IntermediateResult(ComponentTwo):Providinginternationallyrecognizedandaccredited,monitoredandspecializedbusinesscoachingserviceprovidersinareasofsustainablegrowth,competitiveness,technology,innovationandexportsdevelopment.
IntermediateResultindicator1:Attract,Recruit&CertifyBusinessCoaches
Within6months NA 15Coaches
30Coaches
50Coaches
65Coaches
85Coaches
Quarterly 1.CallforProposalfrominterestedbusinesscoaches.2.SelectionReportsforthebusinesscoaches.3.Attendancetotrainingrecords.4.CopiesofcertificatesawardedtoBusinessCoaches.
Contractor&JEDCO
IntermediateResultindicator2:OfferServicestoStartups&SMEs
Within6months NA 50 100 150 200 250 Quarterly 1.CopiesofcommunicationlistingtheservicesofferingtotheMSMEcommunity.2.ExpressionsofinterestreceivedfromtheMSMEcommunity.3.CopiesServicescontractstoMSMEs.
Contractor&JEDCO
IntermediateResult(ComponentThree):Exclusivelyselectandsupporthigh‐growthcompanies,byimplementinganexclusivelyadvancedandintensivecoachingAcceleratorprogrammetosupporttheaspirationsofthisexclusivegroupofbeneficiarycompanies.
IntermediateResultindicator1:Identify&EngageWithtargetedStartupsandSMEs
Within6months NA 5 15 35 50 75 Quarterly 1.ApplicationsofInterestfromtheMSMEs.2.AssessmentReportsofapplicantMSMEs.3.CopyofAgreementwithMSMEtocommittothesupportprogram.
Contractor&JEDCO
IntermediateResultindicator2:ProvideTailoredServices
Within6months NA 3 7 15 20 35 Quarterly ListofservicesprovidedandTimeplanforexecution.
Contractor&JEDCO
IntermediateResult(ComponentFour):EstablishingaStartupsandSMEsGrowthObservatoryatJEDCOIntermediateResultindicator1:EstablishingtheObservatory
Within9months 1 1 1 1 1 1 Quarterly JEDCOBoardofDirectorsDecisiontoEstablishandstaffObservatory
Contractor&JEDCO
andintegrateitintheOrganizationalchartaspartofthePolicyDepartmentattheCrossCuttingSupportDirectorate.
IntermediateResultindicator2:Recruiting&TrainingStaff
Within9months 2 3 4 5 5 5 Quarterly 1.Postsadvertisement.2.ShortlistedCandidatesInterviewreports.3.StaffContracts.4.Stafftrainingneedsassessmentreports.5.Staffattendanceoftrainingprograms.
Contractor&JEDCO
IntermediateResult(ComponentFive):Providingapositive,supportedandcredibledealflowtotheexistingandfuturenewFundsand/orotherinvestors.IntermediateResultindicator1:No.ofDueDiligenceStudiesConducted.
ToBeEstablished
NA NAProvisionallyitwouldaimatsupporting10%ofthehighgrowthSMEsthatwillbenefitfromtheProgramme.
Quarterly CopiesofDueDiligenceStudies.
Contractor&JEDCO/EIB
IntermediateResultindicator2:No.ofSuccessfulStartupsandSMEsthatattractinvestments
ToBeEstablished
NA NAProvisionallyitwouldaimatsupporting10%ofthehighgrowthSMEsthatwillbenefitfromtheProgramme.
Quarterly CopiesofInvestmentagreements.
Contractor&JEDCO/EIB
*** For information (beyond end of project implementation period)
RegionalIntegrationthroughTradeandTransportCorridors:JordanActivities
A. BasicProjectInformation
ActivityName:RegionalIntegrationthroughTradeandTransportCorridors(TRANSTRAC)–JordanActivities
CountryName:Jordan NameofImplementationSupportAgency(ies):EuropeanInvestmentBank
NameofISAProjectLeader:PasqualeStaffini EmailofISAProjectLeader:[email protected]
RecipientEntity:MinistryofPublicWorksandHousing NameandEmailofRecipientEntityContact:
[email protected] TotalAmountApprovedbytheTransitionFund(US$):2,630,000.00
AdditionalFundsLeveragedandSource(s),ifany(US$):0.00
TotalAmountDisbursed(DirectandIndirectinUS$):530,000
SteeringCommitteeApprovalDate:
5/15/2013
ProjectImplementationStartDate:
9/1/2013
ProjectClosingDate:
9/10/2016
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): InclusiveDevelopmentandJobCreationCompetitivenessandIntegrationChooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:
TheobjectiveofTRANSTRACistopromotethereductionoftradeandtransportbarriersalongtheprioritytradecorridorsofJordanandinrelatedbordercrossings.
Ratingforprogresstowardsachievementofobjective: Satisfactory
Ratingforoverallimplementationprogress: Satisfactory
BriefSummaryofProjectImplementationStatus:
‐ A condition precedent for the EIB to procure and sign consultancy contracts for TA is the signing of a technical assistance (TA) Cooperation Agreement (CA) with the promoter or beneficiary country, signed in February 2015.
‐ Component #1 contains regional activities – covering all TRANSTRAC countries. Services are supposed to start after Cooperation Agreements are signed by all beneficiary countries. However following the May 2015 Steering Committee meeting, it was suggested to EIB and beneficiary countries that such regional activities could start without waiting for all country signatures. a) Road Safety Action Programme, the ToR was completed and agreed with all relevant country authorities including Jordan in mid-2014. This is a Regional TA to be procured in one Lot together with the actions in Morocco, Egypt and Tunisia. Procurement is done and the consultant was selected. Activities will thus start in Jordan in 3rd quarter of 2015. b) TA to transportation activity: by end 2014 ToR had been completed and agreed with all countries including the Jordanian authorities. This is a Regional TA to be procured in one Lot together with the actions in Morocco, Egypt and Tunisia. Procurement will start in 3rd quarter of 2015.
‐ Component #2.1 Rehabilitation and upgrading of routes R15 Amman airport-Aqaba Back Road and R65 North Shouna-South Shouna: Consulting Services started in beginning of March 2015 with a kick off meeting. The first steering committee meeting was organised in Amman end of April 2015. Pre-financing of EUR 400,000 was done in the first quarter of 2015. Next milestone and steering committee meeting will be in October 2015 when an analysis of the proposed design for the R15 will be evaluated.
‐ Component #2.2 Jordan-Iraq border crossing (Al Karamah): no new development.
‐ A project management unit (PMU) will be established within the lead Ministry to monitor and coordinate the TAs.
The unit will be led by a ministry official who will be supported by consultants. By end 2014 ToR had been completed and agreed with the Jordanian authorities. Procurement of the related consultancy services will be launched in third quarter of 2015.
C. ImplementationStatusofComponents
Component1:InstitutionalandcapacitybuildingforregionaltradeframeworkimprovementPreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):350,000
Sub‐component1.1:TAtotransportation(regionwidecomponent)StatusofImplementation:
‐ ToR was completed and agreed with all countries including the Jordanian authorities. This is a Regional TA to be procured in one lot together with the actions in Morocco, Egypt and Tunisia. Procurement will start after all Cooperation Agreements are signed by all countries - However following the May 2015 Steering Committee meeting, it was suggested to EIB and beneficiary countries that such regional activities could start without waiting for all country signatures.
‐ In Jordan this item focusses on driver training and improved vehicle inspection within public transport companies.
Sub‐component1.2:Preparationofroadsafetyassessmentandactionplan(regionwidecomponent)StatusofImplementation:
‐ ToR was completed and agreed with all relevant country authorities including Jordan in mid-2014. This is a Regional TA to be procured in one lot together with the actions in Morocco, Egypt and Tunisia. Procurement is done and consultant selected. Services will start after all Cooperation Agreements are signed by all countries. However following the May 2015 Steering Committee meeting, it was suggested to EIB and beneficiary countries that such regional activities could start without waiting for all country signatures.
Component2:PreparatorystudiesforinfrastructureimprovementsoftheprioritycorridorsPreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):1,750,000Sub‐component2.1:UpgradingoftheNorth‐SouthandEast‐WestcorridorsStatusofImplementation:
Rehabilitation and upgrading of routes R15 Amman airport-Aqaba Back Road and R65 North Shouna-South Shouna: Procurement is done and consultant selected. Consulting Services started in beginning of March 2015 with a kick off meeting. Pre-financing of EUR 400,000 was done in the first quarter of 2015. Balance is approximately EUR 600,000 for Phase 1 of this TA (Phase 1 duration is 8 months). The first steering committee meeting was organised in Amman end of April 2015, where the Inception report was presented and discussed. Next milestone and steering committee meeting will be in October 2015 where an analysis of the proposed design for the R15 will be evaluated.
Sub‐component2.2:UpgradingandexpansionofBordercrossingfacilitiesStatusofImplementation:
Jordan-Iraq border crossing (Al Karamah): By mid 2014 ToR had been completed and agreed with the Jordanian authorities. Procurement of the related consultancy services are on hold due to security concerns in the area. Procurement will be launched whenever the situation stabilizes.
Component3:ProjectPreparation,Management,Coordination,MonitoringandEvaluation
PreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):400,000Status of Implementation: A project management unit (PMU) will be established within the lead Ministry to monitor and coordinate the TAs. The unit will be led by a ministry official who will be supported by consultants. By end 2014 ToR had been completed and agreed with the Jordanian authorities. Procurement of the related consultancy services will be launched in third quarter of 2015.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities(US$) Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
550,000 1,950,000 2,500,000
AmountReceivedfromTrustee(b):
550,000 1,950,000 2,500,000
ActualAmountDisbursed(c): 0 400,000 400,000
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2013 2014 2015 400,000 800,000 1,200,000
2016 850,000 450,000 1,300,000
2017 2018 2019
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)130,000 0 130,000
G. ResultsFrameworkandMonitoring
ProjectDevelopmentObjective(PDO):Theobjectiveoftheproposedprojectistopromotereductionoftradeandtransportbarriersalongtheprioritytradecorridorsofthecountryandinrelatedbordercrossings.
PDOLevelResultsIndicators*UnitofMeasure
Baseline
CumulativeTargetValues**
FrequencyDataSource/Methodology
ResponsibilityforDataCollection
Description(indicator
definitionetc.)Jan‐Dec
2014A
Jan‐Dec
2015F
Jan‐Dec
2016F
IndicatorOne:About20transportstaff(fromdifferentsub‐sectors)trainedinPPPaspectsandtechniques.
#ofparticipants
0 0 20Bi‐annually
Reports PMCUandFocalPoints
Quantitative–numberofparticipantswhohavesuccessfullycompletedthetraining
IndicatorTwo:Studiescompleted:(i)priorityNorth‐Southcorridor(s),includingbordercrossings,definedandtechnicalstudiescompleted;(ii)roadsafetyactionplancompleted.
Percentageprogressand#ofstudies
00
50%1
100%3
Bi‐annually
ReportsStudiesproduced
PMCU,FocalPointswithEIBinput
QualityandNumberofstudiescompletedandapproved
INTERMEDIATE RESULTS
IntermediateResult(ComponentOne):InstitutionalandcapacitybuildingforregionaltradeframeworkSub‐componentA.1:TAtotransportationSub‐componentA.2:Roadsafetyassessmentandactionplan
IntermediateResultindicatorOne:
#ofparticipants
0
0
20
Bi‐annually
Reports
PMCUandFocalPoints
Qualitative‐numberofparticipants
TAtoTransportation:traininginPPPaspectsandtechniques
whohavesuccessfullycompletedthetraining.
IntermediateResultindicatorFour: Roadsafetyassessmentandactionplan
Percentageprogressandactionplancompleted
0
10
50%
100%
3‐months
Reports
PMCU,FocalPointswithEIBinput
Qualitystudyandactionplanproducedandapproved
IntermediateResult(ComponentTwo):Preparatorystudiesforinfrastructureimprovementsoftheprioritycorridors
IntermediateResultindicatorOne:PreparationofNorth‐Southroadcorridors(R15andR65)
Percentageprogress
0 50% 100%3‐months Detailed
technicalstudies
PMCU,FocalPointswithEIBinput
QualityStudiesproducedandapproved
IntermediateResultindicatorTwo:PreparationofupgradingandexpansionofBordercrossingfacilities
Report 0 100%
3‐months Report PMCU,
FocalPointsQualityReportproducedandapproved
IntermediateResult(ComponentThree):ProjectPreparation,Management,Coordination,MonitoringandEvaluation
IntermediateResultindicator QualityreportingTimebased
0 33 60% 100% 3‐months Reports PMCU,withEIBinput
Qualityreporting,M&E
IntegratedInspectionManagementSystem
A. BasicProjectInformationActivityName:IntegratedInspectionManagementSystem“IIMS”forJordanCountryName:Jordan NameofImplementationSupportAgency(ies):International
FinanceCorporation
NameofISAProjectLeader:AbeerKamalShalan EmailofISAProjectLeader:[email protected]
RecipientEntity:MinistryofIndustryandTradeandSupplyoftheHashemiteKingdomofJordan
NameandEmailofRecipientEntityContact:
MahaAli,MinisterofIndustryandTradeandSupplyEmailaddress:[email protected]
TotalAmountApprovedbytheTransitionFund(US$):2,642,105
AdditionalFundsLeveragedandSource(s),ifany(US$):
182,000–USAIDJordan
315,000–GovernmentofJordan’sparallelcontributionforhardwareandinfrastructure
TotalAmountDisbursed(DirectandIndirectinUS$):
292,439
SteeringCommitteeApprovalDate:
6/11/2014
ProjectImplementationStartDate:
7/1/2014
ProjectClosingDate:
7/1/2017
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): EnhancingEconomicGovernanceChooseanitem.Chooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:
The objective of this project is to reduce unnecessary time and cost burden on the private sector caused by multiple,uncoordinated,andfrequentinspectionvisitsbythevariousinspectorates;enhanceefficiencyanduseofresourcesforbothinspectoratesandbusinesses;andincreaseprivatesectorawarenessofrequirements.
ThisprojectsupportstheGovernmentofJordan“GoJ”inbuildinganintegratedinspectionmanagementsystem“IIMS”thatissharedamonginspectoratesandbasedoninternationalbestpractices.Thissystemprovidesinspectorateswitharegistryofenterprisessubjecttoinspection,andallowsforcoordinationandsharingofinformationbetweeninspectorates.Thisprojectsupports sustainable growth by enhancing the business environment and improving competitiveness, and enhanceseconomicgovernancebyincreasingtransparency,limitingcorruption,andpromotingaccountabilitypoliciesintheinspectionregime.
Ratingforprogresstowardsachievementofobjective: Satisfactory
Ratingforoverallimplementationprogress: ModeratelySatisfactory
BriefSummaryofProjectImplementationStatus:‐ FinalizedtheprocurementstrategyandtenderingdocumentsrequiredforhiringanITvendortodeveloptheintegrated
inspectionmanagementsystem‐ Receivedofficialsign‐offfromtheMinistryofIndustry&Trade&Supplyonthetenderingdocuments.‐ IssuedtheRequest forProposals,heldapre‐proposalconferencewithbidders,andwearecurrently in thestageof
providingtechnicalclarificationsbasedonbidders’questions.
Theoverallimplementationprogressisratedas“moderatelysatisfactory”wheretheprojectfacedsomedelaysinreceivingofficialclientsign‐offonthetenderingdocuments.Also,duetothelargevalueestimatedforthiscontract,specialprocurementprocedureswerefollowedtoensuretheeffectiveness,clarity,andfairnessofthisprocurementprocess.
C. ImplementationStatusofComponentsComponent1:BuildingandImplementingadatabaseandworkflowsfortheinspectoratesPreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):2,290,000(thisamountrepresentsdirectcostsfundedthroughtheTransitionFundonly)
Sub‐component1.1:Design,development,anddeploymentoftheapplication(enterpriseregistryandsoftware)consistingof:‐ Databaseofenterprisessubjecttoinspection;thisregistryshallbesharedamonginspectoratesandeachinspectorate
willhavetheabilityofupdatingitwithinspectionplansandinspectionvisitresults;‐ Automatedworkflowcapabilities forcarryingout inspectionactivitiessuchasplanning, scheduling, riskassessment,
documentingvisitchecklists,reportsandactions,communicationwithbusinessviae‐mailorSMS,etc.;‐ Reportingenginetoenableinspectoratestogeneratereportsandstatisticsabouttheirinspectionactivitiesandresults;‐ Documentmanagementandarchivingcapabilitiestohandleattachmentsuploadedtothesystem,suchas labresults,
photos,andotherdocumentsobtained.
StatusofImplementation:‐ FinalizedtheprocurementstrategyandtenderingdocumentsrequiredforhiringanITvendortodeveloptheintegrated
inspectionmanagementsystem‐ Receivedofficialsign‐offfromtheMinistryofIndustry&Trade&Supplyonthetenderingdocuments.‐ IssuedtheRequest forProposals,heldapre‐proposalconferencewithbidders,andwearecurrently in thestageof
providingtechnicalclarificationsbasedonbidders’questions.Theimplementationprogressofthiscomponentisratedas“moderatelysatisfactory”wheretheprojectfacedsomedelaysinreceivingofficialclientsign‐offonthetenderingdocuments.Also,duetothelargevalueestimatedforthiscontract,specialprocurementprocedureswerefollowedtoensuretheeffectiveness,clarity,andfairnessofthisprocurementprocess.Sub‐component1.2:Trainingofinspectionpersonnelonthenewlydevelopedsystem,thisincludes:‐ end‐user(i.e.inspectionpersonnel)trainingonusingthesystem‐ technicaltrainingforsystemadministratorsensuringproperhand‐overandchangemanagementStatusofImplementation:NotstartedSub‐component1.3:One‐yearimplementationsupportStatusofImplementation:Notstarted
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
2,290,000 2,290,000
AmountReceivedfromTrustee(b):
2,290,000 2,290,000
ActualAmountDisbursed(c): 89,990
89,990
Note:ThespendingrateondirectcostsisbelowtheexpectationbecausetheITvendor,whichcomprisesthebulkoftheprojectbudget,hasnotbeenhiredyet.Accordingtothecurrentprocurementtimeline,itisexpectedtosignacontractwiththeITvendorinearlyOctober,wherespendingwouldstarttoincrease.Directexpensesincurredto
datearecomprisedofstafftimeandconsultancywhicharecoveredbythetwofundingsources:TransitionFundandUSAID,wherefiguresintheabovetableincludeexpensesthroughTransitionFundonly.
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2014 0 220,305 220,3052015 403,000 396,000 799,0002016 432,600 437,600 870,2002017 427,600 325,000 752,60020182019
Note:ThisforecastwillbeupdatedbasedonthefinaldeliverablesscheduleandcontractualarrangementsthatwillbeagreedwiththeITvendor(tobehiredbyearlyOctober,2015).
F. DisbursementsofFundsforIndirectCosts(US$)Disbursed(US$) Available(US$) Total(US$)
202,449 149,656 352,105
G. ResultsFrameworkandMonitoring
Project Development Objective (PDO):
PDO Level Results Indicators* Unit of
Measure Baseline
Cumulative Target Values**
Frequency Data Source/
Methodology
Responsibility
for Data
Collection
Description (indicator
definition etc.) Jul2014–Jun2015A
Jul2015–Jun2016F
Jul2016–Jul2017F
YR4(Post‐
Completion)F
Indicator One: Averagenumberofinspectionvisitsperenterpriseperyear
Number 31 31 26 26 20 Annual Inspectorates’records
IFC/MinistryofIndustry&Trade
Thisindicatormeasurestheoverallnumberofvisitsconductedbythevariousinspectoratestoasinglebusiness
IndicatorTwo:Averagenumberofinspectoratesvisitinganenterpriseperyear
Number 7 7 5 5 4 Annual Inspectorates’records
IFC/MinistryofIndustry&Trade
Thisindicatormeasurestheaveragenumberofinspectoratesthatvisitasinglebusinessperyear
IndicatorThree:Numberofviolationsandfineissuedagainstenterprisesbyinspectorates
Number 106,700 106,700 96,000 96,000 85,360 Annual Inspectorates’records
IFC/MinistryofIndustry&Trade
Thisindicatorisusedtohelpmeasureimprovementinprivatesectorcompliance
IndicatorFour:Numberofcomplaintsmadebycitizensagainstenterprises
Number 14,400 14,400 13,000 13,000 11,520 Annual Inspectorates’records
IFC/MinistryofIndustry&Trade
Thisindicatorisusedtohelpmeasureimprovementinprivatesectorcompliancebyobservingthenumberofcomplaintsmadebycitizensaboutprivatesectorviolations
INTERMEDIATE RESULTS
IntermediateResultindicatorOne:
Number 0 0 5 5 0 Semi‐annual Projectrecords
IFC
Numberoftrainingsessions,workshops,andawarenessraisingeventsconductedIntermediateResultindicatorTwo:Numberofparticipantsintrainingsessions,workshops,andawarenessraisingevents
Number 0 0 100 100 0 Semi‐annual Projectrecords
IFC
IntermediateResultindicatorThree:Numberofinspectoratesimplementingtheautomatedsystem
Number 0 0 5 5 0 Annual Projectrecords,Inspectoratesrecords
IFC/MinistryofIndustry&Trade
Note: Distribution of
interim targets might be
revised based on the
vendor’s final
implementation plan.
IntermediateResultindicatorFourLaunchoftheintegratedinspectionmanagementsystem
Number 0 0 1 1 0 Projectrecords,Inspectoratesrecords
IFC/MinistryofIndustry&Trade
This is a binary indicator:
0 means “not yet achieved”
1 means “achieved”
LeveragingRegulatoryReformstoAdvanceFinancialInclusioninJordan
A. BasicProjectInformationActivityName:LeveragingRegulatoryReformstoAdvanceFinancialInclusioninJordanCountryName:Jordan NameofImplementationSupportAgency(ies):International
FinanceCorporationNameofISAProjectLeader:NahlaElOkdah EmailofISAProjectLeader:[email protected]:N/A NameandEmailofRecipientEntityContact:N/A
TotalAmountApprovedbytheTransitionFund(US$):750,000
AdditionalFundsLeveragedandSource(s),ifany(US$):0.Butanestimated487,500isplanned
TotalAmountDisbursed(DirectandIndirectinUS$):0
SteeringCommitteeApprovalDate:18May2015
ProjectImplementationStartDate:Notyeteffective
ProjectClosingDate:30June2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar(selectonlyone): InclusiveDevelopmentandJobCreationSecondaryPillar(s)(selectasmanyasapplicable):
InvestinginSustainableGrowth
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:TheobjectiveofthisprojectistoleveragechangesinmicrofinanceregulationsinJordantosupportkeymicrofinanceserviceproviders18,preparethemfor,andtransformthemintofor‐profitentitiesandfurtheradvancefinancialinclusion.Theprojectwillworkwith2MFIstohelpthemrespondtothechangingregulatoryframework.Ratingforprogresstowardsachievementofobjective: Not ApplicableRatingforoverallimplementationprogress: Not ApplicableBriefSummaryofProjectImplementationStatus:TheTransitionfundproposalwasonlyapprovedinMay2015.OurfinanceteamisnowintheprocessofcreatingalocalTrustFund,butthefirsttrancheofTransitionfundinghasnotyetbeenreceived.Thus,whileformalimplementationofprojectactivitieshasnotyetcommenced,theprojectteamhasalreadybeenindiscussionwithexistingandprospectiveMFIpartnersinJordanandarepreparingprojectscopesandassemblingateamtobeginimplementationinthecomingperiod.Thus,itisfullyexpectedthatbytheendofthenextreportingperiod(December2015),someoftheactivitiesundereachofthecomponentsoftheprojectwillbeginasoutlinedinsectionC.
C. ImplementationStatusofComponents
Component1:RiskManagementPreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):261,250(thisamount
representsdirectcostsfundedonlythroughtheTransitionFund).
Sub‐component1.1:AssistingMFIsinJordantodeveloporstrengthentheriskmanagementfunctions.StatusofImplementation:‐IFChasalreadyinitiatedaconversationandsharedaproposalforRiskManagementadvisorywithNationalMicrofinanceBank(Watany)inJordan.Duringthecomingperiod,IFCwillalsocontinuediscussionswithWatany,andpossiblyotherpotentialfinancialinstitutionpartners,inordertoagreeonaprojectscope,andsetatimelineforexpectedriskmanagementadvisorysupport.
Component2:TransformationPreparedness,TransformationandEstablishmentofGreenfields
18 Microfinance service providers in the region include microfinance institutions, microfinance banks, non-bank financial institutions, NGOs and postal banks amongst other entities.
PreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):261,250(thisamountrepresentsdirectcostsfundedonlythroughtheTransitionFund).
Sub‐component2.1:AssistingMFIspreparefortransformationStatusofImplementation:‐AspartoftheproposalsubmittedtotheTransitionFund,IFCincludedadvisorysupporttoTamweelcom,aJordanianMFIontransformation.However,giventhedelayinapprovingandreceivingthefunds,IFChasalreadymovedaheadandconductedamissiontoTamweelcomanddevelopedareportonthebenefitsandchallengesoftransformationaswellasconductedaworkshopwithTamweelcom’smanagementandBoard(whichwascoveredwithparallelfunding).Also,linkedtothechangesinregulationandpossibilityfortransformation,Tamweelcomisnowfeelingmoreconfidenttodevelopnewproducts,includinglendingtoverysmallenterprises(VSEs)‐whichwillhelptoexpanditsmarketandimprovesustainability.However,itwasevidentduringarecentmissionthattheMFIstillneedsassistancetomoveeffectivelyintothismarket,soIFCisindiscussiontofinalizeaprojectunderTransformationthatwillconsistofprovidingtrainingandcoachingtoTamweelcom’sVSEunit/staffonhowtobetteranalyzesandservetheseenterprises.Thisactivitymayalsotakeplaceinthecomingreportingperiod.
Component3:ConsumerProtectionPreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):142,500(thisamount
representsdirectcostsfundedonlythroughtheTransitionFund).
Sub‐component3.1:AssistingMFIsobtaintheSmartCampaignCertificationStatusofImplementation:‐TheaimofthiscomponentistoassistMFIsinJordandemonstratingthehighestlevelsofclientprotectionbyobtainingtheSmartCampaigncertification.Already,IFChasbeenindiscussionwiththeSmartCampaign,SocialPerformanceTaskForceandSanabel(theregionalmicrofinancenetwork)toagreeonascopeofwork.Inthecomingperiod,theIFCteamaimstoformalizethispartnership,andaswelltodevelopand(internally)approveanewregionalprojectconcept,includingaspecificfocusonpilotingthecertificationwithselectMFIsinJordanduringthefirstphase.Ithopestobeginimplementationofthesamebythebeginningof2016,butmayalsotrytoleveragetheupcomingSanabelregionalconferenceinEgypt(October2015)toannouncethenewinitiative.Component4:KnowledgeManagementPreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):142,500(thisamount
representsdirectcostsfundedonlythroughtheTransitionFund).
Sub‐component4.1:Sector‐wideworkshopsandpublicationsStatusofImplementation:REGIONALWORK(alsomentionedinEgyptprogressreport)‐Overthecomingperiod,IFCexpectsto:
WorkwithSanabel(theregionalMFnetwork)toorganizetheannualSanabelconferencetobeheldinEgyptandincludeMFIparticipantsaroundtheregion.IFCwillplayastrongroleinshapingtheconferenceagendaandbringingspeakerstoshareitsglobalandregionalexpertise.TheconferenceisexpectedtoincludesessionsonthesubjectshighlightedintheTFproposal,includingnewregulations,transformationandriskmanagement,aswellaspotentiallyClientProtection/SmartCampaign.
PublishanddisseminateaReportsummarizingresultsofasurveyaboutriskdistributedamongMFIstakeholdersintheMENAregion,anddevelopedjointlybyIFC‐Sanabel
Conductaworkshop(inconjunctionwithSanabel)withMFIpartnersandstakeholdersontopicsrelatedtotransformation/commercialization,suchasmovinguptoservethegapinthemarketandtheneedtoforsupporttodevelopnewproducts(includingverysmallenterpriselending)andenhancecapacityinkeyareas
CompleteafirstdraftofthefindingsofasurveyonVerySmallEnterpriselendingintheregion,currentlybeingadministeredjointlybyIFCandSanabel.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
DirectCostforISA‐Execution(US$)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
0 712,500 712,500
AmountReceivedfromTrustee(b):
0 0 0
ActualAmountDisbursed(c):
0 0 0
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)
Year Jan‐June Jul‐Dec TotalbyYearEnd2015 N/A 35,000 35,0002016 50,000 75,000 125,0002017 125,000 175,000 300,0002018 252,500 N/A 252,5002019
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed Available Total0 37,500 37,500
G. ResultsFrameworkandMonitoring
19 IFC captures results after project closure
Project Development Objective (PDO):
PDO Level Results Indicators*
Unit of Measure
Baseline
Cumulative Target Values**
Frequency
Data Source/ Responsibility for Data Collection
Description (indicator definition
etc.) Jul 2015‐Jun 2016 (F)
Jul 2016‐Jun 2017 (F)
Jul 2017‐Jun 2018 (F)
YR 4 (F)19
Methodology
Businesses received business support/advisory services or financial investment
Number 0 1 2 2 2 Annual IFC IFC
INTERMEDIATE RESULTS
Intermediate Result: Risk Management and Transformation, Transformation Preparedness and Establishment of Greenfields
Business loans provided or guaranteed Number N/A
122,850 253,682 392,905 540,967
Annual MFIs IFC
Value of micro loans disbursed USD N/A
100,183,811 212,463,185 333,618,320 463,375,356 Annual MFIs IFC
Number of micro loans outstanding (non‐cumulative)
Number 107,998 122,850 130,832 139,222 148,063
Annual MFIs IFC
Outstanding microfinance loan portfolio of supported institutions (non‐cumulative)
USD
54,610,807 63,252,500 68,840,881 73,694,572 78,960,765
Annual MFIs IFC
Intermediate Result: Facilitating Knowledge‐Sharing Across the Microfinance Sector
Number of workshops, training events, seminars and conferences
Number 0 0 1 2 3 Annual IFC IFC
Towardsinclusiveandopengovernments:Promotingwomen’sparticipationinparliamentsandpolicy‐makinginJordan
A. BasicProjectInformationActivityName:Towardsinclusiveandopengovernments:Promotingwomen’sparticipationinparliamentsandpolicy‐making
CountryName:Jordan NameofImplementationSupportAgency(ies):OECD
NameofISAProjectLeader:
OECD:AndreasSchaal/TatyanaTeplova
EmailofISAProjectLeader
OECD:[email protected];[email protected]
RecipientEntity:TheJordanianNationalCommissionforWomen
Dr.SalmaNimis
OrganizationandAddress:TheJordanianNationalCommissionforWomen,5118,AMMAN11183,JORDAN
Telephone:+00962(6)5560741
Email:[email protected](US$):633,333.00
AdditionalFundsLeveragedandSource(s),ifany(US$):
Countryco‐financing:
Otherco‐financing:
TotalAmountDisbursed(DirectandIndirectinUS$):0
SteeringCommitteeApprovalDate:
5/19/2015
ProjectImplementationStartDate:
9/1/2015
ProjectClosingDate:
8/31/2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
EnhancingEconomicGovernance
SecondaryPillar(s): InvestinginSustainableGrowthCompetitivenessandIntegrationInclusiveDevelopmentandJobCreation
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:TheprojectwillsupporttheeffortsofMENAcountriesintransitioninfosteringinclusivegrowth and good governance by leveraging open government policies and mainstreaming gender perspectives inparliamentaryoperationstomaximisewomen'sintegrationinpubliclifeandpolicy‐makingprocess.Morespecifically,theprojectaimsto“Promotewomen’sparticipationinparliamentsandpolicy‐making”by
4) Makinglegislaturestransparent,equitableandgender‐sensitiveand;5) Empowering(potential)womenparliamentariansandstrengtheningtheircapacityandskillsatthenational
andlocallevelsand;6) Improvingpublicconsultationcapacityofparliamentsandwomen’sCSOsinlaw‐makingprocesses.
Thiswillbecomplementedbyregularregionalpolicydialogueasanintegralpartofthisproject. Thisdialogueisacross‐cuttingelementforthecontinuityoftheknowledgesharingprocessforimplementationofreformsandtransformationontheground.Inthiscontext,“feedbackloops”or“learningloops”willofferamulti‐levelmechanismforinteractionandnewpolicyapproachesamongparliamentariansandpolicymakersintheregion.
Ratingforprogresstowardsachievementofobjective: NotApplicable
Ratingforoverallimplementationprogress: NotApplicable
BriefSummaryofProjectImplementationStatus:
CoordinationmeetingswithstakeholdersareplannedtotakeplaceduringJulytodiscuss(a)theimplementationmechanismsfor the project with the respective stakeholders, (b) the development of an overall project design, (c) the coordinationbetweeninternationaldonororganizations.
ThroughoutthevariousconferencecallsheldsincetheprojectwasapprovedonMay,theJordanianNationalCommissionforWomenhasdemonstratedstrongengagementandownershipintheprocess.ItisforeseenthatprojectinaugurationwilltakeplaceinSeptember2015.ItisalsoplannedtostarttherecruitmentprocessforandsetupoftheProjectImplementationUnitteaminSeptember.ThisdependsontheresultsofthecapacityassessmentofeachrecipiententitytobecarriedoutinJuly&Augusttodeterminetherequiredpersonnelforsuccessfullaunchandimplementationoftheproject.Furthermore,theOECDincooperationwiththeJordanianNationalCommissionforWomeniscoordinatingcloselytoidentifythefocalcontactsinpartnerinstitutions.InJune2015,backtobackwiththeOECDWeek,theOECDorganizedbilateralcoordinationmeetingswithrepresentativesoftheWomeninParliamentGlobalForumtodiscussthenextstepsofimplementationandcoordination.Anothercoordinationmeeting with USAID‐Jordan took place during the OECD Week, where parties agreed to coordinate closely on theimplementationoftheproject.TheOECDisalsocoordinatingwithUNWomenanditisplannedtoholdacoordinationmeetingin July. At the same time, the OECD is planning to hold coordinationmeetingswith DFID andNDI to learn about theirexperiencesandbuildontheachievementoftheirpreviousprojectsinthefield.ThisprojecthasbeenreportedtotheOECDPublicGovernanceCommitteeandExternalRelationsCommitteeanddiscussedatvariousregionalmeetingsorganised in the frameworkof theMENA‐OECDGovernanceProgramme;aprogrammethatprovidesaforumforthecoordinationofcountry‐anddonor‐ledactivitiesattheregionalandnationallevel.
C. ImplementationStatusofComponentsComponent1:Makinglegislaturestransparent,equitable,andgender‐sensitive.ThiscomponentwilladdressinternalandexternalfunctionsoftheParliament,bothasanemployerandalaw‐makerbyfocusingonensuringthegendersensitivityoftheparliamentaryworkplacepoliciesandelectionandparliamentaryprocessesPreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):200,105.00Sub‐component1.1:Mappingandanalysisofparliamentaryelectoralandworkplaceoperations,processesandpolicyframeworksthroughagenderlens,includinginselectedlocalelectioncouncils.StatusofImplementation:TheOECDisplanningtokickofftheprojectinSeptemberandstartthemappingexercisewithafactfindingmissionwithpeersfromOECDcountries.ThepurposeofthefactfindingmissionwillbetocollectdataontheparliamentaryprocessesandtoconductinterviewswithParliamentsecretariat,seniorpublicofficials,parliamentariansandinternationaldonororganization.Themappingexercisewillalsoincludethedisseminationofaquestionnaireongendersensitiveworkplaceoperations,processesandpolicyframeworks.ThemappingexercisewillbuildonthekeyfindingsoftheOECD‐CAWTARreport“WomeninPublicLife:Gender,LawandPolicyintheMiddleEastandNorthAfrica”ontheopportunities,challengesandbarriersforpromotingwomen’sparticipationinpubliclife.Sub‐component1.2:Providingcountry‐basedcapacitybuildingactivitiestoparliamentarians,selectedlocalelectoralcommitteesandsecretariatsStatusofImplementation:thefirstadvisorysession“Work‐lifebalancepolicies,includingarrangementsforparliamentarysitting times” for (20) representatives of parliamentary secretariat, parliamentarians and local elected officials, willtentativelytakeplaceinOctober2015.
Component2:Strengtheningcapacityandskillsofwomencandidates forparliament.Thiscomponentwilladdressbarriers facingwomen in theirpoliticalcareerandwillbuildon theaccumulatedknowledgeandgoodpractices tobuildcapacitiesofwomencandidateswiththerequiredsetofskillstoassumetheirrepresentativeroleeffectively.Itwillalsoaimtodevelopcapacitiesandstrengtheneffectivenessoffuturefemaleparliamentarians’responsetothegrowingexpectationsofthevoters.PreviousRating:NotApplicable CurrentRating:NotApplicable Cost(US$):223,642.00Sub‐component2.1:Conductingcountry‐basedassessmentoftheexistingopportunitiesandthecurrentchallengesfacedbywomencandidatesStatusofImplementation:Thissubcomponentwillbeimplementedinparalleltothesub‐component1atoaligntheoutputswiththecapacitybuildingneedsassessmentforthetrain‐the‐trainermodules.TheassessmentisscheduledtostartinSeptember.TheassessmentwillbuildonthekeyfindingsoftheOECD‐CAWTARreport“WomeninPublicLife:Gender,LawandPolicyintheMiddleEastandNorthAfrica”ontheopportunities,challengesandbarriersforpromotingwomen’s
participationinpubliclife.TheOECDisalsodeveloping“2015OECDRecommendationoftheCouncilonGenderEqualityinPublicLife”.ThedraftRecommendationaimstoapplytoinstitutionsatrelevantlevelsofgovernment.ItisintendedtoprovideusefulguidelinesforallMembersandnon‐MembersadheringtothedraftRecommendationseekingtoaddresschallengesandidentifygoodpracticesrelatedtofosteringgenderdiversityinpubliclife.Itoffersvaluableguidanceandinternationallyrecognisedbenchmarksongenderequality.Sub‐component2.2:Buildingwomen’scapacitiestoparticipateinelectionsandparliamentaryoperationsatnationalandsub‐nationallevelsStatusofImplementation:Thissubcomponentwillstartin2017.Component3:Strengtheningpublicconsultationcapacityofparliamentsandwomen’sCSOsinlaw‐makingprocessesThiscomponentwillfocusonbuildingcapacitiesofbothParliamentandcivilsocietytoeffectivelyengagewitheachotherinthe lawdraftingprocess, in response to the calls forgreateropenness, andgender responsivenessofpublic institutions,includingparliaments.Theseactivitieswillreinforcetheactivitiesproposedaspartthesub‐component2bonstrengtheninggender‐sensitivelawmakingcapacitiesPreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):119,004.00StatusofImplementation:Activitiesofthiscomponentisscheduledtostartin2016.
Component4:regionalpolicydialogueThe regional policy dialogue meeting is an integral part of this project. The regional policy dialogue will provide anopportunity to exchange lessons learned and good practices on leveraging open government to strengthen women’sparticipationinparliaments,makeparliamentsmoreopenandgender‐sensitiveandenhancewomen’sparticipationinthepolicy‐makingprocessandpromotenetworkingamongfemaleparliamentariansintheregionandOECDcountries.
PreviousRating:Not Applicable CurrentRating:Not Applicable Cost(US$):50,682.00StatusofImplementation:Theannualregionalmeeting“Gendermainstreaming:towardsinclusivegendersensitivepolicies”ofMENA‐OECDWomeninGovernmentPlatformwilltakeplaceinDecember2015withtheparticipationofMENAtransitionandOECDcountries,whichincludesrepresentativesofgovernments,parliaments,courtsandcivilsociety,aswellastheGlobalNetworkofWomenParliamentarians.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
593,433 593,433
AmountReceivedfromTrustee(b):
0 0
ActualAmountDisbursed(c): 0 0
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2015 98,905.00 98,905.002016 98,905.00 98,905.00 197,811.002017 98,905.00 98,905.00 197,811.002018 98,905.00 98,905.00
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$) 39,900 39,900
G. ResultsFrameworkandMonitoring
Project Development Objective (PDO): Towards inclusive and open governments: Promoting women’s participation in parliaments and policy‐making
Indicators by Component Unit Baseline Cumulative Target Values Frequency Data Source/Methodology
Responsibility for Data Collection
Description (Indicator
Definition, etc) Jul 2015 –
Jun 2016
F
Jul 2016 –
Jun 2017
F
Jul 2017 – Aug
2018
F
Indicator 1: No. of assessments and
guidelines completed and approved
Quantitative Existing yes yes yes once Project progress
reports
Project
Implementation Team
(PIT).
Assessments,
reports, action
plans, roadmaps,
models of good
practices or
frameworks
designed to
enhance the
enabling
environment
Indicator 2: No. of internal regulations
and policy proposals endorsed
Quantitative Existing yes yes yes annually Project progress
reports Project
Implementation Team
(PIT).
Internal
parliamentary
operations,
parliamentary
secretariat
Indicator 3: No. of programs and projects
designed and implemented to promote
more gender sensitive and equitable
allocation of government resources
Quantitative none yes yes yes annually Project progress
reports Project
Implementation Team
(PIT).
Programmes and
projects that
support reform of
government
safety net
systems, subsidy
policies and other
related programs
and thereby
promote more
efficient and
equitable
allocation of
resources
Indicator4 : No. of public institutions
(Parliament, Government Bodies and
institutions) received support to conduct
mapping exercise of the current situation
Quantitative
none
20
40
160
annually Project progress
reports Project
Implementation Team
(PIT).
Government
bodies,
institutions and
local government
units received
support services
aimed at
increasing their
capacity to
delivery public
services to
constituents
Indicator5 : No. of trained
representatives of parliamentary
secretariat, parliamentarians, local
elected officials and women candidates
Quantitative none Yes Yes Yes annually Project progress
reports Project
Implementation Team
(PIT).
Public sector staff
received training
in various
thematic areas to
improve their
capacity for better
public service
delivery
Indicator 6: No. of CSOs, women or youth
groups engaged and empowered at the
central and local level
Quantitative Existing Yes Yes Yes annually Project progress
reports Project
Implementation Team
(PIT).
Number of CSO’s
involved in public
consultations and
Number of
awareness
campaigns, hits on
the website and
regional meetings;
communication
strategies;
electoral
commissions and
parliamentary
secretariat
INTERMEDIATE RESULTS
Component 1: Making legislatures transparent, equitable, and gender‐sensitive
Indicator 1: Parliament, Government
Bodies and institutions received support
to conduct mapping exercise of the
current situation
Qualitative yes n/a n/a
Once Project progress
report
PIT Mapping exercise
for gender
sensitive
parliamentary and
electoral
operations,
processes and
policy frameworks
Indicator 2: No. of trained
representatives of parliamentary
secretariat, parliamentarians and local
elected officials
Quantitative 40 80 100 Annually Project progress
report
PIT Number of
training seminars,
advisory sessions,
toolkits and
guidelines
Component 2: Strengthening capacity and skills of women candidates for parliament
Indicator 3: Studies, assessment, reports,
action plans, roadmaps, models of good
practices or frameworks endorsed
Quantitative yes yes n/a Once in 1st and 2nd
year
Project progress
report
PIT set of targeted
policy
recommendations,
supported by a
communication
strategy
Indicator 4: Women candidates for
parliamentary elections, youth groups
trained, engaged and empowered to
participate in public life
Quantitative 40 80 160 Annually Project progress
report
PIT training materials
for the trainers
developed during
the workshops,
training sessions,
feedback from the
training session
Component 3: Strengthening public consultation capacity of parliaments and women’s CSOs in law‐making processes
Indicator 5: CSOs, women or youth
groups engaged and empowered at the
central and local level
Quantitative yes yes yes Annually Project progress
report
PIT CSOs, women or
youth groups
engaged and
empowered at the
central and local
level aimed at
increasing the
involvement of
these groups in
public policies
Indicator 6: Parliament and local elected
institutions received support services to
develop their engagement capacities
Quantitative Yes Yes Yes Annually Project progress
report
PIT Parliament and
local elected
institutions
received support
services aimed at
increasing their
capacity to engage
stakeholders,
including women’s
groups and
mainstream
gender sensitive
principles
Component 4: regional policy dialogue
Indicator 7: improved enabling
environment and institutional capacity
across the region
Quantitative 1 2 3 Annually Project Progress Reports
PIT Number of models of good practices
Indicator 8 : Documents produced and
endorsed at the regional level
Quantitative Yes Yes Yes Annually Project Progress Reports
PIT Studies, assessments, reports, action plans, roadmaps, models of good practices or framework
JordanCompetitivenessandInvestment
A. BasicProjectInformationActivityName:JordanCompetitivenessandInvestment
CountryName:Jordan NameofImplementationSupportAgency(ies):OECD,WBG
NameofISAProjectLeader:
OECD:AndreasSchaal/Marie‐EstelleRey
WBG:NajyBenhassine/MohamedElShiaty/MohamedBaider
EmailofISAProjectLeader:
[email protected]; marie‐[email protected]
[email protected] ; [email protected] ; [email protected]
RecipientEntity:
MinistryofPlanningandInternationalCooperation
MinistryofIndustryandTrade
JordanInvestmentCommission
NameandEmailofRecipientEntityContact:
MukhalladOmari,HeadofCompetitivenessTeam,MOPIC,[email protected]
MahaAli,MinisterofIndustryandTrade,[email protected]
MontaserOklah,President,JordanInvestmentCommission,[email protected]
TotalAmountApprovedbytheTransitionFund(US$):1,650,000
AdditionalFundsLeveragedandSource(s),ifany(US$):
TotalAmountDisbursed(DirectandIndirectinUS$):WorldBank:278,209OECD:219,284
SteeringCommitteeApprovalDate:6/11/2014
ProjectImplementationStartDate:8/1/2014
ProjectClosingDate:8/1/2017
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
EnhancingEconomicGovernance
SecondaryPillar(s): InvestinginSustainableGrowthCompetitivenessandIntegrationInclusiveDevelopmentandJobCreation
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:Inordertoattractmorequalityinvestment,Jordanmustimplementreformsthroughoutthe investment life cycle and the institutional mechanisms, through which investment policy is delivered. The projectproposeswelldefinedsupportinpreciseareasthatwillstrengthennationalandsectorcompetitivenessandattractmuchneededinvestmentintothecountry,whichwillhaveadirectimpactonemploymentandincome.Itiscomposedofactivitiesthataimatstrengtheningtheinvestmentrulesandregulationsbyassessingtheinvestmentframeworkwithaparticularfocuson the core protection provisions, the rules and conditions applying to foreign investors, the incentives regimes, andconsistencywithJordan’sinternationalinvestmentobligations.Theprojectwillalsostrengthentheinvestmentfacilitationprovisions and capacities by streamlining investment procedures for the entry of FDI into the host country through astrengthenedone‐stop‐shop.Inaddition,investmentauthoritieswillbeprovidedwithrecommendationsonhowtoimproveinternalproceduresandregulation,streamlinethedecisionmakingprocess,anddefineefficientprospectiveandestablishedinvestorservices.Theprojectisalsosupportingrelatedreformsinaspecificsector:renewableenergyandenergyefficiency(RE/EE).
Ratingforprogresstowardsachievementofobjective: Satisfactory
Ratingforoverallimplementationprogress: Satisfactory
BriefSummaryofProjectImplementationStatus:Theimplementationoftheprojectiswellontrack.Substantialprogresshasbeenachievedoncomponent1withanalysisconductedaroundtheinvestmentlegalframework,investmentprotectionandtherenewablesectorbytheOECDandcost‐benefitanalysisstartedbytheWBG,aswellasoncomponent2whereimplementationhasbeenaccelerated.
FollowingthelaunchoftheprojectinSeptember2014withtheorganisationoftheprojectsteeringgroup,asecondmajorstepintheimplementationoftheprojectwastheseriesofworkshopsheldfrom2to5March2015topresentthedeliverablesofthetwoISAsanddiscussworkplansforeachprojectcomponent.Thefollowingworkshopswereheld:WorkshopI–EnergyEfficiency/RenewableEnergy(OECD/WorldBank)WorkshopII–BestPracticesinOSSset‐upandoperations(WorldBank)WorkshopIII–InvestmentPromotionandFacilities(WorldBank)WorkshopIV–LegalInvestmentFramework:ChallengesandtheWayahead(OECD)Duringthatmission,bilateralmeetingswerealsoheld,inparticularwiththenewHeadoftheJordanInvestmentCommission(JIC)andtheMinisterofPlanningandInternationalCooperation.Aco‐ordinationmeetingwasalsoorganizedwithkeydonors(USAID,UE,UK),mainstakeholdersfromthegovernment(MoPIC,JIC),andtheprivatesector(JordanStrategyForum).Themeetingallowedensuringcomplementarity/synergyofactivities,inparticularwithUSAIDJordanCompetitivenessProject.Themeetingwasparticularlyconstructiveandreceivedpositivefeedbacksfromparticipants(Governmentanddonors).During the mission, to respond to the government priorities and address JIC’s agenda and timeline, it was decided toaccelerate three of the sixproject components. The remaining three componentswill continue in the originally plannedtimeframeoftheproject(3years).
OtheractivitiesconductedbytheISAsseparatelytocontinuetheimplementationofcomponent1,including:
theOECDWorkshopontherevisionoftheby‐lawonnon‐Jordanianinvestors(Amman,20May2015) Alocalfirmwashiredtodeliverthesurveyforthestudyoncost‐benefitanalysisforinvestors
Implementationofactivitiesundercomponent2havebeenexpedited,andarewellon‐track:
TheWBteamdevelopeddetailedrecommendationsonthetypeanddesignofOSSexploringdifferentoptionsthatcouldyieldbestresults,anddevelopeddetailedimplementationplansincludingrelatedguidesandmanuals.
Aroadmaptoset‐upinvestmentpromotionfunctionwithinJIChasbeendeveloped,andtheWBteamconductedthreeworkshopswithJICstaff,governmentagenciesoperatinginJIC,andprivatesectortodiscusstheInvestmentwindowdesignandrelatedservices.
AfirmwashiredtoassistJSMOintheupgrading/harmonizationofenergyefficiencystandardsandregulations.Ajoint‐ISAsmissionisplannedinSeptemberinAmmantoholdtheProjectSteeringGroupmeeting,takestockoftheprojectoutcomes, monitor the impact of the activities already delivered, plan the next activities and discuss continuation andexpansionoftheproject’ssupport.Co‐operationbetweenthetwoISAsisexcellentandactivitiesarecomplementary.Oneconcernworthflaggingatthisstageisthelimitedhumanresourcesinthenewly‐formedJIC.Thehiringprocessistakingalotlongerthanexpected,andtheprojectmayfindbottlenecksintheimplementationofsomeactivitiesinthefutureifJIC
staffingisfurtherdelayed.Also,forreformsundercomponent2tobearfruits,additionalfundingisrequired,andasaresult,theJordanianGovernmentwillsubmitseparatelyarequestforchannellingthefundsreleasedfromtheEIBprojecttotheJordanCompetitivenessandInnovationProject.
C. ImplementationStatusofComponentsComponent1:The Component 1 supports the implementation of improved investment rules and regulations, both fordomesticandforeigninvestors,atthenationallevelandintheselectedpilotsectorofRE/EE.Theinvestmentframeworkwillbeassessed,withaparticularfocusonthecoreprotectionprovisions,therulesandconditionsapplyingtoforeigninvestors,theincentivesregimeandtheconsistencywithJordan’sinternationalinvestmentobligations,issuesofspecialimportanceforthefollow‐upoftheOECDInvestmentCommitteerecommendations.Basedontheassessmentoftheinvestmentrulesandregulations,policyadviceandrecommendationswillbeelaboratedtoimplement,improveandstrengthenthereforms.PreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):750.000Sub‐component1.1:AnalysisofandadviceonthelegalinvestmentframeworkofJordan(OECD)StatusofImplementation:ThefirstsubstantiveoutputoftheOECDwasthe“AnalysisofthenewInvestmentLawwithafocusontheprotectionofinvestment”. The study provides a comparative overview of the main features of both the former and the new legalinvestmentregimesandshowstheimprovementsbroughtaboutbytheenactmentoftheInvestmentLawNo.30ofOctober2014. It also assesses the protection provisions contained in the Law, based on a comparisonwith international goodpracticesandOECDstandardsand identifiesareas for future improvement in thenewlaw. Itprovidespolicyoptions forimplementingandforstrengtheningfurtherthelegalandregulatoryenvironmentinJordan.ThestudywaspresentedanddiscussedduringtheWorkshopon“LegalInvestmentFramework:ChallengesandtheWayahead”heldon4March2015.Sub‐component1.2:InvestorProtectionandRestrictionsAnalysis(OECD)StatusofImplementation:ThesecondsubstantiveoutputoftheOECDisthe“AnalysisofJordan’sinvestmentregimewithafocusonrestrictionsto foreigndirect investment”. It supports the government in the upcoming revision of the By‐Law on Non‐JordanianInvestors. In light of recognised international investment policy principles and practices and on the basis of the OECDRegulatory Restrictiveness Index, the report provides concrete policy advice for the revision of the by‐law, a countrycomparativeoverviewofJordan’smainregulatoryrestrictionstoFDI,apreliminaryassessmentofthepotentialeffectsofsuchmeasures,andpolicyadviceonthedefinitionofforeigninvestors,tobeintroducedintheby‐law.TherecommendationsofthestudywerepresentedanddiscussedattheWorkshopontherevisionoftheby‐lawonnon‐Jordanianinvestors,on20May2015.Keystakeholdersandlegaladvisorsinchargeofdraftingtheby‐laws(includingtheHeadofJIC,theJICLegalDepartment,legalcounsellorsoftheMinistryofIndustryandTrade,expertsfromtheUSAIDJordanCompetitivenessProjectandrepresentativesoftheITsector)attendedtheworkshopandpositivelyreceivedthereport.Thedraftingteaminchargeofpreparingtheby‐lawonforeigninvestmentiscurrentlyrevisingtheexistingregulationinlightoftheoutcomesoftheworkshop.Technicaladviceonthedraftby‐lawonFDIrestrictionswillbeprovidedbyOECDasafollowtotheworkshop.NextstepsoftheOECDsupport:
Commentontherevisedby‐lawonnon‐Jordanianinvestors Contributiontothepromotionaltools(e.g.InvestorGuide,brochure,website)oninvestorprotectionbasedonthe
OECDanalysisoftheInvestmentLaw Capacity‐buildingondisputesettlement (improvementof the legal framework,preventionmechanismsandcase
management)PolicyadviceonamodernizedModelBIT,capacity‐buildingforfuturetreatynegotiationsSub‐component1.3:ACost‐BenefitAnalysisoftheIncentivesRegime(WB)StatusofImplementation:TheWBteamisconductingacost‐benefit‐analysisofincentivesofferedtoassesstheireffectivenessinachievingthedesiredpolicyoutcomes.Preparationactivitieswerelaunched,including(a)collectionofdataandinformationontaxexpenditureandcostofincentivesfromtaxandcustomsauthorities;(b)preparationoftargetlistforinvestormotivationsurvey(IMS);and(c)alocalsurveyfirmtoimplementIMShasbeenhiredalready.The Government team is aware that he tight deadlines set for some by‐laws/regulations are affecting their quality: Forexample,thenewsetofinvestmentincentivesisnotbasedoncost‐benefitanalysisofthecurrentsetofincentives.Sofar,the
Government team is committed to revisit/improve such regulations in the medium‐term once the JCIP activities areconcludedtoincorporatemainrecommendationsoninvestmentincentives.Sub‐component1.4:AssessmentofpolicyandlegalbarrierstotheRenewableEnergy/EnergyEfficiencysector(OECD)StatusofImplementation:TheOECDiscurrentlydraftingtheJordanCleanEnergyInvestmentPolicyReviewbasedonthegovernment’sneedsandprioritiesidentifiedduringthemissioninAmman(3‐5March)throughbilateralmeetingswithkeystakeholdersincludinggovernmentofficials,privatesectoranddonorswhowelcomedtheproject.ThescopeoftheReviewwaspresented,discussedandapprovedduringtheWorkshopon“Renewable Energy and Energy Efficiency” heldon4March2015.TheReviewaimsatprovidingpolicyrecommendationsforimprovinginvestmentframeworkforprivateinvestmentinrenewable‐energybasedelectricitygeneration,withafocusoncoherenceofinvestmentincentivesforrenewableenergy,gridaccess,enforceabilityintheprocurementprocessanddonorcoordination. Tofactorinkeyconcernsofvariousstakeholdersonpolicyrestrictionstorenewableenergyinvestment,theOECDhasconductedin‐depthinterviewswithkeygovernmentofficials,topdownstreaminvestorsandmajordonorsincludingUSAID.Inparticular,theintervieweesfromprivatesectorincludethosewhohavebeenheadingmajorrenewableenergyprojectsinJordanincludingthe117MWTafilaand90MWFujeijwindfarmprojects,andthe52.5MWShamsMa’ansolarPVproject.TheReviewwillbepresentedattheInvestmentCommitteeoftheOECDthisfallforreviewandcomments.AnOECDexperts’mission is thenplanned topresent theReviewto Jordanianauthoritiesandconductapolicydialoguewithvariousstakeholderstodiscussimplementationoftherecommendations. Component2:SupporttostrengthentheinvestmentserviceprovisionandcapacitiesThecomponentfocusesonstrengtheningthecapacitytoprovideinvestmentfacilitation,investorprotection,trackingandaftercareservicesbuildingonexperiencesfromtheregionandothercountries.Thecomponentproposesthestreamliningofinvestmentprocedures for theentryofFDI into thehostcountry throughastrengthenedone‐stopshop.The investmentauthorities will be provided with recommendations to improve internal procedures and regulations, streamlining thedecisionmakingprocess,anddefiningefficientprospectiveandestablishedinvestors’services.Theservicesinclude,interalia,promotion,one‐stopshop,aftercareservices,marketresearch,andpolicyadvocacy.Basedontherecommendations,ActionPlanswillprovideanexactroadmaptoimprovethepromotioncapacitiesandservicestoinvestors.TheprojectwillnotbeprocuringtheITsystem.PreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):300.000Sub‐component2.1:Simplificationoftheinvestorentry(WB)StatusofImplementation:TheWBteamacceleratedactivitiesunderthissub‐componenttomakesurethatJICcanmeetthedeadlineofopeningtheinvestmentwindowwithinsixmonthsoftheissuanceofthenewinvestmentlaw.TheWorldBankteamconductedananalysisof the existingOSS, developeddetailed recommendations on the appropriate type anddesignofOSS exploringdifferentoptionsthatcouldyieldbestresults,anddevelopeddetailedimplementationplansincludingrelatedguidesandmanuals.Threeconsultativeworkshopswith JICstaff,governmentagenciesoperating in JIC,andprivatesectorwereconductedtodiscusstheInvestmentwindowdesignandrelatedservices.Asoft‐openingofthenewinvestmentwindowtookplacealreadyinMay2015.Nowthatthephysicallayouthaschanged,thefocuswillnowshifttothemoredifficultaspectsofthereform.The immediate next step now is to create a system that allows for investor identity management, investment servicemanagement,dynamicformgeneration,applicationtrackingandcasemanagement/archiving.Acomprehensivereformroadmapfromlegal,organizationalandtechnologicalperspectivewasprovidedtoJICtosimplifyinvestorentry,andachievemoretransparentandinvestor/businessfriendlyenvironmentinJordan.Foratransformationalchangeintheinvestorexperience,deeperreformswillberequiredincludingprocesssimplificationandautomationwithinmultiplegovernmententitiesbeyondJIC,whichwillrequireadditionalresourcesandincreasedcoordinationbeyondJICandMoTI.Sub‐component2.2:Strengthenedservicestoinvestors(WB)StatusofImplementation:A needs assessment of the investment promotion function was conducted in March 2015, and recommendations wereprovidedinrelationtothestructure,staffingandtools/platformsrequiredfortheinvestmentpromotiondirectorate.Closecoordinationwith the EU consultant is ongoing to finalize the detailed structure and jobdescriptions of the investmentpromotiondirectorate,Nextstepsarelinkedincapacitybuilding,andhelpingJICinthedevelopmentofaninvestoroutreachcampaign.Thehiringprocessistakingalotlongerthanexpected(andtheinvestmentpromotiondirectorateissufferingthemost).BottlenecksintheimplementationofsomeprojectactivitiesmayhappeninthefutureifJICstaffingisfurtherdelayed.
Sub‐component2.3:BuildingtheRE/EEcapacities(WB)StatusofImplementation:ThescopeofworkwasagreedwiththeJordanStandardsandMetrologyOrganization(JSMO),andmultiplemeetingswiththedifferentdonorswereconductedtoensurecomplementaritywithotheractivitiesinthisspace.ThescopeincludesassistingJSMOinupdatingitsEEtechnicalregulationsandstandardsforelectricalappliances,andharmonizing/transposingthemwithEUregulation,andcapacitybuilding.Thescopealsoincludesthedevelopmentofapolicyframeworkandactionplanforwaterpumpenergyefficiency.An international firmwashired inApril 2015; a kick‐offmeeting tookplace inMay2015, and the inception reportwassubmitted in June2015.Thenextstepswillbeestablishing thegapsbetweencurrent JordanianandEUregulations,andconducting a preparedness assessment with regards to the drafting of new regulations, test procedures, monitoring,verification,enforcementandregularupdates.Component3:Reformimplementationsupportand coordination(WB)Thiscomponentwillsupportreformimplementationthroughalocalstaff,aprojectsteeringgroup,thesettingupofapublic‐privatedialoguemechanismandensuremonitoringandevaluationofprojectactivities.PreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):500.000StatusofImplementation:ImplementationissupportedbyaWBGteambasedinAmmanandtheMENAregion,ensuringclosecoordinationandtimelyresponsetoGOJneeds,aswitnessedintheabilitytosignificantlyaccelerateactivitieswhenneeded.WiththelocalWBteampresenceinAmman,andduetotheincreasingfundingrequirementsforactivitiesundercomponent2,theWBteamreallocatedasignificantpartofcomponent3fundingtocomponent2.ThefirstphaseoftheinvestorentryreformfocusedonJICinternalprocessesonlyandlefttheprocessesmanagedbygovernmentagenciesrepresentedinJICtoalaterphase.Forsuchreformtobearfruits,additionalfundingisrequired,andasaresult,theJordanianGovernmentwillsubmit separately a request for channeling the funds released from the EIB project to the Jordan Competitiveness andInnovationProject(component2).
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
OECD:630,000WB:920,000
OECD:630,000WB:920,000
AmountReceivedfromTrustee(b):
WB:920,000OECD:9,705
WB:920,000OECD:9,705
ActualAmountDisbursed(c): WB:235,02320OECD:176,696
WB:235,023OECD:176,696
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2015 WB:200,000
OECD:120,000WB:200,000
OECD:120,0002016 WB:200,000
OECD:100,000WB:200,000
OECD:100,000WB:400,000
OECD:200,0002017 WB:85,977
OECD:90,000OECD:43,304 WB:85,977
OECD:133,304
F. DisbursementsofFundsforIndirectCosts(US$)Disbursed(US$) Available(US$) Total(US$)
20WBCommitmentsstandatUSD225,866
WB;43,186OECD:42,588
WB:100OECD:3,412
WB:43,286OECD:46,000
G. ResultsFrameworkandMonitoring
ProjectDevelopmentObjective(PDO):TheprojectaimstosupporttheGovernmentofJordaninstrengtheningthereformimplementationcapacityofselectedinstitutionsresponsibleforinvestmentpolicy,promotionandservices.
PDOLevelResultsIndicators*UnitofMeasure
Baseline
CumulativeTargetValues**
Frequency
DataSource/
Methodology
ResponsibilityforDataCollection
Description(indicator
definitionetc.)Aug2014–Jul2015(A)
Aug2015–Jul2016
Aug2016–Aug2017
YR4 YR5
IndicatorOne:Adoptionofastrategicplantoimplementanewinvestmentframework;
Binary No No Yes Onetime ISAs
IndicatorTwo:EndorsementoftheActionPlantoimproveservicestoinvestors;
Binary No No Yes Onetime ISAs
IndicatorThree:EndorsementofanActionPlantoimproveservicestoinvestorsintheRE/EEsector.
Binary No No No Yes Onetime ISAs
IndicatorFour:RegularmeetingsofaPublicPrivateDialoguegrouponCompetitivenessandInvestment.
Binary No No Yes Yes Yearly ISAs
INTERMEDIATERESULTS
IntermediateResult(ComponentOne):Supporttostrengthentheinvestmentrulesandregulations
IntermediateResultindicatorOne:Submissionofrecommendationstoensurecoherenceofinternationalinvestmentobligationsforendorsement
Binary No No Yes OnetimeProjectReports
ISAs
IntermediateResultindicatorTwo:EndorsementoftheCostBenefitAnalysisoftheIncentivesRegimeandrelatedreformrecommendations
Binary No No OnetimeProjectReports
ISAs
IntermediateResultindicatorThree:Participantstothetechnicalworkshopsondraftingofthebylawonforeigninvestments
Binary No Yes Yes OnetimeProjectReport
ISAs
IntermediateResultindicatorFour:SubmissionofrecommendationsonhowtostrengtheninvestmentframeworkinEE/REsectorforendorsement.
Binary No No Yes OnetimeProjectReport
ISAs
IntermediateResult(ComponentTwo):Supporttostrengthentheinvestmentserviceprovisionandcapacities
IntermediateResultindicatorOne:AdoptionofanActionPlantoimproveinvestorservices.
Binary No Yes Yes OnetimeProjectreport
ISAs
IntermediateResultindicatorTwo:NumberofstudytourstoOECDandMENAinvestmentpromotionagencies.
Number No n/a 3 n/a InYR2Projectreport
ISAs
IntermediateResultindicatorThree:Numberofparticipantsinworkshopsoninvestmentpromotionfunctionsandtools.
Number No n/a 20 10 YearlyProjectreport
ISAs
IntermediateResultindicatorFour:AdoptionofanActionPlantoimproveservicestoinvestorsintheRE/EEsector.
Binary No n/a Yes OnetimeProjectreport
ISAs
Intermediate Result (Component Three): Reform Implementation Support and Coordination
Intermediate Result indicator One: Number of PPD workshop
participants (public and private
sector) to discuss
competitiveness and investment.
Number No n/a 30 40 Yearly Project
Report ISAs
Intermediate Result indicator Two: Monitoring and evaluation
reports prepared and published
regularly on schedule.
Binary No n/a Yes Yes Yearly Project
Report ISAs
SupporttoBuildingActiveLaborMarketProgram
A. BasicProjectInformationActivityName:Support to Building Active Labor Market Program (ALMP) (P145241)CountryName:Jordan NameofImplementationSupportAgency(ies):World BankNameofISAProjectLeader:Setareh Razmara EmailofISAProjectLeader:[email protected]:Employment, Technical and Vocational Education and Training (E-TVET) Fund
NameandEmailofRecipientEntityContact:
Bashar Soboh (PMU Director) [email protected]
TotalAmountApprovedbytheTransitionFund(US$):4.75M
AdditionalFundsLeveragedandSource(s),ifany(US$):Enterco‐financingamountsandsourcesofthesefunds
TotalAmountDisbursed(DirectandIndirectinUS$):1,019,215.44
SteeringCommitteeApprovalDate:5/15/2013
ProjectImplementationStartDate:11/30/2013
ProjectClosingDate:12/31/2015[extensionfortheclosingdatetoJune30,2017hasbeenclearedbythesteeringcommitteeandapprovedbytheCountryDirectoronJuly7,2015]
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar(selectonlyone): InclusiveDevelopmentandJobCreationSecondaryPillar(s)(selectasmanyasapplicable):
InvestinginSustainableGrowthChooseanitem.Chooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:The project development objective is to increase access to career guidance, job search, and on the job training among targeted youth.Ratingforprogresstowardsachievementofobjective:
Satisfactory
Ratingforoverallimplementationprogress:
Satisfactory
BriefSummaryofProjectImplementationStatus:Overall, satisfactory progress has been achieved since January 2015 in the implementation of the project. Most noteworthy achievements to date include: (i) the finalization by the Project Management Unit team and endorsement by the Bank of the Project Operations
Manual which provides details on implementation of all project components and is a condition of disbursement for the Job Readiness and Placement Program (JRPP);;
(ii) the implementation of delivery of counseling manuals for the School to Work Program has kicked off, the training of trainers (TOT) and counselors has already been completed, and two counseling forums for university graduates in the targeted governorates were organized and attended by more than 1,800 university students;
(iii) the preliminary version of the Electronic Labor Exchange (ELE) is ready and TOT has begun to enable collection of feedback for fine-tuning of the Portal before the official launch planned for August 2015;
(iv) the design of the Job Voucher program for JRPP has been finalized and the recruitment process for the management firm and the employability skills training is ongoing;
(v) an employer needs assessment has been prepared in the three governorates where the JRPP will be piloted to better understand the needs of the employers for hiring youth;
(vi) the external auditor for the project was recruited on time and the first audit report covering the period from November 28, 2013 to December 31, 2014 was sent to the Bank on April 26, 2015 and found acceptable to the Bank.
(vii) Most TORs for various activities of the project were completed and consultants have been hired, or are being selected (out of the twenty-six procurement activities planned in Components 1,2,&3, fourteen contracts have been procured and are currently in progress, seven activities are in the procurement process, three activities are planned, and two activities have been successfully completed).
(viii) the project’s disbursement has increased and is currently at 17%. This is expected to increase further as the assignments for the “School career counseling and guidance” (Component 1) and “Electronic labor exchanges” (Component 2) will be fully completed and paid off before end of 2015 and the implementation of activities for the “Job readiness and placement” (Component 3) will kick off in fall 2015.
While most of the key elements/milestones of the program are on track, it should be noted that the hiring of the management firm, the hiring of the placement firm, and the new hiring of the Financial Officer are critical for the project’s timely delivery; these should be completed in August 2015 to maintain the project timeline as well as the current momentum towards successful project completion. In addition, the Bank team is currently applying for additional funding to finance a rigorous impact evaluation of the Job Voucher program to measure the program’s impact on earnings and employment of beneficiaries. To follow up on the implementation of the activities agreed upon in the implementation plan and provide continuous technical support to the PMU team, regular video and audio conferences are being held between the World Bank team and the PMU team. A restructuration of the project to extend the closing date for 18 months from December 30, 2015 until June 30, 2017 was requested and endorsed by the Transition Fund Steering Committee on May 19, 2015. This extension, approved by the CD, is necessary to ensure successful implementation of the project and achievement of its development objectives. The results framework have not be changed in the restructuring. A slight adjustment has been made with regards to the definition of the beneficiaries of the career counseling/guidance services, now including university students of all levels, instead of limiting it to those in their final years. The extension is budget neutral for the Bank as the E-TVET Fund has agreed to cover the additional cost of the employability skills training (for an additional 1,000 youth) and the existing project savings are expected to cover all PMU salaries for the additional 18 months. The next supervision mission is planned for fall 2015 and is expected to be a mid-term review mission.
C. ImplementationStatusofComponents21
Component1:SchooltoWorkProgram(STW)PreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):0.73 millionSub‐component1.1:CareerCounselingServices&JobFairsStatusofImplementation:The International Youth Foundation (IYF) was selected to implement the career counseling services and they have already completed the training of trainers (TOT) and counselors. Moreover, two counseling forums/job fairs for university graduates in the targeted governorates were organized and attended by more than 1,800 university students. The procurement process for the refurbishment of the employment offices and counseling centers in the targeted governorates is ongoing and the implementation is expected to be completed by before end 2015.
21Includeforeachcomponent:(i)qualitativeachievements,(ii)keymilestones(currentorfuture),(iii)anysignificantchangesinprojectcomponentsorbudgetreallocations,andasapplicable(i)reasonsforimplementationdelays,(ii)implementationchallenges,(iii)fundingstatus,and(iv)otherrelevantinformation.
1878 beneficiaries were reached from the career counseling sessions organized in two of the five targeted universities: beneficiaries from Yarmouk (994 students of which 63% are females) and Hussien Ben Talal (884, of which 90% are females). The career guidance and counseling in the remaining universities will be launched by the end of July 2015. Implementation of career counseling in Ministry of Labor Employment Directorates has just started.Sub‐component1.2:NeedsassessmentreportfortargeteduniversitiesandemploymentofficesStatusofImplementation:The Needs Assessment Report for the targeted universities and employment offices was completed and accepted by the Bank. A mapping matrix and a detailed specification of needs and budget have been prepared. Sub‐component1.3:Upgrading career guidance offices at universities and employment offices of the MOL in the targeted governorates including Irbid, Zarka, Maan, Mafraq, and Tafila.StatusofImplementation:The refurbishment will be procured as one activity with different lots for small maintenance and purchase of equipment and furniture. The procurement for the refurbishment of the Employment offices of MOL has been launched and is expected to be completed by fall 2015. Sub‐component1.4:Communication strategy and campaign for Irbid, Zarka, Maan, Mafraq, and Tafila.StatusofImplementation:it was agreed to bundle the communication strategy of the three components of the project. The communication strategy has been launched, including flyers, posters, and ads and is ongoing.
Component2:MarketInformationandJobSearchProgram(MIJS)PreviousRating:Satisfactory CurrentRating:Satisfactory Cost(US$):0.68millionSub‐component2.1:Customization of the Electronic Labor Exchange (ELE) Portal and job-matching engineStatusof Implementation:The customization of the Electronic Labor Exchange (ELE) Portal and job-matching engine has progressed considerably and the preliminary version of the Portal, with the job-matching engine integrated, is already available with more than 400 pages and 28 reports. The Trainings of Trainers [TOTs] are ongoing with a substantial number of trainers being trained, while two awareness workshops have been organized for employers on the ELE portal and the job matching engine to collect feedback and comments on the Portal for potential readjustments. The official launch of the Jobs Portal is planned for August 2015. In addition, two TOTs sessions on the Tamheed Psychometric Tool were held and 56 career counseling advisors were trained. 80 staff members from MOL and KAFD have been trained on the expanded services of ELE including the psychometric tool “Tamheed” which is a part of career guidance services on the portal. The contracted firm also trained 8 TOTs. These TOTs are expected to train about 100 staff (from MoL and KAFD). Sub‐component2.2:Communication strategy and campaign for the whole countryStatusofImplementation:it was agreed to bundle the communication strategy of the three components of the project. The communication strategy has been launched, including flyers, posters, and ads and is ongoing.Sub‐component2.3:EnternameandbriefdescriptionStatusofImplementation:Provideupdateonimplementationstatus
Component3:JobReadinessandPlacementProgram(JRPP)PreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):2.87million
Sub‐component3.1:Employers’needsassessmentStatusofImplementation:An employers’ needs assessment with the objective to better understand the needs of the employers for hiring youth has been implemented in the three governorates where the Job Voucher program (JRPP) will be piloted. This is an important milestone for the design and implementation of the voucher program, including the targeting of beneficiaries and the matching/intermediation of beneficiaries with employers and firms. Sub‐component3.2:Implementationofskillstrainingandon‐the‐jobtrainingwithwagesubsidyvouchersStatusofImplementation:
The fine-tuning of the design features of the voucher program (eligibility, payment system, monitoring, etc.) was completed. The TORs for the Employability skills training has been prepared and cleared. The recruitments for the firm to implement the basic employability skills training, the management of the wage vouchers, and the placement of youth beneficiaries are ongoing and expected to be completed in August 2015. Implementation is expected to kick off as soon as theses recruitments are finalized and contracts signed. . Sub‐component3.3:CommunicationStrategyStatus of Implementation: As mentioned above, it was agreed to bundle the communication strategy of the three components of the project. The communication strategy has been launched, including flyers, posters, and ads and is ongoing.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities22 Country‐Execution(US$)
(x)
DirectCost23 forISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
4,750,000 0 4,750,000
AmountReceivedfromTrustee(b):
4,750,000 0 4,750,000
ActualAmountDisbursed(c):
826,660.47 0 826,660.47
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)24
Year Jan‐June Jul‐Dec TotalbyYearEnd2013 2014 US$500,000 US$500,0002015 US$500,000 US$1,000,000 US$1,500,0002016 US$1,250,000 US$1,250,000 US$2,500,0002017 US$250,000 ‐‐ US$250,0002018 2019
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed Available TotalUS$192,554.97 US$2,445.03 US$195,000
22Fundsfordirectprojectactivitiesshouldincludeapprovedallocationsforbothcountry‐andISA‐executedactivities.23ISAdirectcostsarethosecostsrelatedtotheISA’sdirectprovisionoftechnicalassistancewithintheproject.PleasealsorefertoParagraph47oftheOperationsManualat(http://www.menatransitionfund.org/content/apply‐funding)24Enteractualdisbursementsforyearspast.
G. ResultsFrameworkandMonitoring
Project Development Objective (PDO): The project development objective is to increase access to career guidance, job search, and on the job training among targeted youth.
PDO Level Results Indicators* Unit of
Measure
Baseline (A)
Oct2013‐Dec.
2014
Cumulative Target
Values** Frequency
Data Source/
Methodology
Responsibility
Description (indicator
definition etc.)
Jan 2015 –
Dec.
2015(F)
Jan.
2016‐
Dec
2016(F)
Indicator One: Total Direct project
beneficiaries:
(a) Total; and (b) Of which are female
Number
Percentage
0 5,200
50
13,700
50
Yearly Administrative
data
Online database
PMU in MOL with
collaboration of
KAFD/ETVET‐Fund
and SSC
Sum of beneficiaries of school to
work program, revamped ELE
and job readiness and
placement program
Indicator Two: Beneficiaries of career
guidance and counseling
(a) Total (b) Of which are female
Number
Percentage
0
3000
50
10, 000
50
Yearly Administrative
Data
PMU/MOL/KAFD Beneficiaries = students in the
final years of community college
& university and unemployed
youth in employment offices of
MOL
Indicator Three: Beneficiaries of
revamped Electronic Labor Exchange
(a) Total (b) Of which are female
Number
Percentage
0
1,000
50
2,500
50
Yearly Online database PMU/MOL/KAFD Beneficiaries = those who
accessed the revamped ELE
Indicator Four: Beneficiaries of Job
Readiness and Placement Program
(a) Total (b) Of which are female
Number
Percentage
0 1,200
50
1,200
50
Yearly
Administrative
data
PMU with
collaboration of
MOL/KAFD/ETVET
‐Fund and SSC
Beneficiaries = at least one year
unemployed graduate youth
(19‐25 years) from community
college and university
Indicator Five: Beneficiaries of Labor
Market Programs 25
(a) Total (b) Of which female
Number
Percentage
0 5,200
50
13,700
50
Yearly
Administrative
data
PMU Same as the total beneficiaries
of the project.
INTERMEDIATE RESULTS
Intermediate Result (Component One): School to Work Program (STW)
Intermediate Result indicator One:
Refurbished career counseling centers
in universities and employment
offices
Number 0 5 10 Yearly Administrative
data
PMU/MOL/KAFD/
Universities
Career counseling centers in
selected universities, and
employment offices
Intermediate Result indicator Two:
Trained counselors in universities and
employment offices
Number 0 10 20 Yearly MOL /Universities
database
PMU/MOL/KAFD/
Universities
Counselors in universities and
employment offices
Intermediate Result indicator Three:
System for collecting feedback from
beneficiaries in place
Yes/No NO NO Yes End of project
Beneficiaries of
career counseling
PMU/MOL Based on the beneficiary review.
Intermediate Result (Component Two): Market Information and Job Search Program (Electronic Labor Exchanges)
Intermediate Result indicator One: Staff trained on revamped ELE
Number 0 50 100 Yearly Administrative
data
PMU Staff in universities and
employment offices.
Intermediate Result indicator Second: number of awareness campaigns on
revamped ELE
Number 0 5 10 Yearly Administrative
data
PMU Awareness campaigns to
promote use of revamped ELE
Intermediate Result (Component Three): Job Readiness and Placement Programs
Intermediate Result indicator One: Beneficiaries to complete skills training
Number 0 1200 1200 Yearly Administrative
data
PMU ETVET Beneficiaries: unemployed
university or community college
graduates who have been
unemployed for a year or more
Intermediate Result indicator Two:
25 Total beneficiaries of Labor Market Programs are limited to the project and equal to total direct project beneficiaries.
Beneficiaries satisfied with on the job
training program Percent 0 20 50 Baseline and
Final
Impact evaluation PMU/ETVET‐Fund Based on impact evaluation of
the voucher program (baseline
and final)
**Indicate‘A’for‘Actual’and‘F’for‘Forecast’
EnhancingGovernanceandStrengtheningtheRegulatory&InstitutionalFrameworkforMSMEDevelopment
A. BasicProjectInformationActivityName:EnhancingGovernanceandStrengtheningtheRegulatoryandInstitutionalFrameworkforMSMEDevelopmentTransitionFund
CountryName:TheHashemiteKingdomofJordan
NameofImplementationSupportAgency(ies):
TheWorldBankinpartnershipwiththeArabFundforEconomicandSocialDevelopment(AFESD)
NameofISAProjectLeader:SaharNasr(outgoingTTL),LailaAbdelkader(incomingTTLasofJune2015)
EmailofISAProjectLeader:[email protected]; [email protected]
RecipientEntity:TheCentralBankofJordan NameandEmailAddressofRecipientEntity:[email protected]
TotalAmountApprovedbytheTransitionFund(US$):3,235,000
AdditionalFundsLeveragedandSource(s),ifany(US$):
TotalAmountDisbursed(DirectandIndirectinUS$):679,695
SteeringCommitteeApprovalDate:
12/5/2013
ProjectImplementationStartDate:
3/15/2014
ProjectClosingDate:
8/31/2018
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): EnhancingEconomicGovernanceInclusiveDevelopmentandJobCreationChooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:Theprojectdevelopmentobjective(PDO)istoenhancefinancialservicesandproductsandtostrengthenfinancialprotectionmechanismforMSMEs,whileenhancinggovernance. Ratingforprogresstowardsachievementofobjective:
ModeratelySatisfactory
Ratingforoverallimplementationprogress: ModeratelySatisfactory
BriefSummaryofProjectImplementationStatus:Positivestrideshavebeenmaderegardingprojectimplementation;howevermorestillneedstobedone.CBJiscurrentlyplanninganumberofstudytours,inadditiontotheestablishmentofvariousnewspecializedunits. They are also in the process of hiring consultants for hands on training and capacity building,especiallyinthecontextofconsumerprotectionandfinancialliteracy.Hence,disbursementsareexpectedtospeedupverysooninthenearfuture.OnthecreditguaranteecomponentimplementedbyJLGC,greatprogresswasachieved,incollaborationwithIFC.
C. ImplementationStatusofComponentsComponent1:StrengtheningCreditGuaranteesSchemesPreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):1million
Sub‐component1.1:OrganizationandHumanResources.StatusofImplementation:TherearesignificantgapsthatneedtobeaddressedinorderfortheJLGCtogaintherequiredcompetencies,andenhanceitschancesforthesuccessfulimplementationofthechangeinitiatives.Inthisrespect,JLGChasrecruitedtworesidentadvisors,oneforriskmanagement(toimplementandmanagetheriskframeworktransformationandreformthepaymentrules),andasecondforproductandbusinessdevelopment(tohelplaunchnewproductsandrevamptheexistingones,aswellasoverseeexecutionofstrategicenablers).Athirdmarketingadvisorwillbehiredsoon.TheseresidentadvisorswouldtrainJLGCstaff,andimprovetheirtechnicalknow‐howforchangestobesustained.Sub‐component1.2:Analyticsandsystems.StatusofImplementation:JLGChasalreadyprocuredanEnterpriseResourcePlanning(ERP)system;andenhancedtheirdatawarehousingandanalyticsgeneratingsystems;andareintheprocessofimprovingtheirManagementInformationSystem(MIS)mechanism,andincreasingprocessautomationandbuildinginterfaceswithbanks.JLGChaveacquiredhardwareandsoftwaretosupportallthegrowthinitiatives. Sub‐component1.3:Knowledge.StatusofImplementation:JLGCwillsignificantlybenefitbylearningfrombestpracticeguaranteeschemesaroundtheworld.JLGCteamhasalreadyattendedstudytoursinMalaysia,Morocco,TunisiaandLebanon,andtheyareplanningadditionalstudytoursintheupcomingyears.Sub‐component1.4:Capacitybuildingforbanks.StatusofImplementation:Thereisaneedtobuildthefrontlinepeople’scapacityatbanksthroughtraining,inordertoallowthemtobetterunderstand,bundleandselltheproductsandschemesthatwouldbelaunchedbyJLGC.InthisrespectJLGCisplanningworkshopsforbeneficiarybanksinthenextfewmonths.Component2:EnhancingtheConsumerProtectionMechanismPreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):1.2million
Sub‐component2.1: EstablishmentofaConsumerProtectionUnitatCBJStatusofImplementation:ThisdivisionwasestablishedwithintheBankingSupervisionDepartment,tosupervisethecompliancewithconsumerprotectionregulations(includingthenewTreatingCustomersFairlyInstructions),andtohandlecomplaints.Thiswillbedonebyconductinganassessmentofthecapacitybuilding,trainingandresourcerequirementsforthedivision,andassistingtheCBJinthedevelopmentofapproachestofulfilltheserequirements.
Sub‐component2.2: Twostudytoursonresponsiblefinanceandfinancialconsumerprotection(aftertheestablishmentofCPU)
StatusofImplementation:Notyet.Willbeconductedduringupcomingyears.Sub‐component2.3: BuildingthecapacityandtrainingofConsumerProtectionUnitstaffStatusofImplementation:ProvidingcapacitybuildingtotheCBJtosupporttheconsumerprotectionfunctions, includingfinancingITequipment(bothsoftwareandhardware).ThiswillhelpCBJtoestablishappropriateon‐siteandoff‐sitemonitoringsystemsandprocedures,provideadviceonenforcementmechanisms,aswellastrainingonhowtouseconsumerresearchonaregularbasis,andonhowtoidentifyfinancialinclusionbarrierscreatedbysomefinancialinstitutions(suchasminimumbalanceamountsforopeningabankaccount).Thetechniquestobeincludedinthistrainingcouldinclude;surveys,qualitativeresearch(focusgroups),mysteryshopping,andanalysisofcomplaintsdata.Sub‐component2.4:PromotingfinancialliteracyStatusofImplementation:throughpublicawarenesscampaignsandmediaprograms,focusingonissuessuchasthelegalrightsofclients,understandingdifferentfinancialproductsofferedinthemarket,andthecomplaintresolutionmechanism.ThiswillcomplementtheeffortsdonebythesteeringandtechnicalcommitteesheadedbytheCBJ(whichwereestablishedbyministerialdecreeinMay2014),astheirmainmandateistoconductafinancialliteracyprograminJordan.
Component3:Supportingthedevelopmentoftheinstitutionalframeworkformicrofinanceandnon‐bankfinancialinstitutions(NBFIs)supervisionPreviousRating:Satisfactory CurrentRating:Moderately
SatisfactoryCost(US$):0.8million
Sub‐component3.1:TechnicalassistancetoCBJStatusofImplementation: ThemicrofinanceregulationwasapprovedbytheCBJBoardontheMay29,2014,andwasrecentlyratifiedbytheCabinetontheDecember14,2014.ItwillbeeffectivefourmonthsafterbeingpublishedintheOfficialGazetteinearlyJanuary2015.Basedonthisbylaw,theCBJhasthemandateandauthoritytoregulateandsupervise themicrofinancesector.Thebylawisconsistentwith internationalgoodpractices,andadoptsprudentialruleswithmorefocusonconsumerprotection,fitandproperrequirements,stronggovernancerules, risk management and internal controls. The bylaw also adopts a general definition of the term“Microfinance” by; including other financial services besidesmicrocredit (with the exception of deposittaking),andtargetingthepoorsegmentsofthepopulation,bycateringtotheunbankedortheunderserved.
TheprojectissupportingtheCBJingatheringallavailabledataabouttheNBFIsthatareengagedinfinancialservices(forexample,consumerlending,unregulatedinvestmentfunds,factoringandfinancialleasing),aswellasthosethatoperatewithoutanyspecializedregulationorsupervision.Thisisdoneinordertoidentifythe risks and issues that need to be covered, in order to further assist the CBJ in adopting a morecomprehensiveapproachofregulatingandsupervisingNBFIs,ratherthanjustbeinglimitedtoMFIs.Thiswill include a comprehensivemarket study, technical assistance in drafting any needed regulation, andbuildingthecapacityofthestaffinchargeofsupervisingtheseinstitutions.
Sub‐component3.2:SupportCBJinestablishingtheUnit(includingstaffandIT)StatusofImplementation:TheWorldBank,inclosecooperationwithGIZ,participatedandassistedinorganizingseveralworkshopsandmeetingswiththeCBJteam,theymanagedtofinalizethefollowing:(i)anestimatedbudgetforallcomponentsoftheproject;(ii)aworkplanandtimeframeforeachsubcomponent;(iii)TermsofReference(TOR)fortheleadconsultantwhowillberesponsibleofassistingtheCBJinconductingthemarketstudyandassessmentregardingNBFIs(andbasedonthisassessmenttoconsidermovingallNBFIsatalaterstageunderthesupervisoryauthorityoftheCBJ);and(iv)preparethemicrofinancecriteriaandmainexecutiveinstructionsthattheCBJwillneedtotakeontheresponsibilityofregulatingandsupervisingMFIsinordertomakeuseofthetimeuntilthemicrofinanceregulationbecomeseffective.
D. DisbursementsofTransitionFundFundsforDirectProjectActivities
Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
3,000,000 3,000,000
AmountReceivedfromTrustee(b):
3,000,000 3,000,000
ActualAmountDisbursed(c):
531,007 531,007
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)
Year Jan‐June Jul‐Dec TotalbyYearEnd2014 400,000 0 400,0002015 600,000 400,000 1,000,0002016 500,000 500,000 1,000,000
2017 150,000 200,000 350,0002018 200,000 50,000 250,000
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)148,688 86,312 235,000
G. ResultsFrameworkandMonitoring
PROJECT DEVELOPMENT OBJECTIVE (PDO): The main objective of the project is to enhance financial services and products and to strengthen financial protection mechanism for MSMEs, while enhancing governance.
PDO Level Results Indicators
Cor
e Unit of Measure
Baseline FY 15
Cumulative Target Values Frequency
Data Source/ Methodology
Responsibility for Data
Collection
Mar 2014 – Feb 2015
A
Mar 2015 –
Feb 2016
Mar 2016 –
Feb 2017
Mar 2017 – Aug 2018
Actual Target Target Target Target Number of microfinance loans after bringing the MFIs under the umbrella of CBJ Number 0 0 0 500 1000 1500 Annual CBJ Report CBJ
Number of SME loans guaranteed by JLGC Number 3000 3575 3200 3,500 4,000 4,500 Annual JLGC CBJ
Number of complaints resolved to the satisfaction of the consumer by the Consumer Protection Unit at CBJ within [30] days.
Number 0 0 0 400 500 600 Annual CBJ Report CBJ
Direct Project Beneficiaries Number 3000 3575 3200 4400 5500 6600
Direct Project Beneficiaries, of which female (%) Percentage 10 10 13 14 16 20
INTERMEDIATE RESULTS Component I: Strengthening the Credit Guarantee Schemes
Value of guarantees issued Million JD 49 65.3 51 54 60 65 Annual JLGC CBJ
Guaranteed loans by JLGC to women-owned SMEs Percentage 5 7 6 7 9 11 Annual JLGC CBJ
Component II: Enhancing the Consumer Protection Mechanism
Consumer Protection Unit at CBJ fully staffed and operational Yes/No No No No Yes Yes Yes Annual CBJ Report CBJ
Completion of the necessary training programs for the staff in the Consumer Protection Unit Number 0 0 0 3 4 5 Annual CBJ Report CBJ
Number of public awareness campaigns and financial literacy programs Number 0 0 0 1 2 3 Annual CBJ Report CBJ
Component III: Supporting the development of the institutional framework for microfinance and non-bank financial institutions (NBFIs) supervision
Microfinance Division at CBJ fully staffed and operational Yes/No No No No Yes Yes Yes Annual CBJ Report CBJ
NationalUnifiedRegistryandOutreachWorkerProgram
A. BasicProjectInformationActivity Name: NATIONAL UNIFIED REGISTRY AND OUTREACH WORKER PROGRAM (P144832)
Country Name: Hashemite Kingdom of Jordan Name of Implementation Support Agency(ies): Income and Sales Tax Department (ISTD) in Ministry of Finance (MOF) for Component 1
Ministry of Planning and International Cooperation for Component 2
Name of ISA Project Leader: Setareh Razmara Email of ISA Project Leader: [email protected]
Recipient Entity: Income and Sales Tax Department (ISTD) in Ministry of Finance (MOF) for Component 1 and Ministry of Planning and International Cooperation (MOPIC) for Component 2.
NameandEmailofRecipientEntityContact:
Eyad Al-Qudah, ISTD ([email protected])
Mukhallad Omari , MOPIC ([email protected])
Total Amount Approved by the Transition Fund (US$): 10,000,000
Additional Funds Leveraged and Source(s), if any (US$):
Total Amount Disbursed (Direct and Indirect in US$): 1,498,883
Steering Committee Approval Date:
2/20/2013
Project Implementation Start Date:
11/30/2013
Project Closing Date:
12/31/2017
Pillar(s) to which Activity Responds (as per the proposal approved by the Steering Committee)
Primary Pillar:
Investing in Sustainable Growth
Secondary Pillar(s): Investing in Sustainable Growth Choose an item.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:The project development objective is to improve the targeting of social safety net programs and develop an efficient outreach mechanism
Ratingforprogresstowardsachievementofobjective: ModeratelyUnsatisfactory
Ratingforoverallimplementationprogress: ModeratelyUnsatisfactory
BriefSummaryofProjectImplementationStatus: Since the last progress report of January 2015, a supervision mission was organized from March 24 to April 2, 2015 and several VC meetings were held in the months of May and June. The findings of the mission and the little progress to date have triggered further downgrading of the PDO progress to Moderately Unsatisfactory. The Overall Implementation rating has been also downgraded to Moderately Unsatisfactory where, despite the political decision that a National Unified Registry Unit should be established implementation of activities has required intensive supervision and hands-on. The Government counterparts are (i) technically weak; and (ii) irresponsive to Bank team technical suggestions and not willing to follow the Bank’s procedures, particularly with respect to Component 2. Component I “Building and Using a National Unified Registry” has seen little progress and main components’ activities have yet to kick-off. Nonetheless, following the Ministerial Cabinet’s Directive (January 2015), the NUR Unit has finally been set up in ISTD with (i) four staff seconded from ISTD and a local technical coordinator recruited by the project, and (ii) a dedicated office space within ISTD. After some delays, the recruitments of the three international and three local consultants, on legal, operations and MIS matters, have been launched. Once on board, they are expected to help operationalize the NUR, kick-off the NUR Unit activities, and support implementation of component activities towards achievement of the development objectives.
Component 2 “Piloting the Integrated Outreach Program”, has recorded some progress but further effort is needed to expedite implementation and particularly ensure quality of work. Since the last supervision mission (March 2015), the training institution Arizona International finalized the training toolkit and completed the first batch of trainings mainly for staff from the National Aid Fund and the PMU. The mapping assignment, to help identify the availability and gaps in relevant services in the three selected governorates (Irbid, Zarka and Maan), was awarded and the contract signed. On the other hand, the selection of the NGO, which will be in charge of implementing the Outreach Program, has been largely delayed mostly because of lack of compliance with Bank procurement procedures. Nonetheless, the NGO contract is expected to be signed during the month of July 2015 to enable outreach activities to kick-off. Finally, given the weak capacities of the PMU in MOPIC and the unsatisfactory work of the consultant hired, the Project Operational Manual, whose completion has also experience a long delay, is being redrafted by the Bank team and is expected to be used in the implementation of both components (NUR and Outreach). Originally, the project’s mid-term review (MTR) was planned for December 2015. However, given the mixed performance of the project, the Bank team is planning the MTR mission for fall (October/November 2015) to reassess the relevance, efficacy, effectiveness of the project design (including project objectives), and the implementation approach. The objective of the MTR is to decide whether there is a need to restructure the project (particularly in terms of activities and results matrix). Prior to the MTR mission, the Bank team will prepare a note on issues and remedial measures to be discussed and agreed with main Bank stakeholders.
C. ImplementationStatusofComponents
Component 1: Building and Using National Unified Registry PreviousRating:Moderately Satisfactory
CurrentRating:Moderately Satisfactory
Cost(US$): 2.5 million
Sub-component 1.1: Setting-up a single registry of potential beneficiaries for social assistance - the National Unified Registry (NUR) – at ISTD that will be used to target subsidies and distribute the compensation benefits/social assistance to eligible households affected by the subsidy reform. Status of Implementation: During the March 2015 mission, the Bank was informed that the Fuel Subsidy Cash Compensation Scheme has been suspended for the remainder of 2015. This is due to the drop in the three-month rolling average of the international oil price to below the $US100 threshold for distributing compensation. This suspension of compensation impacts to some extent the scope of the activities under Component 1, although the PDO still remains valid. On January 14, 2015, the Prime Minister informed the Ministry of Finance (MoF) and MOPIC that the creation of the NUR Unit within the ISTD had been endorsed by the Cabinet and that the ISTD should second qualified staff to work on the steps required for the establishment and operation of this Unit. This was an important policy decision for moving forward on the institutionalization of NUR. Subsequent, to this Ministerial Cabinet’s Directive, (i) the NUR Unit has been set up in ISTD, (ii) partially staffed with a Manager, two IT programmers, and one part-time database engineer all three seconded by ISTD, and (iii) it has a dedicated office space within ISTD. To strengthen the capacity of this core team and most importantly help concretely operationalize the NUR Unit, the Project has funded the hiring of a local Technical Coordinator and 6 consultants (3 international and 3 local) on legal, operations, and MIS matters. After some delays, the recruitments of the three international and three local consultants, on legal, operations and MIS matters, have been launched. Once on board, they are expected to help operationalize the NUR, kick-off the NUR Unit activities, and support implementation of component Nonetheless, the project key development objective of building and using the NUR beyond fuel compensation program remains a complex task and requires time. Sub-component 1.2: Developing and using the NUR for social assistance programs. Status of Implementation: MoF has set-up a steering committee to coordinate both the data input (i.e. administrative information that can inform welfare ranking of prospective and current beneficiaries), as well as NUR database utilization (to assist other agencies in utilizing the database for targeting). However this steering committee is not yet functional. It was agreed, however, that during the MIS Assessment and Systems design stage (which is expected to be carried out by the international consultants hired by the project’s Component 1), the National Aid Fund (NAF) will be one of the agencies surveyed. This MIS assessment is expected to better determine the feasibility, costs, and expected timeline for launching the pilot on utilization of NUR, including data-linkages between NUR and NAF to strengthen NAF targeting and monitoring. The Bank team has also stressed the need for the ISTD team to further investigate other potential social agencies/ministries as utilizers of the NUR and that could be included in the upcoming MIS assessment (such as Ministry of Health with its new health insurance program, etc.). To date, these two program pilots have not yet been confirmed.
Component 2: Piloting Integrated Outreach Workers Program (IOWP) Previous Rating: Satisfactory Current Rating: Moderately Satisfactory Cost (US$):7.0 million Sub-component 2.1: Design, Planning and Training of Outreach Workers program. Status of Implementation: Despite delays, MOPIC has advanced in the implementation of this sub-component. Indeed, since the last report (January 2015), the training institution Arizona International finalized the training toolkit and completed the first batch of trainings mainly for staff from the National Aid Fund and the PMU. The mapping assignment, to help identify the availability and gaps in relevant services in the three selected governorates (Irbid, Zarka and Maan), was awarded and the contract signed. On the other hand, the selection of the NGO, which will be in charge of implementing the Outreach Program, has been largely delayed mostly because of lack of compliance with Bank procurement procedures. Nonetheless, the NGO contract is expected to be signed during the month of July 2015 to enable outreach activities to kick-off. On the other hand, the preparation of the Project Operational Manual, which is a legal covenant overdue more than 18 months, has experience tremendous delays stemming mostly from weak capacities of the PMU in MOPIC and the unsatisfactory work of the consultant who was initially hired to draft the POM. Consequently, to avoid any further delay, is being redrafted by the Bank team and is expected to be used in the implementation of both components (NUR and Outreach). Sub-component 2.2: Outreach Deployment and Monitoring. Status of Implementation: After a long delay stemming largely from non-compliance with Bank’s procurement procedures, the selection of the NGO is being finalized and the contract is expected to be signed over the coming weeks. Two weeks after the signing, an inception Report/detailed technical implementation proposal and plan clarifying in details activities/methodology/data information/referral system used for implementation of the outreach program (including linkages with the training and mapping activities, is expected to be submitted by the NGO. Once this milestone is completed, the activities of this subcomponent will finally kick-off. The project still lacks a solid M&E mechanism, MOPIC needs to advance the work on: (i) developing monitoring and reporting mechanisms and tools, and (ii) agreeing on the structure of a project monitoring database to align with the project’s M&E needs as presented in the results matrix, and ensuring that capable staff can capture the data from the field and collect/analyze performance. The Bank team is expected to provide guidance and support to the PMU to develop an appropriate evaluation mechanism for the outreach program. Furthermore, the project’s M&E specialist has quitted his job and his replacement has yet to be hired.
D. Disbursements of Transition Fund Funds for Direct Project Activities
Country-Execution (US$)
(x)
Direct Cost for ISA-Execution (US$)
(y)
Total (US$)
Approved Amount for Direct Project Activities (a):
9,500,000 9,500,000
Amount Received from Trustee (b):
9,500,000 9,500,000
Actual Amount Disbursed (c): 1,000,000 1,000,000
E. Disbursement Forecast of Funds for Direct Project Activities by Calendar Year (US$) Year Jan-June Jul-Dec Total by Year End 2013 2014 1,000,000 0 1,000,000 2015 250,000 250,000 1,500,000 2016 2,000,000 2,000,000 55000,000 2017 1,000,000 1,000,000 7,500,000 2018 1,000,000 1,000,000 9,000,000
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)498,883 1,117 500,000
G. ResultsFrameworkandMonitoring
Project Development Objective (PDO): The project development objective is to “improve the targeting of social safety nets programs and develop an efficient outreach mechanism”.
PDO Level Results Indicators*
Cor
e Unit of Measure
Baseline
Cumulative Target Values
Frequency Data Source/ Methodology
Responsibility for Data Collection
Description (indicator definition etc.)
Dec 2013 – Nov 2014
A
Dec 2014 –
Nov 2015
F
Dec 2015 – Nov 2016
F
Dec 2016 – Dec 2017
F
Indicator One: Direct project beneficiaries:
(c) Of safety net programs (subsidy compensation program) following new targeting schemes
(d) Of outreach worker program
(e) Of which are female
Household Number
percentage
0
0
500,00026
0
0
6,400
50
0
14,000
50
600,000
22,000
50
Annual Ministry of Finance/ISTD Databases
Implementing NGO databases
Ministry of Finance/ISTD
MOPIC
Sum of beneficiaries of subsidy compensation program and outreach worker program
Indicator Two: Beneficiaries of safety net programs
(c) Total
(d) Of which are female
Number
Percentage
0
2,824,339
50
0
50
0
50
3.4 million
50
Annual Ministry of Finance/ISTD Databases
Ministry of Finance/ISTD
Beneficiaries = Households whose annual income is below JD10,000 will benefit from the program. This will cover approx 70% of Jordanian population)
26 The size of household is on average 5.7. Therefore total number of beneficiaries is estimated at 2.8 million.
Indicator Three: Poor households as a share of total beneficiaries of subsidy compensation program
Percentage 30 NA 32 35 40 Annual Ministry of Finance/ISTD databases
Ministry of Finance/ISTD
“Poor households” is defined as those whose incomes range from JD 0-2000/year according to MOPIC/MOF policy that established the Subsidy Compensation Program.
Indicator Four: Beneficiaries of outreach worker program who are receiving the services
Percentage 0 0 50 50 50 Annual Implementing
NGO database and/or survey
Ministry of Planning in partnership with the implementing partners
Beneficiaries = Poor household
INTERMEDIATE RESULTS
Intermediate Result (Component One): (i) Government databases on beneficiaries consolidated into single database; (ii) MOF delivers compensation based using National Unified Registry database
Intermediate Result indicator One: Adopt modified welfare ranking to assess household eligibility for subsidy compensation program
Yes/No No No Yes Yes Yes Annual Revised application form
ISTD ISTD will use additional welfare indicators to establish eligibility.
Intermediate Result indicator Two: Grievance Redress System (GRS) developed and functional.
Yes/No No No Yes Yes Yes Annual GRS reports ISTD/MOF
Intermediate Result Indicator Three: Government databases on beneficiaries consolidated into single database
Yes/No No Yes Yes
Intermediate Result Indicator Four: MOF delivers compensation based using NUR database
Yes/No No Yes Yes
Intermediate Result Indicator Five: Data collected is verified
Percentage 0 0 70% 70% 70%
Intermediate Result Indicator Six: Other Government agencies using NUR in delivering services and assistance
Yes/No No No Yes
Intermediate Results (Component Two): (i) Outreach workers fully integrated in poverty pockets; (ii) poorest households are registered in NUR; (iii) introducing referral system and case management; and (iv) tailoring and delivering services to the needs of households in poverty pockets
Intermediate Result Indicator One: Skilled Outreach Workers deployed
Number 0 0 256 576 896 Quarterly NGO database MOPIC in partnership with the lead NGO
Outreach workers = personnel to be recruited for household case management and supporting the grievance system at NUR
Intermediate Result indicator Two: Supervisors trained to train the outreach workers
Number 0 15 16 36 56 Annual NGO database MOPIC in partnership with the lead NGO
Supervisors = personnel to be recruited as part of the outreach program to train and supervise the outreach workers
Intermediate Result Indicator Three: Case management approach used to assessing the needs of selected households participating in the program.
Percent of Households
0 0 25 50 50 Annual NGO database and rapid assessment reports from the households
MOPIC in partnership with the lead NGO
Households contacted by outreach workers
**Indicate‘A’for‘Actual’and‘F’for‘Forecast’
VirtualMarketPlacesfortheDevelopmentofExportSME:JordanActivities
G. BasicProjectInformationActivityName:DevelopmentofSMEsExportsthroughVirtualMarketPlaces(Jordan)CountryName:Jordan(thisisaregionalprojectthatincludesMoroccoandTunisia)
NameofImplementationSupportAgency(ies):TheWorldBank
NameofISAProjectLeader:LaurentGonnet EmailofISAProject Leader:[email protected]:WorldBankExecuted NameandEmailofRecipientEntityContact:N/ATotalAmountApprovedbytheTransitionFund(US$):1,000,000
AdditionalFundsLeveragedandSource(s),ifany(US$):0
TotalAmountDisbursed(DirectandIndirectinUS$):307,506
SteeringCommitteeApprovalDate:11February2014
ProjectImplementationStartDate:May26,2014(datesignaturecontractwithInternationalTradeCenter,implementationpartner).
ProjectClosingDate:December30,2016.
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar(selectonlyone): InclusiveDevelopmentandJobCreation
SecondaryPillar(s)(selectasmanyasapplicable):
CompetitivenessandIntegrationChooseanitem.Chooseanitem.
H. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:Thisisapilotprojectaimedata)increasingSMEsexportsthroughVirtualMarketPlacesandb)supportinginstitutionalreformstocreateanenablingenvironmentfore‐commerce.Ratingforprogresstowardsachievementofobjective:
Satisfactory.
Ratingforoverallimplementationprogress: Satisfactory.BriefSummaryofProjectImplementationStatus:TheVMPprojectwas launched in Jordanon21September2014. Project implementation isprogressingwell asoutlinedinthereport.Summaryhighlights: Trainingmaterialsdevelopedandcustomized 2trainingworkshopsforexportadvisorsdelivered 20ExportAdvisors(EAs)trainedfromwhich14,thatpassedthetrainingtest,werehired 144SMEssubmittedtheirapplicationamongthem53SMEswereselectedandassignedtotheEAs CoachingofSMEsandregistrationontoVMPsinitiated PartnershipswithsomeVMPestablished ProgrammeImplementationUnitinplaceNomajorrisksjeopardizetheoutlook.Thereissatisfactorylevelofengagementfromourmainpartners.
I. ImplementationStatusofComponents
Component1:InstitutionalReformComponentIt is important thatgovernmentsadoptpolicies, laws,and incentives that focusonpromoting trustandconfidenceamonge‐commerceparticipantsandondevelopinganationalframeworkcompatiblewithinternationalnormsone‐commerce.Thiscomponentaimsatsupportingcurrentdiscussionsandatintroducingpolicyandregulatorychanges.
Thiscomponentwillsupportthecreationofaninter‐ministerialcommitteewiththeprivatesectorparticipation,byanalytical and diagnostic studies, with the objective of concretizing reforms in the enabling environment for e‐commerce.PreviousRating:Chooseanitem. CurrentRating:Satisfactory Cost(US$):100,000InitialproposeddraftoftheTermofReferencefortheInter‐InstitutionalCommitteeonE‐CommercewasdevelopedandsharedwiththeMinistryofTrade.ThedraftproposalwasdevelopedbasedondiscussionsamongITC,MinistryofTrade,MinistryofTelecommunicationandMinistryofTransport, in themonthofApril, about settingupan inter‐InstitutionalCommitteeonE‐Commerce.DuringITCmissiontoJordaninApril,andthemeetingswiththedifferentstakeholders,ITCagreedonthefollowing:The importanceof setting‐up thiscommitteeasa forum for consultingandcoordinatingdifferent tradeand trade‐relatedpolicyissuesconcerninge‐commerce,aimingataddressingconstraintsandproposinganactionplaninrelationtotherequiredpolicyreforms,thatwillcreateamoreconduciveenvironmenttohelpSMEsbetterperformonvirtualmarketplaces.ITC proposed that this committee act as a formal advisory body to the Government or to the Trade FacilitationCommittee.Inaddition,tofacilitatethework,ITCsuggestedthatthiscommitteecouldbeeitherasub‐committeeoftheTradeFacilitationCommitteealreadyestablishedinthecountry,ortaketheformofataskforcereportingtotheTradeFacilitationCommittee.Thecommitteewillbeestablishedeitherthroughaformallegalinstrumentssuchasagovernmentdecreeorlegislation,orasataskforceundertheTradeFacilitationCommittee.Thiswillbedecidedbythestakeholders.ItisexpectedthatthemainstakeholderswillmeettodiscusstheproposedToR,andtotaketherequiredactionsbeforetheendofJuly(ForfurtherdetailsabouttheTermofReference,pleaseseeannex1).ItisworthtomentionthatITCiscurrentlyundertakingtheNon‐TariffMeasuresSurveyinJordan,aspartofadifferentproject:ITCtookthisopportunityandincludedtothesurveyadditionalquestionsonthemainobstaclesandchallengesthatSMEsarefacingwhileexportingthroughVMPs.Theresultofthissurveywillbesharedwiththeinter‐institutionalcommitteetotaketherequiredactions,andworkonthepolicyreform.
Component2:CapacityBuildingProgramPreviousRating:Chooseanitem. CurrentRating:Satisfactory Cost(US$):445,000Sub‐component2.1:CapacityBuildingProgram.Thesub‐componentwillcoverthecostofthedesignandthedeliveryofatrainingprogramthatwillenablecountrypartnerstofullyunderstandthemethods,techniquesanddynamicsofVMPstomaximizetheopportunitiestheyoffertoincreaseexportsanddiversifymarkets.StatusofImplementation:Satisfactory.Twotrainingworkshopsonvirtualmarketplacesweredelivered:ThefirstworkshopwasconductedonDecember9‐11,tobuildVMPsconsultancycapacitiesoflocalITandBusinessconsultants.Theworkshopaimedatenrichingtheire‐commercecapabilitiesande‐solutionsskills, inordertolatergraduallytransferthoseskillstolocalSMEs.Twenty(20)ofthelocalITandBusinessconsultantsattendedthetraining.Thefinalselection,inwhichonlyfourteenoutofthetwentywereselectedinJanuary2015(pleaseseethelistoftheselectedadvisorsinAnnex2).
TheselectedconsultantshavebeenhiredtoworkwithITConassistingtheJordanianselectedcompaniestoregisteronvirtualmarketplaces:theultimategoalisforthemtoacquirenewclientsandincreasetheirsalesthroughthesevirtualmarketplaces.ThesecondworkshopwasconductedonApril21‐23,asacontinuationtothefirsttraining.Theadvisorshavebeentrained mainly on the complete cycle of the cross‐border e‐commerce transactions. The training covered theproduct/marketresearch,contentpreparation,commercialoffers,aswellasfiscal,legalandlogisticenvironmentinthetargetmarkets(seeTrainings/RoadmapinAnnex3).Duringthistraining,thefollowingwasdelivered:
SomeSMEswereinvitedtopresentsomerealcasesaboutthechallengestheyfacewhileexportingthroughVMPs,toexposetheselectedconsultantstorealstories,andtothechallengesSMEsface,andhowtheyexport.
AssigntheSMEstotheconsults,andexplainwhatITCexpectsfromthem.
ActivitiesITCexpectstheadvisorstodeliver,arethefollowing:
DeliveronetothreeshorttrainingworkshopstoagroupofSMEs,followingITC’strainingcurriculum,contentandinstructions.
CoachandassistSMEstogetregisteredandposttheirkeyproducts/servicesforexportonselectedvirtualmarketplacesrelevanttotheirstrategy,offerings,resourcesandcapabilities,andtargetmarkets.
Researchandconfirmtheexport/importcomplianceoftheproducts&servicesoftheSMEsaccordingtothetargetmarkets.
Identifytheregions/countriesandconsequentlythemostappropriateVMPsfortheproducts/servicesofeachSME.Follow‐upwiththeseSMEsonaweeklyorbi‐monthlybasis,coach/supportthemwheneverrequiredandimplementcorrectiveactionsinordertoensurethatamaximumofSMEsareactiveonthevirtualmarketplaces,andthattheyacquirenewclientsandthattheirsaleshaveincreasedasaconsequenceoftheirpresenceontheselectedvirtualmarketplaces.
ITCcreatedanonlineplatformtofacilitatethereportingprocessfortheconsultants,andtobeabletoprovideguidancewhenneeded.Sub‐component2.2:RegistrationandCoachingofSMEsAlongwiththeoutreachphaseoftheproject,beneficiarySMEswillberegisteredinonetothreedifferentVMPs,coachedonhowtomakethebestuseoftheirpresenceontheseVMPsandhowtodealwiththeinquiriescomingfromthefirstpotentialbuyersthroughtheVMPs.StatusofImplementation:Satisfactory.Call forproposals launchedonlineandapplicationsreceivedfrom140SMEstobenefit fromtheproject;FiftythreeSMEshavebeenselectedanddividedbetweenthe14advisors.Currently,eachoftheselectedadvisorsiscoaching4SMEs,inthefirstround.WorkwiththeSMEshasstartedandwillbecompletedbytheendofJuly.Duringthisperiod,theadvisorswillcoachtheassignedSMEsonVMPs,followingITC’strainingcurriculum,contentandinstructions,andwillhelpinidentifyingtheregions/countriesand,consequently,themostappropriateVMPsfortheproducts/servicesofeachSME.ITCiscurrentlyfollowingupontheprogresstheconsultants/advisorsachievedsofar,adetaileddescriptionoftheachievementswouldbeprovidedbythebeginningofAugust.
Component3:Partnerships,BusinessIntelligenceandCertificationPreviousRating:Chooseanitem. CurrentRating:Satisfactory Cost(US$):340,000Sub‐component3.1:PartnershipswithVirtualMarketPlaces.StatusofImplementation:TheprojectteaminitiatedcontactwithseveralVMPsanddiscussedmodalitiesofpartnershiptoensurecustomizedsupporttoselectedSMEs.Thediscussionshelpeddefinetheframeworkforcollaboration.ImplementationofpartnershiparrangementisbeingdiscussedwithAliBaba,eBay,LittleMajlis(LittleMajlis.com),Souq.com,MarkaVIP.com.AcontractwithTradekeyisinplacetohelpsomebeneficiarySMEs.Tradekeywasselectedbecauseitconnectstraderswithglobalwholesellers,buyers,importers&exporters,manufacturersanddistributorsinover240countrieswithaspecialfocusonAsiaandtheMiddleEast,marketsthatareofinteresttoselectedcompanies.DiscussionsareprogressingwithAlibaba,Etsy,Feelancer.
Sub‐component3.2:BusinessIntelligenceDevelopment.ITCwillprovidemarketandexportrelateddatatotheexportadvisors.Furthermore,theprojectwillbenefitfromstatisticsonusers,accessesandtransactionswhichmayallowforacomparativeevaluationofSMEsunderdifferentVMPs.AccesstotoolssuchasTerapeak.comandAlexa.comarebeingdiscussedandorganized.StatusofImplementation:Satisfactory.Thiscomponentwillbeimplementedatalaterstageoftheproject.Sub‐component3.3:Certification.StatusofImplementation:Satisfactory.Thiscomponentwillbeimplementedatalaterstageoftheproject.Component4:ProjectManagementPreviousRating:Chooseanitem. CurrentRating:Satisfactory Cost(US$):90,000Sub‐component4.1:ProjectManagement– ThiscomponentwillfinancethePIUsatcountrylevel.StatusofImplementation:Satisfactory.Thenationalcoordinatorisidentifiedandhiredafteraselectionprocess.Hefollowsuponthedaytodaymanagementoftheproject,ensuringlinkageswiththepartnerinstitutions.ThenationalcoordinatorisworkingwithITConthefollowing:
Take the appropriate actions tomobilisemore companies byundertaking the following: identify potentialSMEsfromJordan;initiatecontactandinvitebeneficiariestolearnaboutandparticipateintheproject;manageCommunicationswithbeneficiariesuntilofficialregistration;
FacilitateITC’sworkwiththenationalconsultants(andtheSMEs); AssistinestablishingtheInter‐institutionalcommittee;ensurethatthecommitteehasaclearunderstanding
oftheprojectandoftheirresponsibilities,follow‐upontheprogressthecommitteeismaking; Assistinestablishinganoversightcommitteefortheproject;andproposetermsofreferenceforitsrolesand
responsibilities,assistITCinsubmittingtherequiredprogressreportstothecommittee(asrequired).Sub‐component4.2:ImpactEvaluationAssessment
StatusofImplementation:Thecomponentwillbeimplementedattheendoftheproject.
J. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution
(US$)(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
975,000 975,000
AmountReceivedfromTrustee(b):
975,000 975,000
ActualAmountDisbursed(c): 282,506 282,506
K. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2014 94,169 94,1692015 188,337 94,169 282,5062016 188,337 282,506 470,8432017 127,482 127.482Total 504,156 470,844 975,000
L. DisbursementsofFundsforIndirectCosts(US$)
Disbursed Available Total25,000 0 25,000
M. ResultsFrameworkandMonitoring
Indicators by Component Unit Baseline Cumulative Target Values Frequency Data Source/ Methodology
Responsibility for Data
Collection
Description (Indicator Definition, etc)
May 2014 –
Apr 2015
A
May 2015 – Apr 2016
F
May 2016 – Dec 2017
F
PDO LEVEL RESULTS INDICATORS:
The proposed project development objective (PDO) is to (i) increase SMEs access and exports via Virtual Market Places, and (ii) support institutional reforms to create an enabling environment for e-commerce in targeted countries.
Indicator 1: Registered SMEs with at least one export transaction completed via VMPs
Number
0 0 200 100 Quarterly Statistics VMP platforms/
Feedback from surveys/M&E
Database
PIU Number of transactions conducted by SMEs
registered Value of Exports
increase since VMP access
Indicator 2. Roadmap for the reform of the enabling business environment for e-commerce in each participating country and integrated in national commerce strategies
Yes/No No No Yes Bi-annual Reporting by the Oversight
Committee; Ministries of
Trade
PIU - ITC Roadmap document endorsed by the OC
Indicator 3. SMEs registered in VMPs
Number
0 0 600 Quarterly Captured by EAs and monitored through M&E
Database
PIU-ITC Registration involves opening of a VMP
account and uploading of product and contact
information. INTERMEDIATE OUTCOMES
COMPONENT I. INSTITUTIONAL REFORM
Indicators by Component Unit Baseline Cumulative Target Values Frequency Data Source/ Methodology
Responsibility for Data
Collection
Description (Indicator Definition,
etc) May 2014 –
Apr 2015
May 2015 – Apr 2016
May 2016 – Dec 2017
Workshops conducted Number 0 2 2 3 Bi-annual Reporting PIU-ITC
PIU-ITC Output Delivered – Workshop report
Analytical Work delivered on key e-commerce topics
Number 0 0 3 4 Bi-annual Reporting PIU – ITC
PIU-ITC Output delivered – Workshop Report
COMPONENT II. EXPORT MARKETS ACCESSED THROUGH VMPS
Indicators by Component Unit Baseline Cumulative Target Values Frequency Data Source/ Methodology
Responsibility for Data Collection
Description (Indicator Definition, etc) May
2014 – Apr 2015
May 2015 – Apr 2016
May 2016 – Dec 2016
Export Advisors Trained Number 0 20 100 0 Bi-annual Reporting PIU-ITC
PIU/ITC Captures number of EAs trained on VMPs
Export Advisors Certified Percent 0 70% 90% 0 Quarterly Training provider assesses
performance
PIU-ITC Percent of EAs who receive certification, out of total number of trained EAs; Not all EAs may end up qualifying; target for 2016 expects 90% to obtain it.
Indicators by Component Unit Baseline Cumulative Target Values Frequency Data Source/ Methodology
Responsibility for Data
Collection
Description (Indicator Definition,
etc) May 2014 –
Apr 2015
May 2015 – Apr 2016
May 2016 – Dec 2016
Training program for TSIs delivered (# activities)
Number 0 0 2 3 Quarterly M&E Database PIU-ITC # Training sessions Report disseminated and workshops evaluations # Number of advisory services provided #SMEs satisfaction with TSIs service delivery
COMPONENT III. VMP PARTNERSHIPS, CERTIFICATION AND BUSINESS INTELLIGENCE
Indicators by Component Unit Baseline Cumulative Target Values Frequency Data Source/ Methodology
Responsibility for Data
Collection
Description (Indicator Definition,
etc) May 2014 –
Apr 2015
May 2015 – Apr 2016
May 2016 – Dec 2016
Collaborative partnerships with VMPs
Number
0 0 4 4 Quarterly Project implementation
reports
PIU MoU, Letter of Intent or other agreement-related documentation.
Newsletters published by TSIs to roll out the Competitive Intelligence Mechanism
Number
0 0 25 50 Quarterly PIU and RIA PIU and EA # product (newsletter) delivery by TSI main partner
Indicators by Component Unit Baseline Cumulative Target Values Frequency Data Source/ Methodology
Responsibility for Data
Collection
Description (Indicator Definition, etc)
May 2014 –
Apr 2015
May 2015 – Apr 2016
May 2016 – Dec 2016
Premium Accounts awarded – Certifications
Number
0 0 40 50 Quarterly Project Implementation
Reports M&E Database
and VMPs
ITC/PIU Trust label certificates
Assessment body created and operational
Yes/No
No No No Yes Quarterly Project Implementation
Reports
WB/ITC/PIU Creation of Conformity Assessment body
LibyaProjects
SMEDevelopmentStrategyforLibya
A. BasicProjectInformationActivityName:SMEdevelopmentstrategyforLibyaCountryName:Libya NameofImplementationSupportAgency(ies):OECDNameofISAProjectLeader:FlorianTheus/AndreasSchaal
EmailofISAProjectLeader:[email protected] / [email protected]
RecipientEntity:LibyaEnterprise NameandEmailofRecipientEntityContact:DrAbdelnasrAbouzkeih;email:[email protected]
TotalAmountApprovedbytheTransitionFund(US$):2,616,000
AdditionalFundsLeveragedandSource(s),ifany(US$):700,000
TotalAmountDisbursed(DirectandIndirectinUS$):1,195,916
SteeringCommitteeApprovalDate:15May2013
ProjectImplementationStartDate:July1,2013
ProjectClosingDate:30September2016
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar(selectonlyone): InvestinginSustainableGrowthSecondaryPillar(s)(selectasmanyasapplicable):
InclusiveDevelopmentandJobCreationEnhancingEconomicGovernanceChooseanitem.
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:TodevelopaSMEstrategyandstrengthentheoveralllegalandinstitutionalframeworkforpromotingentrepreneurshipandhigh‐potentialSME’sinLibya.Ratingforprogresstowardsachievementofobjective: ModeratelyUnsatisfactoryRatingforoverallimplementationprogress: ModeratelyUnsatisfactoryBriefSummaryofProjectImplementationStatus:Activitiesareprogressingonthisprojectinadelayedmannerandwithahighercostbearinginmindthecurrentsecuritysituation,institutionalandpoliticaluncertaintiesinLibya,andOECDconstraintsontraveltohigh‐riskdestinations,butalsoconstraintsforLibyanstotravelabroad.Theproject’smainfocuscurrentlyhasbeenthissemesterandcontinuestobeonpreparingthegroundforprivatesectordevelopmentinapost‐conflictsituationinLibya:ProvidinganalysisonSMEdevelopment(policy)tohelporientafuturestrategy;promotingpolicydialogueamongstilloperatingmajorstakeholdersfromthepublicandprivatesectorbyholdingconsultativemeetings;helpingtoidentify,trainandconnectkeystakeholderstointernationalnetworksbyleveragingtheInvestmentProgramme’sworkinggroups.However,theISAandthepartnersneedtobearinmindthatthepoliticalandsecuritysituationoverthelatterpartof2015willhoweverbedeterminingthefurtheradvancementoftheproject.Muchoftheimplementationofthisprojectconsequentlyfocusedonfinalizingthediagnosticresearch(Component1),sharing good practices on laws and building stakeholder networks (component 2) and component 4 (support inimplementation/capacitybuilding)byexposingLibyancounterpartstoOECDnetworksandworkinggroups.TheLibyancounterpart(LibyaEnterprise)hasbeenactiveinexchangingwithOECDandmaintainingownershipoftheproject,despitepoliticalinstability.Concretely,undercomponent1,afirstfulldraftofthediagnosticstudyhasbeenfinalized,andpreparationsareunderwayforaknowledgeandpolicyforumwhichwillalsoserveasareviewmeetingforthestudy,withLibyanstakeholders,OECDmembercountriesandinternationalexperts.Undercomponent2,thenetworkofstakeholdersinviewoftheconsultationshas been enlarged, and the knowledge and policy forum will also serve as a stakeholder consultation platform fordiscussionabout theSMEstrategy.Furthermore,bestpracticesonSME lawwereshared ina consultativemeeting inFebruary (Component 2 and 3). The capacity of Libya Enterprise for implementation, under component 4, wasfurthermorestrengthenedthroughtheparticipationinthesteeringcommitteemeetingoftheMENA‐OECDInvestmentand Governance Initiative in February as well as the OECD week in June in Paris. Libya Enterprise got exposed tointernationalbestpracticeoninvestment,employmentandprivatesectordevelopment,aswellasfurtherintegratedintoOECDnetworks.
Going forward, theOECDwillmonitorclosely thesituation inLibya,andwilldecide, inclosecoordinationwithLibyaEnterprise,upondevelopmentswhetheritwouldconsideranextension,restructuringorindeedsuspensionoftheproject.
C. ImplementationStatusofComponents
Component 1: Component 1 – Diagnostic Study ‐ aims at developing a common understanding of private sectordevelopmentinLibyaandmainissuesonthedemand‐andsupplysideastoinformthedraftingofaSMEstrategyandmorein‐depthanalysis.Thisdiagnosticstudyconsistsofseveralsub‐sectionsincludinganalysisonmacroeconomicsandthe enabling environment (sub‐component 1.1), business and investment climate (sub‐component 1.2), sectorcompetitiveness(sub‐component1.3),andaSMEpolicyassessment(sub‐component1.4),andaknowledgeandpolicyforum(sub‐component1.5).TheanalysisalsoaimstoreflecttheramificationsofthecurrentconflictinLibya.PreviousRating:ModeratelySatisfactory
CurrentRating:ModeratelySatisfactory
Cost(US$):790,000
Afirstfulldraftofthediagnosticstudyhasbeenfinalizedthissemester.Aknowledgeandpolicyforum,whichwouldservealso as a review meeting to validate the findings and close further knowledge gaps was not possible, due to thecircumstances in Libya, toorganize before July.Upon the outcomesof this reviewmeeting, and furtherpeer reviewsinternallyandexternally,thestudywillbepublishedearlynextsemester.ChaptersofthestudyhavebeensharedwithLibyaEnterpriseinthemeantime.Furthermore,aconsultativemeetinginFebruaryinPariswithLibyaEnterprisetookplacewhenfurtherknowledgegapswereaddressedandinputtedinthestudy.LibyaEnterprisealsosharedanin‐housepresentationontheincubatornetworkinLibya.Preparation for the knowledge and policy forum/ reviewmeeting has been ongoing for the last months. The OECDsucceededinbrokeringapartnershipwiththeStatistical,EconomicandSocialResearchandTrainingCenterforIslamicCountries(SESRIC),situatedinAnkara,Turkey.Libyaisamember,andthecenterhasconductednotonlyresearcharoundSME development in the region, but also boasts a project on economic integration of ex‐warriors. Thanks to thecollaboration with SESRIC, further knowledge and data sharing is happening. Furthermore, in line with the OECDmethodology,anadaptedpeerreviewmechanismwillbeemployedbywhichrelevantinstitutionsfromTurkeyaswellasotherOECDandMENAcountrieswillcommentonthedraft,aswellasenrichthediscussionwithsharingtheirexperiencesandgoodpractices.TheknowledgeandpolicyforumtobeheldinIstanbul29/30ofJulywillcongregatemorethan30expertsfromthepublicandprivatesector,OECDmembercountries,andMENAcountries.Inparticular,theobjectivesoftheconsultationwillbethefollowing:1.ReviewthediagnosticstudyonSMEdevelopmentinLibya2.Addressknowledgegaps3.ProvideinputtotheprioritizationfortheSMEstrategy4.SharegoodpracticesonSMEdevelopmentInordertohavemaximumresultsintheknowledgeandpolicyforum/reviewmeeting,themaindraftchaptersofthestudywerealsotranslatedintoArabic.Sub‐component1.1:Macro‐economicandenablingenvironmentanalysisOneof themain components of thediagnostic study is to analyse themajor framework conditions for private sectordevelopment in Libya. Among these conditions, an analysis of structural and currentmacroeconomic trends is beingundertaken,aswellasananalysisofbroadenablingenvironmentbuildingblocksincludinginfrastructure(roads,power,ICT),theeducationandskillsystem,aswellastheinnovationsystem.Theimpactofthecurrentconflictontheseelementsisalsobeingassessed.StatusofImplementation:Afirstdraftoftheanalysisonframeworkconditionswasfinalizedthissemester.ThechapterwillbereviewedintheupcomingreviewmeetinginJulybylocalandinternationalexperts;preparationforthesessionisongoing.Sub‐component1.2:Businessandinvestmentclimateanalysis
TheBusinessandInvestmentClimateanalysiswillprovideananalysisoftheimpactoftheoveralllegalandinstitutionalframework regarding SMEs in Libya and identifying themajor constraints for SMEs accordingly, thereby completinginformationalreadyprovidedbyotherorganisations,suchastheWorldBank.TheStudywillcoverinthisregardaspectsofeaseofdoingbusiness,taxandlaborregulations,butalsocompetitionandtheinvestmentframeworkfordomesticandinternationalinvestors.Status of Implementation: A first draft of the analysis on business and investment climate has been finalized thissemester,withinputsfromLibyanconsultantHananEl‐NuweisryaswellasOECDstaff.ThechapterwillbereviewedintheupcomingknowledgeandpolicyforuminJulybylocalandinternationalexperts;preparationforthesessionisongoing.Sub‐component1.3:SMEpolicyanalysisTheanalysislooksatSMEdevelopmentfromademand‐sideandsupply‐sideperspective.First, it isanalysingtheSMEsectorinLibya.Furthermore,itisfocusingontheassessmentofSMEdevelopmentpoliciesandprogrammesinLibyabasedonanumberofdimensionsincludedintheSMEPolicyIndex,atooldevelopedbytheOECDandpartnerorganisations(EuropeanCommission,theEuropeanTrainingFoundation,andtheEuropeanBankforReconstructionandDevelopment)toassessSMEpoliciesinthesouthernMediterraneanneighbourhoodcountries.StatusofImplementation:AfirstdraftoftheSMEpolicyanalysiswasfinalizedthissemester,andhasbeensharedwithLibyaEnterprise.ThedraftbenefitedfromaconsultativemeetingheldinFebruaryinPariswithLibyaEnterpriseaswellasfurtherstudiesanddocumentssharedbyLibyaEnterprise.Thechapterwillbereviewed in theupcomingknowledgeandpolicy forum in Julyby localand internationalexperts;preparationforthesessionisongoing.Sub‐component1.4:SectorcompetitivenessstudyFollowinganestablishedmethodology,theOECDwillselectandanalyseprioritysectorsagainsttheirpotentialpositiveimpactontheLibyaneconomyandinvestmentclimate.StatusofImplementation:Afirstdraftoftheanalysisonframeworkconditionswasfinalizedthissemester.ThechapterwillbereviewedintheupcomingknowledgeandpolicyforuminJulybylocalandinternationalexperts;preparationforthesessionisongoing.Sub‐component1.5:KnowledgeandpolicyforumThisForumwillservetodiscussandinformtherelevantstakeholdersintheLibyanGovernmentabouttheoutputofthediagnosticcomponent.Aseriesofworkshopsintegratedintotheforumwillyieldacrucialinputforthenextcomponent,developingtheLibyanSMEdevelopmentstrategy.StatusofImplementation:GiventhepoliticalsituationinLibya,theforumwillbeheldonthetechnicallevel,andwillonlyincludemainstakeholderswhoareworkingonthetechnicalleveloftheadministration,aswellasotherimportantstakeholdersasmentionedbelow.Preparation for the knowledge and policy forum/ reviewmeeting has been ongoing for the last months. The OECDsucceededinbrokeringapartnershipwiththeStatistical,EconomicandSocialResearchandTrainingCenterforIslamicCountries(SESRIC),situatedinAnkara,Turkey.Libyaisamember,andthecenterhasconductednotonlyresearcharoundSME development in the region, but also boasts a project on economic integration of ex‐warriors. Thanks to thecollaboration with SESRIC, further knowledge and data sharing is happening. Furthermore, in line with the OECDmethodology,anadaptedpeerreviewmechanismwillbeemployedbywhichrelevantinstitutionsfromTurkeyaswellasotherOECDandMENAcountrieswillcommentonthedraft,aswellasenrichthediscussionwithsharingtheirexperiencesandgoodpractices.TheknowledgeandpolicyforumtobeheldinIstanbul29/30ofJulywillcongregatemorethan30expertsfromthepublicandprivatesector,OECDmembercountries,andMENAcountries.Inparticular,theobjectivesoftheconsultationwillbethefollowing:1.ReviewthediagnosticstudyonSMEdevelopmentinLibya2.Addressknowledgegaps3.ProvideinputtotheprioritizationfortheSMEstrategy4.SharegoodpracticesonSMEdevelopmentInordertohavemaximumresultsintheknowledgeandpolicyforum,reviewmeeting,themaindraftchaptersofthestudywerealsotranslatedintoArabic.
Component2:LibyanSMEdevelopmentstrategy:This component will be implemented by the OECDwith the assistance of and in close collaboration with the LibyaEnterprise.MajorstakeholdersinLibyawillbeactivelyinvolvedintheactualdevelopmentanddraftingofthestrategywiththeaimofaneventualadoptionbytheGovernmentofLibya.TheoverallapproachofthestrategyistouseanoutputoftheComponent1todevelopandprioritisetwokindsofpolicies:productivedevelopmentpoliciestargetingspecificsectorsand/orareas(verticalpolicies)andbusinessclimateenhancingpolicies(horizontalpolicies).Previous Rating: ModeratelySatisfactory
Current Rating: ModeratelyUnsatisfactory
Cost(US$):500,000
InordertofosterthelinkbetweenthediagnosticstudyandthedevelopmentoftheSMEstudy,severalstepshavebeentaken inthissemester:1)SeniorconsultantLoisStevensonhasbeenvery involved indraftingandreviewingrelevantpartsofthediagnosticstudywithaviewtoidentifythemostsalientimplicationsfordraftingaSMEstrategy2)theseniorlegalconsultantisalsoplayingaroleintranslatingthepointersfromthediagnosticstudyintomorein‐depthanalysisleadingtoconcreterecommendationsfortheSMEstrategydraft.OnefurtherstepwillbetakenintheforthcomingreviewmeetinginJuly(4)Furtherconsiderabletimehasbeenspentonenlargingthenetworkofstakeholdersinordertopreparethegroundforamulti‐stakeholderengagementfortheSMEstrategy.This isevidencedintheparticipationlistfortheconsultative review meeting which already includes about 20 Libyans from the public and private sector includingbusinessassociations,andrepresentativesfromSOEsintheoilindustry.The approach taken forward is to develop a draft SME strategy in the course of 2015 based on amulti‐stakeholderengagementasmuchasitispossibleunderthecurrentcircumstances.Thepoliticalandsecuritysituationover2015willhoweverbedeterminantinthefurtheradvancementofthiscomponent.Sub‐component2.1:DevelopmentofhorizontalpoliciesThisactivityistodevelop,evaluate,andprioritisemeasurestodeveloptheoverallbusinessclimateforSME’s.ItwillbeexecutedbytheOECDwithaninputfromLibyaEnterprise.StatusofImplementation:ThesecondcomponentisbeingimplementedinclosecollaborationwithLibyaEnterprise,–in particular through the intervention ofMs Lois Stevenson, international expert and consultant on this project. ThepreparationsfortheforthcomingknowledgeandpolicyforuminJulyincludealsoadiscussionwithrelevantstakeholdersfrompublicandprivatesectorinLibyaondevelopingverticalpolicies,andbestpracticesfromseveralOECDandMENAcountrieswillbediscussedasanimportantinputintothestudy.Sub‐component2.2:DevelopmentofverticalpoliciesThisactivitylooksattheoutputofthesectorcompetitivenessanalysisfromtheComponent1.ItisbeingexecutedbytheOECDandMsLoisStevenson,withinputsfromLibyaEnterprise.ThepreparationsfortheforthcomingreviewmeetinginJulyincludealsoadiscussionwithrelevantstakeholdersondevelopingverticalpolicies,andbestpracticesfromseveralOECDandMENAcountrieswillbediscussedasanimportantinputintothestudy.StatusofImplementation:Ibid.Itshouldbefurthermorenotedthatascopingofintellectualserviceprovidershasbeenfinalizedwhomighthavetheinterest and capacity to conduct sector studies. As a next step, it is under discussion that an official application andprocurementprocesscouldbe launched,butremainingconcernsabouttheabilitytodeliverbyany institutions inthecurrentcircumstancesarebeingconsidered.Sub‐component2.3:DevelopmentofaninstitutionalframeworkThisactivityaimsatmappingouttherolesandresponsibilitiesofinstitutionsinvolved.Inlinewithitsmandate,itwillpositiontheLibyaEnterpriseasaco‐ordinatorofallpoliciesrelatedtoSMEdevelopment.ThestructureandcapacitiesoftheLibyaEnterprisewillbeevaluatedtoproducerecommendationsonhowtheagencycouldbestbestructuredtoassumethisco‐ordinatingrole.StatusofImplementation:ProvideupdateonimplementationstatusIbidItshouldbefurthernotedthatbasedontheinterestofLibyaEnterprisetodevelopanSMElaw,aconsultativemeetingwasheldinParisinFebruary2015whereOECDsharedbestpracticesofSMElawssuchastheSmallBusinessActinEurope
withLibyaEnterprise.ThisdisseminationprovidedaninputintothedevelopmentofthecurrentdraftingoftheSMElawinLibyabyLibyaEnterprise.Sub‐component2.4:PreparationofthestrategyandpresentationtotheGovernmentofLibyaThisactivitywilldevelopandpilotasolid,regularandbroadconsultationmechanismfortheacceptance,implementation,modification,andevaluationoftheSMEdevelopmentstrategy.Statusofimplementation:Ibid,bearinginmindthatifthecurrentcircumstanceshold,consultationswillneedtotakeplace in the close vicinity of Libya, butmight not be possible to conduct inside Libya. This componentwill likely beimplementedonlyonceaunitygovernmentisinplace.
Component3:LegalframeworkforenterprisecreationandgrowthThiscomponentwillaimatthedevelopmentofaseriesofcomplementarylegalactsaimedtofacilitatetheimplementationoftheobjectivesinthestrategyonthebasisofexistinglawsandregulations.Previous Rating: ModeratelySatisfactory
Current Rating: ModeratelyUnsatisfactory
Cost(US$):275,000
Firstpreliminaryanalysisofthelegalframeworkhasbeenmadeinthecontextofthediagnosticstudy.Aseniorlegalexpertfurthermorehasbeenhiredtoconductanin‐depthanalysisonthelegalframeworkwhichwillalsofurtherinformthedraftSMEstrategy.ConcretediscussionsaroundpossiblenewlawswillhingeontheevolvingpoliticalsituationinLibya.Sub‐component3.1:BroadconsultationofstakeholdersandgoodpracticesThecomponentstartsoutwithabroadreviewofthestructureofsimilarlegislationinMENAcountriesandOECDmemberswithaparticularemphasisonthebestpractices.StatusofImplementation:InthecontextofthereviewmeetinginIstanbul29/30Julywhichiscurrentlyunderpreparation,bestpracticesexamplesonlawsandregulationswillbediscussedfromseveralOECDandMENAcountriestoinformtheLibyancounterpartandasaninputtopotentiallawsandtheSMEstrategy.Sub‐component3.2:GapAnalysisThetheoreticalframeworkforgoodpracticeswillbeevaluatedagainstexistingLibyanlegislationandtheextenttowhichthelegislationisimplemented.Thegapswillbeanalysedandthewaystoamendthosegapsinthemostefficientmannergiventheexistinglegalframeworkwillbeproposed.StatusofImplementation:The senior consultant Hanan El‐Nuweisri has been hired and has shared drafts of preliminary analysis on laws andregulationspertainingtocompetition,investmentregimesandrelatedregulationsandlaws.ThefindingswillbediscussedandpresentedinthemeetinginJuly.Sub‐component3.3:DevelopmentofcomplementarylegalactsAfteridentifyingthegapsthatneedtobefilled,thelegislationandthelegislativeamendmentstofillthosegapswillbedraftedincloseconsultationswithrelevantauthorities.StatusofImplementation:Oncetherelatedanalysiswillbedelivered,andifthepoliticalsituationinLibyastabilises,aqualifiedteamofinternationalandlocalconsultantswillbehiredtoworkcloselywiththegovernmentondevelopingthesecomplementarylegalacts.Component 4: Assistance in implementation This component aims at assisting the implementation of the SMEdevelopmentstrategy.ItalsotargetsareasthattheLibyaEnterpriseconsiderstobestrategicandimportanttoensuringsuccessintheimplementationoftheoverallstrategy.Inparticular,thecomponentwillalsohelptoinstitutionaliseandaligninitiativesalreadyunderwayorinplanning,suchastheEnterpriseDevelopmentCentres.Previous Rating: ‐‐Moderatelysatisfactory
Current Rating: —Moderatelyunsatisfactory
Cost(US$):575,000
AspartofstrengtheningLibyaninstitutionalcapacity,LibyanofficialshavebeeninvitedduringtheperiodoftheprogressreporttoseveraltrainingsandmeetingsconductedbytheOECDinthecontextoftheMENA‐OECDInvestmentProgramme:1)Activeparticipation includingpresentations in thesteeringcommitteemeetingof theMENA‐OECDInvestmentandGovernanceInitiativeaswellasparticipationintheyouthemploymentideafactory,bothheldbacktobackinFebruary2)ActiveparticipationintheOECDweekinJuly2015whichincludedsessionsoninvestmentandyouthunemployment,innovationandprivatesectordevelopment.Theseconferencesalsogave theLibyanofficials theopportunity toexchangeknowledge, shareexperiencesandbuildnetworks. Libya Enterprise got exposed to international best practice on investment, employment andprivate sectordevelopment,aswellasfurtherintegratedintoOECDnetworks.Futurecapacitybuildingeffortswillbecloselyalignedwiththeelements includedinthedraftSMEstrategy.Activitiesmightincludetrainings,participationinOECDMENAworkinggroups,andstudytours.Concretely,oneideawhichmightbetakenforwardisOECDassistanceinsupportingthedraftSMElawwithrelevantcapacitybuildingworkshops.Sub‐component4.1:EstablishmentoftheinstitutionalstructureTheprojectwillassistLibyaEnterpriseandrelated institutions insettinguptheappropriate institutionalstructuretoimplementtheprojectandbuilduptheappropriatecapacities.StatusofImplementation:Thisandothersubcomponentswillbeelaboratedanddetailedaspartofthefollow‐upworkunderComponent2inapost‐conflictenvironment,anddependingonthedemandofaprospectiveunitygovernment.Sub‐component4.2:DevelopmentofregionalbusinesscentersThisactivitywill ensure that thestructure,mandate,andprioritiesof regionalbusinesscenters ‐keyelements in theimplementationofanySMEdevelopmentstrategy‐areinlinewiththeSMEdevelopmentstrategy.StatusofImplementation:IbidSub‐component4.3:DevelopmentoftheincubatornetworkThisactivitywillhelpdevelopingadepartmentwithinthemostappropriateinstitutionorministry(thatremainstobeidentified). This department will be responsible for developing incubators, coaching employees and trainers, infullalignmentwiththeoverallSMEdevelopmentstrategy.Status of Implementation: OECD shared with Libya Enterprise in a consultativemeeting in Paris in February bestpracticeson incubatorset‐upandmanagementasan input into theireffortonestablishing incubatorswhichhas juststarted.Sub‐component4.4:EstablishmentofanadvisorycompetitivenesscouncilThisactivityaimsatestablishingandinstitutionalisinganadvisorycompetitivenesscouncildependingontheneedofthebeneficiary.Areportonthebylaws,theinstitutionalstructureandthemandatewillbeproducedbasedonworldwideexperiencefrom,interalia,Egypt,Sweden,andTurkey,andtheparticularneedsoftheLibyanadvisorycompetitivenessCouncil.StatusofImplementation:IbidSub‐component4.5:AssistanceintheimplementationofthelegalframeworkThisactivitysupportsanimplementationofthestructuralandproceduralframeworkdevelopedundertheComponent3,providingtargetedcoachingandtrainingsessions,dependingontheneedofthebeneficiaryinstitutions.StatusofImplementation:IbidComponent5:AccesstofinanceforSMEsTheOECD,inpotentialcollaborationwiththeIsDBwhichsupportstheestablishmentoftheSMEdevelopmentfund,willleadeffortsonaddressingafundinggapintheLibyanSMEsector.ThecomponenthasbeendesignedtocomplementtheplannedprojectoftheLibyangovernmentwithIDBtosetupregionalSMEdevelopmentfunds,withassistancefromtheIDBundertheaegisoftheLibyanMinistryofEconomy.
The OECD is analysing how to best target the substantial systemic riskswhich the Libyan financial system is facingincludingthedominanceofstate‐backedassets(over96%of loans).A firststepwastakenthroughdiscussionsof thesystemic failures in the Libyan financial systemwith the Central Bank and theMinistry of Finance officials during aSeptember2013mission.Thesediscussionswere theoutcomeof the raisingawareness training theOECDofferedonsovereignguaranteesandequity‐backedmechanismsforSMEandinvestorprojects.TheCentralBankhasrequestedthatasimilar,moreextensivetrainingbeprovidedtohigherlevelsofpoliticalauthority,withtheobjectiveofbringingthistopicmoretotheattentionofpolicymakers.Thesub‐componentsofthiscomponentwerekeptforthisprogressreport,butfuturediscussionwithIsDBandtheLibyancounterpartsmightleadtoadjustmentsintheirnature.Oneoptioninparticularistocomplementexistingandplanneddebtsupportmechanismswithequitymechanismsdesignedtotargethigh‐riskprojectswithhighpotentialsocialreturns,suchasinvestmentintomanufacturingofakindnotalreadyestablishedinthecountry,orproductsliabletocontributetothediversificationoftheexportbasket.Whileaconceptnotehasbeendeveloped,thetechnicalworkiscurrentlyonhold(due,inpart,toinstabilitiesandcurrentfundingconstraintsholdingupthelaunchoftheSMEregionalfunds).Previous Rating: ‐‐Moderatelysatisfactory
Current Rating: ‐‐ModeratelyUnsatisfactory
Cost(US$):300,000
Sub‐component5.1:AssessmentandassistancefortheestablishmentofventurecapitalfundforSMEprojectsandstart‐upsStatusof Implementation:Given thebudgetaryconstraints inLibyaand thesituation in thecountry, theSME fundsinitiativehasbeenputonhold.Sub‐component5.2:AssessmentandassistancefortheestablishmentofanSMEfinancingbankStatusofImplementation:GiventhebudgetaryconstraintsinLibyaandthesituationinthecountry,theideatoestablishaSMEbankhasbeenputonhold.
D. DisbursementsofFundsforDirectProjectActivities Country‐Execution(US$)
(x)Direct Cost for ISA‐Execution(US$)(y)
Total(US$)
Approved Amount forDirectProjectActivities(a):
2,451,192 2,451,192
Amount Received fromTrustee(b):
890,166 890,166
Actual Amount Disbursed(c):
1,195,916 1,195,916
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2015 OECD:650,000USD OECD:650,000USD2016 OECD:500,000USD OECD:105,276USD OECD:605,276USD2017 2018 2019
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)164,808 0 164,808
G. ResultsFrameworkandMonitoring27
ProjectDevelopmentObjective(PDO):Todevelopandstrengthentheoveralllegalandinstitutionalframeworkforpromotingentrepreneurshipandhigh‐potentialSME’sinLibya.
PDOLevelResultsIndicatorsUnitofMeasure
Baseline
CumulativeTargetValues
Frequency
DataSource/
Methodology
ResponsibilityforDataCollection
Description(indicator
definitionetc.)Jul2013–Jun2014
A
Jul2014–Jun2015
A
Jul2015–Sep2016
F
YR4
F
YR5
F
IndicatorOne:ImprovementinSMEPolicyIndexvalue
TBC TBC TBC TBC TBC Onceayear
OECDreport PIO RankingofdifferentaspectsofgoodpracticeSMEpolicy
IndicatorTwo:ImprovementintheGlobalCompetitivenessReport
Ranking 106of144(2012‐2013)
108 126 120 115 110 Onceayear
GlobalCompetitivenessReport
PIO Compositecompetitivenessranking
IndicatorThree:ImprovementinthedimensionBusinessSophisticationoftheGlobalCompetitivenessReport
Ranking 116of144(2012‐2013)
131 135 130 125 120 Onceayear
GlobalCompetitivenessReport
PIO Sub‐componentofGCRratingthelevelofprofessionalismamongbusinesses
27 Nota bene: Due to the conflict in Libya, actual PDO Level Results indicators on all dimensions have actually worsened. The relationship between project impact and impact of the conflict is therefore hard to measure. However, it is clear that targets can only be reached in the context of the improvement of the overall situation. This also relates to intermediate outcomes, many of which needed to be postponed.
IndicatorFour:ImprovementinthedimensionBusinessInnovationoftheGlobalCompetitivenessReport
Ranking 129of144
125 120 110 Onceayear
GlobalCompetitivenessReport
PIO Sub‐componentofGCRrankinglevelsofinnovation(patentsetc.)
IndicatorFive:Improvementintheindexofeconomicfreedom
Ranking 175of178
170 160 150 Onceayear
GlobalCompetitivenessReport
PIO DegreeofopennessoftheeconomyforSME’sandotherinvestors
INTERMEDIATERESULTS
IntermediateResult(ComponentOne):DeepenedcommonunderstandingamongstakeholdersastotheprioritiesforSMEdevelopmentinLibya.
Results Unitofmeasure
Baseline YR1 YR2 YR3 YR4 YR5 Frequency
DataSource ResponsibilityDescription
IntermediateResultindicatorOne:NumberofparticipantsintheKnowledgeandPolicyForum.
Number 0 0 30‐40
Once Forumreport MENA‐OECD
ForuminIstanbul29/30
ofJuly
IntermediateResultindicatorTwo:Formalacceptanceofalloutputs.
Yes/No No No No Once Interimreport MENA‐OECD
IntermediateResult(ComponentTwo):AcceptanceandadoptionoftheSMEdevelopmentstrategy.
Results Unitofmeasure
Baseline YR1 YR2 YR3 YR4 YR5 Frequency
DataSource ResponsibilityDescription
IntermediateResultindicatorOne:AcceptanceofthestrategybythePSC/Government
Yes/No No No No Once Interimreport MENA‐OECD N/A
IntermediateResultindicatorTwo:Adoptionofthestrategy
Yes/No No No No Once Interimreport MENA‐OECD N/A
IntermediateResult(ComponentThree):Adoptionofcomplementarylegalacts.
Results Unitofmeasure
Baseline YR1 YR2 YR3 YR4 YR5 Frequency
DataSource ResponsibilityDescription
IntermediateResultindicatorOne:Acceptanceofcomplementarylegalacts
Yes/No No No No Once Interimreport
MENA‐OECD
IntermediateResultindicatorTwo:FormaladoptionofatleasttwolegalactsasproposedbytheProject
Numberofactsadopted
0 0 0 Everysixmonths
Interimreport
MENA‐OECD
IntermediateResult(ComponentFour):ConsiderableprogressintheimplementationoftheSMEdevelopmentstrategy.
Results Unitofmeasure
Baseline YR1 YR2 YR3 YR4 YR5 Frequency
DataSource ResponsibilityDescription
IntermediateResultindicatorOne:Adoptionofinstitutionalstructure
Yes/No No No No Once Interimreport
MENA‐OECD
IntermediateResultindicatorTwo:AtleastfiveadditionalEnterpriseDevelopmentCentersareoperational.
NumberofEDC
TBC 0 0 5 Everysixmonths
Interimreport
MENA‐OECD
IntermediateResultindicatorThree:Atleastfiveadditionalincubatorsareoperational.
Numberof
incubators
TBC 0 0 5 Everysixmonths
Interimreport
MENA‐OECD
IntermediateResultindicatorFour:CompetitivenessCouncilestablishedandatleastthreemeetingsheld.
Numberofformalmeetings
0 0 0 Everysixmonths
Meetingreports
LibyaEnterprise
IntermediateResultindicatorFive:Atleastthreesectoraldevelopmentplansdeveloped.
Numberof
approved
0 0 0 Everysixmonths
Interimreport
MENA‐OECD TobeApprovedby
the
sectoraldevelopmentplans
PSC/Government
IntermediateResult(ComponentFive):ConsiderableimprovementinaccesstofinanceforLibyanSMEs.
Results Unitofmeasure
Baseline YR1 YR2 YR3 YR4 YR5 Frequency
DataSource ResponsibilityDescription
IntermediateResultindicatorOne:VCfundinvestment
Lengthofbalancesheet
0 0 0 Once Interimreport
MENA‐OECD Equitycapitalinvestedin
Libyanprojectsbythefund
IntermediateResultindicatorTwo:SMEfinancingbankestablished
Yes/No No No No Bankestablishedinlinewith
recommendationsoftheproject
IntermediateResultindicator2:LendingtoSMEsincreased
USDlenttoSMEs
TBC TBC TBC Lendingshouldincreaseby
100%overthefirstfiveyears.
**Indicate‘A’for‘Actual’and‘F’for‘Forecast’
LeadingtheWay:ALeadershipCapacityBuildingPilotProject
A. BasicProjectInformationActivityName:LeadingtheWay:Aleadershipcapacitybuildingpilotprojectatthecountry’sdecision‐makinglevelCountryName:Libya NameofImplementationSupportAgency(ies):AfDBNameofISAProjectLeader:Mr.AhmedYasser&Mrs.SamiaMansour
EmailofISAProjectLeader:[email protected]&[email protected]
RecipientEntity:MinistryofPlanning NameandEmailofRecipientEntityContact:[email protected]
Total Amount Approved by theTransitionFund(US$):3,500,000.00
Additional Funds Leveraged andSource(s),ifany(US$):2,000,000.00(fromGovt.ofLibya)
TotalAmountDisbursed(DirectandIndirectinUS$):0
SteeringCommitteeApprovalDate:
12/5/2013
Project Implementation Start Date:01/08/2014
ProjectClosingDate:
12/31/2016
Pillar(s) towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar(selectonlyone): EnhancingEconomicGovernanceSecondaryPillar(s)(selectasmanyasapplicable):
InvestinginSustainableGrowthInclusiveDevelopmentandJobCreationCompetitivenessandIntegration
B. SummaryofProjectImplementationProgressandKeyIssuesProjectDevelopmentObjective:Thispilotprojectaimsatstrengtheningleadershipcapacityatdecision‐makinglevelsofthesocietyinordertoleadthewaytolong‐terminstitutionaleffectiveness,efficiencyandsuccess.Ratingforprogresstowardsachievementofobjective: ModeratelySatisfactory
Ratingforoverallimplementationprogress: ModeratelySatisfactory
BriefSummaryofProjectImplementationStatus: Theprojectgrantagreementwasdraftedsoonaftertheapprovaloftheproject;however,uncertaintiesinLibya’spoliticallandscapeandgovernancestructureimpliedthatthegrantagreementwasonlysignedbytheLibyancounterpartson22May2014.On30June2014,tofulfilltheconditionsprecedenttodisbursement,theLibyangovernmentissuedanofficialletterconfirmingtheLibyancounter‐partfundingofUSD2mbeingmadeavailablefortheproject.Procurementofservicesofaprojectconsultantwas initiatedon4 July2014. Inaddition,progressontherecruitmentofthemainconsortiumhasbeenpromisingwiththeGeneralProcurementNotice(GPN)publishedonlineon22July2014andtheExpressionsofInterestwerepublished.ExpressionsofInteresthavebeenreceivedfortheconsortiumandcandidateshavebeenshortlisteddowntosixapplicantswhoreceivedtheRequestforProposals(RfP)afteritwasclearedwith the GoL. A conference call with the 6 shortlisted applicants on 15 October helped clarify any issues prior to thesubmissionoftheiractualproposals.TheBankreceived5proposalson21November2014–onecandidatewithdrewtheirapplication.Duetothecurrentpoliticalsituationinthecountry,anextensionoftheprojectwasapprovedduringtheMENATFSteeringCommitteemeetingheldinBerlininMay2015.Thisextensionwillmeanthenewprojectclosingdatewillbe31December 2016. After due consultations internally, the Bank has decided to continue the project and a request for anextensionofthetechnicalandfinancialproposalwassenton11May2015tothe5consortiumaskingthemtoconfirmtheirinterest in the project and their willingness to extend the validity of their original proposals to 31 August 2015. After,receivingtheconfirmationofthe5consortiumstoextendtheirproposals,theBankproceededtothepublicopeningofthetechnicalproposalswhereas the financialproposalswerekept insealedenvelopes.TheBankarranged internally for thetechnicalevaluationofthefiveproposalsandtheevaluationcommitteesubmittedtheresultson22June2015.Now,theevaluationprocessiscontinuingandtheBankinvitesthewinnersforthepublicopeningofthefinancialproposals.
C. ImplementationStatusofComponentsComponent1:ConsolidationofthedeliveryunitwithintheTransitionGovernmentandtheinternationalconsortium:Thiscomponentwillfocusontheconsolidationofthegovernancestructure,thedeliveryunitandtheconsortiumofinternationalinstitutions.PreviousRating:Chooseanitem. CurrentRating:Not Applicable Cost(US$):197,400.00Sub‐component1.1:EstablishmentofthedeliveryunitattheLibyanGovernment
StatusofImplementation:TheBankhashelddiscussionswiththeMinistryofPlanningduringamissiontoTripoliinApril2014todiscussthelogisticsofestablishmentofthedeliveryunitattheMinistry.WiththegrantagreemententeringintoforceinJuly2014,ameetingwasheldwiththeMinistryofPlanninginTunisinAugust2014,wherethedetailsofthedeliveryunitwerefinalized.SinceAugust2014andintheactualpoliticalcontextofthecountry,theBankhasmaintainedchannelsofdiscussionwithourLibyancounterparts(atatechnocraticlevel)toensuretheimplementationoftheprojectunderthebestconditionspossible.Sub‐component 1.2: Negotiation of the partnership agreement with the consortium of international institutions forimplementationofthepilotprojectStatusofImplementation:TheTermsofReferencewiththeconsortiumwere draftedbyAfDB,reviewedandvalidatedbytheMinistryofPlanning.Sub‐component1.3:EstablishmentofthegovernancestructureoftheprogramStatusofImplementation:Completed.ThegovernancestructurewasdiscussedwiththeMinistryofPlanningduringtwoextensivemeetingswiththeMinistryofPlanninginJanuaryandApril2014inTripoli.Sub‐component1.4:DeterminationofdeliveryarrangementsStatusofImplementation:ThesearrangementshavebeenspecifiedintheToRfortheconsortium,andwillbedecidedupononceaconsortiumisselected.
Component2:Requirementanalysisandprogramsarchitectureandcontentdevelopment:Thiscomponentwillencompassasystematicprocessofgatheringrelevant informationtodrawadetailedandaccurateunderstandingofLeadershipCapacityBuildingrequirements.PreviousRating:Chooseanitem. CurrentRating:Not Applicable Cost(US$):625,100.00Sub‐component2.1:PerformleadershiptrainingrequirementsgatheringandanalysisforLibyaStatusofImplementation:N/ASub‐component2.2:Designthetrainingcurriculum(programarchitecture)StatusofImplementation:N/ASub‐component2.3:ContentdevelopmentStatusofImplementation:N/ASub‐component2.4:ImplementadeliveryplatformStatusofImplementation:N/ASub‐component2.5:ConsolidatetrainingprogramsStatusofImplementation:N/ASub‐component2.6:DevelopanassessmentprogramStatusofImplementation:N/A
Component3:Coaching,mentoringandsupportingprogramfortopofficials(governmentlevel):ThiscomponentwillfocusoncoachingandmentoringofcurrentandupcomingLibyanleaders(currentandfutureministers,deputyministers,advisorsandcabinetmembers)todevelop fundamentalstategovernanceskills,andaccessknowledgeandexpertiseofstates‐people fromaroundtheworldwithexperienceindemocratictransitionandinstitutionalreforms.PreviousRating:Chooseanitem. CurrentRating:Not Applicable Cost(US$):361,900.00Sub‐component3.1:TheConsortiumshoulddeliveracoachingandmentoringprogramforthenewLibyanleaders.StatusofImplementation:N/ASub‐component3.2:TheConsortiumwillfacilitateinteractionsbetweenLibyanleadersandmembersofthecivilsociety.
StatusofImplementation:N/AComponent4:Pilotexecutivetrainingandmentoringprogramforseniorexecutivestaff:Thiscomponentaimatrunninganexecutiveleadershipprogramforexecutivelevelmanagers(directorgeneralanddirectororequivalent)inthepublicandprivatesectorsandincivilsociety(nonprofitorganizationsandunions).PreviousRating:Chooseanitem. CurrentRating:Not Applicable Cost(US$):3,290,000.00Sub‐component4.1:EstablishaselectionprocessandparticipantmanagementsolutionStatusofImplementation:N/ASub‐component4.2:EstablishatrainingscheduleStatusofImplementation:ProvideupdateonimplementationstatusSub‐component4.3:Offerpersonaldevelopmentactivities(e.g.,languagetraining,communication,publicrelations,andfoundationtopics)StatusofImplementation:N/A
Sub‐component4.4:DeliversurveysStatusofImplementation:N/ASub‐component4.5:EvaluateinstructorsandprogramsStatusofImplementation:N/ASub‐component4.6:CertifysuccessfulparticipantsStatusofImplementation:N/AComponent5:Development of a strategic leadership capacity development plan: This componentwill focus on groupinginternationally recognized experts with their Libyan counterparts to engage into leadership capacity strategic planningactivitiesinsupportofLibya’sVision2030.PreviousRating:Chooseanitem. CurrentRating:Not Applicable Cost(US$):282,000.00Sub‐component5.1:PerformasituationanalysisStatusofImplementation:N/ASub‐component5.2:HoldaconceptdevelopmentworkshopStatusofImplementation:N/ASub‐component5.3:Conductoptionanalysis:StatusofImplementation:N/ASub‐component5.4:ReviewstrategicguidanceStatusofImplementation:N/ASub‐component5.5:ValidatethestrategicplanStatusofImplementation:N/AComponent6:Independentevaluationoftheprogram:Anindependentandrigorousprojectevaluationteamwillbetaskedwiththeoverallevaluationofallthecomponentsofthisproject.PreviousRating:Chooseanitem. CurrentRating:Not Applicable Cost(US$):188,000.00Sub‐component6.1:EvaluationStatusofImplementation:N/ASub‐component6.2:ImpactAssessmentsStatusofImplementation:N/ASub‐component6.3:ThecapstonecelebrationStatusofImplementation:N/A
D. DisbursementsofTransitionFundFundsforDirectProjectActivities Country‐Execution
(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
3,260,000 3,260,000
AmountReceivedfromTrustee(b):
3,260,000 3,260,000
ActualAmountDisbursed(c): 0.00 0.00
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2014 0 0 02015 0 1,050,000 1,050,0002016 830,000 600,000 1,430,0002017 780,000 0 780,0002018
2019
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed Available Total0 240,000 240,000
G. ResultsFrameworkandMonitoring
ProjectDevelopmentObjective(PDO):
PDOLevelResultsIndicators*UnitofMeasure
Baseline
ForecastsofCumulative
TargetValues**
FrequencyDataSource/Methodology
ResponsibilityforDataCollection
Description(indicatordefinitionetc.)
Jan2015–Dec2015F
Jan2016–Dec2016F
IndicatorOne:DeliverySupportUnitissetupwithintheLibyanGovernment
UnitEstablished
0 1 1 Biannually Reports Projectimplementationunit
QuantitativeQualitative(qualityoforganization)
IndicatorTwo:Highqualityinternationalacademicinstitutionsengaged
ConsortiumEngaged
0 1 1 Biannually Reports Projectimplementationunit
QuantitativeQualitative(internationalstandards
foracademicinstitutions)
IndicatorThree:Multiplepathstrainingcurriculadeveloped
1‐3Curricula
0 1 3 Biannually Reports Projectimplementationunit
Acurriculaismadeavailable(includingteachingmaterialontheelectronicplatform)
IndicatorFour:EffectiveTrainingof200executivelevelparticipants(atleast25%women)
#ofParticipantsTrainingQuality
0 60 200 Biannually Reports Projectimplementationunit
Quantitative–numberofapplicationandacceptancerateQuantitative–numberofparticipantswhohavesuccessfullycompletedthetrainingQuantitative–%ofwomenwhohavesuccessfullycompletedthetrainingQualitative–Participantssurveys
IndicatorFive:Efficientgovernmenthandover
#daysandQualityofengagement
s
0 40 40 Biannually Reports Projectimplementationunit
Quantitative–numberofengagement‐daysforcoachingandmentoringofmembersofgovernmentQualitative–Participantssurveys
Indicatorfour:StrategicplanforleadershipcapacitybuildinginsupportofLibya2030Vision
StrategicPlan
0 1 1 Biannually Reports Projectimplementationunit
Quantitative–numberofstakeholdersconsultedandmeetingsheldQualitative–Acceptancequalityassurancesurvey
INTERMEDIATERESULTS
IntermediateResult(ComponentOne):ConsolidationofthedeliveryunitwithintheTransitionGovernmentandtheinternationalconsortium
IntermediateResultindicatorOne:SetupoftheDeliveryUnit
UnitEstablished
0 1 1 Biannually Reports Projectimplementationunit
QuantitativeQualitative(qualityoforganization)
IntermediateResultindicatorTwo:EstablishmentofthePartnershipAgreement
#ofPartnershipagreementssigned
0 5 5 Biannually Reports Projectimplementationunit
QuantitativeQualitative(internationalrankingof
theparticipatinginstitutions)
IntermediateResultindicatorThree:EstablishmentoftheGovernanceStructure
GovernanceStructure
0 1 1 Biannually Reports Projectimplementationunit
QuantitativeQualitative(qualityoforganization)
IntermediateResult(ComponentTwo):Requirementanalysis,programsarchitectureandcontentdevelopment
IntermediateResultindicatorOne:RequirementGatheringandAnalysis
Report 0 1 1 Biannually Reports Projectimplementationunit
Qualitative–SurveyofStakeholders
IntermediateResultindicatorTwo:CurriculumDesignandContentDevelopment,ProgramsConsolidation
#ofTrainingPrograms
0 3 3 Biannually Reports Projectimplementationunit
ContentforeachtrainingpathQualitative–SurveyofStakeholders
IntermediateResultindicatorThree:DeliveryPlatformDevelopment
1onlineelectronicplatform
0 1 1 Biannually Reports Projectimplementationunit
Electronicandonlinedeliveryplatform
Qualitative–Useracceptancesurvey
IntermediateResultindicatorFour:Participantsrecruitingandassessment
#ofapplicants
0 200 200 Biannually Reports Projectimplementationunit
#ofapplications
IntermediateResult(ComponentThree):Coaching,mentoringandsupportingprogramfortopgovernmentofficials
IntermediateResultindicatorOne:Coachingandmentoringsessions
#sessions 0 10 10 Biannually Reports Projectimplementationunit
Quantitative‐#ofone‐on‐oneoroneonmultiplecoachingandmentoring
sessionsQualitative–Participantssurvey
IntermediateResultindicatorTwo:Workshops
#ofworkshops
0 3 3 Biannually Reports Projectimplementationunit
Quantitative‐#ofworkshopsQualitative–Participantssurvey
IntermediateResult(ComponentFour):Coaching,mentoringandsupportingprogramfortopgovernmentofficials
Indicator1:Numberofexecutivelevelparticipantstrained
Numberofpeople
0 60 200 Biannually Reports Projectimplementationunit
Quantitative–numberofparticipantswhohavesuccessfullycompletedthetraining
Indicator2:%ofwomenparticipating
%ofparticipants
0 25% 25% Biannually Reports Projectimplementationunit
%orfemaleparticipantsinthetrainingsessions
Indicator3:%ofparticipantsfromcentralregions
%ofparticipants
0 50% 50% Biannually Reports Projectimplementationunit
%orfemaleparticipantsinthetrainingsessions
Indicator4:scoreobtainedfromparticipantsonquality
Averagescore
0 6 7 Biannually Reports Projectimplementationunit
AverageRatingobtainedfromtheparticipantsattheendofthetrainingsession(1‐10scale;10beingthehighestscore)
IntermediateResult(ComponentFive):Pilotexecutivetrainingandmentoringprogramforseniorexecutivestaff
IntermediateResultindicatorOne:Situationanalysis
Report 0 1 1 Biannually Reports Projectimplementationunit
Exhaustivesituationanalysisreport
IntermediateResultindicatorTwo:Workshopswithkeystakeholders
Report 0 1 1 Biannually Reports Projectimplementationunit
WorkshopreportsQualitative–Participantssurvey
IntermediateResultindicatorTwo:StrategicPlanningActivities
Plan 0 1 1 Biannually Reports Projectimplementationunit
QualityofthereportAcceptancesurvey
IntermediateResult(ComponentSix):Coaching,mentoringandsupportingprogramfortopgovernmentofficials
Indicator1:independentimpactassessmentmethodologydeveloped
MethodologyandDataCollectionPlan
(Surveys)
0 1 1 Once Impactassessmentmethodology
Independentresearchteam
Researchteam(Researchers,post‐doctoralfellowandgraduatestudents)willbehiredtodesignanevaluationplanoftheprojectincludingdatacollectionplan,surveys,etc.
Indicator2:Projectimpactassessment
Independentprojectevaluation
0 1 1 Midandendofthe
program
Impactassessment
Independentresearchteam
Thesameteamasabovewillberesponsibletocarryontheassessmentandproduceamidandendofprojectimpactassessment
Indicator2:Capstonecelebrationorganized
#ofevents 0 1 1 Biannually Reports Projectimplementationunit
1events
EnergySectorReformTechnicalAssistance
A. BasicProjectInformationActivityName:Libya-Electricity Sector Reform Technical Assistance
CountryName: Libya NameofImplementationSupportAgency(ies): The World Bank
NameofISAProjectLeader: Fanny Missfeldt-Ringius, Mikul Bhatia, Samira Elkhamlichi
EmailofISAProjectLeader: [email protected]
RecipientEntity: Ministry of Electricity and Energy NameandEmailofRecipientEntityContact: Mr. Idres El-Sharif, [email protected].
TotalAmountApprovedbytheTransitionFund(US$):2,000,000
Additional FundsLeveragedandSource(s),ifany(US$):
TotalAmountDisbursed(DirectandIndirectinUS$):119,936.64
SteeringCommitteeApprovalDate:
6/10/2014
ProjectImplementationStartDate:
10/1/2014
ProjectClosingDate:
12/31/2017
Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)
PrimaryPillar:
InvestinginSustainableGrowth
SecondaryPillar(s): EnhancingEconomicGovernanceInclusiveDevelopmentandJobCreationCompetitivenessandIntegration
B. SummaryofProjectImplementationProgressandKeyIssues
ProjectDevelopmentObjective:The overall objective of the Technical Assistance activity would be to support the Government of Libya in its efforts to reform the electricity sector and its institutions with a view of enhancing the technical and financial viability of the sector. Ratingforprogresstowardsachievementofobjective: Unsatisfactory
Ratingforoverallimplementationprogress: Unsatisfactory
BriefSummaryofProjectImplementationStatus:DuetothesecuritysituationandthepoliticalvacuuminLibyatherehadbeenahiatusinthecollaborationonenergywiththeGovernment.AfteralaunchingworkshopscheduledinTunisiacouldnotproceedinearly2015duetoborderclosurebetweenLibyaandTunisia,anotherdatefortheprojectlaunchingworkshopwasagreedfor3‐5June,2015,inIstanbul,Turkey.Theworkshopwasaimedatbringingtogetherenergysectorstakeholdersatthetechnicalleveltodiscuss(i)projectapproachandwayforward(includingtimeline);(ii)trainingonbestpracticeenergysectorreformexperiences;(iii)measurestoimproverevenuerecoveryfromthepowersector;(iv)statusofgasandoilsituation;and(v)operationalassessmentofGECOL.However,afterinitiallyacceptingthedates,closertotheplanneddate,theclientrequestedtopostponetheeventuntilafterRamadan.Theworkshopiscritical,aswithoutcoordinationwiththeGovernment,activitiesassetoutbelowcannotbestarted.Anewdateisnowbeingdiscussedwiththeclient–possiblyforthemonthofSeptember.
C. ImplementationStatusofComponentsComponent1:Support the Reform of the Legal and Institutional Framework in the Electricity SectorPreviousRating:Unsatisfactory CurrentRating:Unsatisfactory Cost(US$):900,000Sub‐component1.1:Institutional gap analysis - The activity consists of assessing the current structure of the electricity sector, including organizational and governance aspects with the aim of identifying areas where the current framework can be enhanced and brought to international best practice.StatusofImplementation:Somemoregenericworkonthegassectorhasstarted.
Sub‐component1.2:Development of a regulatory framework - Based on the option and scenario selected in the abovementioned activity, the regulatory framework will be developed focusing mainly on defining the sector’s new structure and the roles and responsibilities of the power sector actors, including for renewable energy and energy efficiency.StatusofImplementation:NotyetstartedSub‐component1.3:Development of the framework for establishing a Libyan Electricity Market Regulatory Authority (LEMRA). The project will finance technical support to design the framework required to establish an entity in charge of regulating the electricity sector. The objective is to define the functions and responsibilities of the regulator and eventually develop a comprehensive Business Plan for LEMRA. A series of workshops will be organized to build consensus within Government and among stakeholders to complement these activities.StatusofImplementation:NotyetstartedSub‐component1.4:Assessment of GECoL Operations and Roadmap (overall aspects). Taking into account the issues identified in the institutional gap analysis (activity 1‐1) this activity will include a comprehensive analysis and assessment of the current state of the GECoL and the activities performed and propose recommendations for improving management and operations of current GECoL activities overall.StatusofImplementation:NotyetstartedSub‐component1.5:Action plan for Distribution operations (Specific Aspects). This activity will build on the outcomes from the previous activity (including the previous studies done by Booz Allen for GECOL) and focus particularly on the electricity distribution sector, through first the carry out of an audit of the electricity distribution sector to assess the current performance and identify issues affecting this performance and the efficiency and effectiveness of current management structures and billing and collection systems. StatusofImplementation:NotyetstartedComponent2:Development of a Framework for the Deployment of Renewable Energy REPreviousRating:Unsatisfactory CurrentRating:Unsatisfactory Cost(US$):150,000Sub‐component2.1:Energy Mix Assessment. The project will finance the review and update the existing least‐cost expansion plan, which includes dedicated renewable energy scenarios will be developed, that would confirm the economically optimal level of mix of renewables.StatusofImplementation:Somemoregenericworkonthegassectorandonenergyefficiencyhasstarted.Sub‐component2.2:Prepare a Strategic Plan for the Development Renewable Energy. This component will consist of preparing a set of standardized documents for Public Private Partnership (PPP) transactions, and assisting in identification and reserving a dedicated site for a pilot PPP transaction.StatusofImplementation:NotyetstartedSub‐component2.3:Identify and Prepare a Framework for a Pilot Private‐Public Partnership (PPP) Transaction. This component will consist of preparing a set of standardized documents for Public Private Partnership (PPP) transactions, and assisting in identification and reserving a dedicated site for a pilot PPP transaction.StatusofImplementation:NotyetstartedComponent3:Development and implementation of staff training program for energy experts, senior experts and administrative staff.PreviousRating:Unsatisfactory CurrentRating:Unsatisfactory Cost(US$):300,000Sub‐component3.1:Trainings and capacity building. The component consists of assessing the capacity needs and designing appropriate trainings to be provided to professionals and practitioners involved in the sector.StatusofImplementation:NotyetstartedComponent4:Institutional Arrangement for Project ImplementationPreviousRating:Unsatisfactory CurrentRating:Unsatisfactory Cost(US$):460,000Sub‐component4.1:World Bank team and local presence to help with project implementation. The project will finance a world Bank Staff who will be based in Libya and a team with an appropriate skill mix responsible for the implementation of the project. The team will work closely with the Project Implementation Unit PIU established in the Ministry.StatusofImplementation:Notcurrentlyfeasibleduetosecuritysituation.Instead,twolocalconsultantshavebeenrecruitedtohelpliaisonwiththeGovernment.
Sub‐component4.2:Monitoring and Evaluation. The component consists of monitoring and evaluation of project activities to ensure indicators are established and verified and the outputs and outcomes are attained. The World Bank team will coordinate the monitoring and evaluation of the project results.StatusofImplementation:Notyetstarted
D. DisbursementsofTransitionFundFundsforDirectProjectActivities
Country‐Execution(US$)
(x)
DirectCostforISA‐Execution(US$)
(y)
Total(US$)
ApprovedAmountforDirectProjectActivities(a):
0 1,960,000 1,960,000
AmountReceivedfromTrustee(b):
0 1,960,000 1,960,000
ActualAmountDisbursed(c): 0 0 80,189.64
E. DisbursementForecastofFundsforDirectProjectActivitiesbyCalendarYear(US$)Year Jan‐June Jul‐Dec TotalbyYearEnd2014 ‐ 2015 80,189.64 100,000 180,189.642016 400,000 760,000 1,160,0002017 300,000 319,810.36 619,810.362018 2019
F. DisbursementsofFundsforIndirectCosts(US$)
Disbursed(US$) Available(US$) Total(US$)39,747 253.15 40,000
G. ResultsFrameworkandMonitoring
Project Development Objective (PDO): The Project Development objective of this Technical Assistance Project is to support the Government of Libya in its efforts to reform the electricity sector and its institutions with a view of enhancing the technical and financial viability of the sector.
PDO Level Results Indicators*
Unit of Measure
Baseline
Cumulative Target Values**
Frequency Data
Source/Methodology
Responsibility for Data
Collection
Description (indicator definition
etc.) Oct
2014 – Sept 2015
F
Oct
2015 – Sept 2016
F
Oct
2016 – Dec 2016
F
Options for restructuring the power sector analyzed
Text Ministerial decision N°539 that empowers the MoE to undertake necessary reform measures
- Gap analysis - High level strategic policy document
WB Team and the Technical Committee.
Report
Electricity Market Law adopted
Text Law N°17 on creation of GECoL
- Law drafted and endorsed by the advisory committee
- Legal Framework for RE and EE defined
WB Team and the Technical Committee.
Law
The Libyan Electricity Market Regulatory Authority (LEMRA) Framework developed.
Authority None - Sr Expert recruited
- Framework developed
- Business Plan for LEMRA developed
WB Team and the Technical Committee.
Authority responsible of power regulation
Roadmap and Action Plan for GECoL Restructuring developed
Text None - Assessment of GECoL Operations prepared - Technical analysis of losses in the system prepared
- Roadmap and Action Plan for GECoL Restructuring
WB Team and the Technical Committee.
Plan
Development of a Framework for Renewable Energy(RE)
Text None -Energy Mix Assessment reviewed and updated
- a Strategic Plan for RE Development prepared
- A Framework for a Pilot Private-Public Partnership (PPP) Transaction prepared
WB Team and the Technical Committee.
Studies and plans
INTERMEDIATE RESULTS
- A series of stakeholders’ consultation workshop will be organized to build consensus around the reform options.
Number of consultations
0 2 4 4 quarterly WB Team and the Technical Committee.
- Capacity building program is developed and number of training workshops are organized and exchange events
Number 0 0 4 4 quarterly WB Team and the Technical Committee.
- a dedicated site identified and reserved to pilot a PPP transaction for a RE project
project None a feasibility study of the project and its legal framework conducted
WB Team and the Technical Committee.
**Indicate‘A’for‘Actual’and‘F’for‘Forecast’
FinanceandPrivateSectorDevelopmentTechnicalAssistance
A. Basic Project Information Activity Name: Libya Finance and Private Sector Development Technical Assistance
Country Name: Libya Name of Implementation Support Agency(ies): World Bank
Name of ISA Project Leader: Pietro Calice Email of ISA Project Leader: [email protected]
Recipient Entity: Central Bank of Libya, Ministry of Economy, Privatization and Investment Board, Chamber of Commerce, Libya Business Council
Name and Email of Recipient Entity Contact: Dr. El Sadiq El Kabir (Governor, Central bank of Libya - +218 21 333 3588); Khaled Al Bakory (Director, Privatization and Investment Board - +218 21 340 5226); Abdulnaser Ben Nafaa (Chairman, Libya Business Council - +218 91 222 0629).
Total Amount Approved by the Transition Fund (US$): 3,300,000
Additional Funds Leveraged and Source(s), if any (US$):
Total Amount Disbursed (Direct and Indirect in US$): 611,239.67
Steering Committee Approval Date:
12/5/2013
Project Implementation Start Date:
1/1/2014
Project Closing Date:
1/31/2017
Pillar(s) to which Activity Responds (as per the proposal approved by the Steering Committee)
Primary Pillar: Investing in Sustainable Growth Secondary Pillar(s): Enhancing Economic Governance
Inclusive Development and Job Creation Competitiveness and Integration
B. Summary of Project Implementation Progress and Key Issues
Project Development Objective: (i) To strengthen the capacity of key Libyan financial institutions to assess and reform the foundational elements of financial infrastructure; and (ii) to strengthen the capacity of institutions responsible for promoting private investment and private sector development.
Rating for progress towards achievement of objective: Moderately Satisfactory
Rating for overall implementation progress: Moderately Satisfactory
Brief Summary of Project Implementation Status: The project has started implementation in a highly volatile political environment, characterized by outright civil war. The challenging political and security situation in the country has requested a new model of engagement with Libyan counterparts, based on remote delivery and focused on capacity building. The baseline scenario underlying this Progress Report is a gradual yet bumpy and slow normalization of the political situation in the country, supported by the international community. Against this background, the project is deemed to be on track, with one sub-component closed and two ongoing. A change in the baseline scenario will obviously impact the implementation of the project and its ratings. At the request of the Central Bank of Libya (CBL), the original sub-component 1.1 of the Project has been replaced by “Capacity building to the banking industry”. This change will not have any impact on the overall project development objective. This new activity involves technical assistance (TA) to the Institute of Banking and Financial Studies (IBFS), the Libyan banking industry training center operated under the aegis of the CBL
C. Implementation Status of Components
Component 1: Financial infrastructure development Previous Rating: Moderately Satisfactory
Current Rating: Moderately Satisfactory Cost (US$): 1.5 million
Sub-component 1.1: Capacity building to the banking industry (Support to the IBFS) Status of Implementation: Activity launched in May 2015 with the delivery of a two-day workshop in Tunis attended by the Libyan financial community, including the CBL and the IBFS. During the workshop, the team presented the results of a benchmarking and discussed best practices banking training organizations; validated the methodology to undertake a diagnostics of IBFS’ capacity and governance; identified Libyan banks’ needs in professional training; and discussed and agreed on the target organizational structure. Next steps involve the design of a framework for vocational training, including the broad architecture for qualification and diploma programs; and the diagnostics of IBFS.
Sub-component 1.2: Strategic plan to lay the framework for implementing Islamic finance in Libya Status of Implementation: Organized dialogue with key stakeholders, including the Central Bank of Libya, on the transition to an Islamic financial system; contributed to organize a conference on Islamic finance which was supposed to be held in March 2014 but was then postponed due to security issues (next date TBD); initiated the development of a strategic framework for Islamic finance; initiated needs assessment in both the Central Bank and the banking system. In December 2014, the team organized a workshop titled “Towards Developing a Sound Sukuk Market in Libya”, targeting top officials of the Libya Stock Exchange (LSE), which has the mandate to develop the Sukuk market in Libya. The training was delivered through the Global Islamic Finance Development Center in Istanbul. The workshop familiarized senior LSE staff with basic principles, financing structures, as well as sound practices relating to a well-functioning Sukuk market (for both sovereign and corporate issuances). It also introduced participants to key issues relating to the regulation and supervision of Sukuk markets, including compliance with relevant AAOIFI standards. Nest steps include the delivery of a Strategy for Implementing Islamic Finance in the country. Sub-component 1.3: Capacity building to the Central Bank on banking supervision Status of Implementation: This activity has not started yet. A resident expert has been identified and contacts with CBL are ongoing.
Component 2: Private sector development Previous Rating: Not Applicable Current Rating: Moderately Satisfactory Cost (US$): 1.2 million Sub-component 2.1: Capacity building of private sector institutions Status of Implementation: This activity has not started yet as it is conditional upon successful finalization of the sub-component 2.2. Sub-component 2.2: Mapping/assessing private sector activities and opportunities for growth Status of Implementation: A standard Investment Climate Assessment (ICA) had been planned during a period of relative calm in Libya, where it was realistic to consider in-depth interviews with business owners, CEOs and CFOs. However, since July 2014, major clashes have occurred throughout the country, and most notably in the capital, Tripoli, leading to a mass exodus of Libyans to neighboring Tunisia and Egypt. In this context, the team decided to adopt a revised methodology based on a quick assessment of the main constraints to private sector development as well as the impact of the crisis/conflict and business needs and priorities for recovery. In particular, it was agreed that a set of phone interviews reaching out to about 500 firms based on a focused, streamlined questionnaire would be implemented in collaboration with the Libyan Bureau of Census and Statistics. This would be followed by an analysis of the key constraints to doing business in the current environment and a preliminary mapping of private sector activities. The activity is now being finalized. The team delivered a presentation of the preliminary findings at a workshop in Brussels in March 2015 organized by the EU in the context of the UN-led national dialogue, and was well received by the participants. The team is now finalizing the report which will be published in August 2015. Sub-component 2.3: Development of a Privatization and Public Private Partnership (PPP) framework Status of Implementation: This activity has not started yet as it is conditional upon successful finalization of the sub-component 2.2.
Component 3: Project implementation Previous Rating: Not Applicable Current Rating: Moderately
Unsatisfactory Cost (US$):
Sub-component 3.1: World Bank Staff cost to be based in Libya for 2 years Status of Implementation: Due to security issues in the country, World Bank staff is currently managing the project from Washington DC. A local staff may be hired to help coordinate the project on the ground if and when the conditions improve. Sub-component 3.2: Monitoring and Evaluation Status of Implementation: N/A Sub-component 3.3: Travel Cost Status of Implementation: N/A Sub-component 3.4: PPD process for project implementation (TA to the Advisory and Technical Committees) Status of Implementation: The formation of the Advisory Committee has been delayed due to political developments in the country. However, the technical committees have been established. These may change in light of the evolving political situation. Nonetheless, the team remains engaged with the main technical counterparts of the project.
D. Disbursements of Transition Fund Funds for Direct Project Activities
Country-Execution (US$)
(x)
Direct Cost for ISA-Execution (US$)
(y)
Total (US$)
Approved Amount for Direct Project Activities (a):
3,300,000 3,300,000
Amount Received from Trustee (b):
3,300,000 3,300,000
Actual Amount Disbursed (c): 611,239.67 611,239.67
E. Disbursement Forecast of Funds for Direct Project Activities by Calendar Year (US$) Year Jan-June Jul-Dec Total by Year End 2013 2014 71,454 171,533 242,987 2015 368,253 500,000 868,253 2016 500,000 500,000 1,000,000 2017 400,000 400,000
F. Disbursements of Funds for Indirect Costs (US$) Disbursed (US$) Available (US$) Total (US$)
134,379 3,021 137,400
G. Results Framework and Monitoring
ProjectDevelopmentObjective(PDO): (i) to strengthen thecapacityofkeyLibyan financial institutions toassessandreform the foundational elementsof financialinfrastructure;and(ii)tostrengthenthecapacityofinstitutionsresponsibleforpromotingprivateinvestmentandprivatesectordevelopment.
PDO Level Results Indicators*
Unit of Measure
Baseline
Cumulative Target Values**
Frequency Data Source/ Methodology
Responsibility for Data
Collection
Description (indicator definition etc.)
Jan 2014 – Dec 2014
Jan 2015 – Dec 2015
Jan 2016 – Jan 2017
(i) Endorsement by the Advisory Committee of a strategic plan that outlines gradual introduction of Islamic financial services
Plan to introduce exclusive Islamic finance in Jan 2015
Plan developed
and adopted
(F)
Annually World Bank Endorsement of the advisory committee reported in the committee’s minutes of meeting
ii) Endorsement by the CBL of an Instruction Manual to enable banks examiners to produce regulatory reports aligned with CAMELS rating.
Resident advisor
recruited (F)
Manual developed
and adopted (F)
Annually Advisor progress report and CBL supervision program
World Bank Endorsement of the advisory committee reported in the committee’s minutes of meeting and the CBL
(iii) Endorsement by the Advisory Committee of the private sector mapping and capacity assessment
PS mapping
and capacity
assessment prepared
and endorsed
by the committee
(F)
INTERMEDIATE RESULTS
Intermediate Results Indicators*
Unit of Measure
Baseline
Cumulative Target Values**
Frequency Data Source/ Methodology
Responsibility for Data
Collection
Description (indicator definition etc.)
Jan 2014 – Dec 2014
A
Jan 2015 – Dec 2015
F
Jan 2016 – Jan 2017
F
Component I: Financial Infrastructure Development Islamic finance conference organized and attended by key Libyan public and private sector representatives, as well as international practitioners and experts.
Number of participants Female participation (%)
0
0
40
20%
- Annually World Bank Conference completion report
International Islamic finance case studies prepared and disseminated in the conference.
Number of case studies prepared
0 4 - Annually World Bank Conference completion report
CBL supervision unit staff members trained on key banking supervisory and reporting tasks
Percentage of supervision staff trained
0 20 100 Annually World Bank Training completion report
Component 2: Private Sector Development Private sector associations’ staff trained in: Organizational
development. Corporate governance. Strategy development. Business development
practice.
Number of assoc. staff trained
0
10
70
Annually World Bank Training completion reports
Female participation (%)
0%
0%
20%
20%
Identification of a pipeline of projects that are suitable for privatization of PPP
Number of projects included in the pipeline
0 0 10 15 Annually World Bank PIB annual reports
** Indicate ‘A’ for ‘Actual’ and ‘F’ for ‘Forecast’