Page 1: Project X pedition Spacecraft Senior Design – Spring 2009 .

Project Xpedition

Spacecraft Senior Design – Spring 2009http://eng.purdue.edu/jump/25cc30

Page 2: Project X pedition Spacecraft Senior Design – Spring 2009 .
Page 3: Project X pedition Spacecraft Senior Design – Spring 2009 .

Motivation:Commercial Lunar Missions

Resupply Lunar BaseSmall Payload

Page 4: Project X pedition Spacecraft Senior Design – Spring 2009 .

Project Xpedition Requirements

•Land on the Moon

•Move 500 meters

•Transmit HD pictures and video to Earth

•Survive the Lunar Night

•Minimize cost with 90% reliability

Project Xpedition

Page 5: Project X pedition Spacecraft Senior Design – Spring 2009 .

Payloads

•100 g•10 kg•1700 kg

Page 6: Project X pedition Spacecraft Senior Design – Spring 2009 .

Mission Phases

•Earth Launch•Lunar Transfer•Lunar Descent•Locomotion 500 m

Page 7: Project X pedition Spacecraft Senior Design – Spring 2009 .

Earth Launch

110 ft

180 ft

160 ft

Dnepr - 1 Falcon - 9

Page 8: Project X pedition Spacecraft Senior Design – Spring 2009 .

Earth Launch• Site: Baikonur Cosmodrome, Kazakhstan• Cost: $4.8M

250 Mile Parking Orbit

Page 9: Project X pedition Spacecraft Senior Design – Spring 2009 .

LanderOrbital Transfer

Vehicle

Page 10: Project X pedition Spacecraft Senior Design – Spring 2009 .

880 lbs injected to Low

Earth Orbit

Solar Arrays unfold

Attitude Control

InternalView

Hall Thruster produces 80

mN of thrust

Page 11: Project X pedition Spacecraft Senior Design – Spring 2009 .

Power

CommunicationS-Band Antenna

2 Solar ArraysLithium-Ion Battery

Attitude

Chemical Thrusters

Sun SensorStar Sensor

Reaction Wheels

Lunar Transfer

Page 12: Project X pedition Spacecraft Senior Design – Spring 2009 .

•25 km parking orbit•2 hour orbital period

•Lander is self sufficient•160 kg Lander mass •Half of mass is propellant

Page 13: Project X pedition Spacecraft Senior Design – Spring 2009 .

Space Balls Housing

Communication Antenna and Motor

Solar Panel

Attitude Control Thrusters

RadiatorAttitude Sensors

CPU

H2O2 Tank

Helium Tank

Radial Flow Hybrid Engine

3 ft.

Camera

Page 14: Project X pedition Spacecraft Senior Design – Spring 2009 .

Surveyor 3

Apollo 12

40km

Landing Site: Mare Cognitum

Page 15: Project X pedition Spacecraft Senior Design – Spring 2009 .

Mission Requirements Land on Moon Move Payload 500 m Take Picture

Page 16: Project X pedition Spacecraft Senior Design – Spring 2009 .
Page 17: Project X pedition Spacecraft Senior Design – Spring 2009 .

Performing system analysis

Lexan Outer Shell

Camera

CPU

Dust Removing Vibrating Motor

Battery

100g Payload

Main Axle and Motor Housing

Communications Transceiver

Page 18: Project X pedition Spacecraft Senior Design – Spring 2009 .

Mission Requirements

1. Land on Moon

2. Move 500m

3. Take PictureTaking Photo of LanderRemoving Dust

All Systems Are GO!Avoiding Obstacle

Cruise Speed: 3.2 mphMinimum Turning Radius: 2.5 in

Page 19: Project X pedition Spacecraft Senior Design – Spring 2009 .

10 kg Lunar Lander

230 lbs Lander270 lbs Propellant500 lbs Total

Mission Requirements

1. Land on Moon

2. Move 500m

3. Take Picture

4. Survive Night

Hop Engine

Thrust: 45 lbsBurn Time: 135 sec10 kg Payload

Page 20: Project X pedition Spacecraft Senior Design – Spring 2009 .

500m

Record Video

Mission Requirements

1. Land on Moon

2. Move 500m

3. Take Picture

4. Survive Night

Page 21: Project X pedition Spacecraft Senior Design – Spring 2009 .

Completed lunar descent• Full stop• Begin locomotion

Attitude Thrusters

16 ft

6 ft

300 ft

Main EngineAvg. Thrust: 230 lbsBurn time: 60 s

Large Payload

Page 22: Project X pedition Spacecraft Senior Design – Spring 2009 .

Mission Requirements:1. Move 500 meters2. Land on moon3. Resupply base

Page 23: Project X pedition Spacecraft Senior Design – Spring 2009 .

$27MCost

- $22M Purse

= $5MNet Mission Cost

100 g 10 kg 1743 kg0

50

100

150

200

250

$27 Million72% success

$30 Million72% success

$223 Million

Mission Cost, $M in 2009 DollarsCost Per Kilogram ($M)

Mission Cost

Page 24: Project X pedition Spacecraft Senior Design – Spring 2009 .

Recommendations:

1. Balance reliability and cost2. Electric Propulsion for Lunar transfer3. Soft land on Lunar surface

Google Lunar X PRIZE:

1. $27M mission accomplished for $5M2. Many viable locomotion methods3. Potential to open commercial market

Results

Page 25: Project X pedition Spacecraft Senior Design – Spring 2009 .

Question & Answer

http://eng.purdue.edu/jump/25cc30