23
UNIVERSITY OF MARY WASHINGTON 2005 – 2006 ENERGY PERFORMANCE CONTRACT PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION PROJECTS APPROVED $ 8.5 MILLION IN PROJECT COSTS
Transcript
Page 1: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

UNIVERSITY OF MARY WASHINGTON 2005 – 2006 ENERGY

PERFORMANCE CONTRACTPROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE

BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS.

8 ENENRGY CONSERVATION PROJECTS APPROVED

$ 8.5 MILLION IN PROJECT COSTS

Page 2: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

LOW HANGING FRUIT( QUICK PAY BACK

PROJECTS)LIGHTING AND CONTROLS

ENERGY MANAGEMENT SYSTEMS

WATER CONSERVATION

ELECTRICAL SUB-METERING AND PEAK SHAVING

INSULATE PIPING

REDUCE STEAM PRESSURE IN SUMMER

Page 3: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

HIGH PRIORITY MAINTENANCE/ENRGY PROJECTS CONDENSATE PUMP AND PIPING

REPLACEMENT.

DINNING HALL RENOVATION

SAVING ENERGY WHILE MAKING MUCH NEEDED REPAIRS. ALL SYSTEMS HAD TO STAY OPERATIONAL DURING REPAIRS.

Page 4: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 1LIGHTING AND CONTROLS

CHANGED ALL T-12 FLORESCENT LIGHTING TO T-8. COMBINATION OF RETROFITS AND NEW FIXTURES IN ALL BUILDINGS AT UMW’S FREDERICKSBURG CAMPUS.

CHANGED ALL INCADESCENT LIGHTS TO COMPACT FLORESCENTS.

COVERTED SEVERAL OTHER TYPES OF LIGHTING TO MORE ENERGY EFFICIENT LIGHTING.

INSTALLED MOTION SENSORS IN MANY LOCATIONS.

Page 5: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 1 ADDED BENEFITS BEYOND ENERGY SAVINGS

ALL NEW LIGHITNG.

LESS INVENTORY.

LONGER LIFE OF BULBS AND BALLASTS

BETTER LIGHTING IN SOME CASES

COMPLETE INVENTORY OF LIGHTING EQUIPMENT.

Page 6: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM #2EXPAND EMS SYSTEM

INSTALLED ENENRGY MANAGEMENT SYSTEMS IN ALL BUILDINGS ON THE FREDERICKSBURG CAMPUS THAT DID NOT ALREADY HAVE THEM.

MAJORITY OF BUILDINGS DID NOT HAVE EMS SYSTEMS.

REPLACED ALL OLD PNEUMATIC SYSTEMS.

PROVIDED REMOTE MONITORING AND CONTROL CAPABILITIES .

PROVIDED ABILITY FOR LOAD SHEDDING AND NIGHT SET BACK.

Page 7: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 2 ADDED BENEFITS BEYOND ENERGY SAVINGS

TROBLESHOOTING SYSTEMS

CATCHING PROBLEMS WITH BUILDING SYSTEMS BEFORE THEY BECOME BIGGER ISSUES.

REDUCE DOWN TIME.

MORE COMFORTABLE BUILDINGS.

Page 8: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 3 WATER CONSERVATION

INSTALLED NEW TOILETS AND FLUSH VALVES. 1. 6 GPF

INSTALLED ALL NEW PRESSURE ASSIST BOWL TYPE TOILETS. 1.6 GPF

REPLACED URNAL FLUSH VALVES. 1.0 GPF

INSTALL NEW SHOWER HEADS. 2 GPM

LAVATORY FAUCETS AERATORS. 1 GPM AND 1.5 GPM.

KITCHEN SINK AERATORS 2.2 GPM.

Page 9: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 3 ADDED BENEFITS BEYOND WATER SAVINGS

ALL NEW TOILETS AND FLUSH VALVES.

NEW FAUCETS IN CERTAIN AREAS.

ALL NEW SHOWER HEADS.

REDUCE INVENTORY ONE MAKE AND MODEL .

COMPLETE INVENTORY OF TOILETS, LAVATORIES, SHOWERS, AND KITCHEN SINKS

SAMPLE TESTING OF FLUSH VALVES AND TOILETS REDUCED CLOGS.

Page 10: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 4 SUB - METERING

ALLOWS FOR PEAK SHAVING.

BURNING ICE STORAGE DURING PEAK TIMES.

SHOWS WHERE ENERGY IS BEING USED.

PROVIDES TRENDING OPORTUNITIES.

HELPS VARIFY ELECTRICAL POWER USAGE.

Page 11: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 5INSULATE EXPOSED STEAM AND HOT WATER

LINES

INSULATED ALL EXPOSED STEAM PIPING AND HOT WATER PIPES.

REDUCED THERMAL ENERGY LOSS.

REDUCED THE HEAT LOAD IN CERTAIN AREAS.

Page 12: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 6 REDUCE SUMMER STEAM PRESSURE

REDUCED OPERATIONAL STEAM PRESSURE FORM 100 TO 50 PSI.

REDUCED RADIANT LOSS

REDUCED STEAM LEAKAGE DUE TO LOWER PRESSURE.

REDUCE BOILER EXHAUST TEMP AND INCREASED EFFIENCY OF BOILER.

Page 13: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 7 REPLACE CONDENSATE PUMP AND RETURN LINE

REPLACED EXISTING PRIMARY ELECTRICAL CONDENSATE PUMP AND TANK WITH STEAM DRIVEN CONDENSATE PUMP AND TANK.

REPLACED MAIN CONDENSATE FROM PUMP STATION TO THE CENTRAL HEATING PLANT. INSTALL EXPANSION NEW EXPANSION JOINTS AND INSULATE.

OVER 1000 FEET OF PIPING REPLACED.

KEEP ALL STEAM DOMESTIC HOTWATER CONVERTERS IN MAJORITY OF BUILDINGS OPERATIONAL DUEING THE PROJECT.

Page 14: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 7 ADDDED BEBEFITS BEYOND ENERGY

CUT DOWN TIME, CAUSED BY FAILING ELECTRICAL PUMP MOTOR DUE TO THE CONDITIONS IN THE SPACE.

REMOVED ACMs FROM TUNNEL.

REDUCE CONFINE SPACE ENTRIES.

Page 15: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 8 CAMPUS DINNING HALL RENOVATION

REPLACED HEATING SYSTEM, COOLING SYSTEM, ALL WATER AND SEWER LINES WERE REPLACED, NEW KITCHEN HOOD, ALL NEW EQUIPMENT, AND STRUCTURAL REPAIR TO KITCHEN FLOOR.

KEPT DIINING HALL OPERATIONAL THROUGH OUT RENOVATION.

Page 16: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

ECM # 8 ADDDED BENEFITS BEYOND ENERGY

CONVERTED STEAM TO HOT WATER,WHICH PROVIDED BETTER CONTROL.

NEW AIR CONDITIONING SYSTEM.

NEW KITCHEN EQUIPMENT.

Page 17: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

GUARANTEED SAVINGS

ALL GURANTEED SAVINGS WERE MET AND EXCEEDED.

PERFORMED 4 YEARS OF MV AFTER PROJECT WAS COMPLETED.

HAD THIRD PARTY REVIEW ON FIRST YEAR TO CONFIRM SAVINGS.

REMEMBER ENENRGY SAVINGS DOESN’T ALWAYS MEAN UTILITY BILLS WILL COST LESS. ( NEW BUILINGS, COST OF ENERGY ETC.)

COST AVOIDANCE IS THE BEST TERM TO USE WITH FINANCE.

Page 18: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

DOES A ENERGY PERFORMANCE CONTRACT WORK FOR YOUR AGENCY ?

- EPC IS ANOTHER TOOL IN THE TOOL BOX

- CAN HELP MEET EO 31

- CAN HELP REDUCE DEFERED MAINTENANCE

- BRINGS OUTSIDE EXPERTISE THAT CAN HELP WITH FINDING SOLUTIONS TO DIFFICULT ISSUES

- REDUCE CARBON FOOT PRINT

- CAN PROVIDE FINANCING

- CAN CONFIRM ISSUES FACILITY PERSONNEL HAVE IDENTIFIED

Page 19: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

INVOLVE IN HOUSE MAINTENANCE PERSONNEL

-THEY KNOW THE FACILITIES EQUIPMENT AND THE MAINTENANCE NEEDS

- THEY CAN IDENTFY THE MOST PRESSING NEEDS

- - HAVE THEM REVIEW ECM FOR THEIR TRADE AREA.

- HAVE SAMPLES OF ALL EQUIPMENT TO BE INSTALLED REVIEWED AND APPROVED.

- THEIR SUPPORT AND BUY IN, IS KEY TO THE SUCCESS OF THE PROJECT

Page 20: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

WHO SHOULD BE ON THE BOE SELECTION COMMITTEE

- FINANCE

- PURCHASING

- FACILITIES

- - OTHERS WHO MAY BE AFFECTED BY PROJECTS

- USE DMME AS A RESOURCE

Page 21: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

REVIEW OF BACK OF ENVELOPE AUDIT

-THIS IS THE BEST TIME TO NEGOCIATE. YOU HAVEN’T SPENT ANY MONEY YET. YOU CAN NEGOCIATE WITH TWO OR MORE OF THE ESCOs,

- DECIDE WHETHER TO MOVE TO THE NEXT STEP THE INVESTMENT GRADE ENERGY AUDIT

- YOU CAN STOP HERE WITH NO PENALTY.

- IF YOU DECIDE TO MOVE FORWARD SELECT AN ESCO, NEGOCIATE PRICE FOR IGA , SIGN MOU. YOU ARE STILL NOT COMMITED TO MOVE ON ANY PROJECTS.

-

Page 22: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.

REVIEW INVESTMENT GRADE AUDIT

REVIEW ALL PROPOSED ECMs , PROJECTED SAVINGS, COSTS AND PROJECTED SAVINGS OR PAYBACK TIME.

DEFINITELY HAVE ALL INTERESTED PARTIES REVIEW SPECIFIC PROJECTS THAT PERTAIN TO THERE AREA.

THE SCOPE OF WORK IN THE AUDIT IS YOUR CONTRACT. MAKE SURE IT HAS WHAT YOU WANT .

NEGOCIATE AND MOVE FORWARD OR STOP AT THIS POINT.

Page 23: PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.