    Individual Traits:

    Stress Tolerance, Flexibility,Adaptability, Tenacity,

    Independence, Integrity, Attention

    to Detail etc.

  • 8/8/2019 Projects Question and Answer

    2/95

    Managerial Skills:

    Planning & Organizing, ManagementControl, Delegation, Leadership,

    Subordinate Development, Organizational Sensitivity etc.

  • 8/8/2019 Projects Question and Answer

    3/95

    Decision Making Skills:

    Judgment, Problem Analysis,Decisiveness, Creativity, Numerical

    Analysis, Commercial Awareness, RiskTaking etc.

  • 8/8/2019 Projects Question and Answer

    4/95

    Interpersonal Skills:

    Listening, Persuasive OralCommunication, Written Communication,

    Interpersonal Sensitivity, Impact,Sociability, Team-Work etc

  • 8/8/2019 Projects Question and Answer

    5/95

    Motivational Behaviors:

    Initiative, Resilience, Energy, WorkStandards, Commitment, Work Motivation,

    Customer Service

  • 8/8/2019 Projects Question and Answer

    6/95

    Primary Scales -

    1. Adjustment self-confidence, self-esteem, and composureunder pressure

    2. Ambition initiative, competitiveness, and the desire forleadership roles

    3. Sociability extraversion, gregariousness, and a need for social

    interaction 4. Interpersonal Sensitivity warmth, charm, and the ability to

    maintain relationships 5. Prudence being self-disciplined, responsible, and conscientious 6. Inquisitive imagination, curiosity, vision, and creative potential 7. Learning Approach enjoying learning, staying current on

    business and technical matter

  • 8/8/2019 Projects Question and Answer

    7/95

    Occupational Scales -

    1. Service Orientation being attentive, pleasant, andcourteous to customers

    2. Stress Tolerance being able to handle stress,even-tempered, calm under fire

    3. Reliability honesty, integrity, and positiveorganizational citizenship

    4. Clerical Potential following directions, attention todetail, and communicating clearly

    5. Sales Potential energy, social skills, and the abilityto solve problems for customers

    6. Managerial Potential leadership ability, planning,and decision-making skills

  • 8/8/2019 Projects Question and Answer

    8/95

    Assessment Scales -

    1. Excitable: Composure and ability under pressure, teamwork and interpersonal skills

    2. Skeptical:Argumentative, critical thinking, interpersonal skills

    3. Cautious: Decision making ability, ability to adapt, ability to take control

    4. Reserved: Interpersonal, team work, and communication skill, determine before hand.

    5. Leisurely: Degree of assertiveness, ability to adapt, work ethic

    6. Bold: Self confidence, arrogance, ability to take responsibility for actions

    7. Mischievous: Intuitive, willingness to work within guidelines, risk taking, impulsive

    8. Colorful:Attention seeking, listening skills, productivity, ability in crises, belief in self, full of interest.

    9. Imaginative: Influencing and persuasive ability, ability to think laterally, foresight

    10. Diligent:Attention to detail, ability to delegate, ability under pressure, decisiveness, hard working.

    11. Dutiful: Compliant, ability to conform, decision making ability, argumentative ability (obedient)

  • 8/8/2019 Projects Question and Answer

    9/95

    How will you help our company? What do you

    offer this position

    ? The focus of my contribution to company has alwaysbeen in adaptable Quality and Savings. I considerthese two as important factors for the growth of anycompany. By setting up high standards of quality, the

    company promotes the confidence in the clients,investors and in the market. By savings in terms of costand time, the company stands to its commitment ofdelivering the quality product or service on time andwithin the budget.

    So, I bring along quality, cost savings, reducingdevelopment/delivery cycle time, opening up new marketopportunities and complete customer satisfaction.

  • 8/8/2019 Projects Question and Answer

    10/95

    What is the toughest job problem youve ever faced?

    DISCUSSION: This is a problem solving question that tests your critical thinkingskills. This is a great question for showing that you are a creative and capableproblem solver. The problem you select to use as an example should be as similar aspossible to a problem that you are likely to face at the job you are interviewing for.

    "I try to take a systematic approach to problem solving where I take the time togather the relevant data, clearly define the problem or goal, then come up withpossible solutions. I think it is important to get the information and clarify theproblem or understand the root cause of the issue first before you start comingup with possible solutions, or wasting other people's time. FOR INSTANCE,when I was at Job "X" ... What kinds of challenges are you currently facing in yourdepartment? How tough a position does this put you in? What could the idealcandidate do to help solve this problem in his or her first three months on the job?"

    Describe a situation when working with a team produced more successfulresults than if you had completed the project on your own.

    "Well, I have worked both independently and as a member of team, throughout my

    career. I enjoy both, and can do both equally well. I will have to say, though, thatworking with others has often yielded great results for projects I have worked on --specifically when it comes to brainstorming. I try to get everyone involved in comingup with new solutions by making time for sessions where "there are no wrong ideasor answers." The creativity of a group of people is always going to be greater thanthat of one person, and thus the results will be more successful.

  • 8/8/2019 Projects Question and Answer

    11/95

    I did that a lot a Job "Y".

    FOR EXAM

    PLE "Working with others allows you data-mine other

    people's skills and experiences, get perspectives andideas that you would not have on your own, andcheck the quality of your own work before it goes out the

    door. FOR EXAMPLE, at Job "X" I worked with manygreat people. I was able to "pick their brains" -- so tospeak -- about the effectiveness of various techniques,estimates on how long it would take to get various thingsdone, etc. I would not have been able to do my job as

    effectively with out them. Will there be the opportunity towork in team situations at this job?"

  • 8/8/2019 Projects Question and Answer

    12/95

    Describe a time when you were faced with problems orstresses at work that tested your coping skills. What

    did you do?

    DISCUSSION: Workplace stress is an issue for everyone. Don't pretend that younever get stressed out. You want to show that you can deal with stress and cope withdifficult situations. Show that you are calm under pressure, and know how to avoidstress in the first place through planning and time management

    "Well I think it is important to remember that stress affects everyone, and it isinevitable that sometimes people are going to have bad days. That is why I try to givepeople the benefit of the doubt when they seem to have a short fuse.

    What I do personally is try to control my response to a situation.

    You can't necessarily control what happens to you, but you can control yourresponse.

    What I try to do is lengthen the time between the stressful situation and myresponse -- so that I can identify the cause of the stress and decide what I cando about it. FOR EXAMPLE, on several occasions I have had to deal with very iratecustomers who actually yelled at me. What I did was staying calm and not let themget under my skin.

    I really tried to listen and decide exactly what it was that was at the root oftheir problem. Then I provided solutions that could be completed within aspecific time-frame. I always find that it is best to face those types of situationshead-on and be objective about them. I do my best to be professional and notget my emotions involved.Also, I try to avoid stress in the first place bytackling difficult tasks or conversations sooner rather than 11th hour later.Does that make sense?"

  • 8/8/2019 Projects Question and Answer

    13/95

    What was your role in your department's most recent

    success?

    I was instrumental in translating the client's business needs intodetailed product features. I had to make sure that my teamunderstood what the client wanted, and then check the quality tomake sure that we were delivering a quality product with thefeatures that the client was expecting.

    This was an ongoing process that required a lot of communicationand teamwork with my team as well as the client. I think my role really was to clarify the scope of the project, and then

    "manage the client's expectations." We were able to deliver on time,and the client was thrilled! I was able to make sure no time waswasted on adding unnecessary features, and since we were workingon a fixed bid price, we saved my company time and money

  • 8/8/2019 Projects Question and Answer

    14/95

    How would you deal with

    unexpected events on the job? Unexpected events or change is an important event for any team.This can be damaging if not checked and monitored. I break theunexpected events (RISK) into 3 categories

    1) Business related 2) Project related and

    3) Process related and then I do regular evaluation and forecast of the project and

    market on daily/weekly basis. I also do Risk assessment analysis, which helps me in forecasting

    any change or unfavorable results. I use FMEA, RCA, Checkpoints and otherPMP and 6 Sigma tools to

    identify and resolve issues. The solution to unexpected events is to have an backup plans and

    alternate solutions. Having these in place, unexpected events canbe reduced and sometimes eliminated.

  • 8/8/2019 Projects Question and Answer

    15/95

    How do you organize your time?

    I organize and co-ordinate the work of the team, delegating andsharing out tasks, and fundamentally making sure that there is agood work environment.

    I work on the principle of prioritizing the work for timemanagement.

    Usually 60% of time is spent on project planning, documentationand evaluation. The rest of time is devoted to issues, meetings, coordination, follow-

    ups, reviews and the status. Top 5 Priority activities always consume most of the time, as it

    requires immediate attention.

    I also maintain documents for To-Do, Activity Logs, Action Plansand goal setting for the team. However the above is not rigid and has to be altered to address the

    situation.

  • 8/8/2019 Projects Question and Answer

    16/95

    How do you delegate

    responsibility? Definition, Discussion, Direction (Delegate) andDecision are the keys to my successful ProjectManagement.

    I work on Right person on Right Job. During WBS, I delegate the best resource to

    accomplish the task and I take into account theexperience, knowledge, ability to perform andskills of the individual.

    The ongoing monitoring, checklist, weekly jobstatus documents would provide me the pictureof success or failure delegation.

  • 8/8/2019 Projects Question and Answer

    17/95

    What are your ability and experience in developing and

    implementing business plans?

    I follow methodologies suggested by PMP. I work on 4 Ds Discussion, Definition, Direction andDecision and 10 step for any project execution and delivery.

    Use standards and best practices to minimize project-planningredundancies.

    Have flexible and scalable plans to incorporate future changes.

    Projects should have sound and definite requirements Define project management success at the start of the project Keeping changes to a minimum Organizing the team according to needs and organizational realities. Using checkpoints and documenting all the records Keeping project customer engaged in the project from start to finish

    Rigorous testing. Transfer responsibility to the customer once the project is complete Evaluate every project for valuable lessons learned via post-project

    reviews

  • 8/8/2019 Projects Question and Answer

    18/95

    Have you ever misjudged something? How could you

    have prevented the mistake?

    None. I never go beyond what I cannotdeliver. Its better to say NO then regretlatter

  • 8/8/2019 Projects Question and Answer

    19/95

    What do you do to keep up to date in your job? How do

    you improve your-self professionally?

    I keep myself updated with the latesttechnology and scope of its penetration inthe market and career growth. I do regularreading and Internet related developmentson the websites.

  • 8/8/2019 Projects Question and Answer

    20/95

    What are your reasons for

    leaving your current job?

    The current assignments is on near completionand further more I do not see any furtheradvancement in terms of personal and

    organization. And there is no further value-addition that I can bring to the presentorganization.

    The position didnt have room for growth or

    I felt my capabilities were being

    underutilized so I felt it was best that I seek

    employment elsewhere.

  • 8/8/2019 Projects Question and Answer

    21/95

    Where do you see yourself five years from now? How

    does this position fit with your long-term career

    objectives? What are your career plans?

    For next 5 Years, I would like to focusmyself into diversified business domainand Locations (Global). I consider this asFoundation for long term plans. Down theline, I will climb up the career ladder andwould like to take up a position as head of

    an organization.

  • 8/8/2019 Projects Question and Answer

    22/95

    6. How do you plan to achieve

    these goals?

    To achieve my long terms goals,

    I am gaining on experiences towardLeadership and Management roles. I am now

    involving myself into corporate financial activitiesto start with such as costing and budgeting. I amlearning manufacturing and production businessprocesses. I am also exploring the opportunities

    for global projects that involve pre-salescustomer interactions.

  • 8/8/2019 Projects Question and Answer

    23/95

    What is your management style?

    I have Flexible, Adaptable andScalable style of management, and donot restrict myself to PMP methodologies.I believe that one has to analyze thesituation and implement the bestmethodology that can yield the maximum

    result with minimum cost and risk. I alsoenforce quality tools and methodology atevery step of project management.

  • 8/8/2019 Projects Question and Answer

    24/95

    What is your greatest strength? What key assets can you offer in

    this job? What are three things I should know about you?

    I am Flexible, Adaptable and Scalable to any environment. Otherstrengths include Innovative, Can-do Attitude, Communication, Coordinationand excellent Interpersonal skills.

    I not only take initiative towards creative ideas but also proactively and withdetermination ensure that the idea is implemented as a process or solution.

    Experience, Leader ships Traits (characteristic), Credentials,

    Qualified, Enthuastic, intelligent, hardworking, flexible, team work,problem solving skills

    Strengths: As stated above I am Flexible, Adaptable and Scalableto any environment. My CV shows that I have taken up various roles in theinterest of project and company. Other strengths are innovative, initiativecreative, Communication and Coordination and excellent interpersonalskills.

    Weakness: I need to improve on Work-life balance and I am over ambitious. Know about me: I am a quick and sharp learner I am introvert when it comes to personal family life. I dont entertain

    personal discussion in office and vice-versa. I have high skill sets in Negotiations

  • 8/8/2019 Projects Question and Answer

    25/95

    1. How would you describe

    yourself? Professionally, I am assertive, persistent, strong-willed person. I am Quality conscious and I always establish

    benchmarks of performance and standards ofexcellence. I have sought out innovative solutions to

    challenging problems to maximize output. I keep my focus on BiggerPicture and am

    result, customer/stakeholder oriented. Personally I am very fun loving, out-going and

    open-minded person.

  • 8/8/2019 Projects Question and Answer

    26/95

  • 8/8/2019 Projects Question and Answer

    27/95

    3. Why did you choose this

    career?

    During my early engineering days I hadrealized that Engineering segment willcontinually evolve and subsequently willhave wide and challenging career. It is thisaspect, of being on the cutting edge, whichespecially interests me.

  • 8/8/2019 Projects Question and Answer

    28/95

    4. What motivates you to do a

    good job? I've always been motivated by the desire to do a

    good job at whatever position I am in. I want toexcel and to be successful in my job, both for myown personal satisfaction and for my employer.

    I do ensure that stakeholders get the best qualityproduct that I can provide. I am motivated by thechallenge of leading and finishingimplementation and critical support project onschedule, along with reducing the overhead

    costs and managing the teams. Its the success,reward and recognition that motivate me to takeup new challenging assignments and projects

  • 8/8/2019 Projects Question and Answer

    29/95

    8. What do you look for in a job?

    I look for challenging, steep learningcurve, good work culture, demanding,rewarding, opportunities for advancementand growth, team environment,opportunity to build and maintain clientrelationships.

  • 8/8/2019 Projects Question and Answer

    30/95

    11. What is your greatest

    weakness?

    I need to improve on Work-life balanceand I am over ambitious. However I amworking on work-life balance by delegating

    and distributing the additional task acrossthe team. I am improving on setting up aclear objectives and goals for my careeradvancement. I am trying to hang on to

    one company longer and not rather jumpfrequently. I considerPM as laying downthe foundation to higher career.

  • 8/8/2019 Projects Question and Answer

    31/95

    15. Tell me about a time when you failed to meet a deadline. What

    were the (recoil after impact) repercussions?

    One production rare case remained pending. Iwas called in to look into matter on priority basisby the senior management. Though I had kept

    senior management aware of my priorities andworkload well in advance but since the userescalated this, I had to change my priorities andclosed the case. Latter on we had a formal

    meeting with the upset client and assured withcorrective measures to gain back theconfidence.

  • 8/8/2019 Projects Question and Answer

    32/95

    20. Why do you want to work

    here?

    I would like to have diversified (expandone's range of products) experience

    across the globe and I do not want torestrict my experiences to one technology,one position or one business domain.

  • 8/8/2019 Projects Question and Answer

    33/95

    21. Why should I hire you over the others

    waiting to be interviewed?

    The focus of my contribution to company has always been in terms ofQuality and Savings. I consider these two as important factors for thegrowth of any company. By setting up high standards of quality, thecompany promotes the confidence in the clients, investors and in themarket. By savings in terms of cost and time, the company stands to itscommitment of delivering the quality product or service on time and within

    the budget. I bring along quality, cost savings, reducing development/delivery cycletime, opening up new market opportunities and complete customersatisfaction. I should be hired

    Because of my multi-disciplined and wide skill sets ranging from leadership,project and people management to quality to programming and training.

    Because of my ability to deliver even in adverse and deadlock situations.

    Because of my personal and professional strengths Because of my integrity values and always keeping company and customer

    on primary focus I am confident that my knowledge/skills and experience will be huge

    beneficial to your company.

  • 8/8/2019 Projects Question and Answer

    34/95

    Ability to work, understand, build relationships across different

    areas and with people from diverse cultures

    As above. The biggest credit is theusers/customer appreciation. Even after projectclosure I would receive emails/phone calls/ on

    the desk from the customer asking forhelp/support and guidance. I go beyond the linesto ensure the requirement as clearly understoodand defined. For example the users asked fordelivery of xyz. I would ask if it is xyz or

    XYZ, italic, bold or underlined? This explainsmy detailed level of observations andunderstanding of the task/work or project.

  • 8/8/2019 Projects Question and Answer

    35/95

    Strong organisational and leadership skills in an international, complex matrix

    environment with the ability to lead and drive projects to completion

    The above were all achieved by following:

    Clarity of the project (ensure that the requirement/specs/scopes areclearly understood)

    Enforce quality (follow the principle The time RIGHT) (no rework)

    Focus on Big Picture and keep eye on Risk

    H

    ave 4 blocker matrix presentation in meeting 1St block should present Risk and Mitigation

    2nd Block should present Task completed for the week/month

    3rd Block should present Pending task/activities along with Barchart.

    4th Block should present Problematic issues or concerns orachievements

  • 8/8/2019 Projects Question and Answer

    36/95

    Personal Attributes:

    Results-oriented leader adept at managed risk taking with a keensense of bottom-line profitability.

    An inspiring team leader who approaches projects with enthusiasmand vision. (4 Blocker presentation as above and taking up lossmaking project as quality project and turning it around)

    Excellent written and oral communication/coordination skills withmanagement, customers, vendors, and peers. Creative thinker, analytical problem-solver and solution orientated.

    solved several support complex production projects Business aware and customer focused Always looking for ways to improve, to be more efficient.

    Work well with others under varying situations and circumstances.(Have delivered the project under pressure environments) Enthusiastic learner who quickly grasps concepts and technical

    skills.

  • 8/8/2019 Projects Question and Answer

    37/95

    Q1) Have you ever faced an issue where your customer with whom your companyhas a long-term relationship is not signing off the product for any particular

    reason, which is beyond your control. How would you tackle this situation?

    Conduct a meeting with the customer tofocus on the roadblocks and reasons fornot-signing. Invite the external concernedmembers as well to address the situation.Explain the customer the facts. Discuss topossible win-win solutions of the issues

    along with the time-lines and plan-of-actions. Have it documented.

  • 8/8/2019 Projects Question and Answer

    38/95

    Q3) Scenario: Your team has been working for the past 6 months on a major project that is critical to the

    company. During the process a decision to use X was made, as the use of X saved months of development

    time. Your team has just finished Alpha testing and is preparing to move the project to the companys data

    center for Beta testing. Its the week before your team is to deliver the final Beta code and you receive a call

    from the manager of the companys data center. Upon review of a list of the components to be deployed, the

    manager noticed X and under no circumstances will he allow X to reside on any of the servers in his data

    center. Question: How do you handle this development?

    Tough situation, Have a detail rounds ofdiscussion (BRAINSTORMING sessions) withthe data center manager. If you run out of

    options, it always best to ask or take help fromthe team members. Ask the concerned personon alternative feasible solution. If there isfeasible solution for example to put new box;

    then work out the justification and Return oninvestments. Re-do the plans, look from biggerpicture the entire situation.

  • 8/8/2019 Projects Question and Answer

    39/95

    Q4) Scenario: Your team is finishing up the first release of a mission critical

    application for a client. The application is to be housed in their data center in

    London, where youve had a team spending the past week installing hardware and

    prepping everything in anticipation of the softwares release.

    Its Friday morning (you go liveMonday morning) and you get acall from the client saying thateverything needs to be housedout of their data center inFrankfurt. Not going liveM

    onday is not an option, aspress announcements havealready gone out. Question:What do you do?

    I have faced this type of situationon normal basis? For example theissues in production support, thedeadlines are as of yesterday!!!You need to re-prioritize your workaccordingly, if possible distribute

    your workload that can becompleted without monitoring. Listdown work task that go after go-live and Focus on Showstopper orno-go issues. Have brainstormingsessions with the team and have ahourly project update meetings.Display on dashboard the current

    status with completed, pending,burning (Green, Yellow, Red)indicators. Request help, askquestions, and if possible delegatework (autocratic communicator)

  • 8/8/2019 Projects Question and Answer

    40/95

    Sample Project Management Interview Questions (Questions ThatExamine Leadership Potential)

    1. How do you handlenon-productive team

    members?

    Its always 1:1; discussthe reasons of non-productivity, if its due totechnical reasons? Ifpersonal, I call in HR, ifTechnical, look out theways to reduce or removeby training, moving to

    other areas, exploiting hisstrengths and working onweakness.

  • 8/8/2019 Projects Question and Answer

    41/95

    Do not interrupt.

    What kind of projects would I work on? What kind of plans does the company have to increase business? What are the opportunities available in the company (department)? Tell me about the people I will be working with? (If appropriate) what are the people like I will be working with? What about the company convinced you to join and stay through the

    years? How did you get to where you are now? What authority (if appropriate) will I be given? What will you expect of me?

    What is there about the position that has not been mentioned to methat could cause me to decline a job offer? What happened to the last person in this job? How would you define the management philosophy of the company?

  • 8/8/2019 Projects Question and Answer

    42/95

    The Salary Discussion

    *Try to avoid the salary discussion like the plague! Ifasked, What are you looking for?

    The correct answer is, My present salary is $$,$$$, ifyou like me, and I like you, Im sure we can work the

    numbers out. * Dont come up with a specific number you might

    ask for $2,000 more than they can pay or $2,000 less

    than I can get for you.

    * First, lets see if both parties want to buy before wedetermine what it costs.

  • 8/8/2019 Projects Question and Answer

    43/95

    What interests you most about

    the position we have?

    I am anxious to take on addedresponsibility. In addition to enjoying mywork, I'd like to expand my knowledge.

    Frankly, these opportunities don't exist inmy present position, but do in the onehere.

  • 8/8/2019 Projects Question and Answer

    44/95

    What do you think of your boss?

    He's an outstanding man. I have a greatdeal of respect for him and have enjoyedworking with him very much.

  • 8/8/2019 Projects Question and Answer

    45/95

    How long would you stay with

    us?

    As I mentioned to you, I'm looking for acareer opportunity, however, I'm a realist.Obviously, if I don't do the job

    you won't want me around, and if there isno opportunity for me, it won't be the typeof environment Id enjoy.

  • 8/8/2019 Projects Question and Answer

    46/95

    How long would it take for you to make a

    contribution to our company?

    Well, I hope to be able to make acontribution in a very short time, obviouslyit will take some time to get used to

    certain operating procedures. There are anumber of things that I have accomplishedbefore that I may be able

    to institute once I gain a betterunderstanding of your organization.

  • 8/8/2019 Projects Question and Answer

    47/95

  • 8/8/2019 Projects Question and Answer

    48/95

    What is your biggest weakness?

    . Well, I really don't feel I have a weaknessthat affects my working ability. I guess attimes, I have a tendency

    to be impatient and occasionally pushpeople too hard to get a job done.Patience isn't my strongest virtue.

  • 8/8/2019 Projects Question and Answer

    49/95

    what is your EffectiveManagement?

    Lead don't manage by setting up clear goals, vision, clearcommunication,

    Focus on the Customer:

    Hire the best: Grade A players are motivated, driven, energetic,innovative, have the right attitude, aptitude, experience, abilities andtheir enthusiasm and quest for excellence

    Set clear goals Listen to your team: you get ideas, feedback and advice can come

    from anywhere

    Communicate effectively

    Respect your team

    Create a learning culture

    Delegate Don't Abdicate: they delegate then supervise, monitor,inspect and provide feedback

    Remove barriers to success

  • 8/8/2019 Projects Question and Answer

    50/95

    When the employer says, Tell me about

    yourself?

    Talk about your professional background,your qualifications, your education relevantto the position, your duties andachievements.

  • 8/8/2019 Projects Question and Answer

    51/95

    HOW TO CONDUCT A SUCCESSFUL FACE TO

    FACE INTERVIEW

    1. Appearance is critical. Dress properly - It is very important!! The look is conservative and successful. (men) Conservative suit with tie, white shirt,

    dark socks, leather shoes (polished), and get a hair cut. men is Business Casual, meaning nice shirt or blouse

    and dress or khaki pants. Find out before you go what they expect. 2. First thing make eye contact" - and maintain eye contact throughout the

    interview. 3. Hand shake - should be firm (not limp or too strong) Try practicing with a friend

    before you interview. 4. Learn as much about the company before going in as you can; this will impress the

    interviewers. 5. Take at least one fresh original resume Job title/starting and ending dates. Be prepared to discuss each aspect of your career in detail. Know your own resume!

    Be able to speak about your duties/responsibilities in depth. What and how--strong emphasis on your specific duties. Definitely mention specific Accomplishments, Awards, and Rankings. State the facts-- be honest - but not modest! Sell your strengths!!

  • 8/8/2019 Projects Question and Answer

    52/95

    FACE INTERVIEW-2

    6. Find out what the employer is looking for and describe your past accomplishments relating howthey will help him.

    Give Examples!! Maintain eye contact at all times and smile, but don't be phony. Be positive--eager--at ease 7. When the employer says, Tell me about yourself? Talk about your professional

    background, your qualifications, your education relevant to the position, your duties andachievements.

    8. Be able to discuss your past experiences in depth and detail. You are the authority. Come across in a motivated tone. Be enthusiastic; present yourself as a "high energy" person. Be sincere. Answer the questions geared to the position for which you are interviewing. (Be

    careful you don't interview for a different position than the one you were sent on.) When the employer asks you a question, think about your answers as long as you need to But,

    when, you do answer don't be vague--be decisive and specific with your answers. Be careful to not over talk

    your answers.

    Never say no, or I dont know anything about that, or I dont do that, instead say "Although Ihaven't, I can do..." Make the employer comfortable with you as a prospective employee - and as a person! 9. State the reasons for leaving in a very positive manner. Be positive about current employer/manager.

    The old saying, If you cant say anything nice, then dont say anything at all is very appropriate inthe interview

    setting.

  • 8/8/2019 Projects Question and Answer

    53/95

    How do you motivate team members who are burned

    out, or bored?

    Monotonous jobs, tasks or assignmentsare the major factors of burned out.Moving to challenging different role, tech,and assignments would help. Besides thiswe do have regular fun, sports outings

  • 8/8/2019 Projects Question and Answer

    54/95

    How do you handle team members who come to you

    with their personal problems

    I do not, entertain personal issues andpass it on to HR

  • 8/8/2019 Projects Question and Answer

    55/95

    Explain how you operate

    interdepartmentally

  • 8/8/2019 Projects Question and Answer

    56/95

    Tell me how youwould react to asituation wherethere was more thanone way toaccomplish thesame task, andthere were very

    strong feelings byothers on eachposition?

    The best approach iswhich can be justifiedin terms delivering themax output with mininputs (in all aspects,costing, quality, time,performance)

  • 8/8/2019 Projects Question and Answer

    57/95

    Consider that you

    are in a diverse

    environment, out of

    your comfort zone.How would you rate

    your situational

    leadership style?

  • 8/8/2019 Projects Question and Answer

    58/95

    Give me an example

    of your leadership

    involvement where

    teamwork played animportant role?

    During productionSupport, where in Ipersonally looked into

    couple ofP1 tickets.

  • 8/8/2019 Projects Question and Answer

    59/95

    Trustworthiness

    Tell me about a

    situation where your

    loyalty was

    challenged. Whatdid you do? Why?

    My Commitment tothe projects andcompany,

  • 8/8/2019 Projects Question and Answer

    60/95

    In what types of

    situations is it best

    to abandon loyalty

    to your manager?

    When Manager failsto listen or takeactions or decisions

    on important issues

  • 8/8/2019 Projects Question and Answer

    61/95

    In todays business

    environment, when

    is loyalty to your

    manager particularlyimportant?

    Crisis and criticalproject situations.

  • 8/8/2019 Projects Question and Answer

    62/95

    Strengths and Weaknesses

    Why are you

    interested in this

    position?

    Project andmaintenanceManagement, Meddle

    East (Gulf) region

  • 8/8/2019 Projects Question and Answer

    63/95

    Describe what you

    think it would be like

    to do this job every

    day?

    Customer interactionwould be on toppriority, explore the

    other businessopportunities andensuring highcustomer satisfaction

  • 8/8/2019 Projects Question and Answer

    64/95

    What do you believe

    qualifies you for this

    position?

    My skill sets, myknowledge, myleadership, it and

    quality experience.

  • 8/8/2019 Projects Question and Answer

    65/95

    What have you

    learned from your

    failures?

    Never commit tosomething I cannotdeliver in time.

  • 8/8/2019 Projects Question and Answer

    66/95

    DISCUSSION:

    Show that you are able to learnfrom your mistakes, but don't offerup any negative examplesconcerning your pastperformance. Show that you havebeen successful, but that youhave the maturity it takes toexamine your own behavior sothat you can learn and grow andbe a better employee. Be brief.

    "Good question. Well, I have beensuccessful at every job I have had,but I have had the normal ups anddowns. I'd say that I do actively tryto monitor my work habits and thequality of my work so that I canconstantly be improving myself.FOR EXAMPLE, I have had oneor two hiccups with customerswhere their satisfaction was notwhere I thought it was. I learnedthat I have to really monitor certaindifficult customers closely and"take their temperature" so I can

    keep their satisfaction level ashigh as possible. Have you hadany customers like that here?"

  • 8/8/2019 Projects Question and Answer

    67/95

    Describe an ideal job for you.

    I take my every assignment as an idealjob. I consider this as a key to my success.I would take up any opportunity that allows

    me to put my management, analytical,creative and innovative talents to work in alarger capacity, wherein I can learn and

    share my individual perspectives witheveryone.

  • 8/8/2019 Projects Question and Answer

    68/95

    Judgment

    What would you do

    if you found out that

    a contractor was in

    a conflict of interestsituation?

    Ignored + enter =I willalways thing aboutmy organization

    welfare. if he notconvinced matterhand our to purchaseand hr deparmmaent.

  • 8/8/2019 Projects Question and Answer

    69/95

    Give me an example

    of a win-win

    situation you have

    negotiated.

    Purchasedepapartment.

  • 8/8/2019 Projects Question and Answer

    70/95

    Tell me about your

    verbal and written

    communication

    ability. How well doyou represent

    yourself to others?

    What makes you

    think so? Small aor A, italic, bold or

    underlines, best it toask 100 times.

  • 8/8/2019 Projects Question and Answer

    71/95

    Give me an example of a stressful

    situation you have been in. How well

    did you handle it? If you had to do it

    over again, would you do it differently?How do you deal with stress, pressure,

    and unreasonable demands?

    Production Support and Time boundimplements

  • 8/8/2019 Projects Question and Answer

    72/95

    General Experience

    Tell me about a

    tough decision you

    had to make?

  • 8/8/2019 Projects Question and Answer

    73/95

    General Experience

    Describe what you

    did at your work

    place yesterday

    Status meeting,production supportissues, enhancement

    status, meeting withstakeholders etc.

  • 8/8/2019 Projects Question and Answer

    74/95

    How would you

    solve the following

    technical problem?

    What strengths didyou bring to your

    last position?

  • 8/8/2019 Projects Question and Answer

    75/95

    Describe how those

    contributions impacted

    results?

    Persistence, patience,making the usersunderstand the benefitsof the process,

    technology, coaching. Inreturn, I got positiveresponse from the end-users in sharing of

    knowledge and betterideas on thebusiness/functionalprocesses.

  • 8/8/2019 Projects Question and Answer

    76/95

    Project Management Experience

    What are the necessary

    steps to successful

    project management?

    For any project

    I follow methodologiessuggested by PMPadding on 6 Sigma toolsto the projectmanagement. I work on 4Ds Discussion,Definition, Direction and

    Decision and 10 steps forany project execution anddelivery.

    6 Si t l t th j t

  • 8/8/2019 Projects Question and Answer

    77/95

    6 Sigma tools to the project-4 Ds Discussion,

    Use standards and best practices to minimize project-planningredundancies. Have flexible, adaptable and scalable plans toincorporate future changes.

    Projects should have sound and definite requirements

    Define project management success at the start of the project

    Keeping changes to a minimum (reduces time and overhead costs)

    Organizing the team according to needs and organizational realities.

    Using checkpoints and documenting all the records

    Keeping project customer engaged in the project from start to finish

    Rigorous testing.

    Transfer responsibility to the customer once the project is complete

    Evaluate every project for valuable lessons learned via post-project reviews

    For any successful project all 6 Cs should be well covered Clarity

    Communication Conflicts

    Control

    Change

    Coordination

  • 8/8/2019 Projects Question and Answer

    78/95

    78

    How do you plan for aproject?

    (Use PMP Approachto star with, prepare aroadmap, checklist

    and projecttemplates/log book)start with initiation ->planning -> execution

    -> control/monitoring -> closure

  • 8/8/2019 Projects Question and Answer

    79/95

    RESOURSE+DEADLINSE+BUDGET+SCOPE+SPECIFICATION+QUALITY+RISK

    What is important toconsider whenplanning a Fr project?

    (your type of project)?

    Resources,

    Deadlines,

    Budget,

    Scope,

    Specification,

    Quality

    And Risk

  • 8/8/2019 Projects Question and Answer

    80/95

    PLANNING

    1 What are things thatyou have found to below priority when

    planning for (yourtype of project)?

    2 What distinguishesa project from routineoperations? The

    chained or linkedactivities?

    Scope Time scale Cost and

  • 8/8/2019 Projects Question and Answer

    81/95

    Scope, Time scale , Cost and

    Resources The three constraints of project management will almost

    always be competing with each other.

    If a team decides to enlarge the scope of a project, thetime will become larger as well, along with the cost.

    If the time constraint is tighter, the scope may bereduced, but the costs will remain high.

    If the team should decide to tighten the budget, thescope will become smaller but the time will increase.

    To become skilled in project management, the projectmanager and their team must be capable of dealing withthese constraints in a way that will allow them tosuccessfully complete any project that they plan.

  • 8/8/2019 Projects Question and Answer

    82/95

    82

    What are the fivecontrol components ofa project?

    ans

    What qualificationsare required to be aneffective project

    manager? ans

  • 8/8/2019 Projects Question and Answer

    83/95

    83

    Name five signs thatindicate your projectmay fail.

    Over/Under estimation,

    Scope management,

    Over budget,

    Change Management,

  • 8/8/2019 Projects Question and Answer

    84/95

    84

    When you areassigned a project,what steps do you

    take to complete theproject?

    PMP steps

  • 8/8/2019 Projects Question and Answer

    85/95

    85

    As you begin yourassignment as aproject manager, you

    quickly realize thatthe corporate sponsorfor the project nolonger supports the

    project. What will youdo?

    Ans:-

  • 8/8/2019 Projects Question and Answer

    86/95

    86

    Your three-monthproject is about toexceed the projected

    budget after the firstmonth. What stepswill you take toaddress the potential

    cost overrun?

    Ans:-

  • 8/8/2019 Projects Question and Answer

    87/95

    87

    Tell us about asuccessful project inwhich you

    participated and howyou contributed to thesuccess of thatproject

    Ans:-

  • 8/8/2019 Projects Question and Answer

    88/95

    88

    . You are given theassignment of projectmanager and the

    team members havealready beenidentified. To increasethe effectiveness of

    your project team,what steps will youtake?

    Ans:-

  • 8/8/2019 Projects Question and Answer

    89/95

    89

    You have been assignedas the project managerfor a team comprised ofnew employees just out

    of college and "entry-level" consulting staff.What steps can you taketo insure that the projectis completed against avery tight time deadline?

    Ans:-

  • 8/8/2019 Projects Question and Answer

    90/95

    What is a "project milestone"?

    A significant event in the project, usuallycompletion of a majordeliverable

  • 8/8/2019 Projects Question and Answer

    91/95

    What is "project float"?

    Project Float is the length of time betweenthe Contractors Early Completion (orSubstantial Completion) and the Actual

    Contract Completion Date.

  • 8/8/2019 Projects Question and Answer

    92/95

    92

    Your project is beginning to exceed budgetand to fall behind schedule due to almostdaily user change orders and increasing

    conflicts in user requirements. How willyou address the user issues?

    Answer:-Report upfront and not wait till

    11th hour

  • 8/8/2019 Projects Question and Answer

    93/95

    93

    Youve encountered adelay on an earlyphase of your project.

    What actions can youtake to counter thedelay? Which actionswill have the most

    effect on the result?

    Closing or addressingthe reasons of thedelay, resource

    allocation, incompletedocuments, or othersor focus on the taskthat would consume

    most of the time.

  • 8/8/2019 Projects Question and Answer

    94/95

    94

    Describe what you didin a difficult projectenvironment to get

    the job done on timeand on budget ?

    Currently, negotiationwith the vendors, on

    AMC, contracts

    signing off, Strictdeadlines, follow-upwith business userson testing and sign

    off. No re-work, Keepthe changes tominimum

  • 8/8/2019 Projects Question and Answer

    95/95

    AEW Services, Vancouver, BC 2001 Email: [email protected]

    What actions arerequired forsuccessful executive

    sponsorship of aproject?

    Meet the requirement,zero rework, Detailedlevel planning, Risk

    Management.


Recommended