www.construction.murrob.com
BEESHOEK Northern Cape, Postmasburg
PROJECT TYPE: OPENCAST MINING
CLIENT:
Assmang Iron Ore
VALUE:
R722 Million
CONSULTANTS:
None
PROJECT DURATION:
34 Months
DATE OF PROJECT:
1 November 2011
PROJECT DESCRIPTION:
50% Joint Venture with Basil Read for the
contract mining of iron ore.
Approximate volumes for the project:-
Total mining depth will be 190m.
• Total over burden 48,000,000 tons
• Total iron ore 5,500,000 tons