Jewellery shop Management System A PROJECT REPORT (MCA 3 rd Semester) MASTER OF COMPUTER APPLICATIONS Submitted to P.G. DEPARTMENT OF COMPUTER SCIENCE & APPLICATIONS SHRI VAISHNAV INSTITUTE OF MANAGEMENT, INDORE UNDER RAJEEV GANDHI TECHNOLOGICAL UNIVERSITY, BHOPAL, M.P. BY 0807CA101075 Prem Kumar Patel 0807CA101079 Rajendra Kumar Yadav 0807CA101087 Ritu Malviya
Transcript
Page 1: Project Report

Jewellery shop Management System

APROJECT REPORT

(MCA 3rd Semester)

MASTER OF COMPUTER APPLICATIONS

Submitted to

P.G. DEPARTMENT OF COMPUTER SCIENCE & APPLICATIONS

SHRI VAISHNAV INSTITUTE OF MANAGEMENT, INDORE

UNDER

RAJEEV GANDHI TECHNOLOGICAL UNIVERSITY, BHOPAL, M.P.

BY

0807CA101075 Prem Kumar Patel

0807CA101079 Rajendra Kumar Yadav

0807CA101087 Ritu Malviya

Under Guidance of

Professor Kamlesh Malpani Professor Gopal Phoolkar

Session July-Dec 2011

Page 2: Project Report

ACKNOWLEDGEMENT

The project entitled “Jewelry shop Management System” cannot be completed without a word of thanks to those people whose invaluable support & guidance led to its successful completion. I extend my sincere through & grateful to Prof. S. R. Gupta (HOD).

The project entitled “Jewelry shop Management System” cannot be completed without a word of thanks to those people whose invaluable support & guidance led to its successful completion. Prof. Kamlesh Malpani, Prof. Gopal Phoolkar and Computer center that have been continuous source of inspiration & guided the development of the whole project. His guidance not only helped us technically, but also kept our morale high during the development of the project.

I also avail this opportunity to express our heartiest thanks to all Professors of SVIM, Indore & my classmates for providing me invaluable support & inspiration all through MCA course.

Page 2

Page 3: Project Report

SHRI VAISHNAVSM INSTITUTE OF MANAGEMENT, INDORE

PG DEPARTMENT OF COMPUTER SCIENCE & APPLICATIONS

CERTIFICATE

This is to certify that the work embodied in this dissertation entitled “Jewelry

shop Management System” has been satisfactorily completed by Prem Kumar

Patel (0807CA101075), Rajendra Kumar Yadav (0807CA101079), and Ritu

Malviya (0807CA101087). It is a bonafide piece of work, carried out under my

guidance in the Master of Computer Application, Shri Vaishnav of Institute

Management, Indore for the partial fulfillment of the Master of Computer of

Applications degree during the academic Session July-Dec, 2011.

Prof. Kamlesh Malpani (SVIM, Indore) Prof. Gopal Phoolkar (SVIM, Indore)

Approved By

Prof. S. R. Gupta

Head, MCA

Page 3

Page 4: Project Report

SHRI VAISHNAVSM INSTITUTE OF MANAGEMENT, INDORE

PG DEPARTMENT OF COMPUTER SCIENCE & APPLICATIONS

CERTIFICATE

This is to certify that the work embodied in this dissertation entitled “Jewelry

shop Management System” has been satisfactorily completed by Prem Kumar

Patel (0807CA101075), Rajendra Kumar Yadav (0807CA101079), and Ritu

Malviya (0807CA101087). It is a bonafide piece of work, carried out under the

guidance of Project mentor in the Master of Computer Application, Shri

Vaishnav of Institute Management, Indore for the partial fulfillment of the

Master of Computer of Applications degree during the academic Session July-

Dec, 2011.

…………………… …………….External InternalExaminer Examiner

Page 4

Page 5: Project Report

Index1. Introduction of client/organization 07

2. Problem Investigation 08

Introduction to Existing System

Goal & Need of project

Objective

Solution suggested

3. System analysis 12

Information Gathering

Online Observation

Interviews

Questionnaires

Record Review

Process model used

1.) Select model

2.) Advantage of select model

Limitations to current system

Introductions to proposed system

Merits of proposed system

4. Project Planning 18

Project resources

1.) Required documents

2.) Hardware & software requirements

3.) Time

Team organization

Specify the role in team.

Schedule

5. Feasibility study 20

Page 5

Page 6: Project Report

6. System Design 23

DFD

ERD

Data base design

78. Tools used and descriptions 29

Front end

Back end

Reason for tools selected

8. Implementation 31

Programming approach followed

Top Down Approach / Bottom Up Approach

Screen layouts

Forms Layouts

Reports Layouts

9. Testing 42

Testing

Objectives of testing methods

Testing methods (Test cases used)

10. Maintenance 46

11. Conclusion 47

Conclusion and discussion

Limitations

Suggestion for future extension of work

12. Bibliography 48

Page 6

Page 7: Project Report

CHAPTER-11. INTRODUCTION

PUNJAB JWELLERS E-biller is a client based billing system. This system deals with shops, it

provides a complete solution to all problems that arise in conventional client based billing

software.

E-biller is customizable software; this enables it to be used anywhere in the shopping

system. E-biller has one Component; the windows form application for the branch. It can be

easily used to any system where we want to put the billing system. It is an offline system so we

don’t need any internet facility to run the program. It can replace the manual billing entry of

book keeping.

The client uses MS Excel, and maintains their product list, customer list, and prints the

invoice, however it is not possible them to share the data from multiple system in multi user

environment, there is lot of duplicate work, and chance of mistake. When the product price are

changed they need to update each and every excel file. There is no option to find and print

previous saved invoice. There is no security; anybody can access any report and sensitive data,

also no reports to find out the sales volume, stock list, and summary report. This e-billing and

invoicing system is used to overcome the entire problem which they are facing currently, and

making complete atomization of manual billing and invoicing system.

It is far faster than the conventional billing system and saves so much of time to increase the

efficiency of billing work for the shop. This is the system which will provide easy entry, viewing

products and keeping the billing records safe in the database. The owner of shop can easily view

all the transactions of billing from the system without any problem. He can keep the track of the

billing of the shop without any error.

Page 7

Page 8: Project Report

CHAPTER-2

2. PROBLEM INVESTIGATION

2.1 The Future Digital Jewelry Shop

The digital Jewelry Shop of the future will provide electronic access to information in many

different forms. Recent Technological advances make the storage and transmission of digital

Jewelry information possible. This paper will describe the design of a Jewelry Shop Management

System (DJSMS) suitable for storing, indexing, searching, and retrieving video and audio

information and providing that information across the internet or the evolving National

Information Infrastructure. To be an effective Jewelry Shop, users need to be able to find the

Jewelry items they want.

Realizing this goal will require ground breaking research into automatic content-based indexing

of Jewelries that will significantly improve the users ‘ability to access specific segments of

interest with Jewelries.

In our approach, Jewelries items and transcripts will be digitized, this will allow users to quickly

search indices for multiple Jewelries to locate the segments of interest, and to view and

manipulate these segments on their remote computer. While this technology would be applicable

to any collection of Jewelries, we will target educational users, providing teachers with the

ability to select segments of nature and/or current events videos which complement their lessons.

Page 8

Page 9: Project Report

2.2 Introduction to Existing System

Current system is the one that work either offline or online. The online system requires a fulltime

internet facility. The offline system won’t support multi shop managing. The online system

needs separate software for head office and local shops. This made the controlling very tough

since one should install software in a system to view the selling rate or even to send a simple text

message to a local shop.

The security features were normal routines. The non-availability of internet facility in a single

shop may lead to complete shutdown of the system due to synchronization problem. Many of the

multi branched shops were running independent software system for billing, this lead to the

overhead problem in calculation of monthly sales. These systems were not able to compare the

sales of two different shops. There are many drawbacks for the present system.

Drawbacks:-

Online billing systems won’t support offline billing.

Offline billing systems won’t support Multi shops.

Inter shop communication was not supported.

Low speed of operation due to huge local database.

Manual billing was difficult.

Customizing of software was not possible.

2.3 Goal & Need of Project

Page 9

Page 10: Project Report

To design and develop a Information System for a Jewelry Shop Management System , so as to

make the task of management more efficient , speedy and effective using the concepts of

database design and following the steps of IT project management.

The current system makes the work of Jewelry Shop Management System easier. The project

“Jewelry Shop Management System” can help to the activity performed in a Jewelry Shop

Management System to reduce the complexity in different fields like Customer data, transaction

data, and data about items, managing the bills actively, and what the customers want, what are

the titles available etc.

2.4 Objectives

3 The objectives of this system are as follows:

4 Scientifically manage the project development life cycle.

5 Systematically study the working of Jewelry Shop.

6 Develop Systems Requirement Specification for the Jewelry Shop.

7 Design a suitable model, which can represent the Universe of Database.

8 Give documentation on the user requirements.

9 Design a suitable conceptual model, which can represent the Universe of Database.

10 Design a logical model suitable for Database implementation.

11 Perform Testing and closure activities.

2.5 Solution Suggested

Page 10

Page 11: Project Report

Following are the solutions suggested for Scenario:

1. Learn about the problems with the present system.

2. Implement strategies and solutions to pave away the identified problems.

3. Develop a plan to solve the problems through a software solution.

4. To integrate the informational needs of the various aspect of Jewelry Shop.

5. To result a systematic data storage system.

6. To produce logical information out of the variety of data.

CHAPTER-3

Page 11

Page 12: Project Report

3 SYSTEM ANALYSIS

3.1 Information Gathering

Information gathering refers to requirements gathering for the System. It includes study of the

Project scenario and searching for the data that needs to be stored and retrieved, and also how the

system will interact with the users.

1. Online Observation

This technique refers to gathering requirements for the system by searching for the resources

available online, so that facts about already existing similar systems could be studied. This forms

the layout for the system that is to be built.

2. Interviews

This technique refers to gathering requirements for the system by interviewing the clients. Here,

the clients show how they want the system to be and how will the system interact with the users,

what data will be stored, what data will be retrieved and how.

3. Questionnaires

This technique refers to gathering requirements for the system by asking questions. These

questions can be asked by team members themselves, or else Users of the already existing

similar systems.

4. Record Review

After requirements gathering phase, the facts gathered about the system are reviewed, so that the

overall layout and working of the system could be analyzed and studied.

Page 12

Page 13: Project Report

3.2 Process Model Used

A software process model is an abstract representation of a process. It presents a description of a

process from some particular perspective.

1. Select Model

Water fall model

One such approach used in software development is the waterfall model ,waterfall model

approach was first a process model to be introduced and fallowed widely in software engineering

to ensure success of the project .

In waterfall approach the whole process of software development is divided in to separate

phases .these phases in waterfall model are

A: Requirement specification phase

B: software design

C: implementation

D: testing and maintenance

Page 13

Page 14: Project Report

Diagram

a. Advantage Of Select Model 1: compartmentalization of work and control in the waterfall model

2: one phase is over then other phase is start

3 :it maintain quality of the project and easier to understand

Requirement gathering and analysis

System design

Implementation

testing

Deployment of system

Maintenance

Page 14

Page 15: Project Report

3.3 Limitations To Current Systems

The current system that is being used in the Jewellery Shop Management System is completely

manual in nature. Information about various customers is maintained separately in registers. The

entries made in each and every register name and year. These serial numbers are unique in nature

for a particular register. The serial numbers are used for searching the records of various sites.

There are total of 8-10 registers, which are used to maintain details about various works of the

firm. These registers contain information like customer information, Items information and stock

information, Customers transaction data, etc.

The following points describe the problem domain faced by the current users:

1. Non-Integration of all the records of the Jewellery Shop Management System.

2. Most of the bills are written on a paper and are sent to accounts department for final

billing, which gives scope of human error.

3. All the information in the system is also maintained on papers. This results in wastage of

precious time and energy.

4. Customer attraction is absent as he has to wait for things like summary report, bills.

5. Customer is also not satisfied as most of the reports and bills are handwritten in MS

Word.

6. Records may have to be edited or re-entered adding to the cost.

7. Using manual storage and retrieval methods increases the potential pf misplaced

document and compromises client’s confidentiality. These enclosures are enormous

amount of time.

Page 15

Page 16: Project Report

3.4 Introductions to Proposed Systems

The following points will give an overview of the proposed system

1. The proposed system will be a completely automated system, which will manage the

entire operability of the Jewellery Shop Management System.

2. The system will also generate appropriate reports for different records.

3. All limitations of the present system will be removed to make the system more efficient.

4. The proposed system will help the user to retrieve the information as quickly as possible.

5. The system will build in such a way that it avoids data redundancy.

6. The system will provide backup plans to avoid data loss that is high priority.

7. It will be scalable so that in near future the system can be expanded and customized to

the firm’s needs.

8. The system will be reliable enough to perform in adverse conditions.

9. The system will provide a detailed help and user manual to assist the end user.

10. The system will fulfil all necessary requirements of the end user as much as possible.

11. The system will provide a user friendly interface with realistic view.

12. The system will provide an error free environment.

13. The system will be capable enough to reduce the number of registers i.e. system will

update the data from one register to another by a single click.

14. The system will provide search facilities to find a specific entry from the database.

Page 16

Page 17: Project Report

3.5 Merits of Proposed System

The proposed system is developed in order to eliminate the limitations of the current system. The

aim of the proposed system is to address the limitations of the current system. The requirements

have been gathered from feedback obtained from owner of the Video Library. They are also

based on the objectives of the proposed system:

1. Reduce data duplication by use of RDBMS.

2. Implement validation techniques and checks that will help reduce the margin of error in

operations.

3. Provide adequate data backup facilities in order to ensure system restart even after a

calamity.

4. Since the system will be a RDBMS, searching and cataloguing of data will not be a

problem.

5. The system will ensure consistency.

6. Should arrive at and obtain a complete automation of all the registers as well as the

registers, which are used for smooth working of the firm.

7. Should produce reusable and extensible model/code.

8. Should develop a foolproof system that simulates and replaces the present manual

system.

Page 17

Page 18: Project Report

CHAPTER-4

4 PROJECT PLANNING

4.1 Project Resources

1. Required Documents

1.1 Project Report

Project report provides an introduction to current system and system to be built. It gives the brief

knowledge of current system.

1.2 Project Documentation

A complete documentation will be given in the form of SRS. Software requirement specification

(SRS) will provide an introduction an introduction of current system and the system to be built.

This overview includes the purpose of SRS and a brief knowledge of current system. The

overview also provides an introduction of the proposed system.

1.3Pre- Installation

The installation of prior software’s like visual studio 6.0 and MS Office. This software is

essential for the smooth and proper running project.

4.2 Hardware & Software requirements

2.1Hardware Required-

Minimum 40 GB hard disk

128/256 MB RAM

Celeron 1.70 GHZ/Pentium 4

Page 18

Page 19: Project Report

2.2 Software Required-

Windows 98/2000/XP/NT/2003

Microsoft Office 2000/or later

Microsoft visual studio 6.0

4.3 Time

Successful information system projects are those that have been successfully managed. Poorly

planned systems project to meet the schedule and disappoint the enthusiastic users. Those

projects that are developed on time have these characteristics in common-

1. A carefully formulated estimation of time requirements.

2. A mean for management to monitor progress.

3. A mean of comparing actual against planned performance.

4. Sufficient information to deal with problems when they arise.

One of the most aspects of project management is the formulation of estimates of the time

required to develop a system. Estimates and time scheduling is an approximation of the hours,

days, or months. The time includes collection requirements for the system from the current users

of the similar system available, then actually implementing the system with the help of

development tools like visual basic 6.0(for front end) and MS Access(for back end).

Page 19

Page 20: Project Report

CHAPTER-5

5. FEASIBILITY STUDY

One of the many stages in the system development life cycle is determining the feasibility of a

project. A measure of how beneficial or practical the development of a software system will be

to an organization. This analysis recurs, and how that technology can be of benefit. These studies

can include policy recommendations for imaging systems, document management, and workflow

applications for an interactive process of collecting and analyzing through the life cycle.

Feasibility studies examine the organization data with the client and searching for cost-effective,

viable technical and non technical solutions.

5.1 Economic Feasibility

The economic analysis of one project counts for the cost effectiveness of the project. The

economic feasibility study (EFS) should demonstrate the net benefit of the proposed application

in light of the benefits and costs to the agency, other state agencies and the general public as a

whole. Economic feasibility is generally the “bottom-line” consideration for most of the systems.

Economic justifications includes a broad range on concerns that include cost-benefit analysis,

long term corporate incomes strategies, impact on other profit centres or products, cost of

resources needed for the development etc.

Economic feasibility is measured under the following heads:

1. The project fits in the proposed budget.

2. The project satisfies the economic constraints.

3. Weather the existing hardware will meet the budget proposed.

4. Weather new software is required for its working.

Page 20

Page 21: Project Report

5.2 Technical Feasibility

The technical feasibility of the system counts for the technical acceptance of the system. It refers

to the ability of the process to take advantage of the current state of the technology in pursing

farther improvement. The technical available technology should be considered.

The criteria for technical feasibility is

1. Easy to use: the users were assumed to be normal ordinary people having knowledge of

simple computer operation, so ease of use is a very essential factor if we want to get the job

actually done quickly.

2. Reliable: we assume that the device will receive a lot of shock, from mishandling, vibrations,

etc.

3. Easy maintenance of information

Since the records of all the activities performed by the various sites are stored digitally and

with the use of software it becomes east to retrieve and maintain data. It is also easy to

backup the data.

4. Save time and effort

Since the entire data management task is done by the system, it saves lot of time, effort and

energy of the user to get the work done.

5. Various processes running

The various processes that will be running through the project execution time can be

summarized as follows:

1. User login

2. Changing password

3. Adding new item

4. Adding new copies of existing item

Page 21

Page 22: Project Report

5. View an item

6. Searching an item

7. Entry of transaction detail(rent/purchase)

8. Return of items, if rented

9. Searching a customer

10. Looking at transactions and incomes

6. Secure: the system should be secure enough to provide access to only authorized users.

In our project the technical feasibility is considered up to a greater extent. The software is build

using visual basic 6.0. Thus the problem of non availability of software is eradicated. The

backend of the system is MS access, which is freeware database application. Proposed system

can be expanded in future if required. Proposed system also provides data security by password

protecting.

Page 22

Page 23: Project Report

CHAPTER-6

6. SYSTEM DESIGN

6.1 DFD (Data Flow Diagram)

6.2 ERD

UsernamePasswordLogin

System use System responsibleUser

validation

Service to user

Page 23

Page 24: Project Report

System flow diagram

User Process

Check database

Process out

Database

Check status

Database

Database

Search guest

Enquiry authority

Check out authority

Administer

Enquiry Authority

Page 24

Page 25: Project Report

Login Password Login NameLogin

Login Id

Item Id Item Name

Item Weight

Present Item Id

Item

Jewelry Type

Price/Quantity

Item Quantity

Bill No.

C. Id

Item Id

C. Mobile No.

C. Name

C. Phone No.

C. AddressC. Id

Have

Bill

Purchase

Customer

6.2 (Entity-Relationship Diagram)

Page 25

Page 26: Project Report

6.3 Database Design

Login

user password

A a

Naresh prem

PANJAB JWELERS PANJAB JWELERS

Item

Item_Id Item_Name Item_Type Item_W

1 RING Gold 10

2 EARRING Gold 11

3 PENDANT Gold 12

4 NECKLACE Gold 13

5 DIAMONDRING Gold 15

6 BROOCH Gold 14

7 BRACELET Gold 16

8 BANGEL Gold 17

9 GOLD RING Gold 18

10 BELT Silver 20

11 RING Silver 10

12 CHAIN Gold 100

13 CLIP Silver 3

Page 26

Page 27: Project Report

Stock

S_Id Item_Id U_Q1 1 42 2 23 3 65 4 26 5 27 6 18 6 09 7 1

10 8 111 8 017 9 218 9 019 10 520 11 421 12 922 12 0

Customer

C_Id C_Name C_P_No C_M_No C_Add1 ABC 0 0 ABC2 a a3 b b4 cc cc5 dd dd6 nm nm7 mm mm8 abc abc9 ww ww

10 q q13 v v14 nnnn nnnn15 gh gh16 asas asas17 vb vb18 q q19 a 11 11 a

Page 27

Page 28: Project Report

Bill

B_Id C_Id Item_Id S_POI T_POI P_AOI1 1 1 $1,000.00 $2,000.00 23 2 2 $3,000.00 $6,000.00 24 3 1 $1,000.00 $3,000.00 35 3 4 $5,000.00 $10,000.00 26 3 6 $2,000.00 $4,000.00 27 4 1 $2,000.00 $4,000.00 28 4 2 $2,000.00 $4,000.00 29 5 1 $3,000.00 $6,000.00 2

10 5 2 $4,000.00 $8,000.00 211 6 1 $2,000.00 $2,000.00 112 7 1 $4,000.00 $4,000.00 113 8 1 $1,500.00 $1,500.00 114 9 1 $1,000.00 $2,000.00 215 10 1 $1,800.00 $3,600.00 218 11 2 $2,222.00 $4,444.00 219 14 10 $1,111.00 $1,111.00 121 15 2 $2,222.00 $2,222.00 123 16 2 $3,333.00 $3,333.00 125 17 1 $1,000.00 $1,000.00 127 18 3 $444.00 $444.00 128 18 6 $666.00 $666.00 129 18 8 $88.00 $88.00 130 19 1 $1,200.00 $2,400.00 231 19 2 $6,000.00 $6,000.00 1

CHAPTER-7

Page 28

Page 29: Project Report

7. TOOLS USED AND DESCRIPTIONS

7.1 Front End

The Front end, i.e., the User Interfaces is implemented in:

Microsoft Visual Basic 6.0

7.2 Back End

The Back end, i.e., the Database is implemented in:

Microsoft Access 2003

7.3 Reasons for Tools Selected

1. Visual basic 6.0

Visual basic is not just a language. It’s an integrated development environment in which you can

run, test, and debug your programs.

Visual basic comes in three flavours

*the visual basic learning edition

*the visual basic professional edition

*the visual basic enterprise edition

The visual basic learning edition is the introductory edition that nets you easily create windows

applications.

The visual basic professional edition is for computer professionals and includes advanced

features such as active x and internet control.

The visual basic enterprise edition is the most advanced edition and is aimed at programmers

who built the applications in a team environment. It includes all the features of professional

edition plus tools such as visual source safe (a version control system) and automation and

component manager.

Page 29

Page 30: Project Report

Advantage- a standard language means that, no matter which program you use, you have to

learn only on set of statements and techniques. VB is easier to use than most programming

language. You can also create dialog box by simply drawing appropriate controls on to a

document or on to separate user form by providing title codes as desired by user. VB is a full

blown programming environment that includes high level programming constructors as well as

every access to every future in the application it also include the powerful tools and the ability to

create a help system .

CHAPTER-8

8. Implementation

Page 30

Page 31: Project Report

8.1 Programming approach followed

The programming approach followed while development of the system is Bottom-up approach.

This approach is implemented by developing the sub-modules, then integrating those sub-

modules into the wholly integrated, fully functional jewellery shop management system.

A crucial phase in the system life cycle is the successful implementation of the new system design.

Implementation simply means converting a new system design in to operation.

Bottom-up Approach

A bottom–up approach is the piecing together of systems to give rise to grander systems, thus making

the original systems sub-systems of the emergent system. Bottom-up processing is a type of information

processing based on incoming data from the environment to form a perception. Information enters the

eyes in one direction (input), and is then turned into an image by the brain that can be interpreted and

recognized as a perception (output). In a bottom–up approach the individual base elements of the system

are first specified in great detail. These elements are then linked together to form larger subsystems,

which then in turn are linked, sometimes in many levels, until a complete top-level system is formed.

This strategy often resembles a "seed" model, whereby the beginnings are small but eventually grow in

complexity and completeness. However, "organic strategies" may result in a tangle of elements and

subsystems, developed in isolation and subject to local optimization as opposed to meeting a global

purpose.

Advantages:

User and business awareness of the product. Benefits are realized in the early phases.

You can replace many manual processes with early automation.

You can implement password management for a large number of users.

You do not have to develop custom adapters in the early phases.

Your organization broadens identity management skills and understanding during the first

phase.

Tivoli Identity Manager is introduced to your business with less intrusion to your

operations.

Page 31

Page 32: Project Report

Disadvantages:

The organizational structure you establish might have to be changed in a later roll-out

phase.

Because of the immediate changes to repository owners and the user population, the roll-

out will have a higher impact earlier and require greater cooperation.

This strategy is driven by the existing infrastructure instead of the business processes.

Implementation of Computerized System To Replace Old One

This involves creating computer compatible files, training the operating staff and installing hardware, terminals, and telecommunication network before the system is up and running.

ConversionConversion means changing from one system to another. The objective is to put the tested system into operation while holding costs, risks and personnel irritation to minimum. It involves:

Creating computer-compatible files Training the operation staff and Installing terminals and hardware

8.2 Screen layouts 1 Forms Layouts

Page 32

Page 33: Project Report

Welcome Screen

Page 33

Page 34: Project Report

Login Screen

Page 34

Page 35: Project Report

Change Password

Page 35

Page 36: Project Report

Adding New Item

Page 36

Page 37: Project Report

Update Jewellery Stock

Page 37

Page 38: Project Report

Showing All Jewellery

Page 38

Page 39: Project Report

Sales

Page 39

Page 40: Project Report

Bill

Page 40

Page 41: Project Report

2 Reports Layouts

Report

Page 41

Page 42: Project Report

CHAPTER-9

9. TESTING

Testing

Testing is an important step in software development life cycle. The process of testing takes

place at various stages of development in programming. This is vital step in development life

cycle because the process of testing helps to identify the mistakes and sends the program for

correction.

Objectives Of Testing Methods

Testing is a process of executing a program with the intent of finding an error.

A good test case is one that has high probability of finding an as-yet-undiscovered error.

A successful test is one that uncovers an as-yet-undiscovered error.

The objective is to design tests that systematically uncover different classes of errors and to do so

with a minimum amount of time and effort.

Test Planning

Test planning is concerned with setting out standards for the testing process. The test plans are

intended for both management and software developers. The preparation of test plans usually

starts at the end of the requirements analysis stage and developed throughout the design stage.

Plans should be made for both development testing (done by software developers) and

independent testing (done by an independent team of testers). We will look at techniques for

testing “in the small” (i.e. testing individual components) first. Later we will discuss techniques

of testing “in the large” i.e. testing clusters of components and testing the complete system. We

will discuss black box and white box techniques. In black box testing, the tester does not know

the internal structure to design test cases. These techniques are applicable to both traditional and

Page 42

Page 43: Project Report

object oriented systems. In object oriented systems, test techniques would be applied to the

operations within a class. It is impossible to test exhaustively (i.e. test every possible situation

that might occur). The goal is to select a set of test cases, which provides good coverage and can

be completed with a reasonable amount of effort.

Testing Methods (Test Cases Used)

Testing requires that the developer discard preconceived notions of the correctness of

software just developed and overcome a conflict of interest that occurs when errors are

uncovered.

Testing a software system usually involves 4 stages:

1. Unit Testing – In unit testing, individual components are tested individually. This can

be done throughout the coding process, as each unit is completed. White box methods are

typically used for unit testing.

2. Integration Testing – It is a systematic technique for constructing the program

structure while conducting tests to uncover errors associated with interfacing. An

incremental approach to integration means that we build the program by increments and test

after each piece is added on. Two incremental approaches are:

Top Down Integration – Top down integration is appropriate for testing systems built

using the traditional view. The structure chart created during the design stage shows the

control hierarchy of the program. We start with the main control module and add other

modules in either a depth-first or breadth-first manner. Breadth-first integration allows

us to test all the high-level modules before the low-level ones. Depth-first integration

allows us to test certain major control paths of the structure early in the testing stage.

Page 43

Page 44: Project Report

Bottom-Up Integration – It is opposite of top-down testing. We first test modules

at the lower levels of the control hierarchy and then we work towards the top. Test

drivers are used to exercise the low-level components. Then the components are grouped

into clusters sometimes called builds and these clusters are tested together with another

driver. Drivers are removed and larger clusters are combined, as we move upward in the

program structure.

Regression Testing – It is the process of checking whether changes made to the

system has introduced unintended behavior or additional errors. It generally involves re-

executing a small subset of the test cases that have already been executed. There should

also be additional tests that focus on the components that have changed and the

components most likely to have been affected by the change.

3. Validation Testing – It refers to the process of checking that all “reasonable”

expectations for the software are met. These expectations are usually defined in the

requirements specifications developed during the analysis stage. Usually, black-box testing

techniques are used for validation testing and tests are done by independent testers

(customers or members of an independent test team from the developer’s organization). It

includes acceptance testing done by the customer or potential customers. Acceptance testing

involves both alpha testing and beta testing. A customer conducts alpha testing at the

developer’s site. The testing is done in a controlled setting with the developer presence.

Beta testing is conducted at one or more customer sites. The developer is usually not present

during beta testing and thus cannot control the environment. The customer must report the

errors to the developer as beta testing takes place.

4. SYSTEM TESTING – When a software system is part of a larger system containing

many other elements as hardware, people, etc. additional tests are necessary once the whole

system is put together. Tests should be designed so that it is possible to answer the questions

listed below:

Page 44

Page 45: Project Report

Recovery: How well does the system recover from faults and how quickly does it resume

processing?

Security: How secure is the system? How easy it is for unauthorized users to break into

the system?

Stress: How well does the system stand up to abnormal situations in which there are unusual demands for resources?

Performance: Does the system meet all performance requirements?

Debugging – It is the process of locating and fixing an error, after testing has determined that the error exists. Usually locating the error rather than fixing it, takes the majority of the effort required for debugging. After fixing an error, it is important to do regression testing to make sure that the correction did not introduce new errors into the program.

CHAPTER-10

Page 45

Page 46: Project Report

10. MAINTENANCE

Maintenance is the enigma of the system development. It holds the software industry captive, trying up

programming resources. Maintenance can be classified as corrective, adaptive or perceptive

Corrective maintenance means repairing process or performance failures or making changes

because of previously unconnected problem or false assumption.

Adaptive maintenance means changing the program function.

Perceptive maintenance means enhancing the performance or modifying the programs to respond

to the user’s additional or changing needs.

For providing maintenance and security to databases the users have been classified in two types the

administrator and general user. Administrator handles the maintenance part and other system design.

Documentation is as much a part of maintenance as it is of system development as system is well

documented user can understand the system unambiguously, so modifications in the programs can be

performed in the system with great case.

CHAPTER-11

Page 46

Page 47: Project Report

11. CONCLUSION

11.1 Conclusion and Discussion

Following are the conclusions and lessons learnt throughout the project lifecycle:

1. Coordination among team member.

2. Communication with end user.

3. Complete the task within the time span.

4. Document design.

5. Decide team member’s responsibility based on personnel interests and each team member’s

strength.

11.2 Limitations

As we are also student according to our views we have tried our best of fulfill the

Requirement about the project inspire other awareness may be left some important things.

As we have realized later after discussion in our friends.

1. Visual Studio can make system slower.

2. Any Unexpected bug can be cause the data failure.

CHAPTER-12

Page 47

Page 48: Project Report

12. BIBLIOGRAPHY

1.”Complete reference: Visual Basic 6.0”, Tata McGraw-Hill Publication by jerky

2.”Complete reference: Visual Basic 6.0”, Tata McGraw-Hill Publication by Bradley

3.”Mastering Visual Basic 6.0”, Gupta Publishing by Petroutsos Davis

4.”Mastering Visual Basic 6.0”, Gupta Publishing by Evangelos Petroutsos

Page 48


Recommended