+ All Categories
Home > Documents > Projectblad PG Hoekpolder UK 20120601

Projectblad PG Hoekpolder UK 20120601

Date post: 17-Jan-2017
Category:
Upload: guus-van-beveren
View: 24 times
Download: 0 times
Share this document with a friend
2
Pumpin Pumping station S distribut The pum This pum The capa screws a capacity Pumping narrow s east side Royal Ha Delfland togethe committ of Royal The uniq an optim [author: Photo 1: pu Figure 1: m Figure 2: dr ng station H g station Hoe Schaapweimo tionstation n mping station mping station acity of the p are installed b of letting in w g station Hoe space. The de e, a gas distrib askoning rea d and Fish flo r as a team w tee full insigh Haskoning v que approac mal design. T : Jeroen Bakk umping station ap of the polder rawing pumping Hoekpolder kpolder is a n olen. The pum nearby Rijswij connects the has to guara umping statio by Fish flow In water is 21 m kpolder is sp esign had fou bution statio alizes the des ow Innovatio with the clien ht into the p visually defin ch of Royal H The result is a ker] station new pumping mping station jk. e water syste antee enough on is 64 m 3 /m nnovations. O m 3 /min. ecial because r boundaries n on the nort sign of a pum on. From our nt. To give t process and t ned the core Haskoning m a new pump Photo 2 g station as a is nearby a r m of the pold h drainage to min out of the One of the fir e of its fish fr s: a cycle brid th side and o mping station vision of op he customer the possibilit of the pump ade it possib ing station w 2: test at TU Delf replacement recreative cyc der in Hinterl protect the p e polder and rst composite iendly charac ge on the we n the south s n in partners erational exc r, Fish flow In ties of the pu ping station ble to work c with the lates ft – Fishflow Inno t for a monum cle route, hig and with the polder of floo fish friendly. e screws in Th cter. The desi est side, the h side the smal ship with the cellence, we nnovations a umping statio the dewate close togeth st technique ovations mental pump ghway A4 and e small river Z oding in the f The Archam he Netherland ign is created highway A4 o l river Zweth. e Waterboard work closely and the aesth on, the desig ering feature er with the c s, fit for the ping d a gasZweth. uture. edian ds. The d in a on the . d y hetics gn team es. client for future.
Transcript
Page 1: Projectblad PG Hoekpolder UK 20120601

 Pumpin Pumpingstation Sdistribut The pumThis pum The capascrews acapacity  Pumpingnarrow seast side 

Royal HaDelflandtogethecommittof Royal 

The uniqan optim[author:    

  

 

 

 

 

 

 

 

 

 

 

Photo 1: pu

Figure 1: m

Figure 2: dr

ng station H

g station HoeSchaapweimotion‐station n

mping station mping station

acity of the pare installed bof letting in w

g station Hoespace. The dee, a gas distrib

askoning read and Fish flor as a team wtee full insigh Haskoning v

que approacmal design. T: Jeroen Bakk

umping station 

ap of the polder 

rawing pumping 

Hoekpolder

kpolder is a nolen. The pumnearby Rijswij

connects the has to guara

umping statioby Fish flow Inwater is 21 m

kpolder is spesign had foubution statio

alizes the desow Innovatiowith the clienht into the pvisually defin

ch of Royal HThe result is aker] 

station 

r

new pumpingmping stationjk. 

e water systeantee enough

on is 64 m3/mnnovations. Om3/min. 

ecial becauser boundariesn on the nort

sign of a pumon. From our nt.  To give tprocess and tned the core

Haskoning ma new pump

Photo 2

g station as a  is nearby a r

m of the poldh drainage to 

min out of theOne of the fir

e of its fish frs: a cycle bridth side and o

mping stationvision of ophe customerthe possibilit of the pump

ade it possibing station w

2: test at TU Delf

replacementrecreative cyc

der in Hinterlprotect the p

e polder and rst composite

iendly characge on the wen the south s

n in partnerserational excr, Fish flow Inties of the puping station 

ble to work cwith the lates

ft – Fishflow Inno

t for a monumcle route, hig

and with thepolder of floo

fish friendly.e screws in Th

cter. The desiest side, the hside the smal

ship with thecellence, wennovations aumping statio− the dewate

close togethst technique

ovations

mental pumpghway A4 and

e small river Zoding in the f

 The Archamhe Netherland

ign is createdhighway A4 ol river Zweth.

e Waterboard work closelyand the aesthon, the desigering feature

er with the cs, fit for the 

ping d a gas‐

Zweth. uture.  

edian ds. The 

d in a on the .  

d  y hetics gn team es. 

client for future. 

Page 2: Projectblad PG Hoekpolder UK 20120601

Phot

Figu

 

 

 

to 4: Archamedia

ure 3: sketch pum

an srew on site 

mping station 

Photo 5:: bearing Photo 6: on s

Figur

site

re 4: sketch Archa

Photo 7: location

amedian screw 


Recommended