PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT Commercial Registry December 28, 2008 This publication was produced for review by the United States Agency for International Development. It was prepared by Pedro Valdes.
Transcript
Page 1: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

PROJECT TEMPLATES

CRA IT APPLICATION DEVELOPMENT Commercial Registry

December 28, 2008

This publication was produced for review by the United States Agency for International Development. It was prepared by Pedro Valdes.

Page 2: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

PROJECT TEMPLATES

CRA IT APPLICATION DEVELOPMENT Commercial Registry

TECHNICAL ASSISTANCE FOR POLICY REFORM II

CONTRACT NUMBER: 263-C-00-05-00063-00

BEARINGPOINT, INC.

USAID/EGYPT POLICY AND PRIVATE SECTOR OFFICE

DECEMBER 28, 2008

AUTHOR:

PEDRO VALDES

DISCLAIMER:

The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.

Page 3: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II i CRA IT Application Development

CONTENTS 1.0 INSTRUCTIONS .......................................................................................... 1

1.1 Naming Conventions ....................................................................................................... 1 1.2 Document Names Samples ............................................................................................. 3

1.3 Contact List ...................................................................................................................... 4

1.4 Meeting Agenda ............................................................................................................... 6

1.5 Minutes of Meetings ......................................................................................................... 7

1.6 Team Members Weekly Reports ..................................................................................... 8

1.7 Team Leaders Weekly Reports ....................................................................................... 9

1.8 Managers Weekly Reports ............................................................................................ 11

1.9 Monthly Status Report ................................................................................................... 13

Page 4: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II ii CRA IT Application Development

AUTHORS

Pedro Valdes, Manager BearingPoint, Inc. Technical Assistance for Policy Reform II 8 El Sad El Aali Street, 18

th Floor

Dokki, Giza T: +2 02 335 5507 F: +2 02 337 7684 M: +2 010 600 4679

[email protected]

Date Document

Version

Document Revision Description Document Author

09-24-08 1 Initial Draft Pedro Valdes

10-15-08 2 Meeting Agenda Template Added Pedro Valdes

12-28-08 3 Project Issue and Change Request forms added Pedro Valdes

Approval

Date

Approved

Version

Approver Role Approver

Page 5: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 1 CRA IT Application Development

1.0 INSTRUCTIONS

1.1 Naming Conventions

In order to ensure that the project maintain a well organized repository of project documents;

a naming convention for the different types of documents must be establish. This preliminary

list will be used as an input in the preparation of the Configuration Management Plan. Every

time the need for new types of documents arises, it will be documented in this list.

Therefore, all project team members MUST follow the conventions described below when

preparing deliverables, reports and other documents. Should the need arise to define

additional categories at any given level, it MUST be communicated to the Project Manager,

which will initiate the change of the current document.

The document name comprises the following elements and their corresponding clssifictions:

Organization: It is any organization or agency; internal or internal to the project that

prepared the document.

CRA Commercial Registry Authority

Page 6: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 2 CRA IT Application Development

TPR: Technical Assistance for Policy reform TAPR II

SKR: Sakhr Software Company

ETA: Egyptian Tax Authority

Etc.

Document Type: It is any type of document used in the project.

PRP: Project Plan

PRM: Project Management

DEL: Deliverable

REP: Report

MOM: Minutes of Meetings

MAG: Meeting Agenda

Etc.

Document Sub-Type: It is any required classification (if any) to better qualify the document:

SP: Sub Plan

MP: Master Plan

WR: Weekly Report

MR: Monthly Report

AT: Attachment

IN: Internal

EX: External

TM: Team Members

TL: Team Leads

MG: Managers

Version Number: When required (V99) with 99 indicating the version number

Author: Initials (2) of the author of the document. Initials for the project team members will

be maintained in the Contact List.

Date of the Document: The date of the document in the format MM-DD-YYYY

Page 7: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 3 CRA IT Application Development

1.2 Document Names Samples

The list below represents some samples of documents named after the conventions.

DOCUMENT NAME DESCRIPTION

SKR-REP-WR-NN-2008-09-15 Weekly Report Prepared By Mr. NN on September 15, 2008

TPR-MOM-PV-2008-09-24 Minutes of Meeting Prepared By Pedro Valdes on September 24, 2008

PRP-SP-V01-ANALYSIS-PHASE Project Sub Plan version 1 of Analysis Phase

DEL-01-FUNCTIONAL SPECIFICATIONS Project Deliverable

TPR-MAG-TM-2008-09-20 Meeting Agenda for Team Members Meeting to be held September 20, 2008

CRA-MAG-MG-2008-09-22 Meeting Agenda for Managers Meeting to be held September 22, 2008

Page 8: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 4 CRA IT Application Development

1.3 Contact List

CRA IT APPLICATION DEVELOPMENT PROJECT

CONTACT LIST

NAME INI. POSITION TELEPHONE E-MAIL

DR. MOSTAFA ABOU EL ENEIN

MA CHAIRMAN OF CRA

M: 012 742 2750

T: 26720452

F: 26720453

[email protected]

MR. AMR HEGAZY AH CRA – OPERATIONS MANAGER

M: 011 450 1000

T: 26720452

F:

[email protected]

MRS. MONIQUE COURCHESNE

MC TAPR II – CRA MODERNIZATION COORDINATOR

M: 012 795 3849

T:

F:

[email protected]

MR. PEDRO VALDES

PV TAPR II – PROJECT MANAGER

M: 010 600 4679

T: 33377684

F:

[email protected]

MRS. SAWSAN FARAHAT MOHAMED

SF CRA – HEAD OF INVESTMENT OFFICE

M: 018 156 1468

T: 22633790

F:

[email protected]

MR. MOHAMED KAMAL EL DEEN

MK CRA – HEAD OF MAIN CAIRO OFFICE

M: 012 579 5758

T: 27979902

F:

[email protected]

MR. GAMAL IBRAHIM

GI

CRA – GENERAL MANAGER COMMERCIAL REGISTRIES

M: 012 373 6093

T: 29186021

F:

[email protected]

MR. NADER MOHAMED EL SHARNOBY

NS CRA – IT MANAGER

M: 010 170 3553

T: 26720452

F:

[email protected]

MR.MOSTAFA RAMADAN HAMMAD

MR CRA – IT SPECIALIST

M: 011 464 7999

T: 26720452

F:

[email protected]

MR. MOHAMED TAREK AZZAM

MT CRA – IT SPECIALIST

M: 010 188 2879

T: 26720452

F:

[email protected]

MS AMIRA ABDEL GHAFFAR

AG TAPR II – LEGAL ADVISOR

M: 010 306 2438

T: 33377684

F:

[email protected]

Page 9: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 5 CRA IT Application Development

CRA IT APPLICATION DEVELOPMENT PROJECT

CONTACT LIST

NAME INI. POSITION TELEPHONE E-MAIL

MR. MOUSTAFA EL-SHAFIE

MS TAPR II – TRAINING ADVISOR

M: 012 020 0386

T: 33377684

F:

[email protected]

MR. ISMAIL ZIDAN IZ TAPR II – QUALITY MANAGER

M: 012 780 5115

T: 33377684

F:

[email protected]

MR. YASSER MAREI YM SAKHR – PMO MANAGER

M: 010 162 1156

T: 22749929

F: 22740044

[email protected]

MR. MOHAMED DIAB

MD SAKHR – PROJECT MANAGER

M: 011 189-0003

T: 22749929

F: 22740044

[email protected]

MR. TAREK EID TE SAKHR – TECHNICAL MANAGER

M: 012 253 5454

T: 22749929

F: 22740044

[email protected]

MR. MOSTAFA EZZAT

ME SAKHR – TECHNICAL MANAGER

M: 010 562 0789

T: 22749929

F: 22740044

[email protected]

MRS. MANAL WILLIAM

MW SAKHR – DESIGNER MANAGER

M: 010 169 0658

T: 22749929

F: 22740044

[email protected]

GEN. AHMED SHEHAB

GS MSAD – PROJECT GENERAL MANAGER

M: 012 357 2771

T: 33315626

F: 37607222

[email protected]

MR. MOSAAD MM MSAD – DB EXPERT

M: 012 357 2771

T: 33315626

F: 37607222

DR. SAMIR A. EL GAMMAL

DM GOEIC – CIO MINISTER’S ADVISOR

M: 012 313

T: 268 3241

F: 268 1733

[email protected]

MAJ. ALAA ABDEL KARIM

AA GOEIC – US FOR IT AND DECISION SUPPORT

M: 012 398 2539

T: 2266 9620

F: 22669342

[email protected]

MR. AHMED MANSOUR

AM

IDA- GM TECHNOLOGY & INFORMATION SYSTEMS

M: 010 119 7588

T: 2795 2923

F: 2794 4984

[email protected]

Page 10: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 6 CRA IT Application Development

1.4 Meeting Agenda

CRA IT APPLICATION DEVELOPMENT PROJECT

MEETING AGENDA

FROM: POSITION: DATE: MM/DD/YYYY

MEETING SUBJECT:

MEETING DATE AND LOCATION:

AGENDA

Monday, April 26, 2010

1. AGENDA ITEM

Agenda Sub-Item

2. AGENDA ITEM

Agenda Sub-Item

3. AGENDA ITEM

Agenda Sub-Item

Page 11: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 7 CRA IT Application Development

1.5 Minutes of Meetings

CRA IT APPLICATION DEVELOPMENT PROJECT

MEETING REPORT

FROM: POSITION: DATE: MM/DD/YYYY

MEETING SUBJECT:

MEETING DATE AND LOCATION:

ATTENDEES TITLE CONTACT NUMBER

Table Text Table Text Table Text

Table Text Table Text Table Text

Table Text Table Text Table Text

Table Text Table Text Table Text

Table Text Table Text Table Text

DISCUSSION POINTS BODY TEXT 1

BODY TEXT 1 BULLET 1

ACTIONS

BODY TEXT 1 BULLET1

DOCUMENTS DELIVERED

BODY TEXT 1 BULLET 1

Page 12: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 8 CRA IT Application Development

1.6 Team Members Weekly Reports

Each team member during a given week will be required to forward a weekly report to the

Team Leader by close of business (COB) every Friday.

CRA IT APPLICATION DEVELOPMENT PROJECT

TEAM MEMBERS WEEKLY REPORT

FROM: POSITION: DATE: MM/DD/YYYY

TO: POSITION: ORG.:

HIGHLIGHTS FOR THE PERIOD WEEK FROM <DD/MM/200X> TO <DD/MM/200X>

TASKS COMPLETED THIS WEEK

WBS Description Date Time

TASKS IN PROGRESS

WBS Description Time

Expended

Time

Remaining

NEW TASKS FOR NEXT WEEK

WBS Description Starting

Date Duration

Page 13: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 9 CRA IT Application Development

1.7 Team Leaders Weekly Reports

The Team Leaders will be required to forward a consolidated Weekly Report to the Project

Manager based on the Team Member’s Weekly Reports.

CRA IT APPLICATION DEVELOPMENT PROJECT

TEAM LEADERS WEEKLY REPORT

FROM: POSITION: DATE: MM/DD/YYYY

TO: POSITION: ORG.:

HIGHLIGHTS FOR THE PERIOD WEEK FROM <DD/MM/200X> TO <DD/MM/200X>

TASKS COMPLETED THIS WEEK

WBS Description Date Time

NEW TASKS IN PROGRESS

WBS Description Time

Expended

Time

Remaining

NEW TASKS FOR NEXT WEEK

WBS Description Starting

Date Duration

Page 14: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 10 CRA IT Application Development

ISSUES AND RISKS

BODY TEXT 1

BODY TEXT 1 BULLET 1

REVIEWED DATE: MM/DD/YYYY SUBMITTED TO MANAGER DATE: MM/DD/YYYY

Page 15: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 11 CRA IT Application Development

1.8 Managers Weekly Reports

The Managers will be required to forward a consolidated Weekly Report to the Project

Manager based on the Team Leader’s Weekly Reports.

CRA IT APPLICATION DEVELOPMENT PROJECT

TEAM MANAGERS WEEKLY REPORT

FROM: POSITION: DATE: MM/DD/YYYY

TO: PEDRO VALDES POSITION: PM ORG.: TAPRII

HIGHLIGHTS FOR THE PERIOD WEEK FROM <DD/MM/200X> TO <DD/MM/200X>

TASKS COMPLETED THIS WEEK

WBS Description Date Time

TASKS IN PROGRESS

WBS Description Time

Expended

Time

Remaining

NEW TASKS FOR NEXT WEEK

WBS Description Starting

Date Duration

Page 16: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 12 CRA IT Application Development

ISSUES AND RISKS

BODY TEXT 1

BODY TEXT 1 BULLET 1

REVIEWED DATE: MM/DD/YYYY SUBMITTED TO TAPRII/PM DATE: MM/DD/YYYY

Page 17: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 13 CRA IT Application Development

1.9 Monthly Status Report

CRA IT APPLICATION DEVELOPMENT PROJECT

MONTHLY STATUSREPORT

FROM: POSITION: DATE: MM/DD/YYYY

TO: PEDRO VALDES POSITION: PM ORG.: TAPRII

HIGHLIGHTS FOR THE PERIOD OF <MONTH 1 TO 30, 200X

DELIVERABLE 1: FINAL FUNCTIONAL REQUIREMENTS CRA IT APPLICATION MODULES

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 2: WORKFLOW SOLUTION DESIGN

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 3: CASE TRACKING SOLUTION DESIGN

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 4: DOCUMENT MANAGEMENT SOLUTION DESIGN

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 5: CALCULATION OF FEES AND ONLINE PAYMENTS

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 6: INTERFACE DESIGN

BODY TEXT 1

BODY TEXT 1 BULLET 1

Page 18: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 14 CRA IT Application Development

DELIVERABLE 7: WEB PORTAL AND CONTENT MANAGEMENT DESIGN

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 8: SECURITY REQUIREMENTS

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 9: SOFTWARE DESIGN DOCUMENT

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 10: SIGN OFF REPORT ON THE DELIVERY OF ITEMS 1-9

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 11: DEVELOPMENT & DEVELOPMENT METHODOLOGY AND TOOLS DOCUMENT

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 12: TESTING PLAN

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 13: IMPLEMENTATION PLAN

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 14: INSTALLATION AND CONFIGURATION DOCUMENT

BODY TEXT 1

BODY TEXT 1 BULLET 1

Page 19: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 15 CRA IT Application Development

DELIVERABLE 15: APPLICATION INSTALLED AND RELEASE IN ELECTRONIC FORMAT (CDS)

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 16: SYSTEM TESTING REPORT

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 17: ACCEPTANCE TESTING PLAN

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 18: DOCUMENTATION

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 19: TRAINING PROGRAM AND TRAINING MATERIALS

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 20: END-USER TRAINING

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 21: TECHNICAL AND SYSTEM ADMINISTRATORS TRAINING

BODY TEXT 1

BODY TEXT 1 BULLET 1

DELIVERABLE 22: DATA MIGRATION

BODY TEXT 1

BODY TEXT 1 BULLET 1

Page 20: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 16 CRA IT Application Development

DELIVERABLE 23: SERVICE LEVEL AGREEMENT (SLA)

BODY TEXT 1

BODY TEXT 1 BULLET 1

ISSUES AND RISKS

BODY TEXT 1

BODY TEXT 1 BULLET 1

TRAINING

BODY TEXT 1

BODY TEXT 1 BULLET 1

CONTACTS

BODY TEXT 1

BODY TEXT 1 BULLET 1

DOCUMENTS DELIVERED

BODY TEXT 1

BODY TEXT 1 BULLET 1

INVOICES SUBMITTED

BODY TEXT 1

BODY TEXT 1 BULLET 1

Page 21: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 17 CRA IT Application Development

1.10 Project Issues Form

PROJECT ISSUE FORM

Issue Title:

Prepared By:

Issue Date: Assigned Issue No.

A DOCUMENT ISSUE

Issue Type (check one)

Request for Information System Problem

Procedural Problem Other

Specify:

Issue Description:

Due Date:

Attachments (if any):

B RESEARCH ISSUE

Researcher: Researcher Completion Date:

Attachments (if any):

Researcher Comments:

Issue Recommendation:

Page 22: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 18 CRA IT Application Development

PROJECT ISSUE FORM

Potential Impact (if not resolved)

Cost / Schedule Impact Analysis Required? Yes No

Resources Required Work Days / Cost

D RESOLVE ISSUE

Accepted Rejected Postponed

Escalated Deferred

Assigned to: Org./Dept.:

Assigned Priority: Planned Completion Date:

Final Comments:

E SIGNATURES

Name/Title Signature Date

Page 23: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

Technical Assistance for Policy Reform II 19 CRA IT Application Development

1.11 Change Request Form

CRA IT APPLICATION DEVELOPMENT PROJECT

PROJECT CHANGE REQUEST FORM

A: GENERAL INFORMATION

CHANGE REQUEST NO. INITIATOR

STATUS TELEPHONE NO.

PRIORITY (H / M / L): ORGANIZATION:

DATE SUBMITTED: DATE EXPECTED:

CHANGE REQUEST

DESCRIPTION OF CHANGE:

B: EVALUATION RESULTS

FEASIBILITY EVAL. ASSIGNED BY: DATE ASSIGNED:

FEASIBILITY OF CHANGE:

COMPLETED BY: DATE COMPLETED:

IMPACT EVAL. ASSIGNED BY: DATE ASSIGNED:

IMPACT OF CHANGE:

COMPLETED BY: DATE COMPLETED:

C: RECOMMENDATION AND AUTHORIZATION

MANAGEMENT IMPLEMENTATION TEAM RECOMMENDATION:

REJECTED BY:

EXPLANATION FOR REJECTION:

AUTHORIZED BY:

EXPLANATION FOR IMPLEMENTATION:

Page 24: PROJECT TEMPLATES CRA IT APPLICATION DEVELOPMENT

20

Technical Assistance for Policy Reform II BearingPoint, Inc,

18 El Sad El Aali Street, 18th Floor, Dokki, Giza

Egypt Country Code: 12311

Phone: +2 02 335 5507 Fax: +2 02 337 7684

Web address: www.usaideconomic.org.eg