Project Schedule PLAN IT!
Transcript
Page 1: Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.

Project Schedule

PLAN IT!

Page 2: Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.

Project Schedule

• Project Schedule is based on Work Breakdown Structure (WBS)

• Define the WBS correctly or the Project Schedule will contain errors

• Identify Deliverables, Task effort and duration

Page 3: Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.

Project Schedule

• Check task dependencies• Determine earliest start date of a task• Use estimated duration to determine when

the task should end• Enter the dates the WBS/Project Schedule

template• Update project schedule during “DO IT” phase

Page 4: Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.

Project Schedule

• Scheduling Tools Options– Microsoft Project – Scheduling using Project Web Access (PWA)– SharePoint PWA Schedule Updates– Milestone Charts and other views