GLOBAL ENVIRONMENT FACILITY/
SMALL GRANTS PROGRAMME (GEF/SGP) SRI LANKA - OP VI
PROJECT PROPOSAL FORMAT
TABLE OF CONTENTS
I. PROPOSAL COVER SHEET
II. PROJECT DESCRIPTION
1. Project Rationale and Needs Analysis
2. Project Outcomes, Outputs and Activities
3. Implementation Plan and Timeline
4. Monitoring and Evaluation
5. Community Participation
6. Institutional Capacity Building
7. Sustainability
8. Clearance and Approval from Agencies
9. Partnerships
10. Innovation
III. RESULTS BASED BUDGET
IV. BANK DETAILS
V. ANNEXURES
1. Matrix to Present GEF Outcomes, Outputs, Indicators, Baselines, Targets, Assumptions, etc.
2. Proposed Budget in LKR
3. Implementation Plan and Timeline
2
I. PROJECT PROPOSAL COVER SHEET
Project Title:
Name and Address of Organization:
Telephone: Fax: Email:
Principal Officer: (name and position)
Project Contact: (name and position)
Project Location & Directions (Give detailed directions and attach a simple map)
Proposed Project Duration:
Total Amount Requested: LKR
3
II. PROJECT DESCRIPTION
1. PROJECT RATIONALE AND NEEDS ANALYSIS
Describe the problem or challenge the project is intended to address and describe the situation and
context in which the project is to take place.
The methodology adopted in identifying needs and the identified needs should be stated clearly.
2. PROJECT OUTCOMES, OUTPUTS AND ACTIVITIES
Complete the Matrix attached (below) to address the following topics:
i. The outcomes of the proposed project - the vision or societal/environmental change expected in the
long term should be stated here.
ii. The outputs that you intend the project to produce - Intended results are the measurable changes,
which will have occurred by the end of the project. There are ordinarily several related results, such as:
“By the completion of the project, capacities developed of 10 CBOs/CSOs to implement projects,
documented and shared 10 best practices and capacities developed of a minimum of 3 projects that has
potential to be up-scaled and replicated....”
iii. Activities are what you would actually do to produce the intended results and accomplish the project’s
objectives. There should be a direct linkage between the activities & the outcomes. The activities that the
project will undertake to achieve the expected results should be described in detail with specific
indicators for each activity. Project activities should also indicate as specifically as possible the
participation of - women (%), youth (%), disadvantaged groups (%), indigenous communities (%), forest
dependent communities (%)
iv. Indicators – should be SMART (Specific, Measurable, Assignable, Realistic, Time bound) relating
to project performance and impact which can form the basis for monitoring and evaluation. Specific
indicators for monitoring would provide reference to time-bound monitoring of project work plan
implementation.
v. The key assumptions on which the project plan is based, mostly related external factors (for example,
government environmental policy remaining stable) which are anticipated in project planning should be
stated. The major risk factors both internal (e.g. the technology involved fails to work as projected) and
external factors (eg. the currency exchange rate drops, changing the economics of the project) that could
result in the project not producing its intended results should be identified and listed.
vi. The means of verification specify the sources of information, which enables the evaluator to verify
the indicators.
3. IMPLEMENTATION PLAN AND TIMELINE
See matrix attached below
4
4. MONITORING AND EVALUATION
Explain your plan for monitoring and evaluating the project, both during its implementation and at
completion, in this section. Pay special attention to the need to involve community members in the
monitoring and evaluation process and state how this will be achieved.
Among the key questions to be addressed are:
How will you track performance of the project in terms of achievement of the steps and milestones set
forth in the implementation plan?
How will you assess the impact of the project in terms of achieving the project’s objectives?
How will you facilitate mid-course correction and adjustment of the project design and plans based on
feedback you receive?
5. COMMUNITY PARTICIPATION/ EMPOWERMENT
The extent of community involvement is the most critical indicator of project success. The quality of
your involvement with the community, and your ability to articulate it clearly in the proposal will be a
major factor in funding decisions. Please describe here how stakeholders in the affected communities
will be/have been involved in: (i) project planning and design; (ii) project implementation; and (iii) in
monitoring and evaluating for project effectiveness and impact.
6. INSTITUTIONAL CAPACITY BUILDING
Please describe here the needs and requirements of your organization related to the proposed project.
7. SUSTAINABILITY
Explain how the project activities and benefits can be sustained beyond the funded period. Follow-up
activities covering at least a two-year period should be given.
8. CLEARANCE AND APPROVAL FROM AGENCIES
Name of Agency Yes No Comments
Forest Dept.
Dept. of Wildlife Conservation
Dept. of Coastal Conservation
Central Environment Authority
Divisional Secretariat
Dept. of Agrarian Development
Other
9. Partnerships with other organizations
10. Innovation adopted in the Project
5
III. RESULTS BASED BUDGET
The Project Budget becomes part of the binding contract between UNDP GEF/SGP and the proposing
organization.
A few important principles in preparing the project budget: -
Be realistic in your budgeting. An unrealistically low budget is just as likely as an overly high
budget to result in failure of the proposal and the project.
The budget should include costs associated with managing and administering the project.
The figures contained in the Budget Information Section should agree with those on the Proposal
Cover Sheet and the text of the proposal itself.
N.B. All relevant financial records should be made available to the UNDP at any given time. These
maybe independently audited, and may become public information.
See Matrix to present the Proposed Budget attached below.
IV. BANK DETAILS
Information on bank account into which funds would be deposited:
(Preferably, the GEF/SGP project Account should be separately maintained)
Account Name/Title:
Account Number:
Bank Name/Address:
The Two Signatories of the Bank Account with their ID numbers and copy of ID attached
6
V. ANNEXURES
1. MATRIX TO PRESENT PROJECT OUTCOMES, OUTPUTS, INDICATORS, BASELINE AND TARGET, etc.
Indicators
Baseline Target Means of
Verification
Assumptions &
Risks* Quantity Description
GEF SGP Outcome
Output 1
Activities
Output 2
Activities
Output 3
Activities
Output 4
Activities
Output 5
Activities
* Suggestions for mitigating the risks should be stated in separate paragraph. ** Please adjust table as required.
7
2. PROPOSED BUDGET in LKR
DESCRIPTION REQUESTED
ASSISTANCE
FROM
GEF/SGP
SUB
TOTAL
COUNTERPART
(NGO)
CONTRIBUTION
SUB TOTAL COMMUNITY
CONTRIBUTION
SUB TOTAL OTHER
CONTRIBUTIONS
SUB TOTAL TOTAL
1. ACTIVITY
1.1. Sub Activity
1.2. Sub Activity
1.3. Sub Activity
SUB TOTAL XX,XXX.XX XX,XXX.XX XX,XXX.XX XX,XXX.XX XX,XXX.XX
2. ACTIVITY
2.1. Sub Activity
2.2. Sub Activity
SUB TOTAL XX,XXX.XX XX,XXX.XX XX,XXX.XX XX,XXX.XX XX,XXX.XX
3. ACTIVITY
3.1. Sub Activity
3.2. Sub Activity
3.3. Sub Activity
SUB TOTAL XX,XXX.XX XX,XXX.XX XX,XXX.XX XX,XXX.XX XX,XXX.XX
4. ACTIVITY
4.1. Sub Activity
4.2. Sub Activity
4.3. Sub Activity
SUB TOTAL XX,XXX.XX XX,XXX.XX XX,XXX.XX XX,XXX.XX
*5. Publicity for Project XX,XXX.XX XX,XXX.XX
*6. Erection of Board/s at
Project site
X,XXX.XX
XX,XXX.XX
SUB TOTAL XX,XXX.XX XX,XXX.XX XX,XXX.XX XX,XXX.XX XX,XXX.XX
7. ADMINISTRATION
5% -7%
Project Co-ordination
SUB TOTAL XX,XXX.XX XX,XXX.XX XX,XXX.XX XX,XXX.XX
GRAND TOTAL XXX,XXX.XX XXX,XXX.X XXX,XXX.X XXX,XXX.XX X,XXX,XXX.XX
* Please note that Items 5 & 6 are compulsory requirements. Costs of Item 5 is to be borne by the CSO/Grantee.
** Please adjust table as required.
8
3. IMPLEMENTATION PLAN AND TIMELINE
Describe in separate paragraph the sequence of all-major activities and implementation milestones, including targeted beginning and ending dates for each step.
Descriptions should identify what will be done, when it will be done and who will do it. All required reports, project reviews and evaluation activities should also
be included.
Fill attached Matrix to present the timeframe.
DESCRIPTION
Timeline
RESPONSIBILITY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1. ACTIVITY
1.1. Sub Activity
1.2. Sub Activity
1.3.Sub Activity
2.ACTIVITY
2.1. Sub Activity
2.2. Sub Activity
3.ACTIVITY
3.1. Sub Activity
3.2. Sub Activity
3.3. Sub Activity
4.ACTIVITY
4.1. Sub Activity
4.2. Sub Activity
4.3. Sub Activity
*5. Publicity for Project
*6. Erection of Board/s
at Project site
* Please adjust table as required.
9
DESCRIPTION OF ORGANIZATION
1. Name of the Organization:
2. Address of the Organization (Please state District & D.S Division):
3. Contact Telephone Number/E-Mail Address:
4. No. of Members:
5. No. of Staff Members:
6. Names of Committee Members:
7. What is the principal purpose of the Organization:
8. Structure of the Organization:
9. Nature of Organization: (Community Based Organization/ Non-Governmental Organization/ Research
Organization/ Branch of an International Organization):
10. Registration date of Organization (submit a copy of the business registration):
11. Evolution of Organization to present status:
12. Is the Organization a member of any NGO association or umbrella grouping?
13. What are the key expert areas:
13.1 Women
13.2 Another specific population group
13.3 Environment
13.4 Human Rights
13.5 Others
14. What activities does the Organization conduct at present?
10
15. Budget:
15.1 What is the Organization’s total budget?
15.2 Do you have annually audited budgets?
16. External funding received by the Organization (last 4 years):
(Please give the names of the recent donors, year, amount and project)
17. What previous experience does the Organization have that is specifically relevant to the proposed
project, including:
i. Implementation of projects that address problems of global warming and loss of
biodiversity? (Please give details)
ii. Implementation of projects that focus on the relationships between environmental
protection and building sustainable livelihoods at the community level?
iii. Experience in working with particular technologies that are being proposed for this project?
(If relevant)
iv. Working with specific communities, which will be participating and will be affected by the
proposed project.
18. Details of the person who will be responsible for the project:
(E.g. Name, Qualifications)
19. Audited accounts of the last 3 years
11
Project Evaluation
Name of NSC Member:
No
Project Title/Name of NGO
Cri. 1
Y/N
Cri. 2
Y/N
Cri. 3
Y/N
01
. Ou
tpu
ts a
re n
eces
sary
an
d s
uff
icie
nt
for
the
ou
tcom
e
02
. Act
ivit
ies
are
nec
essa
ry a
nd
suff
icie
nt
for
the
ou
tpu
ts S
ust
ain
ab
ilit
y
03
. Su
stain
ab
ilit
y
04
. Org
an
izati
on
al
cap
aci
ty/
05
. Co
mm
un
ity
Pa
rtic
ipati
on
06
. Pa
rtn
ersh
ips
07
. Rea
list
ic B
ud
get
08
. Gen
der
an
d E
qu
ity
09
. Mon
itori
ng a
nd
Ev
alu
ati
on
10
. In
nov
atio
n
Tota
l
01
02
03
Criteria 1-3* Criteria 1 – 10
Please Mark Yes/No or / Scale 0 – 5
A. Conformity to GEF/ SP Criteria – Yes/No (bio Diversity/land Degradation/Climate Change)
B. District within the SP area (Mannar)- /
C. Conformity to Project outcomes – Yes/No
At least 500 hectares of degraded wetlands rehabilitation concentrating on wise utilization of water, tank rehabilitation systems or
mangrove restoration.
At least 100 hectares under reforestation or farmer managed natural regeneration
At least 100 hectares of land re habilitated through best practice soil conservation measures and agroforestry
At least 100 hectares of agricultural land under agro ecological practices and systems that increase sustainability and productivity and/or
conserve crop genetic resources
12
Plate 1. Selected landscape and the seascape of Mannar Island to Jaffna coastal region