Underground & Overhead Distribution • Fiber Optics Power & Communications Group Project Summary
Transcript
Page 1: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

Underground & Overhead Distribution • Fiber Optics

Power & Communications GroupProject Summary

Page 2: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

Hypower’s Power & Communications Group specializes in the installation of underground power, overhead FOC telecommunication infrastructure, large ductbank systems, WI-FI and DAS systems. We are uniquely qualified to assist utility companies, municipalities & developers expand power and communications facilities. Hypower’s resources include experienced project managers & an extensive equipment fleet. Our four Business Groups provide expertise providing an extraordinary level of efficiency and innovation. The Hypower team of highly specialized and trained engineers, technicians and professionals are specifically prepared to meet network development needs regardless of complexity, location or technology. We are available day or night for emergency restoration and disaster recovery.

Hypower Inc.Com

munica

tions

Communications Outside Plant Construction• Underground Conduit Placement

TrenchingPlowingDirectional DrillingAll Diameter BoresJack and Bore

• SplicingFiberCoaxCopper

• Manhole Placement• Aerial Construction• Cell Site Construction• Maintenance Contracts• Emergency Restoration• Project Management

Outside Plant Engineering

• Route Analysis & Conceptual Design

• Permitting, Private Easements• Drawings• Plan & Profile Construction• Signed & Sealed• Inspection Services

From Planning to Installation: Guided

by Innovation, Safety, Quality & Productivity-

Hypower has continually proven to be

“One Company. Powerful Solutions”

Power • Trenching• Medium Voltage Wire Placement• Cable Splicing/Installations• Full Overhead to Underground Conversions of Power• Manhole Placement• Duct Bank Infrastructure Installation• Switch, Transformer, and Junction Box installations• Directional Drilling

4kV to 34.5kV

• Aerial Fiber• Emergency Restoration• Maintenance• New Construction• Street Lighting• Design & Field Engineering

Distrib

utio

n

Page 3: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

Our EMR for 2014 is .81

Hypower takes a proactive role in employee & public safety. Our corporate culture includes an extraordinary emphasis on safety & loss prevention. Hypower’s full-time Safety Director administers our time-tested, proven safety policies & procedures. As our most valuable asset, Hypower invests in our employees by providing them with the tools, training, guidance, & the methods required to work safely & productively each & every day.

Safety/EMRQualityAt Hypower, Quality Begins & Ends With Our Customers

Our objectives are clear:To be recognized as the industry’s “Best in Class”, reflected by high quality, cost effective delivery of products & services.To reach this level of quality, Hypower emphasizes the identification, documentation & enterprise-wide implementation of Best Practices. Integration of continuous process improvement into everyday execution is accomplished through formal Lesson Learned analyses. Chartered Safety, Supervisor, & Leadership Academies foster “Best in Class” performance.

Key Components of Quality- The Hypower Way• Customer Focused• Results Driven• Employee Involvement

Resources

Properly LicensedOur staff includes:• Unlimited Electrical Contractor• Unlimited General Contractor• Unlimited Utility Contractor• FL State PE• Licenses in 28 States

Hypower Differentiators

Sen

ior V

ice Presid

ent

Eric Paul-HusEric is a hands-on VP who is on-site to ensure that Hypower’s reputation for quality is uncompromised. Leading by example, Eric has the know-how and the experience to deliver projects on time and on budget.

Pow

er D

ivisio

n M

anager

Vice

Pre

sident o

f Com

munica

tions

Raymond McCorkelRay’s 30 year background in the utility construction field includes a solid foundation in aerial & underground construction. He has extensive experience in long haul fiber, metro builds, Homeland Security, Disaster Recovery, and Ductbank construction.

John ZoerhoffJohn manages the Underground Power Division. John works directly on a face to face basis with the client, insuring consistent, reliable service and planning. His applies his extensive experience to avoid obstacles and offers quick resolution

• Leadership Development • Employee Involvement • Cost Containment Processes:

Equipment

Hypower’s multi-million dollar investment in a state of the art Heavy Equipment & Truck Fleet ensures our ability to facilitate each and every project. Proper maintenance & care with experienced operators enable on time & on budget project & delivery.

Page 4: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

Ave Maria Central Energy PlantImmokalee, Florida

Verizon FTTP Pennsylvania & DelawareInnerduct, fiber, handholds, throughout the Eastern counties of Pennsylvania and the entire state of Delaware.

FAU Stadium Duct Bank Extension

Boca Raton, FL

Hypower furnished & installed the electrical ducts system which included: 3,300 ft of ductbank (ducts are concrete encased with Schedule 80 PVC), temporary electric power, excavation, compaction and survey of trench line, flow-able fill at road crossings, new transformers andswitches, stadium switch placed on switch chamber and transformers, precast concrete pads, conduit future stadium transformer, manholes, switch chamber and transformer pads, cable, parallel feeders, to the two stadium transformers.

Smart City Orlando, Florida4 Mile design-build, fiber to the cell site

Project Showcase

Page 5: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

City CenterWest Palm Beach, FLDuct Bank System Around City Center In Downtown WPB Incorporating & Jack & Bore Across FEC Railway

FPL FibernetVarious Locations, FloridaNumerous projects since 2006, totaling over $30 million in completed work.

FP&L FiberNetBroward, Dade and Lee Counties, Florida300 Miles of (4) each 1.5” conduits with aerial strand placement throughout Broward, Dade, Palm Beach, and Lee County.

Allied Fiber Phase 2Atlanta GA to Miami, FL

Hypower was contracted to build approximately 800 miles fiber and 11 co-location sites in Jacksonville, Palm Coast, Edgewater, Melbourne, Jensen Beach, Lake Worth.• Fiber Count: 528 ,432, and 216• Allied Fiber CoLos located throughout

Florida and Georgia• Power: 150kw Protected AC & DC Power,

Backup Generator, HVAC

Project Showcase

Page 6: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

Dover Air Force Base Phase 1Dover Air Force Base, DE

Relocation of overhead electrical to underground. Scope included:

Robert’s Bay Cable & Directional BoreVenice, FLDirectional Bores, 1000 MCM Cable Was Placed

Terminal 18 at Port Everglades Fort Lauderdale, FloridaInstallation of 200+ Security Cameras, Conduit & Cat5 Cabling, Fiber Optic Cable, Network Switches & Nodes, Bridge Electrical Work

Lime Substation InterconnectSarasota, FLInstalled Duct Bank Infrastructure for the City of Sarasota included total 1000 KCMIL Copper Conductor installation

in conjunction with an inter-city infrastructure upgrade & Loop Tie between substations.

• Removal of existing 15kv overhead primary and placed it underground• Demolition of the existing 15kv overhead primary• Provided and installed 21,000 circuit feet of 400 MCM 15kv cable with directional boring• Provided and installed 5 new 600amp 15kv 4way pad mounted switches• Provided and installed 14 new 4-way above ground terminal cabinets• Provided and installed 1 new 75 kVA pad mounted transformer• Provided and installed 5 new 25 kVApad mounted transformers• Completed 300+ 15kv cable terminations• Reworked 18 building services from 1000 kva to 200 kVA• Provided and installed 36 new street lights transformers

Project Showcase

Page 7: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

LCEC/Cape Coral Cape Coral, Florida

Hypower installed 4500 LF of concrete encased duct-bank though the Future City Center Improvement area of Cape Coral, Florida as part of an underground design-build project.

Florida Atlantic University Infrastructure ImprovementsBoca Raton, FloridaHypower installed 7,000 feet of concrete encased duct bank from substation to the new chiller building

Flagler Memorial Bridge Bore CrossingWest Palm Beach, FloridaHypower forces expertly drilled a 2,500 LF directional Bore under the Intracoastal Waterway

Village at GulfstreamHallandale, FLCombination of Distribution / 12 way duct banks

Project Showcase

Page 8: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

Hypower Power Distribution Projects

Power Project Experience Matrix

Project Location Description JOB NUMBER Owner/ General Contractor Project Value

Town of Gulfstream Gulfstream, FL • Conversion of utilities for FPL, ATT Comcast from overhead to underground

• 2013-2014

6247 PROJECT PROFILE

EPH, JZ,

Town of Gulf Stream 100 Sea Drive Gulfstream, Florida 33483

Rita Taylor 561-276-5116 [email protected]

$157,6000

Market and Fronton Miami, FL • ROW Power Distribution Duct Bank Utility Work • 2013-2014

6246 EPH, JZ,

Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408

David Fite 305-377-6146 [email protected]

$214,400

Wilcox CSX RR Crossing Miami, FL • Directional Bore & Tie-In • 2013

6245 EPH, JZ,

Florida Power & Light Company 4200 Flagler St. Miami, FL 33134

Angel Vargas 305-442-5129 [email protected]

$198,400

Everglades Island Palm Beach, FL • OH - UG Conversion, Bore, Trench, Cable • 2012

6239 jz,cs,tm,eph

Town of Palm Beach 951 Old Okeechobee Road West Palm Beach, FL 33401

Charles R. (Chuck) Langley, P.E. 561-838-5440

$685,587

FAU Blvd. IRM (w/ 7043) Boca Raton, FL • Direct Buried Duct bank • Install IRM, FPL, ATT & COM • 2011-2012

6226, 7043 EPH, JZ,

FAU University Engineering & Utilities, Building #5, 777 Glades Road Boca Raton, FL 33431

Jeff Modlin, Associate Director, Engineering & Utilities 561-297-0239 [email protected]

$571,912

Capri Feeder Bonita Springs, FL • Directional Bore, Splice Boxes & Cable Install • 2012

6234, jz,rw,eph,cs Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408

Melissa Ebel, Senior Sourcing Specialist, 561-694-4893 [email protected]

$763,472

FPL Feeder Upgrades

West Palm Beach, FL • 2011-2012

6231,6232,6230 EPH, JZ,

Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408

Kaile Macon [email protected] 561-691-7133

$2,225,461

Florida Atlantic University Stadium

Boca Raton, FL • 3,300 ft.duct bank provide material, install duct and cable, transformers and switches

• 2012

6218 EPH, JZ,

Florida Atlantic University/Balfour Beatty 6100 Blue Lagoon Drive Miami, FL 33126

Justin J. Thorpe, LEED® AP 561-447-2114 x2007

$977,013

Dover Air Force Base Delaware • Bury overhead electrical to underground • 2010-2013

6217 PROJECT PROFILE

EPH, JZ,

CH2M Hill Constructors, Inc. 15010 Conference Center Dr. Suite 200 Chantilly, VA. 20151

Dorcas Clark 703-376-5098 [email protected]

$2,510,700

Flagler Memorial Bridge Crossing

West Palm Beach, FL • Directional Bore 2,500’ across Intracoastal Waterway, trench 500’ across Royal Poinciana Blvd. Install cable, 2 transformers and switch cabinet, demo existing infrastructure

• 2010-2012

6210 PROJECT PROFILE

EPH,JZ, TM

Florida Power and Light 500 Business Parkway Royal Palm Beach, FL

Sharon Parker 561-790-5030

$1,599,659

Distribution Line Storm Work

AR, LA, MS, TX • AR, LA, MS, TX service territory • 2012-2013

EPH, JZ, Entergy Arkansas, Inc. 7701 Frazier Pike Little Rock, AR 72206

Jerl Duvall 501-490-3732 [email protected]

$250,000

Cape Coral Transmission

Cape Coral, FL • Design - build duct bank, manholes and cable • 138 KV Underground Transmission • 2010-2012

6205-6 PROJECT PROFILE jz,rod white,eph

Lee County Electric Cooperative 4980 Bayline Drive Fort Myers, Florida 33917

Rick Fuson 239-656-2250 [email protected]

$10,200,747

To create client facing PDFs of this matrix, change ”job number” text style in the style pallet to white text so that job numbers are not visible. Do NOT save the MS Word file

with white text.

Page 9: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

Hypower Power Distribution Projects

Power Project Experience Matrix

Project Location Description JOB NUMBER Owner/ General Contractor Project Value

Town of Gulfstream Gulfstream, FL • Conversion of utilities for FPL, ATT Comcast from overhead to underground

• 2013-2014

6247 PROJECT PROFILE

EPH, JZ,

Town of Gulf Stream 100 Sea Drive Gulfstream, Florida 33483

Rita Taylor 561-276-5116 [email protected]

$157,6000

Market and Fronton Miami, FL • ROW Power Distribution Duct Bank Utility Work • 2013-2014

6246 EPH, JZ,

Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408

David Fite 305-377-6146 [email protected]

$214,400

Wilcox CSX RR Crossing Miami, FL • Directional Bore & Tie-In • 2013

6245 EPH, JZ,

Florida Power & Light Company 4200 Flagler St. Miami, FL 33134

Angel Vargas 305-442-5129 [email protected]

$198,400

Everglades Island Palm Beach, FL • OH - UG Conversion, Bore, Trench, Cable • 2012

6239 jz,cs,tm,eph

Town of Palm Beach 951 Old Okeechobee Road West Palm Beach, FL 33401

Charles R. (Chuck) Langley, P.E. 561-838-5440

$685,587

FAU Blvd. IRM (w/ 7043) Boca Raton, FL • Direct Buried Duct bank • Install IRM, FPL, ATT & COM • 2011-2012

6226, 7043 EPH, JZ,

FAU University Engineering & Utilities, Building #5, 777 Glades Road Boca Raton, FL 33431

Jeff Modlin, Associate Director, Engineering & Utilities 561-297-0239 [email protected]

$571,912

Capri Feeder Bonita Springs, FL • Directional Bore, Splice Boxes & Cable Install • 2012

6234, jz,rw,eph,cs Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408

Melissa Ebel, Senior Sourcing Specialist, 561-694-4893 [email protected]

$763,472

FPL Feeder Upgrades

West Palm Beach, FL • 2011-2012

6231,6232,6230 EPH, JZ,

Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408

Kaile Macon [email protected] 561-691-7133

$2,225,461

Florida Atlantic University Stadium

Boca Raton, FL • 3,300 ft.duct bank provide material, install duct and cable, transformers and switches

• 2012

6218 EPH, JZ,

Florida Atlantic University/Balfour Beatty 6100 Blue Lagoon Drive Miami, FL 33126

Justin J. Thorpe, LEED® AP 561-447-2114 x2007

$977,013

Dover Air Force Base Delaware • Bury overhead electrical to underground • 2010-2013

6217 PROJECT PROFILE

EPH, JZ,

CH2M Hill Constructors, Inc. 15010 Conference Center Dr. Suite 200 Chantilly, VA. 20151

Dorcas Clark 703-376-5098 [email protected]

$2,510,700

Flagler Memorial Bridge Crossing

West Palm Beach, FL • Directional Bore 2,500’ across Intracoastal Waterway, trench 500’ across Royal Poinciana Blvd. Install cable, 2 transformers and switch cabinet, demo existing infrastructure

• 2010-2012

6210 PROJECT PROFILE

EPH,JZ, TM

Florida Power and Light 500 Business Parkway Royal Palm Beach, FL

Sharon Parker 561-790-5030

$1,599,659

Distribution Line Storm Work

AR, LA, MS, TX • AR, LA, MS, TX service territory • 2012-2013

EPH, JZ, Entergy Arkansas, Inc. 7701 Frazier Pike Little Rock, AR 72206

Jerl Duvall 501-490-3732 [email protected]

$250,000

Cape Coral Transmission

Cape Coral, FL • Design - build duct bank, manholes and cable • 138 KV Underground Transmission • 2010-2012

6205-6 PROJECT PROFILE jz,rod white,eph

Lee County Electric Cooperative 4980 Bayline Drive Fort Myers, Florida 33917

Rick Fuson 239-656-2250 [email protected]

$10,200,747

To create client facing PDFs of this matrix, change ”job number” text style in the style pallet to white text so that job numbers are not visible. Do NOT save the MS Word file

with white text.

Power Project Experience Matrix

MIL-CON Overhead 15kV Feeders

Merritt Island, FL • Replace Overhead G Line And R Line 15kV Feeders 6196 PROJECT PROFILE

MIL-CON 6142 Lake Gray Blvd. Jacksonville, FL 32244

Jerry Robinson 321-452-5489

$1,327,121

Davie Blvd River Crossing

Fort Lauderdale, FL • Directional Bore across the New River at the Davie Blvd Bridge Installation of 1000 KCMIL Copper Conductor and pole risers on each side

• 2010

6182 EPH, JZ,

Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408

John Falciglia 954-658-2495

$235,000

FAU Infrastructure Improvements

Boca Raton, FL • Concrete encased duct bank 7,000 feet from substation to new chiller building; 750 MCM copper cable Installation, 2 risers in substation, vista switches, switching to accommodate redirection of campus feeders

• 2009-2011

6176 PROJECT PROFILE

EPH, JZ,

FAU University Engineering & Utilities Building #5, 777 Glades Road Boca Raton, FL 33431

Jeff Modlin, Associate Director, Engineering & Utilities 561-297-0239 [email protected]

$2,019,690

Port Everglades Terminal 18 Power and Telecommunication Feeds

Fort Lauderdale, FL • Multiple Directional Bore and Trench Installations in conjunction with the Building of Terminal 18 for the arrival of Carnival’s largest Cruise Ship

• 2009-2010

6174 EPH, JZ,

Hewett-Kier Construction 3451 NW 14th Ave Pompano Beach, FL 33064

Jim Hewett, President 954-946-4224 [email protected]

$90,000

Northeast Substation St. Petersburg, FL • Concrete encased 8” multi duct bank in new substation 6159 EPH, JZ,

Progress Energy 299 First Avenue North, St. Petersburg, Florida 3701

Jeffrey Nelson 919-546-4868

$275,100

Hutchinson Island

Jenson Beach, FL • Directional bore 6 way 6” duct bank, 13 manholes along east side of A1A, redirect AT&T line

• 2008-2010

6154 EPH, JZ,

Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408

Ellis Clenton 954-382-5120

$2,136,001

University of Miami Utility Design Academic Building Power Duct Bank

Miami, FL • Telecom concrete encased trench duct bank and manholes • 2008-2009

6148 EPH, JZ,

Elcon Electric 3500 Park Central Blvd Pompano Beach, FL 33064

Jill Mathison 954-979-5445

$271,344

Robert’s Bay Crossing

Venice, FL • Directional bore, plow/dredge and cable installation across water body; 1000 MCM copper cable spliced on barges and submerged

• 2008-2009

6139 EPH, JZ,

Casper Colisimo 135 S. Banana River Drive Merritt Island, FL 32952

Norm Van Pelt, PM 321-459-3848 [email protected]

$600,000

Village @ Gulfstream Infrastructure Improvements

Hallandale, FL • Transmission, distribution, primary and ATT duct bank installations throughout the property in conjunction with development build out including residential, recreational, restaurant and shopping areas

• 2008-2011

6138 PROJECT PROFILE

EPH, JZ,

The Law Company 345 Riverview, P.O. Box 1139 Wichita, KS 67201-1139

Doug Kimple 316-268-0200 [email protected]

$1,750,000

PBCC Science & Technology Building Power Feeder Installation

West Palm Beach, FL • Concrete encased duct bank, transformer and switch installation, high voltage cable installation, ATS installation and programming

• 2008

6133 EPH, JZ,

James A Cummings 2101 Centerpark West Drive Suite 160 West Palm Beach, FL 33409

Christian Guarneri 561-655-1982

$187,000

Marymount Substation

Boca Raton, FL • Concrete encased duct bank installation in conjunction with large development contract

• 2007

6125 EPH, JZ,

Florida Power and Light 700 Universe Blvd. Juno Beach, FL 33408

Damian Vallas 561- 691-2134

$151,740

City Center and Clematis Garage

West Palm Beach, FL • Placement of MH’s and conduit for several different utilities (FPL, ATT, Peoples Gas) in downtown West Palm Beach

• Organized utility consortium to minimize construction in downtown area by doing joint trench venture

• 2009

6124, 6082 PROJECT PROFILE

EPH, JZ,

Catalfumo Construction 4300 Catalfumo Way North Palm Beach Gardens, FL 33410

Frank Melehan,PM 561-694-8846 [email protected]

$1,595,380

Page 10: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

Hypower Communications Projects

Communications Experience Matrix

Project Location Description JOB NUMBER Owner/ General Contractor Project Value

Allied Fiber-Phase 2 Atlanta to Miami, FL • Atlanta to Miami, approximately 800 miles fiber and build 14 co-location sites with a landing site in Jacksonville

• 2013- ongoing

2325 PROJECT PROFILE

EPH, Ray Mc Corkle, R White

R Carrero

Allied Fiber 601 Lexington Ave 59th floor New York New York 10022

Mr. Patrick Opelt Vice-President 317-453-0336 [email protected]

$13,000,000

Velocitel R1717 Hickory Road

Petersburg, VA • AT&T LTE Upgrade • 2012

2320 Velocitel/AT&T 4164 Innslake Dr. Suite B, Glen Allen, VA

Jeff Woods 804-217- 7088 [email protected]

$212,280

FPL/Fibernet Various Locations: Venice, North Port , Sarasota, FL

• Outside plant fiber build;FTTCS • 2012-2013

2318 EPH-Dan DiSalvo-N/A Armando Lopez-Fraga

FPL/FiberNet 9250 W Flagler Miami, FL 33174

Jennifer Pierre 305-552-2869 [email protected]

$546,800

FPL/Fibernet MSA Various Florida Locations

• Installation of fiber optic network backbone and lateral conduit and cable; 2014

2305 EPH, Dan DiSalvo,

Armando Lopez-Fraga

FPL/FiberNet 9250 W Flagler Miami, FL 33174

Jennifer Pierre 305-552-2869 [email protected]

$1,312,947

Four Points MacDill Air Force Base

Tampa, FL • Replacing and relocating fiber optic cable and placing copper cable to new facilities; 2011-2013

2299 PROJECT PROFILE

Four Points Communication Services Inc. 30 Gerber Industrial Drive, St Peters , Missouri

Chris Schrader 636-278-3727 ext. 134 [email protected]

$500,000

FPL/Fibernet Various Florida Locations

• Installation of fiber optic network backbone and lateral conduit and cable

• 2012

2288 EPH

Dan DiSalvo N/A

Armando Lopez-Fraga

FPL/FiberNet 9250 W Flagler Miami, FL 33174

Hamad Shah 305-552-2019 [email protected]

$500,000

TMP-002312 Tampa Tower Locations

Tampa, FL • Fiber optic lateral BB to the property line of 36 sites from the existing FPL BB

• 2012

2296 PROJECT PROFILE

EPH, Dan DiSalvo,

FiberLight, LLC 792 S. Military Trail Deerfield Beach Florida 33442

Chris Pancione 954-596-2559 [email protected]

$310,100

Level 3-Communications Tampa, FL • Gunn Highway • Pasco County Road Improvements fiber optic cable relocation

project; 2012 • Lois Avenue • City of Tampa road improvements fiber optic cable relocation

project; 2012 • Sunrise, FL, I595 from Hiatus Road to Nob Hill Road; 2012

2290 EPH

Ray McCorkel N/A

Armando Lopez-Fraga

Level (3) Communications 2121 W Prospect Road Ft Lauderdale, FL 33309

Bob Priestap 813-349-1477 [email protected]

$502,000

Four Points Shaw Air Force Base

Sumter, SC • Design build of fiber infrastructure; the repair and replace of underground fiber optic cable from B712 to Control Tower

• 2012

2286 PROJECT PROFILE

Four Points Communication Services Inc. 30 Gerber Industrial Drive, St Peters , Missouri

Kevin Pinson 636-278-3727 [email protected]

$197,000

Four Points Charleston Air Force Base

Charleston, SC • Fiber upgrades and infrastructure upgrades for the installation of fiber for security cameras In

• 2011

2280 Four Points Communication Services Inc. 30 Gerber Industrial Drive, St Peters , Missouri

Kevin Pinson 636-278-3727 [email protected]

$116,823

Smart City – Crown Castle Orlando, FL • This 64 Mile design-build is This 64 Mile design-build is a fiber to the cell site project, tying in all cell sites on Disney property with new fiber. This work is underground construction on both DOT right of way and Disney property; 2012

2278 PROJECT PROFILE

Smart City 3100 Bonnet Creek Road Lake Buena Vista, FL 32830

Carlos Vassell, Construction Manager 407.828.6696

$1,456,790

To create client facing PDFs of this matrix, change ”job number” text style in the style pallet to white text so that job numbers are not visible. Do NOT save the MS Word file

with white text.

Page 11: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

Hypower Communications Projects

Communications Experience Matrix

FPL FiberNet Naples/Fort Myers, FL • Installation of over 300 miles of fiber optic network backbone and lateral conduit and cable installation connecting over 200 cell towers for cellular providers

• 2012 -2013

2267 PROJECT PROFILE

FP&L Fibernet 10650 S.R. 80 Fort Myers FL 33905

Eddy Lopez, Project Manager OSP Engineering and Construction 305-202-1337 [email protected]

$38,107,000

Indiana Telehealth Network Green County Hospital

Linton, IN • Backbone fiber to connect Hospitals in the areas to a state wide WAN

• 2011- Ongoing

2266 PROJECT PROFILE

Smithville Digital 1600 W. Temperance St. Ellettsville, IN 47429 United States

Bart Bretsch General Manager 812-876-0054 [email protected]

$243,000

AT&T IFL236 Hollywood, FL • Placement of 2 each 4” HDPE via directional bore on A1A for approximately 11,070’ providing future fiber optic network connectivity to other existing infrastructure

2246 AT&T 8601 W Sunrise Blvd. Room 1406 Plantation, FL 33322

Carl Gonzalez 954-747-4050 [email protected]

$618,525

AT&T 1E850065N Broward County, FL • Conduit reinforcement • 2012

2245 AT&T Broadband 8601 W Sunrise Blvd. #1406 Plantation, FL 33322

Carl Gozalez 954-476-2925 [email protected]

$337,000

AT&T IFL233 Hallendale Beach, FL • Placement of 2 each 4” HPDE via directional bore on A1A for approximately 6,250’ providing future fiber optic network connectivity to future infrastructure

2239 AT&T 8601 W Sunrise Blvd. Room 1406 Plantation, FL 33322

Carl Gonzalez 954-747-4050 [email protected]

$234,700

AT&T IFL211 Miami, FL • Placement of 3 each 4” HPDE via directional bore with manhole connectivity in paved surfaces on SR A1A in Hallendale Beach

AT&T 8601 W Sunrise Blvd. Room 1406 Plantation, FL 33322

Carl Gonzalez 954-747-4050 [email protected]

$329,939

FP&L Fibernet Broward County Metro

Broward County, FL • Placement of 3 ea 1 ½” conduits with 432 count fiber placed in pipe. Cell tower connectivity to FP&L Fibernet existing fiber backbone; 2012

2240 PROJECT PROFILE

FP&L Fibernet 10650 S.R. 80 Fort Myers FL 33905

Eddy Lopez, Project Manager OSP Engineering and Construction 305-202-1337 [email protected]

$3,902,500

City of Weston Fiber Optic Infrastructure Project

Weston, FL • Placement of 1 each micro-duct pipe with a 96 count fiber optic cable encased in it between

• 2009-2011

2234 PROJECT PROFILE

City of Weston/Clavin Giordano & Assoc., Inc. 1800 Eller Drive, Ste. 600 Fort Lauderdale, FL 33316

Joanne Maglietta 954-921-7781

$1,149,036

Verizon FTTP DE Delaware • Placement of a single 1 ¼” HDPE pipe via directional bore, plow, and trench methods for FiOS project

• 2009-2010

2229,2220 PROJECT PROFILE

Verizon 180 Sheree Boulevard, Suite 2100 Exton, PA 19341 United States

Susan Terry 610-280-2173 [email protected]

$7,800,000

FPL/FN Broward Laterals Broward County, FL • Outside plant lateral fiber to the cell site builds in Broward County

• 2010

2231 EPH-Dennis Miller

Billy Richards Armando Lopez-Fraga

FPL Fibernet 9250 W Flagler Miami, FL 33174

Tony Diaz 305-552-2272 [email protected]

$500,000

FPL/FN Broward Backbone Metro Broward County, FL

• Outside plant fiber to the cell site 2227 EPH

Dennis Miller Billy Richards

Armando Lopez-Fraga

FPL Fibernet 9250 W Flagler Miami, FL 33174

Tony Diaz 305-552-2272 [email protected]

$4,000,000

Page 12: Project Summary - Hypower Inc. · Florida Power & ight Company 4 Flagler St. Miami, F 4 Angel argas 305- 44-5129 Angel.argas@fpl.com $,4 Everglades Island Palm each, FL x OH -G Conversion,

“I was with the inspector in Ft. Pierce on Wednesday morning and

would like to paraphrase some of his comments during the inspection: 1. The Highest Quality work he has seen in a

commercial installation for many years; 2. A high level Expertise in electrical installation is apparent; 3. Attention to detail is obvious;

During the inspection the Inspector raised some questions of which I could not answer so I reached out to Tom Budkey who spoke with authority

and courtesy and satisfied the inspector with his responses. The inspector was extremely complementary towards Tom and the manner in which he responded to him

showing the utmost respect at all times. Again another great example of the first class representation Tom provides not only to HYPOWER but also as the leading edge of the Allied

Fiber Network build. Many thanks for the high standards and it is a pleasure to work with such good professionals! Cheers,”

Andrew ThompsonDirector, Colocation Operations

Allied Fiber, LLC

“LCEC awarded two consecutive contracts to Hypower, Inc. , 2009-T-01 and 2010-T-01, based on their ability and price. Both of the contracts entailed the same scope of work, which included working through some of Southwest

Florida’s more environmentally sensitive areas. The project passed through the western edge of the Everglades National Park, The Florida Panther National Wildlife Refuge and the U.S. National Park Service along Hwy 29. These two contracts proved to be very difficult due to the environmental concerns. However Hypower was able to conquer all hurdles that nature could throw at them. The project consisted of changing out 59 two-pole structures with concrete two-pole structures on an energized 138kV transmission line with 14kV distribution underbuild. The Department of Environmental Protection and Army Corps of Engineers set very stringent permit regulations, which were followed to the letter. The two contracts were completed without any issues and LCEC would gladly have them back on our system in the future.”Jeffrey J. Slaybaugh Jr. Transmission Construction Coord/Project Mgr.

“I am writing this letter to comment on the outstanding performance of John Zoerhof (Hypower Project Manager) on some recent sensitive projects. ... John’s influence was evident in the team that ultimately performed the construction activities. The bore was placed underneath the waterway to depths of 100’, reamed numerous times to the correct circumference and the product fused and pulled back without incident. While they did encounter some unidentified utilities in the path of the physical duct bank and manhole placement on the upland areas, all were able to be accommodated and no loss of service or damage to any utility occurred. All conductors were installed, tested and the switching order to put them in service was carried out seamlessly. All in all, projects that might have been very complex were made to seem as nothing out of the ordinary for this group. And that is a relief when you are in the position of engineering the types of large scale projects I am frequently charged with managing.”Eliud “Eli” PerezEngineering LeaderFlorida Power and Light

Hypower Inc. Power & Communications Group5913 NW 31st AvenueFort Lauderdale, FL 33309hypowerinc.com