WORKS IN PROGRESS
Architectural Aluminium Framing
Complex Architectural Framing
Pre-Fabricated Top Level Wall and Roof Truss Framing
Pre-Fabricated Balustrade Framing
Pre-Fabricated Facade and External Framing
Pre-Fabricated Bulkhead and Internal Framing
Pre-Fabricated Wall Framing
Smart Hob Formwork Framing
®
PROJECT REPORT
Pre-Fabricated Light Gauge Steel Framing Systems
Spring Malvern
Maison Apartments
474 Beach Rd, Beaumaris
OCTOBER 2017
© 2017 SBS Group
Project / The Kingston Central Park Apartments
Builder / Samssons Projects
When structural steel is replaced with a superior lightweight alternative, there are significant savings involved for the builder.
On this apartment project, pre-fabricated framing alternatives for the balustrade, feature boxes and fins achieved multiple smarts.
The combined SBS Smart Frame system incorporated the front balustrade and box feature for ease of installation. For structural fixings back to the building, brackets and cleat systems were designed with diagonal bracing to increase and strengthen structural integrity.
Fully customised to the building requirements, the SBS Smart Frame system included in house detailing and framing layouts with full engineering.
Framing was fabricated using light gauge steel in a controlled factory environment before being transported to site for simple and efficient installation.
SBS Smart Frame…smarter off site solutions for easier on site construction.
PROJECT REPORT
Pre-Fabricated Light Gauge Steel Framing Systems Unit 1, 308-310 Maroondah Hwy, Chirnside Park VIC 3116
T: 1300 782 950 F: 1300 782 960
W: sbsgroup.com.au© 2017 SBS Group
OCTOBER 2017
Project / City Life Church - Wantirna South
Builder / Figurehead Constructions
Building smarter starts with designing systems that solve real common construction difficulties.
After reviewing the project documentation and engineering, SBS Group proposed a pre-fabricated cantilevered trussed solution for the box facade. The use of light gauge steel materials eliminated the traditional structural steel and concrete slabs.
The SBS Smart Frame system was designed to incorporate the revealed box windows and fascia facade with a unique spanning advantage.
Following initial design approval and sign off, framing was manufactured true and straight. Engineered lifting points were concealed within the framework for easy lifting and fixing off to the building structure. Once installed, cladding was then directly applied using a mixture of cladding products.
SBS Smart Frame…pre-fabricated alternatives for on site cost and time savings.