18
Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897
Transcript
Page 1: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

Project Status for the James Webb Space Telescope Partner’s Workshop

Phil SabelhausJWST Program Manager

May 19, 2009

JWST-PRES-012897

Page 2: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

Organization Mission Lead: Goddard Space Flight Center International collaboration with ESA & CSA Prime Contractor: Northrop Grumman Space Technology Instruments:

― Near Infrared Camera (NIRCam) – Univ. of Arizona― Near Infrared Spectrograph (NIRSpec) – ESA― Mid-Infrared Instrument (MIRI) – JPL/ESA― Fine Guidance Sensor (FGS) – CSA

Operations: Space Telescope Science Institute

Description

Deployable infrared telescope with 6.5 meter diameter segmented adjustable primary mirror

Cryogenic temperature telescope and instruments for infrared performance

Launch June 2014 on an ESA-supplied Ariane 5 rocket to Sun-Earth L2

5-year science mission (10-year goal)

James Webb Space Telescope (JWST)

www.JWST.nasa.gov

JWST Science Themes

End of the dark ages: First light and reionization

The assembly of galaxies

Birth of stars and proto-planetary systems

Planetary systems and the origin of life

Optical Telescope Element (OTE)

Integrated Science Instrument Module (ISIM)

Sunshield

Spacecraft Bus

Warm Sun-facing Side

Cold Space-facing Side

Optical Telescope Element (OTE)

Integrated Science Instrument Module (ISIM)

Sunshield

Spacecraft Bus

Warm Sun-facing Side

Cold Space-facing Side

Page 3: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

3

2006 2007 2008 2009 2010 2011 2012 2013 2014

FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

JWST Master Schedule

Major Mission Milestones

Integration & Test

OTE

JSC Activity

SSDIF Activity

Pathfinder Structure (PF) Flight Structure (PMBSS)

Pr imary Mirrors (PMSA)

Flight Sunshield

Spacecraft (SC)

SC & IES Simulators

Observatory FSW/EMTB

Build 1 & 2/V&V

ISIM

Integration & Test

NIRSpec

MIRI

NIRCam

FGS

Cooling System

Ground Segment

1

SDR

1

T-NAR

3

PDR/NAR

6

KDP-II

12

CDR

9

SIR

12

KDP-III

12

MOR

6

TRR

2

PSR

5

FRR/KDP-IV

6

LRD

12

ORR

11

Design & Drawings for 1/3 Scale Sunshield Test

9

IDR

12

Fab

2

Integ

3

TRR

5

Test

TRR

6

Depreps 8

Test

9

Depreps

7

SC Panel Integ

9

SCE In teg

11 12

Subsys Deploy

1

Vib

2

TV

4

SubsysDeploy

6 6

CST 2/ EMC

8

Acoustic, Vib ,

Shock

10

Deploy/ CST 3

2 2

Ship Prep

5 6

Launch Prep

11

OTE PDR

10

OTE CDR

9

OTIS TRR

2

ACFRA

1

ITT GSESRR

4

GSEPDA

3

GSECDA

11

JSC InstallReady GSE

1

Bakeout

2

Install PAF w/o AOS

3 4

GSE Comm

6

InstallPAF w/AOS

7 8

PFCryoTest

1 2

Ambient

6

OTE/F lt ISIM Cryo

12

OAS RA

1

GSESRR

4

GSEPDA

3

GSECDA

5

SESReady

SSDIF Ready

5

GSE Installation

12

PF OpticsInteg

3

F lt Optics In teg

7

F inal Mir ro r

F lt ISIMInteg

10 11 1

Acous, Vibe CoCi Test

3

Start PF Struct. PF Structure Design/Fab /Assy

8

CDA 12

PF Stru tsPF PMBSS

5

Cry Cyc TRR 7

PF SMSS

8

9

11

Test 11

PF Str Integ

2

Assy

3

MMS ISIM Test Cpt.

6

TRL 6 Vib ro -Acoustic

7

Delta-2CDA

12

Start FltCryo Test #1

6

Start F lt Cryo Test #2

12

PF PMSA

3

#1

4

#2

5

#3,

6

#4#5 #6 (Last PM Batch )

7

4

1

SRS Membrane Development

12

Sheldahl Pilot Production

1

SRS PDR

NGST Membrane Qual Testing

12

F lt Membrane Mat'l Fab Cpt

1

TV Membrane Del

5

SRS CDR 12

Qual Test Cpt

1 6

F lt Membrane Fab

1

Preliminary Design

Evolu tionary Path finder (EPF) Development & Testing

12

Structure T IM

2

PDR 3 4

IVA Design

12

2

MMS PDA 4

Fab

6

Shell MRR 7

Integ & Test

9

SSCDR

11

Tooling MFG & Un it Testing

4

Integ & Test

9

Sh ip to I&T

12

StructurePDA 7

PDR

12

Prem Structure CDA 2

Structure CDA

8

CDR

12

Test

3

SC Structure Del

3

Prop I&T

9

Sh ip Propulsion System to I&T

10

ISIM SDL

1

ISIM SDL &ICDH Lab

3

ETU ISIM I&T(Type 1A)

5

10

IESSDL

6

IES EMTB

7

F lt ISIM (Type 2A)

11

IES OTB

2

Bld 1 PDR

6

Bld 1 CDR/ Bld 2 PDR

3

Bld 1 TRR

3

Bld 2 CDR

1

Bld 2 TRR

5

FSW Del to SC

12

FSW Del to Obs

2

B 1.1

6

B 1.2

4

B 1.3

9

B 1 Update

10

B1 Verif

1

B 2 Verif 3

B 1 Val Cpt

5

B 2.1 Verif 11

B 2.1 Val Cpt

11

B 2.2 Verif 5

B 2.2 Val Cpt

7

Obs Ver if 10

Obs Val

10

ISIM PDR

3

ISIM CDR

4

Rec Structure (from ATK)

6

Structure Acceptance Testing

3

Start I&T

5

OSIM

10

PER

10

Del F lt ISIMto OTE

11

10

CDR

7

ETU Del

7

F lt Del

12

CDR

8

STM Del

6

F lt Del

5

CDR

8

ETU Del

9

F lt Del

3

Guider CDR

3

TFI/Systems CDR

10

ETU Del

6

F lt Del

10

SRR

2

PDR

4

CDR

6

6

EM CHARegion 1

9

EM CTA

1

CCES/CELS

3

F ltCTA

4

F ltCHA

5

CCAMock-up

12

F lt CCA/CCE

3

F ltCCA/CCE

(spare)

12

CCTS B 1.2

4

CCTS B 2.0

9

CCTS B2.1

5

CCTS B2.2

4

CCTS B2.3

4

S&OC PDR

10

CCTS B 2.4

7

S&OC Rel 0.0

10

S&OC CDR

12

S&OC Rel 1.0

12

OTB Del

7

S&OC Rel 2.0

1

S&OC Rel 2.x

12

Start "on call" Support

Rev. G Inc ludes NGAS Master Sc hedule - December 2008 Baseline& ISIM Master Sc hedule - Rev. G

Sunshield (SS)

Evolutionary Pathfinder (EPF)

Mate OTE/F lt ISIM

Membranes

3

CST 1,Modal

Mgm'tReserve

Cryo Pr f Load

SC Bus Fab & Assembly

Cryo Cycle BP Cpt

JWST Overview ScheduleJWST Overview Schedule Needs to be updated for the June 2014 LRDNeeds to be updated for the June 2014 LRD

JWST_ISIM.May.QSR/3

Page 4: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

4

Associate DirectorP. Sabelhaus

Deputy Associate DirectorJ. Decker

Deputy Associate Director / TechnicalJ. Durning

Business ManagerR. King

Deputy Business ManagerC. Steeley

Senior Project ScientistJ. Mather (665)

Deputy Sr Project ScientistJ. Gardner (665)

Chief Safety and Mission Assurance Officer (CSO)J. Radich (324)

Mission Systems EngineerM. Menzel (599)

Deputy Mission Sys EngM. Davis (Ball)

ISIM ManagerJ. Dunn

Deputy ISIM MgrM. Voyton

ISIM Financial MgrC. Doria-Warner

Ground Segment & Ops Manager

A. Johns

Observatory ManagerP. Geithner

Deputy Obs MgrK. Parrish (545)

ISIM Systems EngineerR. Lundquist (599)

ISIM Structure MgrE. Johnson (543)

ISIM I&T ManagerM. Drury (Sigma)

Instrument Systems Manager

S. Lambros

MIRI Instr MgrP. Driggers (SGT)

NIRSpec Instr MgrT. Johnson (556)

NIRCam Instr MgrD. Yun

FGS Instr MgrS. Lambros

J. Abell (SGT) - FGS ISE

ISIM FSW MgrB. Savadkin (582)

Science Operations Manager

B. Seaton (581)

Mission Engineering Manager

J. Gal-Edd (581)

OTE ManagerL. Feinberg (550)

Deputy OTE ManagerR. Keski-Kuha (551)

L. Markley (591) – ACSP. Maghami (OSC) – GNCC. Schiff (595) – Flt DynK. Mehalick (551) – Opt SysR. Sengupta (Sigma) – Risk CoordA. Sherman (SGT) – Chair, ERBC. Perrygo (SGT) – SunshieldM. Bussman (SGT) – Rqmts R. Ivancic (SGT) – S/C SysD. Muheim (592) – Integ Modeling

M. Greenhouse (665) - ISIM Scientist M. Clampin (667) – Observatory ScientistG. Sonneborn (665) – Operations ScientistC. Bowers (667) – Deputy Observatory ScientistB. Rauscher (665) - Deputy ISIM Scientist

P. Gibbons (321) – Project Safety MgJ. Radich (Acting) (324) – ISIM CSO

W. Hayden (592) – OTE SEJ. Howard (551) – Opt. Design LeadB. Dean (551) – OTE WFSC LeadL. Cohen (SAO) – Mech Sys LeadK. Thakore (544) – Electromech Lead

M. Smith (556) – NIRSpec ISER. Estep (556) – Microshutter SS Mgr

S. Manthripragada (556) – Detector SS Mgr

C. Aymergen (SGT) – MIRI ISE

R. Ohl (Acting) (551) – Optical LeadP. Davila (551) – Optical SysJ. McCloskey (565) – Elec SysS. Glazer (545) – Thermal SysR. Carter (SGT) – Mech SysJ. Johnston (542) – Str Sys & Int ModR. Ladbury (561) - RadiationS. Le (Ball) – MaterialsR. Perry (SGT) – Contam E. Greville (SGT) - FSW Sys R. Sharma (544) – Electromech SysS. Allen (565) – HarnessD. Ramey (SGT) – Ops Lead K. Barnes (581) - FSW Sys

IGSS Development Manager

J. Steck (583)

R. O’Mara – Financial MgrC. McKenzie (210.S) – Procurement MgrJ. King (210.S) – Contracting OfficerD. Miller – Project Support MgrL. Chandler (130) – Public Affairs

ICDH Hardware MgrQ. Nguyen (561)

Obs ScientistM. Clampin (667)

Deputy Obs Scientist C. Bowers (667)

OperationsScientist

G. Sonneborn (665)

ISIM ScientistM. Greenhouse (665)Deputy ISIM Scientist

B. Rauscher (665)

C. Adams (584) – FOS MgrB. Bruce (441) – PRD MgrR. Detter (594) FITSWriter MgrP. Johnson (583) – PPS MgrD. Matusow (581) – OSS Mgr

A. Bigel (583) – Dev/Test EngT. Pfarr (CSC) – IGSS Integ. Mgr

E. Woodward (583) - IGSS I&T Mgr.

J. Van Campen (SGT) –NIRCam ISE

R. Lynch (599) – Sys MgrR. Sabatino (581) – F&G SW SysG. Mosier (592) – Integ Modeling(Acting) K. Parrish (545) – Therm SysJ. Lawrence (543) – Mech SysG. Golnik (Schafer) – Opt SysS. Irish (542) – Structures(Acting) R. Meloy (Muniz) – Elec SysB. Jeffers (QSS) – PartsS. Le (Ball) – Materials E. Wooldridge (546) – Contam

Ground Segment I&T Manager

C. Fatig (SAIC)

G. Henegar (564) IRSU Mgr

R. Rashford (GEC) – IEC Mgr

James Webb Space Telescope (JWST) Project – Code 443

OSIM MgrT. Pham (556)

K. Banks (552) – Obs Cryocooler SE

ISIM CSOJ. Radich (Acting) (324)R. Lynch (599) – JSC Sys Eng

J. Allen (DSC) – S/C Electrical

Signature:

Observatory Sys EngM. Davis (Ball)

Observatory I&T MgrC. Diaz (Sigma)

Launch Vehicle LiaisonJ. Lawrence (543)

Sunshield ManagerK. Parrish (545)

Spacecraft ManagerR. Ivancic (SGT)

Software ManagerR. Sabatino (581)

Cryocooler ManagerM. Larson (JPL)

JWST-REF-000838Revision Y

Original signed by John E. Decker3/20/2009

JWST_ISIM.May.MPR/4

Page 5: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

5

Personnel Changes since last WorkshopPersonnel Changes since last Workshop

Personnel update:– Richard Lynch has rejoined the team as the JSC Systems Engineer– Robby Estep has taken over as the MSS Manager– Ray Ohl is the ISIM optical lead– Hal Bremmer is the project’s scheduling lead– Claudia Krogel has joined the Mission Systems Team– Lisa Link is the point of contact in the CM Office

Page 6: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

6

General: All observatory components, except for the spacecraft, have successfully completed their

preliminary design reviews ISIM CDR held in March

All science instruments have successfully completed their critical design reviews LRD moving to June 2014; Mission CDR moving to March 2010

Will have 7 months of critical path slack; so the ship date only slipped by 8 months Maintain ISIM deliveries Maintain near term OTE, Sunshield and Spacecraft milestones

Not sure about plans for the next Partner’s Workshop with the upcoming major reviews Observatory:

Lower level Spacecraft PDR’s underway JWST full scale core test is underway Completed the Sunshield Membrane Management System (MMS) delta PDR First spacecraft simulator delivered to the ISIM software lab at GSFC

Ground System: The Ka band upgrades required to support JWST L&EO and normal operations have been

completed at the DSN Canberra and Goldstone Sites NGAS hosted an open house to mark the grand opening of the “Webb Telescope Control Room” in

M8. The control room will be operated using CCTS hardware and software

Project StatusProject Status

Page 7: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

7

Full Scale Core Test HardwareFull Scale Core Test HardwareCore Thermal Test

Focus AreaOptical Telescope Element

Sun ShieldSpacecraft Bus

Decagon Test Membrane

SS Support Frame

Top Weldment

Base Weldment

Bus Simulator

IEC

PTR Radiators

Lift Sling

Backplane Support Frame (BSF)

Membrane Tensioning System

Center Backplane

Stray Light Bib

Diagonal Shields

Deep Space Edge Radiator (DSER) Panels

Cable Radiator

Counterbalance Weights

FLIGHT Observatory

CORE TEST thermal facsimile

Page 8: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

8

Core Test Article Integration Complete and Core Test Article Integration Complete and Testing is UnderwayTesting is Underway

Core Test integration complete– OTE/SC assemblies mated– GSFC radiometers received and installed– He shroud installed, leak checks completed– MLI closeouts complete– Instrumentation installation and checkout complete– Cool down started on April 17th

Core Test Article

Installation on Chamber Lid

He Shroud Installation

Page 9: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

9

Observatory I&T control room at NGST

Page 10: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

10

Telescope: ATK Operations:

Bonding of flight and pathfinder OTE Primary Mirror Backplane Support Structure (PMBSS) continues

Tinsley operations are continuing: Five PM segments have been shipped to Ball Secondary Mirror has been delivered to Ball TM1 (Tertiary Mirror 1) delivered to Ball The remaining flight primary, secondary and tertiary mirrors are in various stages of rough

polishing and smooth out grinding

Ball operations: Four Primary Mirror Segment Assembly (PMSA) have been built up to configuration 3 (the full

PMSA configuration) Received, inspected and cleaned Tertiary Mirror at Ball Received last 4 flight Delta Frames from Axsys; JWST work at Axsys is complete!

MSFC XRCF Operations: The A1 and EDU PMSA’s cryo vac test has been completed

Project Status (Continued)

Page 11: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

11

Optical Telescope Element (OTE) Hardware ProgressOptical Telescope Element (OTE) Hardware Progress

Flight Center Section bonding with Pathfinder CS in foreground

Fine Steering Mirror

Mirrors in XRCF ChamberMirrors in XRCF Chamber

Tertiary Mirror

SMA Hexapod complete

Secondary MirrorSecondary Mirror

Page 12: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

12

Integrated Science Instrument Module (ISIM)– Successfully completed ISIM Level CDR in March– Good progress on other ISIM components, ISIM Command and Data Handling (IC&DH) unit,

ISIM Remote Services Unit (IRSU), structure, etc Instruments:

– MIRI- MIRI Verification Model (VM) completed it’s second cryo test- Selected flight and spare detectors and built into Focal Plane Module’s (FPM’s)- Instrument shield (for cryo cooler) concept review held last week

– NIRSpec- Selection of flight detectors agreed to by NASA & ESA- Instrument CDR successfully held- Development Model (DM) cryo testing underway- Flight Model (FM) integration underway

– NIRCam- Selected flight detectors for NIRCam- Completed bonding and vibration testing of the NIRCam Engineering Test Unit (ETU)

Optical Bench– FGS

- 3 of 4 FGS flight detectors (including the spare) have been selected- Completed first ETU cryo pupil illumination test- All ETU hardware installed on optical bench or in formal testing

Program Status and Recent Progress (Continued)

Page 13: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

1313

JWST Instrument Engineering, Verification and Development Models

FGS Engineering Model MIRI Verification Model

NIRSpec Development ModelNIRCam ETU OBA with Mass Simulators

Page 14: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

14

ISIM Hardware

PDU ETU Side A and Side B

ISIM Structure Bonding

OSIM Primary Mirror

IC&DH ETU

Page 15: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

15

SES Shroud in Bldg 10 for ISIM Testing

Page 16: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

1616

Remaining Major 2009 events: ISIM flight structure delivery to the GSFC from ATK in August MIRI flight Focal Plane system delivery to RAL in August (TBR) Sunshield 1/3 Scale Test Readiness Review (TRR) in August at NGAS Spacecraft Bus PDR, July 28-30 at NGAS Cryo Cooler CDR in June at NGAS Flight NIRSpec Micro Shutter system delivery to ESA in September Modified Pathfinder NIRSpec Detector system delivery to ESA July Optical Telescope Element CDR scheduled for October at NGAS Sun Shield CDR scheduled for November at NGAS

Mission Critical Design Review in March 2010 at the GSFC

Project Status (continued)Project Status (continued)

Page 17: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

17

Cost increases Late ISIM deliveries Low cost reserves Problematic use of the Space Cargo Transporter System (SCTS)

– The project has included costs for a JWST unique shipping container in this year’s budget– Working with NGAS and Arianespace on requirements

NIRCam Wave Front Error– Proceeding with the redesigned bonded lens mount design

- Review held on May 14th

– Developed a new alignment plan, which allows for greater accuracy both during build up and at the module level Meeting Cryo Cooler allocations with required margins

– Baselined MIRI shield– Concept review held last week

Microshutter shock survivability– Qualification unit over tested and failed– Established new testing approach and levels– Testing currently underway at Astrium

Rebuilt ASIC cost and schedule– New ASIC’s will be ready in the November 2009 to March 2010 timeframe

MIRI FPE noise issues Primary Mirror A1 actuator gear motor failure

Worry List

Page 18: Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES-012897.

18

Zoe’s Lounge in lobby area will open daily @ 8:00 am – CASH and CARRY ONLY

Coffee Tea Juices Fruit Yogurt Pastries Etc.

Meeting Refreshments


Recommended