Project Risk Management
Dr. A.K.Panigrahi
1
2
3
What is Risk?• Risk is the possibility of suffering loss• Risk is a measure of the probability and
consequence of not achieving a defined project goal.
• Possible – but not certain, so it is expressed as probability
• Risks change though out the life of a project• Loss - is any unwanted consequence that
might occur4
Risk in Projects
• In a development project, the loss describes the impact to the project which could be in the form of diminished quality of the end product, increased costs, delayed completion, or failure.
5
6
Possible Risks in a Project
• Creeping user requirements
• Excessive schedule pressure
• Low quality
• Cost overruns
• Poor estimates
• Low customer satisfaction
• Long schedules
Project Risk
Project Risk
Scope
IntegrationCommunication
Human Resources
Procurement
Cost
Quality
Time
The Importance of Project Risk Management
• Project risk management is the art and science of identifying, analyzing, and responding to risk throughout the life of a project and in the best interests of meeting project objectives
• Risk management is often overlooked in projects, but it can help improve project success by helping select good projects, determining project scope, and developing realistic estimates
• Unfortunately, crisis management has higher visibility due to the obvious danger to the success of the project but it’s risk management that helps a project have fewer problems to begin with.
8
9
Risk Can Be Positive• Positive risks are risks that result in good things
happening; sometimes called opportunities
• A general definition of project risk is an uncertainty that can have a negative or positive effect on meeting project objectives
• The goal of project risk management is to minimize potential negative risks while maximizing potential positive risks
10
11
Risk Management
• Risk management is the act or practice of dealing with risk.
• Risk management is proactive rather than reactive.
• Risk management is not a separate activity but rather on aspect of sound project management.
12
Elements of Risk Management
• Effective Risk Management is made up of:– Risk Assessment: identify, analyze, prioritize– Risk Control: planning, resolution, monitoring
RISK RISK MANAGEMENTMANAGEMENT
RISK RISK
CONTROLCONTROL
RISK RISK
ASSESSMENTASSESSMENT
IDENTIFICATIONIDENTIFICATION
ANALYSISANALYSIS
PLANNINGPLANNING
PRIORITIZATIONPRIORITIZATION
RESOLUIONRESOLUION
MONITORINGMONITORING
13
Common Mistakes in Risk Management
• Not understanding the benefits of Risk Management
• Not providing adequate time or resources for Risk Management
• Not identifying and assessing risk using a standardized approach
Project Risk Management Processes
• Risk management planning: deciding how to approach and plan the risk management activities for the project
• Risk identification: determining which risks are likely to affect a project and documenting the characteristics of each
• Qualitative risk analysis: prioritizing risks based on their probability and impact of occurrence 14
Project Risk Management Processes
• Quantitative risk analysis: numerically estimating the effects of risks on project objectives
• Risk response planning: taking steps to enhance opportunities and reduce threats to meeting project objectives
• Risk monitoring and control: monitoring identified and residual risks, identifying new risks, carrying out risk response plans, and evaluating the effectiveness of risk strategies throughout the life of the project
15
Project Risk Management Summary
16
• Four Main Steps
Risk Management
Risk Identification
Plan Risk Management Process
Risk Assessment
Risk Response Development
Risk Response Control
• Before these activities?
17
Risk Identification
• The possible risk is determined by a number of interrelated factors such as:– Nature of the Project– Aggressive or Conservative Schedule/Budget– Skills and motivation of the Project Team
Risk Response Control
Risk Response Development
Risk Assessment
Risk Identification
18
19
Risk Identification
• The need to proactively identify risks.– When an event happens it is too late to plan.
• Tools for identifying risk– Brainstorming– Nominal Group Technique
• Each member identifies their ideas• Each member writes an idea on the board until all
ideas are listed
20
Risk Identification
• The group discusses each idea• Each individual ranks each of the ideas• The group then ranks all the ideas• Each individual ranks all the ideas again• Rankings are summarized
– Delphi technique• Experts asked individually to provide input• Input summarized and distributed• Experts rank input
21
Risk Identification
– Strength, Weakness, Opportunities, Threats– Cause and effect diagrams– Past Projects
Likelihood
• What is the likelihood of risk?– Expressed as a Probability (Percentage)– Example – There is a 5% chance of a programmer
breaking their big toe whilst coding in any 6 month period
Risk Response Control
Risk Response Development
Risk Identification
Risk Assessment
22
Impact
• What impact will it have on the project?– Example – A broken toe on average results in the loss of 20
working days for a programmer– Expected Value of Loss/Profit
• Expected Value = Loss/Profit x Likelihood• -20 x 0.05 = -1• So we will lose 1 day of coding per programmer on a 6 month
project
Risk Response Control
Risk Response Development
Risk Identification
Risk Assessment
23
Urgency
• How urgently do we need to deal with it?– Immediate remedy or Can it wait?– Additional means of prioritising action
Risk Response Control
Risk Response Development
Risk Identification
Risk Assessment
24
Example Risk Assessment Team Conflict and Injuries
Description: Teammates in the group might have conflicts with one another throughout the semester. Injuries might result from conflict, accidents, and other mishaps throughout the semester.
How to Avoid It:
If any of the teammates show signs of conflict against one another, we need to mediate between them in order to make our team working smoothly and such throughout the whole semester. Thus that will reduce a factor for injury. However, for the other factors of injury, we need to make sure that we take good care of ourselves such that no harm will befall upon us (such as carpal tunnel syndrome, leg breaking, finger breaking, etc).
What It Will Affect:
If there is a large enough conflict, we might lose some teammates. Same with for injuries, if the injury is bad enough to cause teammates to not be able to work on the project.
Possible Likelihood:
3/100 chance
The Real World Lab: http://www.cc.gatech.edu/classes/RWL/Web/
25
Quantifying Risk
• Programmer has 5% chance of breaking toe in any 6 month period– Broken toe results in the loss of 20 programmer days– Cost of a programmer-day = £500
• Expected Loss per year due to broken toes– 2 x (0.05 x -20) = -2 days– Expected loss = -£1000
26
Techniques
• Risk Map/Probability Impact Matrix
• Hazard Control Matrix
• Payoff Matrix
• Decision Tree
27
Risk Map
Likelihood of Occurrence
High Medium Low
Large
Medium
Sca
le o
f im
pact
Small
28
Likelihood of Occurrence
High Medium Low
Large
Medium
Sca
le o
f im
pact
Small
Risk Map
29
Risk Map
Likelihood of Occurrence
High Medium Low
Large
Medium
Sca
le o
f im
pact
Small
A B
C
D
30
Risk Map
• List the risks in order of priority
• What else can we use to help prioritise?
Likelihood of Occurrence
High Medium Low
Large
Medium
Sca
le o
f im
pact
Small
A B
C
D
31
Hazard Control Matrix
From Curtis, G (1998) "Business Information Systems" Addison Wesley
Errors and omissions
Lost data and documents
Computer Failure
Unauthorized Access
Fire Fraud
Input controls Processing controls Output controls Storage controls
Operating system controls
Records management
Accounting controls Contingency plan
Physical security
32
Hazard Control Matrix
From Curtis, G (1998) "Business Information Systems" Addison Wesley
Errors and omissions
Lost data and documents
Computer Failure
Unauthorized Access
Fire Fraud
Input controls Processing controls Output controls Storage controls
Operating system controls
Records management
Accounting controls Contingency plan
Physical security
33
Hazard Control Matrix
From Curtis, G (1998) "Business Information Systems" Addison Wesley
Errors and omissions
Lost data and documents
Computer Failure
Unauthorized Access
Fire Fraud
Input controls
Processing controls
Output controls
Storage controls
Operating system controls
Records management
Accounting controls
Contingency plan
Physical security
34
Hazard Control Matrix
From Curtis, G (1998) "Business Information Systems" Addison Wesley
Errors and omissions
Lost data and documents
Computer Failure
Unauthorized Access
Fire Fraud
Input controls
Processing controls
Output controls
Storage controls
Operating system controls
Records management
Accounting controls
Contingency plan
Physical security
35
Identification and Assessment
• Problems– Not a particularly interesting task– Needs experience to do well
• Are these good reasons to not do it?
36
Risk Response Development
• How are we going to deal with risks when they occur?– What about those we weren’t expecting?
Risk Response Control
Risk Identification
Risk Assessment
Risk Response Development
37
38
Risk Response Planning
• Who is going to detect when the risk occurs?
• Who has the responsibility to respond and communicate?
• What is the response?
Risk Response Planning
• After identifying and quantifying risks, you must decide how to respond to them
• Four main response strategies for negative risks:– Risk avoidance– Risk acceptance– Risk transference– Risk mitigation
39
Risk Management Planning
Risk Response Definitions
• Avoidance – Changing a project objective to eliminate the threat posed by an adverse risk event.
Risk Management Planning
Risk Response Definitions
• Transference – Shifting the negative impact of a threat, along with the ownership of the response, to a third party.
Risk Management Planning
Risk Response Definitions
• Mitigation – Reducing the Probability or Impact of an adverse risk event (threat) to an acceptable threshold.
Risk Response Definitions
• Acceptance – The project team decides not to change project objectives to deal with the risk.• Passive acceptance: no action , deal with threats as they occur
(workarounds)
• Active acceptance: establish a contingency reserve to handle risks
Risk Management Planning
44
Risk Strategies
• Factors impacting the strategy– Impact of the risk– Project constraints– Tolerances
• Strategy– Accept or Ignore
• Provide reserves
– Contingency plans• Natural disaster/backup plans
45
Risk Strategies
– Avoidance, eliminate the risk – Mitigate, lessen the impact of the risk
• Performance impact, provide extra hardware
– Transfer the risk• Offsite backup planning• Server farms• Outside management
46
Risk Monitoring and Control
• Risk monitoring– Determine who is responsible for monitoring– How are risks monitored?
• Project tracking, resources, quality, etc
– Communicating the status of identified risks• Reviews and Audits
• Once a risk is identified as occurring – Communicate– Take action
Control Systems
• Preventive Control– Stops undesirable events (disturbances) from
occurring (see Curtis, 1998 Chapter 8)
• Feedback Control– Doesn’t attempt to prevent unpredictable disturbances– Is able to recover from effects
• Systems will usually combine both
47
Risk Control
• Goals of Control– Prevention– Detection– Minimise Loss– Recovery– Investigation
H. A. Simon
• Risk Response– Avoidance
• Prevention
– Mitigation• Transfer
– AcceptanceCadle and Yeates
48
Risk Response Control
• Implement Risk Responses• Identify new Risks
– Implement new responses
Risk Identification
Risk Assessment
Risk Response Development
Risk Response Control
49
50
Risk Response and Evaluation
• Trigger the defined risk response plan– Identify the risk owner– Assign resources– Understand the impacts
• PERTs, Dependencies
• Communicate
• Evaluate once action is taken– Is more action needed?– What additional risks are triggered?
Risk Register
• Can be used to keep information about identified risks– Title and description– Risk Status - e.g. candidate, live, closed– Potential impact– Risk owner– Actions– Action Log
51
Risk Ownership
• Risk owner is someone who:– Has sufficient information concerning the risk– Has the necessary resources to do something
about the risk– Possesses the authority to do something
about the risk
52
Don’t take the risk if...
• the organization cannot afford to lose.• the exposure to the outcome is too great.• the situation (or project) is not worth it.• the odds are not in the project’s favor.• the benefits are not clearly identified.• there appear to be a large number of acceptable
alternatives.
53
Don’t take the risk if...
• the risk does not achieve the project objective.• the expected value from baseline assumptions is
negative.• the data is unorganized, without structure or
pattern.• there is not enough data to understand the
results.• a contingency plan for recovery is not in place
should the results prove unsatisfactory.
54