+ All Categories
Home > Documents > PROJECT WATCH – SAUDI ARABIA * PROJECT WATCH – … · Sulphur Recovery Units (SRU) and Tail Gas...

PROJECT WATCH – SAUDI ARABIA * PROJECT WATCH – … · Sulphur Recovery Units (SRU) and Tail Gas...

Date post: 18-Feb-2021
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
*Sources: DMS Projects EP: Engineering & Procurement *Sources: DMS Projects EP: Engineering & Procurement PROJECT WATCH – KUWAIT * Project Facility Budget Status KGOC - Al Khafji Gas and Condensate Export Pipeline Gas 2,100,000,000 Construction KGOC - Wafra Central Gas Utilization Project Sulphur Recovery 1,000,000,000 Shelved KGOC - Wafra Main Gathering Center Gas Gathering Centre 200,000,000 Shelved KIPIC - Al Zour LNG Import And Regasification Terminal Liquefied Natural Gas (LNG) 3,330,000,000 Construction KIPIC - Al Zour New Refinery - Overview Petroleum Oil Refinery 19,000,000,000 Construction KIPIC - Al Zour New Refinery - Package 1 (Main Process Plant) Petroleum Oil Refinery 3,000,000,000 Construction KIPIC - Al Zour New Refinery - Package 2 (Support Process Plant) Petroleum Oil Refinery 3,000,000,000 Construction KIPIC - Al Zour New Refinery - Package 3 (Utilities and Offsites) Petroleum Oil Refinery 2,100,000,000 Construction KIPIC - Al Zour New Refinery - Package 4 (Tankage) Petroleum Oil Refinery 1,600,000,000 Construction KIPIC - Al Zour New Refinery - Package 5 (Marine Facilities) Petroleum Oil Refinery 850,000,000 Construction KNPC - Mina Abdulla Refinery Sulphur Recovery Units Sulphur Recovery 1,000,000,000 Shelved KNPC - Ahmadi Depot Expansion Oil Storage Tanks 250,000,000 Construction KNPC - Clean Fuels Project - Mina Abdulla Refinery - Package 1 Petroleum Oil Refinery 4,000,000,000 Construction KNPC - Clean Fuels Project - Mina Abdulla Refinery - Package 2 Petroleum Oil Refinery 4,000,000,000 Construction KNPC - Clean Fuels Project - Mina Al Ahmadi Refinery Package Petroleum Oil Refinery 5,000,000,000 Construction KNPC - Clean Fuels Project - Package 1 - Mina Abdulla Refinery Units Petroleum Oil Refinery 550,000,000 Construction KNPC - Discharge Of Treated Effluent In MAA & MAB Refineries Pipeline 100,000,000 On Hold KNPC - Kuwait Clean Fuels Project - Overview Petroleum Oil Refinery 13,000,000,000 Construction KNPC - Mina Abdulla Debottlenecking of Coke Unit 20 Petroleum Oil Refinery 100,000,000 Construction KNPC - Mina Al Ahmadi Refinery Fifth Gas Train Gas Processing 1,500,000,000 Construction KNPC - Mina Al Ahmadi Refinery High Integrated Pressure Protection for Gas Units Gas Processing 150,000,000 Shelved KNPC - Mina Al Ahmadi Refinery Sulphur Recovery Units Sulphur Recovery 50,000,000 Shelved KNPC - Mutla Ridge Project Oil Storage Tanks 1,000,000,000 Shelved KOC - Al Zour New Refinery Crude Oil Pipelines Oil 845,000,000 Construction KOC - Installation Of New Desalter Train At GC-9, GC-10, GC-19 & GS-21 Crude Oil Distillation Unit 250,000,000 Engineering & Procurement KOC - Jurassic Gas Facility (JGF-1) Gas Processing 3,500,000,000 Shelved KOC - Jurassic Production Facilities Off-Plot Works Oil Field Development 300,000,000 Construction KOC - Kuwait Bay Exploration Exploration 200,000,000 EPC ITB KOC - Minagish Marrat Water Injection Project Water Injection 164,000,000 Shelved KOC - New 48’’ Crude Transit Line From North Kuwait To CMM (TL-5) Pipeline 270,000,000 Construction KOC - New Strategic Gas Export Pipeline From North Kuwait To Mina Al-Ahmadi Gas Pipeline 480,000,000 Engineering & Procurement KOC - North Kuwait Gathering Center (GC) 24 Upgrade Gas Gathering Centre 150,000,000 On Hold KOC - North Kuwait Gathering Center (GC) 32 Gas Gathering Centre 1,650,000,000 Construction KOC - North Kuwait Manifold Gathering System for Gathering Centers (GC) Gas Gathering Centre 2,500,000,000 Construction KOC - North Kuwait Manifold Group Trunkline (MGT) System Oil 800,000,000 Construction KOC - Ratqa Lower Fars Heavy Oil Development - Phase 1 Steam Injection 4,300,000,000 Construction KOC - Small Boat Harbor Project Ship Yard 1,000,000,000 Construction KOC - Southeast Kuwait Manifold Scheme Flowlines 350,000,000 Shelved KOC - Southeast Kuwait Replacement of Air System Flowlines 100,000,000 Shelved
Transcript
  • 35Business

    *Sources: DMS Projects

    PROJECT WATCH – SAUDI ARABIA *

    *

    EP: Engineering & Procurement

    COMPANY NEWS

    JUNE 2019

    *Sources: DMS ProjectsEP: Engineering & Procurement

    Fertilizer

    IndustrialInfrastructure

    MiningConstruction

    Gas

    Refining

    Oil

    Pipeline

    Petrochemicals

    Renewables

    Power

    Offshore

    Water

    SECTORS COVERED

    SUBSCRIBE TODAY

    • Tel: +973 1740 5590 • [email protected]• www.dmsprojects.net

    Contact us for further information A Division of

    REGIONS COVERED

    • China• Europe

    • India• Asia Pacific

    • Latin America• Middle East

    • East Africa• North Africa• West Africa

    • Central America• North America

    • Russia & CIS

    resized advert OGN.pdf 1 8/31/2016 10:36:54 AM

    PROJECT WATCH – KUWAIT *

    KIPIC - Al Zour New Refinery - Package 2 (Support Pro-

    XXXXXXXXX

    Name of Client : KIPIC - Kuwait Integrated Petro-chemical Industries Company Revised Budget : $3.8 billionFacility Type : PetroleumOilRefinerySector : RefiningStatus : ConstructionLocation : Al ZourFeed : Fluor Corporation PMC : Wood GroupMain Contractor : Fluor Corporation, Hyundai Heavy Industries, Daewoo Engineering & Construction

    BackgroundTheAl-ZournewrefineryiskeytoKuwait’shopesofmeeting growing power demand. The 615,000 barrel-a-day (b/d) facilitywill supply 225,000 b/d of low-sulphurfueloilforpowergeneration.Theschemewillbeoneofthelargestsingle-phaserefinerieseverbuilt.Therefinerywillultimatelyprovidelowsulphurfuelsto power stations.

    Project StatusJune2019:Theclientistenderingcommissioningser-vicescontractforthePackage2.

    Project ScopeThe project scope includes:Hydrogen Recovery unit (HR) (55 Million standard cubicfeetofgasperday(MMscfd)).HyrogenProductionunits(HPU)(4X145MMscfd).Sour Water Stripper unit (SWS) (3 X 450 cubic meter per hour (Cu.M/Hr).

    Amine Regeneration Unit (ARU) (3 X 1300 Cu.M/Hr).Sulphur Recovery Units (SRU) and Tail Gas Treating Unit (TGTU) (3 X 1000 metric tons per day (MT/Day).

    Project FinanceThe Kuwait National Petroleum Company (KNPC) is theclientoftheproject.

    Project Schedules FeasibilityStudy Q4-2004PMC Q4-2012Feed Q4-2013EPCITB Q2-2014Engineering&Procurement Q3-2015Construction Q3-2016Completion Q1-2020

    THE Gulf Petrochemical Industries Company (GPIC) has once againachievedahighlevelofexcellencebywinningtwoAwardsfromtheUnit-edKingdom’sRoyalSocietyforthePreventionofAccidents(RoSPA).TheAwardswerepresentedduringaceremonyunderthepatronageof

    Her Majesty Queen Elizabeth II and attended by RoSPA Vice President LordJordanofBournville,dignitariesinthefieldofoccupationalsafetyandrepresentativesofcompaniesaroundtheworld.

    GPIC President Dr. Abdulrahman Jawahery received the Awards to thunderousapplause from thoseattending,whopraised thecompanyforitsglobalachievementincompetingwith5,500companies.GPICwasawardedthefirstprizeforitsoutstandingroleinthefieldofsafetyandhealthandsafetypracticesinthechemicalindustryandtheRoSPAInternationalAwardforExcellenceinHealthandSafety.Inastatement,Dr.Jawaheryexpressedprideinthecompany’sapproach

    undertheleadershipoftheBoardofDirectors,ledbyH.E.Dr.AhmedAl-Sharyan, especially with regard to investing in human resources.Hesaidtheboardhastakengreatcaretoorganisecoursesandwork-

    shopsfortheemployeestohelptrainandqualifythem.HesaidGPIC’sprimary concern lies in the safety of individuals and not onmakingprofits.“TheManagementandentireteamarecommittedtoworkinginac-

    cordancewithbalancedpoliciesapprovedbytheBoardofDirectors,”he said. “Weareallkeen to followupon the implementationof theprinciplesofsafetyandmaintainthecompany’sachievements.”HesaidGPIChasbeenverykeentomaintainexcellenceinthefield

    ofsafetyformanyyears.“WeareproudofthisformanyyearsandofannualAwardswegetfromRoSPA.”Hesaidthecompanyhasworkedonsettingupavarietyofactivities

    related to safetyandhealthand iskeenon the implementingacom-prehensive management system aimed at promoting and continuously developingperformance,whileincreasingprofitabilityandefficiency.

    GPIC wins RoSPA award again

    Project Facility Budget StatusKGOC - Al Khafji Gas and Condensate Export Pipeline Gas 2,100,000,000 ConstructionKGOC - Wafra Central Gas Utilization Project Sulphur Recovery 1,000,000,000 ShelvedKGOC - Wafra Main Gathering Center Gas Gathering Centre 200,000,000 ShelvedKIPIC - Al Zour LNG Import And Regasification Terminal Liquefied Natural Gas (LNG) 3,330,000,000 ConstructionKIPIC - Al Zour New Refinery - Overview Petroleum Oil Refinery 19,000,000,000 ConstructionKIPIC - Al Zour New Refinery - Package 1 (Main Process Plant) Petroleum Oil Refinery 3,000,000,000 ConstructionKIPIC - Al Zour New Refinery - Package 2 (Support Process Plant) Petroleum Oil Refinery 3,000,000,000 ConstructionKIPIC - Al Zour New Refinery - Package 3 (Utilities and Offsites) Petroleum Oil Refinery 2,100,000,000 ConstructionKIPIC - Al Zour New Refinery - Package 4 (Tankage) Petroleum Oil Refinery 1,600,000,000 ConstructionKIPIC - Al Zour New Refinery - Package 5 (Marine Facilities) Petroleum Oil Refinery 850,000,000 ConstructionKNPC - Mina Abdulla Refinery Sulphur Recovery Units Sulphur Recovery 1,000,000,000 ShelvedKNPC - Ahmadi Depot Expansion Oil Storage Tanks 250,000,000 ConstructionKNPC - Clean Fuels Project - Mina Abdulla Refinery - Package 1 Petroleum Oil Refinery 4,000,000,000 ConstructionKNPC - Clean Fuels Project - Mina Abdulla Refinery - Package 2 Petroleum Oil Refinery 4,000,000,000 ConstructionKNPC - Clean Fuels Project - Mina Al Ahmadi Refinery Package Petroleum Oil Refinery 5,000,000,000 ConstructionKNPC - Clean Fuels Project - Package 1 - Mina Abdulla Refinery Units Petroleum Oil Refinery 550,000,000 ConstructionKNPC - Discharge Of Treated Effluent In MAA & MAB Refineries Pipeline 100,000,000 On HoldKNPC - Kuwait Clean Fuels Project - Overview Petroleum Oil Refinery 13,000,000,000 ConstructionKNPC - Mina Abdulla Debottlenecking of Coke Unit 20 Petroleum Oil Refinery 100,000,000 ConstructionKNPC - Mina Al Ahmadi Refinery Fifth Gas Train Gas Processing 1,500,000,000 ConstructionKNPC - Mina Al Ahmadi Refinery High Integrated Pressure Protection for Gas Units Gas Processing 150,000,000 ShelvedKNPC - Mina Al Ahmadi Refinery Sulphur Recovery Units Sulphur Recovery 50,000,000 ShelvedKNPC - Mutla Ridge Project Oil Storage Tanks 1,000,000,000 ShelvedKOC - Al Zour New Refinery Crude Oil Pipelines Oil 845,000,000 ConstructionKOC - Installation Of New Desalter Train At GC-9, GC-10, GC-19 & GS-21 Crude Oil Distillation Unit 250,000,000 Engineering & ProcurementKOC - Jurassic Gas Facility (JGF-1) Gas Processing 3,500,000,000 ShelvedKOC - Jurassic Production Facilities Off-Plot Works Oil Field Development 300,000,000 ConstructionKOC - Kuwait Bay Exploration Exploration 200,000,000 EPC ITBKOC - Minagish Marrat Water Injection Project Water Injection 164,000,000 ShelvedKOC - New 48’’ Crude Transit Line From North Kuwait To CMM (TL-5) Pipeline 270,000,000 ConstructionKOC - New Strategic Gas Export Pipeline From North Kuwait To Mina Al-Ahmadi Gas Pipeline 480,000,000 Engineering & ProcurementKOC - North Kuwait Gathering Center (GC) 24 Upgrade Gas Gathering Centre 150,000,000 On HoldKOC - North Kuwait Gathering Center (GC) 32 Gas Gathering Centre 1,650,000,000 ConstructionKOC - North Kuwait Manifold Gathering System for Gathering Centers (GC) Gas Gathering Centre 2,500,000,000 ConstructionKOC - North Kuwait Manifold Group Trunkline (MGT) System Oil 800,000,000 ConstructionKOC - Ratqa Lower Fars Heavy Oil Development - Phase 1 Steam Injection 4,300,000,000 ConstructionKOC - Small Boat Harbor Project Ship Yard 1,000,000,000 ConstructionKOC - Southeast Kuwait Manifold Scheme Flowlines 350,000,000 ShelvedKOC - Southeast Kuwait Replacement of Air System Flowlines 100,000,000 Shelved

    cess Plant)


Recommended