13
Beaufort County Public Works Stormwater Infrastructure Project Summary Project Summary: Sheldon Vacuum Truck - Witsell Road, Kline Circle, Huspah Creek Drive, Paige Point Bluff, Activity: Routine/Preventive Maintenance George Williams Lane, Indian Point Road, Jesse Chisholm Road, Bailey Circle, Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline pipes, (32) driveway pipes and 40 L.F. of roadside pipe. CPJ / Channel Pipe - Jetted 10.0 $223.40 $104.60 $15.62 $0.00 $493.17 $149.55 CLPJT / Crossline Pipe - Jetted 52.0 $1,161.68 $458.24 $135.78 $0.00 $777.66 $2,533.36 Before Completion: Jun-15 Total Cost 2015-308A / Sheldon Vacuum Truck Labor Labor Equipment Material Narrative Description of Project: $22.79 $0.00 $0.00 $0.00 Contractor Hours Cost Cost Cost Cost $448.54 STBY / Stand By 10.0 $66.55 $9.04 $13.23 $36.02 $166.54 AUDIT / Audit Project 1.0 $6,875.41 148.0 $3,311.45 $967.91 $380.10 $0.00 $2,215.95 $3,311.45 $6,875.41 CLPINP / Crossline Pipe - Inspected 2.0 $44.44 $8.68 $22.60 $0.00 $29.70 $105.42 69.0 $1,546.38 $312.48 $197.06 $0.00 $1,036.44 $3,092.36 RD / Rainy Day 4.0 $89.36 $17.36 $0.00 $0.00 $59.82 DPJT / Driveway Pipe - Jetted $223.40 $0.00 $149.55 2015-308A / Sheldon Vacuum Truck Sub Total Grand Total 148.0 $967.91 $380.10 $0.00 $2,215.95
Transcript
Page 1: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

Beaufort CountyPublic Works

Stormwater InfrastructureProject Summary

Project Summary: Sheldon Vacuum Truck - Witsell Road, Kline Circle, Huspah Creek Drive, Paige Point Bluff, Activity: Routine/Preventive Maintenance

George Williams Lane, Indian Point Road, Jesse Chisholm Road, Bailey Circle,

Kelly Road, H.E. Wilson Lane and Middlefield Circle

IndirectLabor

During After

Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline pipes, (32) driveway pipes and 40 L.F. of roadside pipe.

CPJ / Channel Pipe - Jetted 10.0 $223.40 $104.60 $15.62 $0.00 $493.17$149.55CLPJT / Crossline Pipe - Jetted 52.0 $1,161.68 $458.24 $135.78 $0.00 $777.66 $2,533.36

Before

Completion: Jun-15

Total Cost2015-308A / Sheldon Vacuum Truck Labor Labor Equipment Material

Narrative Description of Project:

$22.79 $0.00 $0.00 $0.00

ContractorHours Cost Cost Cost Cost

$448.54STBY / Stand By 10.0 $66.55 $9.04

$13.23 $36.02

$166.54

AUDIT / Audit Project 1.0

$6,875.41148.0 $3,311.45 $967.91 $380.10 $0.00 $2,215.95

$3,311.45 $6,875.41

CLPINP / Crossline Pipe - Inspected 2.0 $44.44 $8.68 $22.60 $0.00 $29.70 $105.42

69.0 $1,546.38 $312.48 $197.06 $0.00 $1,036.44 $3,092.36RD / Rainy Day 4.0 $89.36 $17.36 $0.00 $0.00 $59.82DPJT / Driveway Pipe - Jetted

$223.40 $0.00 $149.552015-308A / Sheldon Vacuum Truck Sub Total

Grand Total 148.0 $967.91 $380.10 $0.00 $2,215.95

Page 2: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

BAILE

Y CIR

BAILEY RD

NIX RD

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: SheldonVacuum Truck-Bailey CircleActivity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 100 200 300 40050Feet 1 inch = 210 feet

Prepared By: BC Stormwater Management UtilityDate Print:08/04/2015File:C:\project summaries map/Sheldon Vacuum Truck-Bailey Circle_2015-308A

Jetted (1) crossline pipe.

Jetted (5) drivewaypipes.

Page 3: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

PAIGE POINT BLF

HAULOVER CREEK DR

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: SheldonVacuum Truck-Paige PointBluff Activity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 120 240 360 48060Feet 1 inch = 250 feet

Prepared By: BC Stormwater Management UtilityDate Print:08/04/2015File:C:\project summaries map/Sheldon Vacuum Truck-Paige Point Bluff_2015-308A

Jetted (1) crossline pipe.

Page 4: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

WITSELL RD

COOSAW PLANTATION DR

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: SheldonVacuum Truck-Witsell RoadActivity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 50 100 150 20025Feet 1 inch = 100 feet

Prepared By: BC Stormwater Management UtilityDate Print:08/04/2015File:C:\project summaries map/Sheldon Vacuum Truck-Witsell Road_2015-308A

Jetted (1) crossline pipe.

Page 5: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

WITSELL RD

BOWERS RD

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: SheldonVacuum Truck-Witsell RoadActivity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 80 160 240 32040Feet 1 inch = 170 feet

Prepared By: BC Stormwater Management UtilityDate Print:08/04/2015File:C:\project summaries map/Sheldon Vacuum Truck-Witsell Road_2015-308A

Jetted (1) crossline pipe.

Page 6: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

GEORGE WILLIAMS LN

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: Sheldon Vacuum Truck-George WilliamsLaneActivity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 100 200 300 40050Feet 1 inch = 210 feet

Prepared By: BC Stormwater Management UtilityDate Print:08/04/2015File:C:\project summaries map/Sheldon Vacuum Truck- George Williams Lane_2015-308A

Jetted (2) driveway pipes.

Jetted (3) driveway pipes.

Jetted (3) driveway pipesand (1) access pipe.

Page 7: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

HE WILSON LN

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: Sheldon Vacuum Truck- HE Wilson LaneActivity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 40 80 120 16020Feet

1 inch = 83 feetPrepared By: BC Stormwater Management UtilityDate Print:08/05/2015File:C:\project summaries map/Sheldon Vacuum Truck-HE Wilson Lane_2015-308A

Jetted (1) crosslinepipe.

Page 8: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

")

")

")

")

")

")

")

")")

")

")

#0#0

#0#0

#0")

TRAS

K PK

WY

HUSPAH CREEK DR

FERTILE RD

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: Sheldon Vacuum Truck- Huspah Creek Drive Channel #1Activity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 160 320 480 64080Feet

1 inch = 330 feet Prepared By: BC Stormwater Management UtilityDate Print:08/05/2015File:C:\project summaries map/Sheldon Vacuum Truck-Huspah Creek Drive Channel #1_2015-308A

Jetted (3) drivewaypipes.

Jetted (2) driveway pipes and (1) crossline pipe.

Jetted (1) crosslinepipe.

Page 9: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

INDIAN POINT RDJOHNSON RD

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: Sheldon Vacuum Truck-Indian Point RoadActivity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 80 160 240 32040Feet 1 inch = 170 feet

Prepared By: BC Stormwater Management UtilityDate Print:08/04/2015File:C:\project summaries map/Sheldon Vacuum Truck- Indian Point Road_2015-308A

Jetted (4) driveway pipes.

Jetted (4) driveway pipes.

Page 10: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

JESS

E CHI

SHOL

M RD

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: Sheldon Vacuum Truck-Jesse ChisholmRoadActivity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 80 160 240 32040Feet 1 inch = 170 feet

Prepared By: BC Stormwater Management UtilityDate Print:08/04/2015File:C:\project summaries map/Sheldon Vacuum Truck- Jesse Chisholm Road_2015-308A

Jetted (3) drivewaypipes.

Jetted (1) driveway pipe.

Page 11: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

KELL

Y RD

SHELDON DR

GEORGE WILLIAMS LN

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: Sheldon Vacuum Truck-Kelly RoadActivity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 80 160 240 32040Feet 1 inch = 170 feet

Prepared By: BC Stormwater Management UtilityDate Print:08/04/2015File:C:\project summaries map/Sheldon Vacuum Truck- Kelly Road_2015-308A

Jetted (2) driveway pipes.

Page 12: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

KLINE CIR

KEANS NECK RDHUNT TER

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: Sheldon Vacuum Truck- Kline CircleActivity: VacuumTruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 20 40 60 8010Feet 1 inch = 50 feet

Prepared By: BC Stormwater Management UtilityDate Print:12/29/09File:C:\project summaries map/Sheldon Vacuum Truck-Kline Circle_2015-308A

Cleaned out 40 LFof roadside pipe.

Page 13: Project Summary...Kelly Road, H.E. Wilson Lane and Middlefield Circle Indirect Labor During After Project improved 40 L.F. of drainage system. Jetted (1) access pipe, (8) crossline

MIDD

LEFIE

LD C

IR

JEFFERSON PARK CT

LegendDrainage Type

Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe

®Project: SheldonVacuum Truck-MiddlefieldCircleActivity: Vacuum TruckProject #:2015-308ATownship:SheldonCompleted:June 2015

0 50 100 150 20025Feet 1 inch = 100 feet

Prepared By: BC Stormwater Management UtilityDate Print:08/18/2015File:C:\project summaries map/Sheldon Vacuum Truck- Middlefield Circle_2015-308A

Jetted (1) crosslinepipe.


Recommended