Underground & Overhead Distribution • Fiber Optics
Power & Communications GroupProject Summary
Hypower’s Power & Communications Group specializes in the installation of underground power, overhead FOC telecommunication infrastructure, large ductbank systems, WI-FI and DAS systems. We are uniquely qualified to assist utility companies, municipalities & developers expand power and communications facilities. Hypower’s resources include experienced project managers & an extensive equipment fleet. Our four Business Groups provide expertise providing an extraordinary level of efficiency and innovation. The Hypower team of highly specialized and trained engineers, technicians and professionals are specifically prepared to meet network development needs regardless of complexity, location or technology. We are available day or night for emergency restoration and disaster recovery.
Hypower Inc.Com
munica
tions
Communications Outside Plant Construction• Underground Conduit Placement
TrenchingPlowingDirectional DrillingAll Diameter BoresJack and Bore
• SplicingFiberCoaxCopper
• Manhole Placement• Aerial Construction• Cell Site Construction• Maintenance Contracts• Emergency Restoration• Project Management
Outside Plant Engineering
• Route Analysis & Conceptual Design
• Permitting, Private Easements• Drawings• Plan & Profile Construction• Signed & Sealed• Inspection Services
From Planning to Installation: Guided
by Innovation, Safety, Quality & Productivity-
Hypower has continually proven to be
“One Company. Powerful Solutions”
Power • Trenching• Medium Voltage Wire Placement• Cable Splicing/Installations• Full Overhead to Underground Conversions of Power• Manhole Placement• Duct Bank Infrastructure Installation• Switch, Transformer, and Junction Box installations• Directional Drilling
4kV to 34.5kV
• Aerial Fiber• Emergency Restoration• Maintenance• New Construction• Street Lighting• Design & Field Engineering
Distrib
utio
n
Our EMR for 2014 is .81
Hypower takes a proactive role in employee & public safety. Our corporate culture includes an extraordinary emphasis on safety & loss prevention. Hypower’s full-time Safety Director administers our time-tested, proven safety policies & procedures. As our most valuable asset, Hypower invests in our employees by providing them with the tools, training, guidance, & the methods required to work safely & productively each & every day.
Safety/EMRQualityAt Hypower, Quality Begins & Ends With Our Customers
Our objectives are clear:To be recognized as the industry’s “Best in Class”, reflected by high quality, cost effective delivery of products & services.To reach this level of quality, Hypower emphasizes the identification, documentation & enterprise-wide implementation of Best Practices. Integration of continuous process improvement into everyday execution is accomplished through formal Lesson Learned analyses. Chartered Safety, Supervisor, & Leadership Academies foster “Best in Class” performance.
Key Components of Quality- The Hypower Way• Customer Focused• Results Driven• Employee Involvement
Resources
Properly LicensedOur staff includes:• Unlimited Electrical Contractor• Unlimited General Contractor• Unlimited Utility Contractor• FL State PE• Licenses in 28 States
Hypower Differentiators
Sen
ior V
ice Presid
ent
Eric Paul-HusEric is a hands-on VP who is on-site to ensure that Hypower’s reputation for quality is uncompromised. Leading by example, Eric has the know-how and the experience to deliver projects on time and on budget.
Pow
er D
ivisio
n M
anager
Vice
Pre
sident o
f Com
munica
tions
Raymond McCorkelRay’s 30 year background in the utility construction field includes a solid foundation in aerial & underground construction. He has extensive experience in long haul fiber, metro builds, Homeland Security, Disaster Recovery, and Ductbank construction.
John ZoerhoffJohn manages the Underground Power Division. John works directly on a face to face basis with the client, insuring consistent, reliable service and planning. His applies his extensive experience to avoid obstacles and offers quick resolution
• Leadership Development • Employee Involvement • Cost Containment Processes:
Equipment
Hypower’s multi-million dollar investment in a state of the art Heavy Equipment & Truck Fleet ensures our ability to facilitate each and every project. Proper maintenance & care with experienced operators enable on time & on budget project & delivery.
Ave Maria Central Energy PlantImmokalee, Florida
Verizon FTTP Pennsylvania & DelawareInnerduct, fiber, handholds, throughout the Eastern counties of Pennsylvania and the entire state of Delaware.
FAU Stadium Duct Bank Extension
Boca Raton, FL
Hypower furnished & installed the electrical ducts system which included: 3,300 ft of ductbank (ducts are concrete encased with Schedule 80 PVC), temporary electric power, excavation, compaction and survey of trench line, flow-able fill at road crossings, new transformers andswitches, stadium switch placed on switch chamber and transformers, precast concrete pads, conduit future stadium transformer, manholes, switch chamber and transformer pads, cable, parallel feeders, to the two stadium transformers.
Smart City Orlando, Florida4 Mile design-build, fiber to the cell site
Project Showcase
City CenterWest Palm Beach, FLDuct Bank System Around City Center In Downtown WPB Incorporating & Jack & Bore Across FEC Railway
FPL FibernetVarious Locations, FloridaNumerous projects since 2006, totaling over $30 million in completed work.
FP&L FiberNetBroward, Dade and Lee Counties, Florida300 Miles of (4) each 1.5” conduits with aerial strand placement throughout Broward, Dade, Palm Beach, and Lee County.
Allied Fiber Phase 2Atlanta GA to Miami, FL
Hypower was contracted to build approximately 800 miles fiber and 11 co-location sites in Jacksonville, Palm Coast, Edgewater, Melbourne, Jensen Beach, Lake Worth.• Fiber Count: 528 ,432, and 216• Allied Fiber CoLos located throughout
Florida and Georgia• Power: 150kw Protected AC & DC Power,
Backup Generator, HVAC
Project Showcase
Dover Air Force Base Phase 1Dover Air Force Base, DE
Relocation of overhead electrical to underground. Scope included:
Robert’s Bay Cable & Directional BoreVenice, FLDirectional Bores, 1000 MCM Cable Was Placed
Terminal 18 at Port Everglades Fort Lauderdale, FloridaInstallation of 200+ Security Cameras, Conduit & Cat5 Cabling, Fiber Optic Cable, Network Switches & Nodes, Bridge Electrical Work
Lime Substation InterconnectSarasota, FLInstalled Duct Bank Infrastructure for the City of Sarasota included total 1000 KCMIL Copper Conductor installation
in conjunction with an inter-city infrastructure upgrade & Loop Tie between substations.
• Removal of existing 15kv overhead primary and placed it underground• Demolition of the existing 15kv overhead primary• Provided and installed 21,000 circuit feet of 400 MCM 15kv cable with directional boring• Provided and installed 5 new 600amp 15kv 4way pad mounted switches• Provided and installed 14 new 4-way above ground terminal cabinets• Provided and installed 1 new 75 kVA pad mounted transformer• Provided and installed 5 new 25 kVApad mounted transformers• Completed 300+ 15kv cable terminations• Reworked 18 building services from 1000 kva to 200 kVA• Provided and installed 36 new street lights transformers
Project Showcase
LCEC/Cape Coral Cape Coral, Florida
Hypower installed 4500 LF of concrete encased duct-bank though the Future City Center Improvement area of Cape Coral, Florida as part of an underground design-build project.
Florida Atlantic University Infrastructure ImprovementsBoca Raton, FloridaHypower installed 7,000 feet of concrete encased duct bank from substation to the new chiller building
Flagler Memorial Bridge Bore CrossingWest Palm Beach, FloridaHypower forces expertly drilled a 2,500 LF directional Bore under the Intracoastal Waterway
Village at GulfstreamHallandale, FLCombination of Distribution / 12 way duct banks
Project Showcase
Hypower Power Distribution Projects
Power Project Experience Matrix
Project Location Description JOB NUMBER Owner/ General Contractor Project Value
Town of Gulfstream Gulfstream, FL • Conversion of utilities for FPL, ATT Comcast from overhead to underground
• 2013-2014
6247 PROJECT PROFILE
EPH, JZ,
Town of Gulf Stream 100 Sea Drive Gulfstream, Florida 33483
Rita Taylor 561-276-5116 [email protected]
$157,6000
Market and Fronton Miami, FL • ROW Power Distribution Duct Bank Utility Work • 2013-2014
6246 EPH, JZ,
Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408
David Fite 305-377-6146 [email protected]
$214,400
Wilcox CSX RR Crossing Miami, FL • Directional Bore & Tie-In • 2013
6245 EPH, JZ,
Florida Power & Light Company 4200 Flagler St. Miami, FL 33134
Angel Vargas 305-442-5129 [email protected]
$198,400
Everglades Island Palm Beach, FL • OH - UG Conversion, Bore, Trench, Cable • 2012
6239 jz,cs,tm,eph
Town of Palm Beach 951 Old Okeechobee Road West Palm Beach, FL 33401
Charles R. (Chuck) Langley, P.E. 561-838-5440
$685,587
FAU Blvd. IRM (w/ 7043) Boca Raton, FL • Direct Buried Duct bank • Install IRM, FPL, ATT & COM • 2011-2012
6226, 7043 EPH, JZ,
FAU University Engineering & Utilities, Building #5, 777 Glades Road Boca Raton, FL 33431
Jeff Modlin, Associate Director, Engineering & Utilities 561-297-0239 [email protected]
$571,912
Capri Feeder Bonita Springs, FL • Directional Bore, Splice Boxes & Cable Install • 2012
6234, jz,rw,eph,cs Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408
Melissa Ebel, Senior Sourcing Specialist, 561-694-4893 [email protected]
$763,472
FPL Feeder Upgrades
West Palm Beach, FL • 2011-2012
6231,6232,6230 EPH, JZ,
Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408
Kaile Macon [email protected] 561-691-7133
$2,225,461
Florida Atlantic University Stadium
Boca Raton, FL • 3,300 ft.duct bank provide material, install duct and cable, transformers and switches
• 2012
6218 EPH, JZ,
Florida Atlantic University/Balfour Beatty 6100 Blue Lagoon Drive Miami, FL 33126
Justin J. Thorpe, LEED® AP 561-447-2114 x2007
$977,013
Dover Air Force Base Delaware • Bury overhead electrical to underground • 2010-2013
6217 PROJECT PROFILE
EPH, JZ,
CH2M Hill Constructors, Inc. 15010 Conference Center Dr. Suite 200 Chantilly, VA. 20151
Dorcas Clark 703-376-5098 [email protected]
$2,510,700
Flagler Memorial Bridge Crossing
West Palm Beach, FL • Directional Bore 2,500’ across Intracoastal Waterway, trench 500’ across Royal Poinciana Blvd. Install cable, 2 transformers and switch cabinet, demo existing infrastructure
• 2010-2012
6210 PROJECT PROFILE
EPH,JZ, TM
Florida Power and Light 500 Business Parkway Royal Palm Beach, FL
Sharon Parker 561-790-5030
$1,599,659
Distribution Line Storm Work
AR, LA, MS, TX • AR, LA, MS, TX service territory • 2012-2013
EPH, JZ, Entergy Arkansas, Inc. 7701 Frazier Pike Little Rock, AR 72206
Jerl Duvall 501-490-3732 [email protected]
$250,000
Cape Coral Transmission
Cape Coral, FL • Design - build duct bank, manholes and cable • 138 KV Underground Transmission • 2010-2012
6205-6 PROJECT PROFILE jz,rod white,eph
Lee County Electric Cooperative 4980 Bayline Drive Fort Myers, Florida 33917
Rick Fuson 239-656-2250 [email protected]
$10,200,747
To create client facing PDFs of this matrix, change ”job number” text style in the style pallet to white text so that job numbers are not visible. Do NOT save the MS Word file
with white text.
Hypower Power Distribution Projects
Power Project Experience Matrix
Project Location Description JOB NUMBER Owner/ General Contractor Project Value
Town of Gulfstream Gulfstream, FL • Conversion of utilities for FPL, ATT Comcast from overhead to underground
• 2013-2014
6247 PROJECT PROFILE
EPH, JZ,
Town of Gulf Stream 100 Sea Drive Gulfstream, Florida 33483
Rita Taylor 561-276-5116 [email protected]
$157,6000
Market and Fronton Miami, FL • ROW Power Distribution Duct Bank Utility Work • 2013-2014
6246 EPH, JZ,
Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408
David Fite 305-377-6146 [email protected]
$214,400
Wilcox CSX RR Crossing Miami, FL • Directional Bore & Tie-In • 2013
6245 EPH, JZ,
Florida Power & Light Company 4200 Flagler St. Miami, FL 33134
Angel Vargas 305-442-5129 [email protected]
$198,400
Everglades Island Palm Beach, FL • OH - UG Conversion, Bore, Trench, Cable • 2012
6239 jz,cs,tm,eph
Town of Palm Beach 951 Old Okeechobee Road West Palm Beach, FL 33401
Charles R. (Chuck) Langley, P.E. 561-838-5440
$685,587
FAU Blvd. IRM (w/ 7043) Boca Raton, FL • Direct Buried Duct bank • Install IRM, FPL, ATT & COM • 2011-2012
6226, 7043 EPH, JZ,
FAU University Engineering & Utilities, Building #5, 777 Glades Road Boca Raton, FL 33431
Jeff Modlin, Associate Director, Engineering & Utilities 561-297-0239 [email protected]
$571,912
Capri Feeder Bonita Springs, FL • Directional Bore, Splice Boxes & Cable Install • 2012
6234, jz,rw,eph,cs Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408
Melissa Ebel, Senior Sourcing Specialist, 561-694-4893 [email protected]
$763,472
FPL Feeder Upgrades
West Palm Beach, FL • 2011-2012
6231,6232,6230 EPH, JZ,
Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408
Kaile Macon [email protected] 561-691-7133
$2,225,461
Florida Atlantic University Stadium
Boca Raton, FL • 3,300 ft.duct bank provide material, install duct and cable, transformers and switches
• 2012
6218 EPH, JZ,
Florida Atlantic University/Balfour Beatty 6100 Blue Lagoon Drive Miami, FL 33126
Justin J. Thorpe, LEED® AP 561-447-2114 x2007
$977,013
Dover Air Force Base Delaware • Bury overhead electrical to underground • 2010-2013
6217 PROJECT PROFILE
EPH, JZ,
CH2M Hill Constructors, Inc. 15010 Conference Center Dr. Suite 200 Chantilly, VA. 20151
Dorcas Clark 703-376-5098 [email protected]
$2,510,700
Flagler Memorial Bridge Crossing
West Palm Beach, FL • Directional Bore 2,500’ across Intracoastal Waterway, trench 500’ across Royal Poinciana Blvd. Install cable, 2 transformers and switch cabinet, demo existing infrastructure
• 2010-2012
6210 PROJECT PROFILE
EPH,JZ, TM
Florida Power and Light 500 Business Parkway Royal Palm Beach, FL
Sharon Parker 561-790-5030
$1,599,659
Distribution Line Storm Work
AR, LA, MS, TX • AR, LA, MS, TX service territory • 2012-2013
EPH, JZ, Entergy Arkansas, Inc. 7701 Frazier Pike Little Rock, AR 72206
Jerl Duvall 501-490-3732 [email protected]
$250,000
Cape Coral Transmission
Cape Coral, FL • Design - build duct bank, manholes and cable • 138 KV Underground Transmission • 2010-2012
6205-6 PROJECT PROFILE jz,rod white,eph
Lee County Electric Cooperative 4980 Bayline Drive Fort Myers, Florida 33917
Rick Fuson 239-656-2250 [email protected]
$10,200,747
To create client facing PDFs of this matrix, change ”job number” text style in the style pallet to white text so that job numbers are not visible. Do NOT save the MS Word file
with white text.
Power Project Experience Matrix
MIL-CON Overhead 15kV Feeders
Merritt Island, FL • Replace Overhead G Line And R Line 15kV Feeders 6196 PROJECT PROFILE
MIL-CON 6142 Lake Gray Blvd. Jacksonville, FL 32244
Jerry Robinson 321-452-5489
$1,327,121
Davie Blvd River Crossing
Fort Lauderdale, FL • Directional Bore across the New River at the Davie Blvd Bridge Installation of 1000 KCMIL Copper Conductor and pole risers on each side
• 2010
6182 EPH, JZ,
Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408
John Falciglia 954-658-2495
$235,000
FAU Infrastructure Improvements
Boca Raton, FL • Concrete encased duct bank 7,000 feet from substation to new chiller building; 750 MCM copper cable Installation, 2 risers in substation, vista switches, switching to accommodate redirection of campus feeders
• 2009-2011
6176 PROJECT PROFILE
EPH, JZ,
FAU University Engineering & Utilities Building #5, 777 Glades Road Boca Raton, FL 33431
Jeff Modlin, Associate Director, Engineering & Utilities 561-297-0239 [email protected]
$2,019,690
Port Everglades Terminal 18 Power and Telecommunication Feeds
Fort Lauderdale, FL • Multiple Directional Bore and Trench Installations in conjunction with the Building of Terminal 18 for the arrival of Carnival’s largest Cruise Ship
• 2009-2010
6174 EPH, JZ,
Hewett-Kier Construction 3451 NW 14th Ave Pompano Beach, FL 33064
Jim Hewett, President 954-946-4224 [email protected]
$90,000
Northeast Substation St. Petersburg, FL • Concrete encased 8” multi duct bank in new substation 6159 EPH, JZ,
Progress Energy 299 First Avenue North, St. Petersburg, Florida 3701
Jeffrey Nelson 919-546-4868
$275,100
Hutchinson Island
Jenson Beach, FL • Directional bore 6 way 6” duct bank, 13 manholes along east side of A1A, redirect AT&T line
• 2008-2010
6154 EPH, JZ,
Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408
Ellis Clenton 954-382-5120
$2,136,001
University of Miami Utility Design Academic Building Power Duct Bank
Miami, FL • Telecom concrete encased trench duct bank and manholes • 2008-2009
6148 EPH, JZ,
Elcon Electric 3500 Park Central Blvd Pompano Beach, FL 33064
Jill Mathison 954-979-5445
$271,344
Robert’s Bay Crossing
Venice, FL • Directional bore, plow/dredge and cable installation across water body; 1000 MCM copper cable spliced on barges and submerged
• 2008-2009
6139 EPH, JZ,
Casper Colisimo 135 S. Banana River Drive Merritt Island, FL 32952
Norm Van Pelt, PM 321-459-3848 [email protected]
$600,000
Village @ Gulfstream Infrastructure Improvements
Hallandale, FL • Transmission, distribution, primary and ATT duct bank installations throughout the property in conjunction with development build out including residential, recreational, restaurant and shopping areas
• 2008-2011
6138 PROJECT PROFILE
EPH, JZ,
The Law Company 345 Riverview, P.O. Box 1139 Wichita, KS 67201-1139
Doug Kimple 316-268-0200 [email protected]
$1,750,000
PBCC Science & Technology Building Power Feeder Installation
West Palm Beach, FL • Concrete encased duct bank, transformer and switch installation, high voltage cable installation, ATS installation and programming
• 2008
6133 EPH, JZ,
James A Cummings 2101 Centerpark West Drive Suite 160 West Palm Beach, FL 33409
Christian Guarneri 561-655-1982
$187,000
Marymount Substation
Boca Raton, FL • Concrete encased duct bank installation in conjunction with large development contract
• 2007
6125 EPH, JZ,
Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408
Damian Vallas 561- 691-2134
$151,740
City Center and Clematis Garage
West Palm Beach, FL • Placement of MH’s and conduit for several different utilities (FPL, ATT, Peoples Gas) in downtown West Palm Beach
• Organized utility consortium to minimize construction in downtown area by doing joint trench venture
• 2009
6124, 6082 PROJECT PROFILE
EPH, JZ,
Catalfumo Construction 4300 Catalfumo Way North Palm Beach Gardens, FL 33410
Frank Melehan,PM 561-694-8846 [email protected]
$1,595,380
Hypower Communications Projects
Communications Experience Matrix
Project Location Description JOB NUMBER Owner/ General Contractor Project Value
Allied Fiber-Phase 2 Atlanta to Miami, FL • Atlanta to Miami, approximately 800 miles fiber and build 14 co-location sites with a landing site in Jacksonville
• 2013- ongoing
2325 PROJECT PROFILE
EPH, Ray Mc Corkle, R White
R Carrero
Allied Fiber 601 Lexington Ave 59th floor New York New York 10022
Mr. Patrick Opelt Vice-President 317-453-0336 [email protected]
$13,000,000
Velocitel R1717 Hickory Road
Petersburg, VA • AT&T LTE Upgrade • 2012
2320 Velocitel/AT&T 4164 Innslake Dr. Suite B, Glen Allen, VA
Jeff Woods 804-217- 7088 [email protected]
$212,280
FPL/Fibernet Various Locations: Venice, North Port , Sarasota, FL
• Outside plant fiber build;FTTCS • 2012-2013
2318 EPH-Dan DiSalvo-N/A Armando Lopez-Fraga
FPL/FiberNet 9250 W Flagler Miami, FL 33174
Jennifer Pierre 305-552-2869 [email protected]
$546,800
FPL/Fibernet MSA Various Florida Locations
• Installation of fiber optic network backbone and lateral conduit and cable; 2014
2305 EPH, Dan DiSalvo,
Armando Lopez-Fraga
FPL/FiberNet 9250 W Flagler Miami, FL 33174
Jennifer Pierre 305-552-2869 [email protected]
$1,312,947
Four Points MacDill Air Force Base
Tampa, FL • Replacing and relocating fiber optic cable and placing copper cable to new facilities; 2011-2013
2299 PROJECT PROFILE
Four Points Communication Services Inc. 30 Gerber Industrial Drive, St Peters , Missouri
Chris Schrader 636-278-3727 ext. 134 [email protected]
$500,000
FPL/Fibernet Various Florida Locations
• Installation of fiber optic network backbone and lateral conduit and cable
• 2012
2288 EPH
Dan DiSalvo N/A
Armando Lopez-Fraga
FPL/FiberNet 9250 W Flagler Miami, FL 33174
Hamad Shah 305-552-2019 [email protected]
$500,000
TMP-002312 Tampa Tower Locations
Tampa, FL • Fiber optic lateral BB to the property line of 36 sites from the existing FPL BB
• 2012
2296 PROJECT PROFILE
EPH, Dan DiSalvo,
FiberLight, LLC 792 S. Military Trail Deerfield Beach Florida 33442
Chris Pancione 954-596-2559 [email protected]
$310,100
Level 3-Communications Tampa, FL • Gunn Highway • Pasco County Road Improvements fiber optic cable relocation
project; 2012 • Lois Avenue • City of Tampa road improvements fiber optic cable relocation
project; 2012 • Sunrise, FL, I595 from Hiatus Road to Nob Hill Road; 2012
2290 EPH
Ray McCorkel N/A
Armando Lopez-Fraga
Level (3) Communications 2121 W Prospect Road Ft Lauderdale, FL 33309
Bob Priestap 813-349-1477 [email protected]
$502,000
Four Points Shaw Air Force Base
Sumter, SC • Design build of fiber infrastructure; the repair and replace of underground fiber optic cable from B712 to Control Tower
• 2012
2286 PROJECT PROFILE
Four Points Communication Services Inc. 30 Gerber Industrial Drive, St Peters , Missouri
Kevin Pinson 636-278-3727 [email protected]
$197,000
Four Points Charleston Air Force Base
Charleston, SC • Fiber upgrades and infrastructure upgrades for the installation of fiber for security cameras In
• 2011
2280 Four Points Communication Services Inc. 30 Gerber Industrial Drive, St Peters , Missouri
Kevin Pinson 636-278-3727 [email protected]
$116,823
Smart City – Crown Castle Orlando, FL • This 64 Mile design-build is This 64 Mile design-build is a fiber to the cell site project, tying in all cell sites on Disney property with new fiber. This work is underground construction on both DOT right of way and Disney property; 2012
2278 PROJECT PROFILE
Smart City 3100 Bonnet Creek Road Lake Buena Vista, FL 32830
Carlos Vassell, Construction Manager 407.828.6696
$1,456,790
To create client facing PDFs of this matrix, change ”job number” text style in the style pallet to white text so that job numbers are not visible. Do NOT save the MS Word file
with white text.
Hypower Communications Projects
Communications Experience Matrix
FPL FiberNet Naples/Fort Myers, FL • Installation of over 300 miles of fiber optic network backbone and lateral conduit and cable installation connecting over 200 cell towers for cellular providers
• 2012 -2013
2267 PROJECT PROFILE
FP&L Fibernet 10650 S.R. 80 Fort Myers FL 33905
Eddy Lopez, Project Manager OSP Engineering and Construction 305-202-1337 [email protected]
$38,107,000
Indiana Telehealth Network Green County Hospital
Linton, IN • Backbone fiber to connect Hospitals in the areas to a state wide WAN
• 2011- Ongoing
2266 PROJECT PROFILE
Smithville Digital 1600 W. Temperance St. Ellettsville, IN 47429 United States
Bart Bretsch General Manager 812-876-0054 [email protected]
$243,000
AT&T IFL236 Hollywood, FL • Placement of 2 each 4” HDPE via directional bore on A1A for approximately 11,070’ providing future fiber optic network connectivity to other existing infrastructure
2246 AT&T 8601 W Sunrise Blvd. Room 1406 Plantation, FL 33322
Carl Gonzalez 954-747-4050 [email protected]
$618,525
AT&T 1E850065N Broward County, FL • Conduit reinforcement • 2012
2245 AT&T Broadband 8601 W Sunrise Blvd. #1406 Plantation, FL 33322
Carl Gozalez 954-476-2925 [email protected]
$337,000
AT&T IFL233 Hallendale Beach, FL • Placement of 2 each 4” HPDE via directional bore on A1A for approximately 6,250’ providing future fiber optic network connectivity to future infrastructure
2239 AT&T 8601 W Sunrise Blvd. Room 1406 Plantation, FL 33322
Carl Gonzalez 954-747-4050 [email protected]
$234,700
AT&T IFL211 Miami, FL • Placement of 3 each 4” HPDE via directional bore with manhole connectivity in paved surfaces on SR A1A in Hallendale Beach
AT&T 8601 W Sunrise Blvd. Room 1406 Plantation, FL 33322
Carl Gonzalez 954-747-4050 [email protected]
$329,939
FP&L Fibernet Broward County Metro
Broward County, FL • Placement of 3 ea 1 ½” conduits with 432 count fiber placed in pipe. Cell tower connectivity to FP&L Fibernet existing fiber backbone; 2012
2240 PROJECT PROFILE
FP&L Fibernet 10650 S.R. 80 Fort Myers FL 33905
Eddy Lopez, Project Manager OSP Engineering and Construction 305-202-1337 [email protected]
$3,902,500
City of Weston Fiber Optic Infrastructure Project
Weston, FL • Placement of 1 each micro-duct pipe with a 96 count fiber optic cable encased in it between
• 2009-2011
2234 PROJECT PROFILE
City of Weston/Clavin Giordano & Assoc., Inc. 1800 Eller Drive, Ste. 600 Fort Lauderdale, FL 33316
Joanne Maglietta 954-921-7781
$1,149,036
Verizon FTTP DE Delaware • Placement of a single 1 ¼” HDPE pipe via directional bore, plow, and trench methods for FiOS project
• 2009-2010
2229,2220 PROJECT PROFILE
Verizon 180 Sheree Boulevard, Suite 2100 Exton, PA 19341 United States
Susan Terry 610-280-2173 [email protected]
$7,800,000
FPL/FN Broward Laterals Broward County, FL • Outside plant lateral fiber to the cell site builds in Broward County
• 2010
2231 EPH-Dennis Miller
Billy Richards Armando Lopez-Fraga
FPL Fibernet 9250 W Flagler Miami, FL 33174
Tony Diaz 305-552-2272 [email protected]
$500,000
FPL/FN Broward Backbone Metro Broward County, FL
• Outside plant fiber to the cell site 2227 EPH
Dennis Miller Billy Richards
Armando Lopez-Fraga
FPL Fibernet 9250 W Flagler Miami, FL 33174
Tony Diaz 305-552-2272 [email protected]
$4,000,000
“I was with the inspector in Ft. Pierce on Wednesday morning and
would like to paraphrase some of his comments during the inspection: 1. The Highest Quality work he has seen in a
commercial installation for many years; 2. A high level Expertise in electrical installation is apparent; 3. Attention to detail is obvious;
During the inspection the Inspector raised some questions of which I could not answer so I reached out to Tom Budkey who spoke with authority
and courtesy and satisfied the inspector with his responses. The inspector was extremely complementary towards Tom and the manner in which he responded to him
showing the utmost respect at all times. Again another great example of the first class representation Tom provides not only to HYPOWER but also as the leading edge of the Allied
Fiber Network build. Many thanks for the high standards and it is a pleasure to work with such good professionals! Cheers,”
Andrew ThompsonDirector, Colocation Operations
Allied Fiber, LLC
“LCEC awarded two consecutive contracts to Hypower, Inc. , 2009-T-01 and 2010-T-01, based on their ability and price. Both of the contracts entailed the same scope of work, which included working through some of Southwest
Florida’s more environmentally sensitive areas. The project passed through the western edge of the Everglades National Park, The Florida Panther National Wildlife Refuge and the U.S. National Park Service along Hwy 29. These two contracts proved to be very difficult due to the environmental concerns. However Hypower was able to conquer all hurdles that nature could throw at them. The project consisted of changing out 59 two-pole structures with concrete two-pole structures on an energized 138kV transmission line with 14kV distribution underbuild. The Department of Environmental Protection and Army Corps of Engineers set very stringent permit regulations, which were followed to the letter. The two contracts were completed without any issues and LCEC would gladly have them back on our system in the future.”Jeffrey J. Slaybaugh Jr. Transmission Construction Coord/Project Mgr.
“I am writing this letter to comment on the outstanding performance of John Zoerhof (Hypower Project Manager) on some recent sensitive projects. ... John’s influence was evident in the team that ultimately performed the construction activities. The bore was placed underneath the waterway to depths of 100’, reamed numerous times to the correct circumference and the product fused and pulled back without incident. While they did encounter some unidentified utilities in the path of the physical duct bank and manhole placement on the upland areas, all were able to be accommodated and no loss of service or damage to any utility occurred. All conductors were installed, tested and the switching order to put them in service was carried out seamlessly. All in all, projects that might have been very complex were made to seem as nothing out of the ordinary for this group. And that is a relief when you are in the position of engineering the types of large scale projects I am frequently charged with managing.”Eliud “Eli” PerezEngineering LeaderFlorida Power and Light