Senior Estimator | Orascom Construction Industries | Jun 2011 to Dec 2013
Project: Airport 2 STP (Sewage Treatment Plant) | Contract Value: $400M
This STP, with CH2M HILL as the consultant and KBR as the process designer, was an EPC project with
estimated budget of $400 million on a land area of 410,000 m2. The STP’s planned treatment capacity
was 500,000 m3/day. The designed liquid treatment process included preliminary treatment (screening
and grit removal), primary clarification, secondary treatment (biological nutrient removal), secondary
clarification, tertiary treatment and disinfection. The solids treatment process included sludge
thickening, anaerobic digestion and dewatering. Biogas produced by the anaerobic digestion process
was planned to be used as a renewable and sustainable source of energy for cogeneration. The
designed total reinforced concrete quantity was 190,000 m3.
Project: K. A. International Airport | Contract Value: $300M
The design consultant of this project was Atkins. Our company’s final contract value was more than
$300 million. Our scope of work consisted of several packages, some of which were infrastructure
packages such as: Sewer Network (25,000 Lm), Storm Water Network (68,000 Lm), Potable Water
Network (2,500 Lm), Chilled Water Network (3,000 Lm), Fire Fighting Network (5,000 Lm), Grey Water
Network (9,000 Lm), Street Lighting Network (65,000 Lm), 9 Sewer Pump Stations, Grey Water Pump
Station, Landside Roads (160,000 Lm) and Road Tunnels. Other packages included buildings such as:
Car Park, Gate House and Plant Nursery Buildings.
Senior Project Engineer | Orascom Construction Industries | Jan 2010 to May 2011
Project: BNP Paribas Bank Headquarters | Contract Value: $50M
The contract value of this EPC project was $50 million. The new BNP Paribas headquarters is located on
a plot area of 7,175 m2 and is comprised of 2 basement floors, garden level, ground floor and 6 typical
floors. This reinforced concrete building had a total built-up area of 12,000 m2.
Senior Project Engineer | Samsung C&T Corporation | Mar 2005 to Nov 2009
Project: The American University in Cairo New Campus | Contract Value: $400M
The contract value of the project was US$ 400 million, and was built on a total area of 260 acre (about
1,052,183 m2) with Flour International Limited as the project’s PMCM. It consisted of Administration
Building, Centre for the Arts, Campus Centre, Core Academic Centre, sustainable landscape, Library,
Research Centres Building, School of Business, School of Global Affairs, School of Humanities and Social
Science, School of Sciences and Engineering, Sports Complex and Student Housing. All project
buildings are reinforced concrete structures. I was assigned in the School of Sciences and Engineering
which consists of a utility service tunnel and 6 connected 3-story buildings on a total area of 35,000 m2,
and about 30,000 m3 of reinforced concrete.
Junior Engineer | Consolidated Contractors Company | Nov 2001 to Jun 2004
Project: City Stars Commercial & Residential Complex | Contract Value: $600M
This project had a contract value of US$ 600 million, a land area of 115,000 m2 and a total constructed
built-up area of 784,470 m2. The project was divided into several zones containing a Commercial
Centre (Mall), several Residential Buildings (Hotel Furnished Apartments) and two 5-star Hotels. I was
assigned in one of the two 5-star Hotels (Intercontinental City Stars) which is a reinforced concrete
building consisting of 18 stories above ground and 4 stories underground. The hotel capacity is 824
guest rooms, 232 suites and it contains of 14 meeting rooms and 11 restaurants.
4
BNP Paribas Bank Headquarters | Contract Value: $50M
External Photo during Construction
External Photo after Completion
5
BNP Paribas Bank Headquarters Cont’d
Internal Finishing and Furniture Mock-up
Internal Finishing and Furniture Mock-up
6
The American University in Cairo New Campus | Contract Value: $400M
Early Construction Stages
Early Construction Stages
7
The American University in Cairo New Campus Cont’d
Early Construction Stages
Early Construction Stages
8
The American University in Cairo New Campus Cont’d
Early Construction Stages
Final Construction Stages
9
The American University in Cairo New Campus Cont’d
Final Construction Stages
Final Construction Stages
10
The American University in Cairo New Campus Cont’d
Final Construction Stages
Final Construction Stages
11
The American University in Cairo New Campus Cont’d
Aerial View during Construction
Aerial View after Completion
12
City Stars Commercial & Residential Complex | Contract Value: $600M
External Photo during Construction
External Photo during Construction
13
City Stars Commercial & Residential Complex Cont’d
External Photo at Final Stages
External Photo at Final Stages
14
City Stars Commercial & Residential Complex Cont’d
Internal Finishing at Final Stages
Internal Finishing at Final Stages