PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme Government of Tamilnadu Conducted by Entrepreneurship Development Institute,Guindy,Chennai Prepared by Name : N. Santhosh Kumar Address: 7/22, Jeeva street, Urumandampalayam, GN Mills post, Coimbatore-29 Mobile: 7502384061 Email:[email protected] Training at Codissia, Coimbatore Financed by TIIC, Nanjappa Road, Coimbatore.
Transcript
Page 1: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

PROJECT REPORT

On

Manufacturing of Pump Components

Submitted

As part of requirement of The Training

under

New Entrepreneur cum-Enterprise Development Scheme

Government of Tamilnadu

Conducted by

Entrepreneurship Development Institute,Guindy,Chennai

Prepared by

Name : N. Santhosh Kumar

Address: 7/22, Jeeva street, Urumandampalayam, GN Mills post,

Coimbatore-29

Mobile: 7502384061

Email:[email protected]

Training at Codissia, Coimbatore

Financed by TIIC, Nanjappa Road, Coimbatore.

PHOTO

Page 2: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

TABLE OF CONTENT

Sl. No. Description

1. Executive summary

2. Business plan

3. Market survey

4. Machinery / equipment catalogue & invoice/quotations

5. Qualification and experience certificates

6. Part 1 registration under MSME

Page 3: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

EXCUTIVE SUMMARY

INTRODUCTION:

In today’s market competition demand plays vital role. Even though many

companies have formed year by year the competition goes higher but still there is

demand for right product from customer’s side. In CNC machining works the

customers demand is in terms of quality and delivery. As from my experience in

the Engineering field for years I found it’s the right business to do. To fulfill their

requirement in terms of superior quality and delivery at right time is the ultimate

aim of our business. In current scenario this aspect is very challenging. And there

is huge scope in the Pumps Industries, Textile Machines Spares, Valves and Heavy

Engineering market.

ASK ENGINEERING is the company which comes across with plan to fulfill

customer’s needs and demand through development in ourselves, society and

nation. This project aims at studying about detailed outline of a new business

proposal.

LAND AND BUILDING:

The Unit is proposed to start the industry in the area of

NANJEKOVENDENPUDUR in 1800 sq.ft with 35 HP.

PLANT AND MACHINERY:

The following table refers the plant and machinery details,

S.NO Description TYPE CAPACITY POWER Qty

1. CNC TURNING

CENTRE

SUPPER JOBBER 200 MM CHUCK 15KVA 2

Page 4: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

2. CONSUL STABLIZER INDUSTRIAL 430 – 460 V 3 PHASE 1

3. AIR COMPRESSOR RECIPROCATING 7.5 HP 5.5 KW 1

MAN POWER: The following table refers the Manpower details

TRANSPORT:

Since the proposed unit is within the corporation limit of Coimbatore

transport facilities are easily available.

WATER:

Water is required to mix with cutting oil for machining purpose. Purified RO

drinking water should be purchased for drinking purposes.

MATERIALS:

The main materials used are Coolent oils, Cutting tools, Cotton wastes,

Lubrication oils, Measuring Instruments, Jigs and fixtures are available in local

market.

SNO PARTICULARS QUANTITY

1 Machine Operators 4

3 Quality Inspectors 1

TOTAL 5

Page 5: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

POLLUTION:

Since the machines are computer based and pollution does not arise.

INTRODUCTION OF PROPRIETOR:

Proprietor N. Santhosh Kumar is a B.com (CA) graduate with hands on

experience in industrial engineering for 4 years. Holds good expereince in

business development, planning and execution, administration, marketing.

Playing a key role in an organization managing, development & end-to-end

operations. Having a good relationships amoung the companies around

coimbatore.

The better part of me is attitude, comprising of attributes like striving for

excellence, quick learning, multi tasking, communication skills and above all a

huge appetite for being the best.

BIO DATA:

EDUCATION

B.com (CA)

SNS Rajalakashmi College of Arts and Science, Coimbatore. (Barathiar University)

Year of Completion – 2009

EXPERIENCE

Operations and supervising

Marks Engineering , Coimbatore

Page 6: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Year of Experience – 4 years

LANGUAGE PROFICIENCY: Read : English and Tamil

Write : English and Tamil

Speak : English, Tamil.

PERSONAL DETAILS:

Date of Birth : 06.10.1983

Marital Status : Single

Phone : 7502384061

Permanent Address : 7/22, Jeeva street, Urumandampalayam, GN Mills

post, Coimbatore-29.

MATERIALS AND JOB ORDER PROVIDER:

Texmo pumps and Aquapump, Coimbatore who are the leading manufacturers of pumps and motors products who are one of the major supplier to our country and worldwide.

Page 7: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

MARKET SURVEY ON

DEMAND OF CNC TURNING CENTER

BASIC QUESTIONS:

1. Do you think that there is a demand for the turning center in Coimbatore?

A. Yes B. No. C. Moderate demand D. No idea.

2. What problem do you face often with the CNC job work?

A. Quality issues. B. Punctuality issues. C. Price issues.

D. Other.

3. What is the main problem that has been faced by the CNC turning center nowadays?

A. Power problem. B. Labor problem. C. Order problem. D. Payment

problems.

4. Will there be a future demand for the CNC?

A. Yes. B. No. C. Moderate. D. More demand.

5. Which CNC machine do you think it is economic and good in performance in India?

A. Ace micromatic. B. Lakshmi.

6. Is there any difficulty in getting orders for CNC turning center nowadays?

A. No. B. Yes. C. Very easy. D. Very difficult.

Page 8: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

7. Are you receiving continuous orders for your machines?

A. Yes B. No. C. Occasional orders. D. High orders.

8. Do you having capacity of resources to full fill their requirement?

A. Low level C. Medium level. D. Higher level.

9. Is reference an important factor in receiving orders initially?

A. Yes. B. No.

10. What are the major expenditure you are spending for?

A. Power. B. Labor. C. Tools and consumables. D. Rent.

INTRODUCTION

OVERVIEW:

An important indicator of success for any business is the extent to which it has a high performing

management team. This evaluation process is intended to know the current demand of the CNC

turning center in Coimbatore at present time.

Page 9: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

The information has been gathered through surveys with the intension of knowing the CNC machine

demand. At the same time the information has been gathered from the expert in the CNC and from

the companies in Coimbatore.

Using the overall average rating, we prepared a graph sheet below to know the feedback easily. I

discussed around 10 companies in Coimbatore and gather information and prepared the graph sheet.

As I approached these companies, some companies have refused and some gave the information

which we cannot relay. So we have not included those companies which have not co-operate with

me.

1. Do you think that there is a demand for the turning center in Coimbatore?

A. Yes B. No. C. Moderate demand D. No idea.

When we ask that there is a demand for the CNC turning center in Coimbatore nowadays, out of 10, 7

companies answered yes, 2 companies answered Moderate demand and 1 company answered no.

Page 10: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

2. What problem do you face often with the CNC job work?

A. Quality issues. B. Punctuality issues. C. Price issues.

D. Other.

When I ask what problems that the company face often in CNC job work, out of 10, 4 companies

answered Quality issues, 5 companies answered Price issues, and 1 company answered that the

punctuality is their problem.

Page 11: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

3. What is the main problem that has been faced by the CNC turning center nowadays?

A. Power problem. B. Labor problem. C. Order problem. D. Payment

problems.

When I ask the companies that what are all the problems that they are facing, 4 companies told that

the power problem is the main problem that they are facing, 4 companies said labor is becoming

scarce, 1 said rent has been his problem and 1 said payment problems.

Page 12: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

4. Will there be a future demand for the CNC?

A. Yes. B. No. C. Moderate. D. More demand.

When I ask the companies that there is a demand for the CNC turning center in future, 4 companies

said Yes, 1 company said No, 3 companies said Moderate, and 2 companies said more demand.

Page 13: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

5. Which CNC turning machine do you think it is economic and good in performance in India?

A. Ace Micromatic. B. Jothi. Lakshmi. C. Doosan.

D. Hurco

When I ask the companies about which CNC is the best in India for performance and economy, 6

companies said Ace Micromatic, 1 company said Jothi, 2 companies said Doosan, and 1 company said

Hurco.

Page 14: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

6. Is there any difficulty in getting orders for CNC turning center nowadays?

A. No. B. Yes. C. Very easy. D. Very difficult.

When I ask the companies that there is a difficulty getting Job order for CNC turning center, 4

companies said No, 1 company said Yes, 4 companies said very easy, and 1 companies said very

difficult.

Page 15: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

7. Are you receiving continuous orders for your machines?

A. Yes B. No. C. Occasional orders. D. High orders.

When I questioned the companies regarding the orders for their machinery 5 companies said Yes, 1

company said No, 2 companies said Occasional orders, and 2 companies said High orders.

Page 16: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

8. Do you having capacity of resources to full fill their requirement?

A. Low level C. Medium level. D. Higher level.

When I ask the companies that they have the capacity to fulfill the requirement of their customer, 2

companies said they have low level, 5 companies said they have medium level and 3 companies have

higher level.

Page 17: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

9. Is reference an important factor in receiving orders initially?

A. Yes. B. No.

When we ask the companies that reference is important factor in receiving orders 7 companies said

yes and 3 companies said no.

Page 18: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

10. What are the major expenditure you are spending for?

A. Power. B. Labor. C. Tools and consumables. D. Rent.

When I ask to the companies regarding the major expenditure, 4 companies said Power, 2 companies

said Labor, 2 companies said Tools and consumables and 2 companies said Rent.

Page 19: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Conclusion:

According to the survey results we have concluded that Coimbatore is the best place for CNC based

business startups.

Page 20: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Application Form - Business Details

Name of Business Enterprises : ASK ENGINEERING

Office Address

Door No 35/A

Street VIVEKANANDA STREET

Area NANJEKOVENDEN PUDUR

City COIMBATORE

District Coimbatore

State TamilNadu

Pincode 641029

Factory Address

Factory Door No 35/A

Factory Street VIVEKANANDA STREET

Factory Area NANJEKOVENDEN PUDUR

Factory City COIMBATORE

Factory District Coimbatore

Factory State TamilNadu

Factory Pincode 641029

Type of Industry Manufacturing

EM no 330121260735E

Page 21: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Product Name CNC TURNING CENTER

Consitution Proprietary

No of key persons involved 1

Name of Business Enterprises : ASK ENGINEERING

Key Person 1

Title Selvan

Name SANTHOSH KUMAR

Father/Husband Name NANJAKUTTY

Age 30

Address 7/22

JEEVA STREET Personal Finance

URUMANDAMPALAYAM

Permanent Account

Number FILPS5822J

Telephone number

Do you have Bank

account Yes

Mobile number 7502384061 Bank name Axis Bank Ltd

Educational background Bcom Branch SARKARSAMAKULAM

Whether ration card

available Yes Bank address

DOOR NO.12/55

SATHYAMANGALAM

ROAD

SARKARSAMAKULAM

Whether voter identity

card available Yes Account number 912010060906251

Page 22: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Social status MBC Account type Savings Bank

Employment of spouse Not employed IFSC code UTIB0001294

Qualification of spouse XII Std Credit card No

Networth Statement

Assets (Rs.Lakhs)

Immovable Properties( Including Land and Building

) 30.00

Investment in Business Capital 2.10

Deposits with Banks/institutions 0.00

Gsecs/Bonds/NSC/NSS 0.00

Shares/Debentures ( Market Value ) 0.00

Life Insurance Policies ( Surrender Value ) 0.00

Value of Vehicles ( Market Value ) 0.30

Other Assets ( Incl. Jewellery ) 0.00

Total Assets 32.40

Liabilities 0.00

Loans Availed from Banks (Total Outstanding) 0.00

Other Liabilities 0.00

Total Liabilities 0.00

Networth 32.40

Property Location URUMANDAMPALAYAM, G.N. MILLS POST,

COIMBATORE

Page 23: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Name of Business Enterprises : ASK ENGINEERING

Project Cost (Rs.lakhs)

Land 0.00

Building 0.00

Plant and Machinery

Imported 0.00

Indigenous 40.00

Vehicles 0.00

Furniture and Fittings 0.00

Computers and office automation 0.00

Testing equipment 0.90

Other fixed assets 0.00

Erection/installation charges 0.00

Pre-operative expenses 0.00

Provision for contingencies 0.00

Working capital margin 0.59

Total Cost 41.49

Means of finance

Owners contribution 5.00%

Owners contribution 2.07

Loan from bank/other institutions 39.42

Page 24: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Total 41.49

Name of Business Enterprises : ASK ENGINEERING

Fullfillment of statutory requirements

Requirements Status

1.Approval from Local Authority / body Not Applicable

2.Approval for Building Plan Obtained

3.Approval from Inspector of Factories Not Applicable

4.Approval from Electricity Board Obtained

5.Have you obtained Import and Export Code? Not Applicable

6.Sales Tax Registration To be Obtained

7.Service Tax Registration To be Obtained

8.Pollution Control Board Clearence Not Applicable

9.Registeration for Partnership/Company/Co-operative Society Not Applicable

Name of Business Enterprises : ASK ENGINEERING

Personal strengths in the area of business

I have 4 years of relevant experience. I have handled production in my previous assignment.

None of my family members have experience in this business. The raw material required for the

business are . Raw materials are available in the local market. The suppliers of the raw

materials are TEXMO AND AQUASUB. The processes involved in manufacturing the final

product are WE MAKE THE COMPONENT COMPLETE ACCORDING TO THE

DIAGRAM PROVIDED BY THE SUPPLIERS USING THE CNC TURNING CENTER.. For

this business skilled and semiskilled manpower are required. I am confident of having

necessary manpower for the business. power requirement is 35 horse power per day. I do not

have any backup. I require 100 liters of water. I have adequate facility to draw water. I have

approval for the land and building . I conducted survey and based on the findings only and I am

Page 25: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

trying to get into this business.The competitors in my district are SHANRAG MACHINE

TOOLS, MARKS ENGINEERING and G-TEC. I will take 1 month to deliver the first order. I

will get repeat orders from the following companies: TEXMO and AQUASUB. We expect an

order size to the extent of Rs. 3 lakhs from them. The business potential for this product is

growing at higher rate in India and growing at higher rate in exports.

Name of Business Enterprises : ASK ENGINEERING

Projected Profit & Loss Statement (Rs.Lakhs)

Mar-2015 Mar-2016 Mar-2017 Mar-2018 Mar-2019

Sales 14.35 22.96 25.83 27.26 27.26

Other Income 0.00 0.00 0.00 0.00 0.00

Closing Stock 3.59 5.74 6.46 6.82 6.82

Total Income 17.94 28.70 32.29 34.08 34.08

Raw Material Consumed 0.00 0.00 0.00 0.00 0.00

Wages 1.86 2.98 3.35 3.53 3.53

Power & Fuel 0.60 0.96 1.08 1.14 1.14

Rent 0.75 1.20 1.35 1.42 1.42

Other Manufacturing Costs 0.00 0.00 0.00 0.00 0.00

Administration Expenses 0.00 0.00 0.00 0.00 0.00

Selling & Distribution Expenses 0.00 0.00 0.00 0.00 0.00

Excise Duty 0.50 0.80 0.90 0.95 0.95

Depreciation 4.00 3.60 3.24 2.92 2.62

Finance Charges 0.00 0.00 0.00 0.00 0.00

Total Expenditure 7.71 9.54 9.92 9.96 9.66

Page 26: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Profit & Loss 10.23 19.16 22.37 24.12 24.42

Name of Business Enterprises : ASK ENGINEERING

Projected Balance Sheet (Rs.Lakhs)

Mar-2015 Mar-2016 Mar-2017 Mar-2018 Mar-2019

Capital 2.07 2.07 2.07 2.07 2.07

Reserves & Surplus 10.23 29.39 51.76 75.88 100.30

Loan from Bank 31.54 23.66 15.78 7.90 0.02

Sundry Creditors 0.00 0.00 0.00 0.00 0.00

Total Liabilities 43.84 55.12 69.61 85.85 102.39

Fixed Assets 36.90 33.30 30.06 27.14 24.52

Sundry Debtors 2.39 3.83 4.31 4.54 4.54

Stock 3.59 5.74 6.46 6.82 6.82

Loans & Advances 0.00 0.00 0.00 0.00 0.00

Cash & Bank Balance 0.96 12.25 28.78 47.35 66.51

Total Assets 43.84 55.12 69.61 85.85 102.39

Name of Business Enterprises : ASK ENGINEERING

Projected Cash Flow Statement

Mar-2015 Mar-2016 Mar-2017 Mar-2018 Mar-2019

Net Profit as per Tax 10.23 19.16 22.37 24.12 24.42

Add: Depreciation 4.00 3.60 3.24 2.92 2.62

Page 27: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Add: Capital Contribution 2.07 0.00 0.00 0.00 0.00

Add: Loan from Bank 39.42 0.00 0.00 0.00 0.00

Add: Increase in Sundry Creditors 0.00 0.00 0.00 0.00 0.00

Add: Decrease in Sundry Debtors 0.00 0.00 0.00 0.00 0.00

Add: Decrease in Stock 0.00 0.00 0.00 0.00 0.00

Total Inflow 55.72 22.76 25.61 27.04 27.04

Less: Purchase of Fixed Assets 40.90 0.00 0.00 0.00 0.00

Less: Repayment on Loan to Bank 7.88 7.88 7.88 7.88 7.88

Less: Increase in Sundry Debtors 2.39 1.44 0.48 0.23 0.00

Less: Decrease in Sundry Creditors 0.00 0.00 0.00 0.00 0.00

Less: Increase in Stock 3.59 2.15 0.72 0.36 0.00

Less: Loans & Advances 0.00 0.00 0.00 0.00 0.00

Total Outflow 54.76 11.47 9.08 8.47 7.88

Opening Balance 0.00 0.96 12.25 28.78 47.35

Surplus/Deficit 0.96 11.29 16.53 18.57 19.16

Closing Balance 0.96 12.25 28.78 47.35 66.51

Name of Business Enterprises : ASK ENGINEERING

Ratios

Usual Norms Mar-2015 Mar-2016 Mar-2017 Mar-2018 Mar-2019

Current Ratio >1.33 0.00 0.00 0.00 0.00 0.00

Page 28: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Debt-Equity Ratio <2.00 2.56 0.75 0.29 0.10 0.00

Debt Service Coverage Ratio >1.5 1.30 2.43 2.84 3.06 3.10

TOL / TNW <3.00 2.56 0.75 0.29 0.10 0.00

Interest Coverage Ratio >2.00 0.00 0.00 0.00 0.00 0.00

Net Profit Margin(%) >5.00 71.29 83.45 86.60 88.48 89.58

Name of Business Enterprises : ASK ENGINEERING

Interest & Loan Repayment Schedule (Rs.Lakhs)

Mar-2015 Mar-2016 Mar-2017 Mar-2018 Mar-2019

Opening Balance 0.00 31.54 23.66 15.78 7.90

Receipt 39.42 0.00 0.00 0.00 0.00

Total 39.42 31.54 23.66 15.78 7.90

Repay 7.88 7.88 7.88 7.88 7.88

Closing Balance 31.54 23.66 15.78 7.90 0.02

Average 15.77 27.60 19.72 11.84 3.96

Interest 0.00 0.00 0.00 0.00 0.00

Name of Business Enterprises : ASK ENGINEERING

Working Capital (Rs.Lakhs)

Mar-2015 Mar-2016 Mar-2017 Mar-2018 Mar-2019

Stock 3.59 5.74 6.46 6.82 6.82

Sundry Debtors 2.39 3.83 4.31 4.54 4.54

Page 29: PROJECT REPORT of Pump...PROJECT REPORT On Manufacturing of Pump Components Submitted As part of requirement of The Training under New Entrepreneur cum-Enterprise Development Scheme

Loans & Advances 0.00 0.00 0.00 0.00 0.00

Cash & Bank Balance 0.96 12.25 28.78 47.35 66.51

Total Current Assets 6.94 21.82 39.55 58.71 77.87

Sundry Creditors 0.00 0.00 0.00 0.00 0.00

Salaries & Wages 0.16 0.25 0.28 0.29 0.29

Power & Fuel 0.05 0.08 0.09 0.10 0.10

Working capital 6.73 21.49 39.18 58.32 77.48


Recommended