+ All Categories
Home > Documents > PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... ·...

PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... ·...

Date post: 14-Mar-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
31
Yes No Yes Generation (kW) No 1 23/Aug/2016 24115359996113 224 B-2b(12)T 135 Khuzaima Aslam Creative Electronics Pvt. Ltd. - - Yes Yes 135 2 16/Dec/2016 24112530025005 663 A-2c(06)T 17 Osman Muhammad Maud Reon Energy Solution Pvt. Ltd. - - Yes Yes 17 3 05/Dec/2016 08112121095000 Old 08112721095000 New 9 A1b (03)T 10 Khuzaima Aslam Creative Electronics Pvt. Ltd. - - Yes Yes 10 4 18/Nov/2016 08112122115500 Old 08112722115500 New 5 A1b(03)T 2.25 Amir Pervaiz Ch. Read Solar - - Yes Yes 2.25 5 31/Aug/2016 09112121339200 Old 09112721339200 New 8 A1b(03)T 2.5 Amir Pervaiz Ch. Read Solar - - Yes Yes 2.5 6 27/Oct/2016 24115311000076 250 B2b(12)T 100 ADAPTIV Technologies Pvt. Ltd. - - Yes Yes 100 7 31/Aug/2016 14115241476201 6 A1b (03) 3 Amir Pervaiz Ch. Read Solar - - Yes Yes 3 8 21/Dec/2016 15115160057100 5 A1b (03)T 14.85 Farhan Power Highway - - Yes Yes 14.85 9 21/Dec/2016 15115160057200 5 A1b (03)T 14.85 Tahira Arshad Power Highway - - Yes Yes 14.85 10 21/Nov/2016 11115241179100 9 A1b(03) 6 Khurram Jan JKS Pvt. Ltd. - - Yes Yes 6 11 02/Dec/2016 44114161433600 5 A1b (03)T 5 M. Zahid Mustafa MHM Technologies - - Yes Yes 5 12 23/Aug/2016 14115251652718 5 A1B(03)T 10 Yasir Haleem Nizam Energy Pvt. Limited - - Yes Yes 10 13 02/Dec/2016 01112110487600 Old 01112710487600 New 9 A1b (03)T 6.2 M. Zahid Mustafa MHM Technologies - - Yes Yes 6.2 14 08/Nov/2016 24112131006000 84 B2b(12)T 30 Zain-ul-Abideen Premier Energy Pvt. Ltd. - - Yes Yes 30 15 20/Oct/2016 13115421260810 5 E-i (55) 6 Farrukh Nayyar Solar Tech Intl. Limited - - Yes Yes 6 16 21/Feb/2017 14112110259904 Old 14112710259904 New 8 A1b(03)T 2.5 M. Ishaq Bhatti Read Solar - - Yes Yes 2.5 17 21/Feb/2017 14112110259903 Old 14112710259903 New 5 A1b(03)T 2.5 M. Ishaq Bhatti Read Solar - - Yes Yes 2.5 18 23/Aug/2016 13115261692600 9 A1a (01) 5.6 Yasir Haleem Nizam Energy Pvt. Limited - - Yes Yes 5.6 19 08/Dec/2016 09112110968003 Old 09112710968003 New 8 A1b (03)T 6 Gul Sher Khan ALPHA Renewables (SMC) Pvt. Ltd. - - Yes Yes 6 20 03/Feb/2017 44115260204128 35 A1b (03)T 9.6 Mushtaq Muhammad Multiline Engineering Company - - Yes Yes 9.6 21 03/May/2017 15115162801000 5 A1b(03)T 5 Khalid Mukhtar Sabbo Traders - - Yes Yes 5 22 21/Apr/2017 15115231928500 4 A1a(01)T 3 Khalid Mukhtar Sabbo Traders - - Yes Yes 3 23 04/Apr/2017 13115441916900 5 A1b(03)T 6 Yahya Hassan Naqvi Paragon International - - Yes Yes 6 24 31/Aug/2016 15115421487402 9 A1b(03)T 7.28 Abdul Wassay Spel Technology Support Pvt. Ltd. - - Yes Yes 7.28 25 08/Nov/2016 24112341240731 Old 24112621240731 New 180 A1b (03)T 10 Anis Arif TSMLE Solar - - Yes Yes 10 26 29/Nov/2016 15115421376643 9 A1b(03)T 7.54 Farrukh Nayyar Solar Tech Intl. Limited - - Yes Yes 7.54 Billing Started Reason for Unripe Case PROMOTION OF NET METERING IN LESCO Sr. No. Date of Application Reference No. Sanctioned Load / Connected Load (kW) Required Load for Net Metering (kW) Name of Vender Unripe Cases Ripe Cases Connections Installed Tariff Page 1 of 31
Transcript
Page 1: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

1 23/Aug/2016 24115359996113 224 B-2b(12)T 135Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 135

2 16/Dec/2016 24112530025005 663 A-2c(06)T 17Osman Muhammad Maud

Reon Energy Solution Pvt. Ltd.- - Yes Yes 17

3 05/Dec/201608112121095000 Old

08112721095000 New9 A1b (03)T 10

Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 10

4 18/Nov/201608112122115500 Old

08112722115500 New5 A1b(03)T 2.25

Amir Pervaiz Ch.

Read Solar- - Yes Yes 2.25

5 31/Aug/201609112121339200 Old

09112721339200 New8 A1b(03)T 2.5

Amir Pervaiz Ch.

Read Solar- - Yes Yes 2.5

6 27/Oct/2016 24115311000076 250 B2b(12)T 100 ADAPTIV Technologies Pvt. Ltd. - - Yes Yes 100

7 31/Aug/2016 14115241476201 6 A1b (03) 3Amir Pervaiz Ch.

Read Solar- - Yes Yes 3

8 21/Dec/2016 15115160057100 5 A1b (03)T 14.85Farhan

Power Highway- - Yes Yes 14.85

9 21/Dec/2016 15115160057200 5 A1b (03)T 14.85Tahira Arshad

Power Highway- - Yes Yes 14.85

10 21/Nov/2016 11115241179100 9 A1b(03) 6Khurram Jan

JKS Pvt. Ltd.- - Yes Yes 6

11 02/Dec/2016 44114161433600 5 A1b (03)T 5M. Zahid Mustafa

MHM Technologies- - Yes Yes 5

12 23/Aug/2016 14115251652718 5 A1B(03)T 10Yasir Haleem

Nizam Energy Pvt. Limited- - Yes Yes 10

13 02/Dec/201601112110487600 Old

01112710487600 New9 A1b (03)T 6.2

M. Zahid Mustafa

MHM Technologies- - Yes Yes 6.2

14 08/Nov/2016 24112131006000 84 B2b(12)T 30Zain-ul-Abideen

Premier Energy Pvt. Ltd.- - Yes Yes 30

15 20/Oct/2016 13115421260810 5 E-i (55) 6Farrukh Nayyar

Solar Tech Intl. Limited- - Yes Yes 6

16 21/Feb/201714112110259904 Old

14112710259904 New8 A1b(03)T 2.5

M. Ishaq Bhatti

Read Solar- - Yes Yes 2.5

17 21/Feb/201714112110259903 Old

14112710259903 New5 A1b(03)T 2.5

M. Ishaq Bhatti

Read Solar- - Yes Yes 2.5

18 23/Aug/2016 13115261692600 9 A1a (01) 5.6Yasir Haleem

Nizam Energy Pvt. Limited- - Yes Yes 5.6

19 08/Dec/201609112110968003 Old

09112710968003 New8 A1b (03)T 6

Gul Sher Khan

ALPHA Renewables (SMC) Pvt. Ltd.- - Yes Yes 6

20 03/Feb/2017 44115260204128 35 A1b (03)T 9.6Mushtaq Muhammad

Multiline Engineering Company- - Yes Yes 9.6

21 03/May/2017 15115162801000 5 A1b(03)T 5Khalid Mukhtar

Sabbo Traders- - Yes Yes 5

22 21/Apr/2017 15115231928500 4 A1a(01)T 3Khalid Mukhtar

Sabbo Traders- - Yes Yes 3

23 04/Apr/2017 13115441916900 5 A1b(03)T 6

Yahya Hassan Naqvi

Paragon International - - Yes Yes 6

24 31/Aug/2016 15115421487402 9 A1b(03)T 7.28Abdul Wassay

Spel Technology Support Pvt. Ltd.- - Yes Yes 7.28

25 08/Nov/201624112341240731 Old

24112621240731 New180 A1b (03)T 10

Anis Arif

TSMLE Solar- - Yes Yes 10

26 29/Nov/2016 15115421376643 9 A1b(03)T 7.54Farrukh Nayyar

Solar Tech Intl. Limited- - Yes Yes 7.54

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

Page 1 of 31

Page 2: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

27 21/Feb/201714112110266902 Old

14112710266902 New5 A1b(03)T 2.5

M. Ishaq Bhatti

Read Solar- - Yes Yes 2.5

28 06/Mar/2017 13115441889900 5 A1b(03)T 6M. Saad Muzamil

Pantera Energy- - Yes Yes 6

29 11/Apr/2017 14115241551600 5 A1a(01)T 4.8Zamir Khan

GO Solar Pvt. Ltd- - Yes Yes 4.8

30 14/Jun/2017 12115251513397 8 A1b(03) T 7.5Ehsan Ali

Nizam Energy Pvt. Ltd.- - Yes Yes 7.5

31 12/May/2017 14115255532300 11 A1b(03)T 10.4M. Saad Muzamil

Pantera Energy- - Yes Yes 10.4

32 06/Jun/2017 12115421194600 10 A1b(03) T 11Ali Raza

Ravi Sundar Pvt. Ltd.- - Yes Yes 11

33 05/Jun/2017 8115161019200 4 A1a(01) 6.315M. Saad Muzamil

Pantera Energy- - Yes Yes 6.315

34 31/Aug/2016 8115130764300 5 A1b(03)T 6Tehseen Qureshi

Pantera Energy- - Yes Yes 6

35 23/May/2017 15115262007512 5 A1b(03)T 3M. Ishaq Bhatti

Read Solar- - Yes Yes 3

36 24/May/2017 15115257710840 11 A1b(03)T 7.8M. Saad Muzamil

Pantera Energy- - Yes Yes 7.8

37 26/Jul/2017 15115257257504 11 A1b(03)T 12.4Rana Abbas

AE Solar Alternative Energy- - Yes Yes 12.4

38 21/Jun/201712112370493804 Old

12112610493804 New7 A1b(03) T 7.5

Ali Raza

Multi Links Pvt. Ltd.- - Yes Yes 7.5

39 10/May/2017 12115262722000 17 A1b(03)T 10.6Ali Raza

Multilinks Solar Energy- - Yes Yes 10.6

40 13/Jun/2017 12115262104803 17 A1b(03) T 7.8Zain-ul-Abideen

Premier Energy Pvt. Ltd.- - Yes Yes 7.8

41 19/Sep/2016 27112530289400 9 A2c(06)T 3Mian Sultan Mehmood

Creative Electronics Pvt. Ltd.- - Yes Yes 3

42 20/Jun/2017 15115262008001 9 A1b(03)T 8 Mansha Energy Pvt. Ltd. - - Yes Yes 8

43 21/Jul/2017 15115421361200 10 A1b(03)T 9.36Zubair Aslam Khan

AGE Solar- - Yes Yes 9.36

44 25/May/2017 24115150901800 145 A2c(06)T 59.4Zaeem Aslam

EBR Energy Pvt. Ltd.- - Yes Yes 59.4

45 23/Aug/2016 24113312401301 47 A2C(06)T 3Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 3

46 04/May/2017 24115159000802 48 A2b(05) 9.18M. Ishaq Bhatti

Read Solar- - Yes Yes 9.18

47 29/Nov/2016 14115442002100 5 A1b(03)T 3Farrukh Nayyar

Solar Tech Intl. Limited- - Yes Yes 3

48 23/May/2017 15115257503100 11 A1b(03)T 13Sharafar Ali Khan

Indus Solar International - - Yes Yes 13

49 12/Jun/2017 10115230881208 13 A1b(03) T 12.8Waqar Amir

DWP Technologies Pvt. Ltd.- - Yes Yes 12.8

50 28/Mar/201746112111660925 Old

46112711660925 New38 A2c(06) T 10.08

Usman Muhammad

Plans Energy Solution- - Yes Yes 10.08

51 23/Feb/201724112399000628 old

24112639000628 New150 B2b(12)T 55.44

Syed Amir Ali

G-Hop Pvt. Ltd.- - Yes Yes 55.44

52 06/Mar/201712112351292645 old

12112641292645 New6 A1b(03)T 3

M. Saad Muzamil

Pantera Energy- - Yes Yes 3

Page 2 of 31

Page 3: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

53 04/Jul/2017 2112210204110 18 A1b(03)T 22.8Asif Javed

Thermovision- - Yes Yes 22.8

54 13/Jun/2017 24115159250116 60 A1b(03) T 55.36Zain-ul-Abideen

Premier Energy Pvt. Ltd.- - Yes Yes 55.36

55 31/Aug/201710112121432900 Old

10112721432900 New5 A1b(03)T 3

M. Saad Muzamil

Pantera Energy- - Yes Yes 3

56 07/Jul/2017 13115411007300 8 A1b(03)T 8.96Kaheel Butt

Reon Energy- - Yes Yes 8.96

57 24/Jul/2017 9115230811007 14 A1b(03)T 10.2M. Saad Muzamil

Pantera Energy- - Yes Yes 10.2

58 28/Mar/2017 24117419113001 222 B2b (12) T 80.64Ali Zeshan

JKS Pvt. Ltd.- - Yes Yes 80.64

59 24/Oct/2017 45117391037003 69 D1b(50) 46.8Abdul Majeed Saqib

Haris & CO.- - Yes Yes 46.8

60 24/Jul/2017 12115262924100 17 A1b(03)T 12.96Farooq Saeed

Pantera Energy Pvt. Limited- - Yes Yes 12.96

61 14/Jun/2017 15115111433700 6 A1b(03) T 5.3Imran Hashmi

Pakistan Solar Association- - Yes Yes 5.3

62 07/Sep/2017 5115260553200 8 A1b(03)T 4.16Yasir Ali

Maxell Power Pvt. Ltd.- - Yes Yes 4.16

63 18/Oct/2017 14112182217000 5 A1b(03)T 3.78Waqas Khaleeque

Smart Solar- - Yes Yes 3.78

64 04/Jul/201715112122238200 Old

15112722238200 New5 A1b(03)T 6.24

Sajid Rafique

Hadron Solar Pvt. Ltd.- - Yes Yes 6.24

65 10/Aug/2017 12115241327501 7 A1a(01)T 6.24Hafiz Ali Riaz

Read Solar- - Yes Yes 6.24

66 21/Jul/201710112110191270 Old

10112710191270 New8 A1b(03)T 3.2

Sajid Rafique

Hadron Solar Pvt. Ltd.- - Yes Yes 3.2

67 05/Oct/2017 13115261641203 15 A1b(03)T 14.08M. Salman Shuaib

Solar System Pvt. Ltd.- - Yes Yes 14.08

68 31/Aug/2017 15115231963300 7 A1b (03) 3Amir Ch.

Read Solar Pvt. Ltd.- - Yes Yes 3

69 11/Sep/2017 14115231695400 10 A1b(03)T 9.945Zain-ul-Abideen

Premier Energy Pvt. Ltd.- - Yes Yes 9.945

70 27/Sep/2017 13115231601200 14 A1a(01) 11.73M. Aitiq

ECO Engieering Concept Pvt. Ltd.- - Yes Yes 11.73

71 19/Oct/2017 15115231957100 8 A1b(03)T 6.12Farooq Saeed

Pantera Energy Pvt. Limited- - Yes Yes 6.12

72 23/Dec/2016 24115271000065 995 B3(14)T 157.5Mirza Azhar Baig

Orient Energy System Pvt. Limited- - Yes Yes 157.5

73 20/Jul/2017 11115320273700 8 A1b(03)T 7.6Saim Mehmood

Salam Enterprises- - Yes Yes 7.6

74 20/Jul/2017 11115320272323 5 A1b(03)T 4.94Saim Mehmood

Salam Enterprises- - Yes Yes 4.94

75 16/Oct/2017 10115241123305 8 A1b(03)T 9.92Haziq Shoaib

RH Realty (SMC-Pvt) Ltd.- - Yes Yes 9.92

76 25/Sep/2017 15115257229700 17 A1b(03) T 15Sheraz Tahir Khan

WRL Technologies Pvt. Ltd.- - Yes Yes 15

77 23/Aug/2017 44115130018600 9 A2c(06)T 6.24Sajid Rafique

Hadron Solar Pvt. Ltd.- - Yes Yes 6.24

78 20/Jun/2017 15112431561603 2 A1a(01) 2Imran Hashmi

Pakistan Solar Association- - Yes Yes 2

Page 3 of 31

Page 4: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

79 06/Mar/2017 43114111011102 8 A2c(06)T 6M. Saad Muzamil

Pantera Energy- - Yes Yes 6

80 29/Sep/2017 4117140329721 5 A1b(03)T 3Yasir Ali

Maxell Power Pvt. Ltd.- - Yes Yes 3

81 11/Sep/2017 10115252564900 5 A1b(03)T 5Zain-ul-Abideen

Premier Energy Pvt. Ltd.- - Yes Yes 5

82 11/Sep/2017 14112541251703 5 A1a(01) 4.96Zain-ul-Abideen

Premier Energy Pvt. Ltd.- - Yes Yes 4.96

83 15/Sep/2017 14115255104103 11 A1b(03)T 5Zain-ul-Abideen

Premier Energy Pvt. Ltd.- - Yes Yes 5

84 13/Nov/2017 15115257705000 11 A1b(03)T 6Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 6

85 04/Dec/2017 7112520662700 5 A1b(03)T 3 Farooq Saeed, Pantera Energy Lahore - - Yes Yes 3

86 25/Sep/2017 15115256731900 11 A1b(03)T 6.48Zeeshan Ali Bhatti

ERCON Energy- - Yes Yes 6.48

87 30/Nov/2016 13115261658800 9 A1a (01) 7.1Sajid Rafique

Hadron Solar Pvt. Ltd.- - Yes Yes 7.1

88 15/Dec/2017 14115261720607 18 A1b(03) T 10.45 Elemetec (Pvt.) Ltd. - - Yes Yes 10.45

89 22/May/2017 24115159001400 58 A1a(01) 18.5Muneeb Baig

Nizam Solar- - Yes Yes 18.5

90 23/Aug/2017 14115411039403 25 A1b(03)T 8.16Sajid Rafique

Hadron Solar Pvt. Ltd.- - Yes Yes 8.16

91 26/Dec/2017 15112141448200 5 A1b(03) T 3Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 3

92 20/Oct/2017 24112520095001 89 A1a(01) 63.49Mirza Azhar Baig

Orient Energy System Pvt. Limited- - Yes Yes 63.49

93 09/Jan/2018 12115410909600 6 A1b(03) T 8.1 Haseeb Saadat, Allied Solar - - Yes Yes 8.1

94 17/Jan/2018 15115421378203 8 A1b(03) T 1.6 Nizam Energy - - Yes Yes 1.6

95 21/Jun/2017 7115230584900 5 A1a(01)T 3.06Tehseen Qureshi

Pantera Energy- - Yes Yes 3.06

96 02/Nov/2017 24115132108805 69 A2c(06)T 62.6M. Ali Zaman

AZL Pvt. Ltd.- - Yes Yes 62.6

97 24/Oct/201724112349000710 old

24112629000710 new52 A1b(03)T 45

Zain-ul-Abideen

Premier Energy Pvt. Ltd.- - Yes Yes 45

98 09/Feb/201814112110253200 Old

14112710253200 New9 A-1b(03)T 3.5 Nizam Energy - - Yes Yes 3.5

99 09/Feb/201814112110253300 Old

14112710253300 New9 A-1b(03)T 3.5 Nizam Energy - - Yes Yes 3.5

100 31/Jan/2018 13112181990901 5 A1b(03) T 4.56Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 4.56

101 09/Feb/2018 8112540772600 7 A-1b(03)T 5Saif-ur-Rahman

Solar Tech (Pvt) Ltd- - Yes Yes 5

102 25/Jul/2017 7115130708601 5 A1b(03)T 4.8Ali Zeshan

JKS Pvt. Ltd.- - Yes Yes 4.8

103 13/Nov/2017 14115411033968 18 A1a(01) 13.64 Amir Pervaiz Ch. Read Solar - - Yes Yes 13.64

104 25/Jul/2017 13115421209000 9 A1b(03)T 9M. Ishaq Bhatti

Read Solar- - Yes Yes 9

Page 4 of 31

Page 5: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

105 24/Oct/2017 24112520008602 67 A2b(05) 14Sami Ullah

Premier Energy- - Yes Yes 14

106 09/Feb/2018 13115241437400 14 A1b(03) T 14

Umair Arshad

Tesla Industries Private

Limited

- - Yes Yes 14

107 24/Oct/2017 13115261691700 9 A1b(03)T 9Zeeshan Ali

Premier Energy- - Yes Yes 9

108 24/Oct/2017 24115159250117 30 A2c(06)T 15Sami Ullah

Premier Energy- - Yes Yes 15

109 11/Sep/2017 24115159250273 68 A1b(03)T 18.8Zain-ul-Abideen

Premier Energy Pvt. Ltd.- - Yes Yes 18.8

110 04/Dec/2017 12115151468901 5 A1b(03)T 4.86 Farooq Saeed, Pantera Energy Lahore - - Yes Yes 4.86

111 09/Feb/201809112121249800 Old

09112721249800 New5 A-1b(03)T 4.84

Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 4.84

112 12/Mar/201824112119008629 Old

24112719008629 New320 A-1b(03)T 60.5 M/s Adaptive technologies Private Ltd. - - Yes Yes 60.5

113 07/Dec/2017 12115241363202 10 A1b(03)T 4Sami Ullah

Premier Energy- - Yes Yes 4

114 11/Dec/2017 13115241377400 14 A1b(03) T 8.32Farooq Saeed

Pantera Energy Pvt. Ltd.- - Yes Yes 8.32

115 09/Feb/2018 10115241162000 6 A-1a(01) 5.13Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 5.13

116 09/Feb/2018 9115230806100 8 A1b(03) T 7.8Hafiz Ullah M/s Siddiq Renewable

Eneragy- - Yes Yes 7.8

117 11/Dec/2017 10115230923000 5 A1b(03) T 3.1Muhammad Amir Shahzad

SUN Player & CO Pvt. Ltd.- - Yes Yes 3.1

118 26/Feb/2018 9115230810400 7 A-1b(03)T 6.12 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 6.12

119 25/Sep/2017 14115331501920 7 A1b(03)T 6.49Zeeshan Ali Bhatti

ERCON Energy- - Yes Yes 6.49

120 31/Jan/2018 3115260209500 7 A1b(03) T 6.75Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 6.75

121 26/Mar/2018 10115151196500 10 A-2A(04) 10.24 Creative electronics (Pvt). Ltd - - Yes Yes 10.24

122 30/Nov/2017 15115261970200 18 A1b(03)T 6.1Ali Hassan Habib

HIMA^Verte Lahore- - Yes Yes 6.1

123 16/Oct/2017 13115231558300 7 A1b(03)T 5.7Sajid Rafique

Hadron Solar Pvt. Ltd.- - Yes Yes 5.7

124 11/Dec/2017 13115231533905 7 A1b(03) T 6.6Muhammad Amir Shahzad

SUN Player & CO Pvt. Ltd.- - Yes Yes 6.6

125 11/Dec/2017 15115256534600 11 A1b(03) T 4.34Muhammad Amir Shahzad

SUN Player & CO Pvt. Ltd.- - Yes Yes 4.34

126 28/Mar/2018 15115256316600 11 A-1b(03)T 5.3 Creative electronics (Pvt). Ltd - - Yes Yes 5.3

127 12/Jun/2017 24112520130100 179 A2c(06)T 19.2Waqar Amir

DWP Technologies Pvt. Ltd.- - Yes Yes 19.2

128 09/Feb/2018 14112182163600 9 A-1b(03)T 7.8Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 7.8

129 04/Dec/2017 15115460640093 9 A1b(03)T 8 Farooq Saeed, Pantera Energy Lahore - - Yes Yes 8

130 26/Feb/2018 15115460640095 9 A-1b(03)T 3.12 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 3.12

Page 5 of 31

Page 6: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

131 11/Sep/2017 11115230958200 14 A1b(03)T 7.5Zain-ul-Abideen

Premier Energy Pvt. Ltd.- - Yes Yes 7.5

132 09/Feb/2018 44115262516107 25 A-2c(06)T 5Naseer Ahmad

Catkin Engineering - - Yes Yes 5

133 01/Feb/201724111259921400 Old

24111629921400 New430 B2b(12)T 30

Farrukh Nayyar

Solar Tech Intl. Limited- - Yes Yes 30

134 24/Oct/2017 9115240943408 14 A1b(03)T 11.9Zeeshan Ali

Premier Energy- - Yes Yes 11.9

135 01/3/2018 08112520881904 5 A-1b(03)T 5.94 Solar Tech - - Yes Yes 5.94

136 01/3/2018 8112520881800 5 A-1b(03)T 5.94 Solar Tech - - Yes Yes 5.94

137 06/3/2018 14115411077800 9 A-1b(03)T 7.5 Premier Energy Pvt. Ltd - - Yes Yes 7.5

138 16/Apr/2018 4115150457800 7 A-1b(03)T 5.5 Creative electronics (Pvt). Ltd - - Yes Yes 5.5

139 31/Jan/2018 11115230998100 10 A1b(03) T 9.36Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 9.36

140 26/Feb/2018 10115241121806 14 A-1b(03)T 10.8 Pantera Energy Pvt. Ltd. - - Yes Yes 10.8

141 06/3/2018 10115241129709 7 A-1a(01)T 9 Premier Energy Pvt. Ltd - - Yes Yes 9

142 31/Jan/2018 13115231591600 5 A1b(03) T 3Khuzaima Aslam

Creative Electronics Pvt. Ltd.- - Yes Yes 3

143 13/Nov/2017 13115421207200 7 A1b(03)T 6 Amir Pervaiz Ch. Read Solar - - Yes Yes 6

144 06/Apr/2018 15115411158800 20 A-1b(03)T 11.7 Premier Energy Pvt. Ltd - - Yes Yes 11.7

145 28/Mar/2018 15115470822169 16 A-1b(03)T 10.6 Creative electronics (Pvt). Ltd - - Yes Yes 10.6

146 12/Mar/2018 24115240012000 76 A-1b(03)T 25.11Farrukh Nayyar

Solar Tech Intl. Limited- - Yes Yes 25.11

147 10/Jul/201724111249008800 old

24111659008800 new1550 B3(14)T 181.45

Hafiz Ullah M/s Siddiq Renewable

Eneragy- - Yes Yes 181.45

148 16/Aug/2017 24116410008101 1016 B3(14)T 1000Tayyab Rafique

Reon Energy Ltd.- - Yes Yes 1000

149 06/Mar/2017 15115257216600 17 A1b(03)T 7.65Farooq Saeed

Pantera Energy Pvt. Limited- - Yes Yes 7.65

150 16/Mar/2018 14115255596000 11 A-1b(03)T 10.24 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes Yes 10.24

151 18/Apr/2018 15115256512400 11 A-1b(03)T 5.88 HISEL Power Pakistan Pvt Ltd - - Yes Yes 5.88

152 02/May/2018 11115230979100 9 A-1b(03)T 7.8 Creative electronics (Pvt). Ltd - - Yes Yes 7.8

153 29/May/2018 13115231589302 7 A-1a(01) 7.15 Nizam Energy - - Yes Yes 7.15

154 21/Jun/2018 27112520746100 7 A2c(06)T 7 Pantera Energy Pvt. Ltd. - - Yes Yes 7

155 21/May/2018 24118312600675 178 B-2b(12)T 107.2 M/s Orient Energy Systems (Private) Ltd - - Yes Yes 107.2

156 13/Apr/201824112399000440 old

24112639000440 New60 B-2b(12)T 32.64 HISEL Power Pakistan Pvt Ltd - - Yes Yes 32.64

Page 6 of 31

Page 7: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

157 07/Jun/2018 7112520719000 12 A1b(03) T 10.56 M/s Renewable Stars (PVT.) Limited - - Yes Yes 10.56

158 03/Apr/201805112170585900 Old

05112730585900 New8 A-1b(03)T 7.98 Creative electronics (Pvt). Ltd - - Yes Yes 7.98

159 06/May/201824112179026300 Old

24112739026300 New205 A1b(03) T 25.6 JAFFER BROTHERS PVT LIMITED - - Yes Yes 25.6

160 07/Dec/2017 24115159250374 85 A1b(03) T 19.12Sami Ullah

Premier Energy- - Yes Yes 19.12

161 03/Apr/2018 11115241187800 11 A-1b(03)T 6.24 Hadron Solar (Pvt) Ltd - - Yes Yes 6.24

162 29/Mar/2018 14115261767500 9 A-1b(03)T 9 Solar Tech - - Yes Yes 9

163 06/May/2018 15115256328000 11 A1b(03) T 9.88 M/s Renewable Stars (PVT.) Limited - - Yes Yes 9.88

164 11/May/2018 15115256964000 11 A1b(03) T 10.4 Premier Energy Pvt. Ltd - - Yes Yes 10.4

165 11/May/2018 12115262002700 18 A1b(03) T 11.22 Creative electronics (Pvt). Ltd - - Yes Yes 11.22

166 16/May/2018 24115159250045 295 A-2c(06)T 57.6 Premier Energy Pvt. Ltd - - Yes Yes 57.6

167 16/May/2018 14115162757700 6 A-1b(03)T 5.2 Premier Energy Pvt. Ltd - - Yes Yes 5.2

168 06/May/2018 12115410895300 7 A1b(03) T 5.2 M/s Renewable Stars (PVT.) Limited - - Yes Yes 5.2

169 21/May/201824111259029731 Old

24111629029731 New480 B-2b(12)T 60 Msquare R Engineering Services - - Yes Yes 60

170 11/Oct/201746112390217300 old

46112630217300 New37 B2b(12)T 32.46

Umair Idrees

Masco Energy Services- - Yes Yes 32.46

171 25/Jun/2018 13115261705699 5 A1b(03)T 5.12 Masco Energy Services - - Yes Yes 5.12

172 04/May/2018 9115130018100 10 A1b(03) T 9.36 Hardon Solar (PVT) LTD - - Yes Yes 9.36

173 07/Aug/2018 15115421361201 5 A1b(03) T 4.68 Read Solar Pvt. LTD - - Yes Yes 4.68

174 06/May/2018 15115241669300 10 A1b(03) T 10.32 M/s Renewable Stars (PVT.) Limited - - Yes Yes 10.32

175 27/Jul/2018 8115250258419 14 A1b(03) T 7.8 Premier Energy Pvt. Ltd - - Yes Yes 7.8

176 11/May/201814112122077500 Old

14112722077500 New6 A1b(03) T 4.62 Creative electronics (Pvt). Ltd - - Yes Yes 4.62

177 29/Jun/201814112171831100 Old

14112731831100 New9 A1b(03) T 5.2 Hadron Solar (Pvt) Ltd - - Yes Yes 5.2

178 05/Jul/201803112170382800 Old

03112730382800 New9 A1b(03) T 9 Hadron Solar (Pvt) Ltd - - Yes Yes 9

179 11/May/201807112370092101 Old

071112610092101 New6 A1b(03) T 5.72 Creative electronics (Pvt). Ltd - - Yes Yes 5.72

180 09/Aug/201807112370059602 Old

07112610059602 New9 A1b(03) T 10.71 Creative electronics (Pvt). Ltd - - Yes Yes 10.71

181 29/Jun/2018 15115411129300 12 A1b(03) T 12 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes Yes 12

182 16/Aug/2018 11115410834703 5 A1b(03) T 6.16 HISEL Power Pakistan Pvt Ltd - - Yes Yes 6.16

Page 7 of 31

Page 8: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

183 02/May/2018 13112331299300 5 A-1b(03)T 5.1 Creative electronics (Pvt). Ltd - - Yes Yes 5.1

184 06/May/2018 24115256131007 205 A1b(03) T 35.1 ZEDSOLAR LIMITED - - Yes Yes 35.1

185 24/Oct/2017 24115141000307 69 A1b(03)T 36.85 Orient Energy System Pvt. Ltd. - - Yes Yes 36.85

186 05/Jul/201804112120514900 Old

04112720514900 New6 A1b(03) T 3.72 Creative electronics (Pvt). Ltd - - Yes Yes 3.72

187 04/May/2018 12115264131000 5 A1b(03) T 5.44 Hardon Solar (PVT) LTD - - Yes Yes 5.44

188 12/Jun/2018 27115130430400 5 A1C(06)T 4.86 Pantera Energy Pvt. Ltd. - - Yes Yes 4.86

189 01/Aug/2018 12115410846600 5 A1b(03) T 5.12 Premier Energy Pvt. Ltd - - Yes Yes 5.12

190 28/Aug/2018 11115410821700 6 A1b(03)T 5.1 M/s Renewable Stars (PVT.) Limited - - Yes Yes 5.1

191 27/Jul/2018 12115451355408 5 A1b(03) T 4.86 Pantera Energy Pvt. Ltd. - - Yes Yes 4.86

192 05/Jun/201824112122403700 Old

24112722403700 New2345 A1b(03) T 488 Premier Energy Pvt. Ltd - - Yes Yes 488

193 07/Aug/2018 12115251513303 8 A1b(03) T 7.2 Msaqure R Enginering Services - - Yes Yes 7.2

194 27/Aug/2018 8115250258420 14 A1b(03)T 10.4 M/s Sky Electric (Private) Limited - - Yes Yes 10.4

195 27/Aug/2018 15115256508300 17 A1b(03)T 15.08 M/s Sky Electric (Private) Limited - - Yes Yes 15.08

196 03/Aug/2018 14115331502080 7 A1b(03) T 3.54 Ercon Energy - - Yes Yes 3.54

197 08/Aug/2018 10112210639576 9 A1b(03) T 6.24 Creative electronics (Pvt). Ltd - - Yes Yes 6.24

198 03/Sep/2018 44112521653600 5 A2c(06)T 6 Pantera Energy Pvt. Ltd. - - Yes Yes 6

199 01/Aug/2018 13115151589101 23 A1b(03) T 5.12 Premier Energy Pvt. Ltd - - Yes Yes 5.12

200 21/Jun/2018 15115162828203 9 A1b(03)T 7.56 Creative electronics (Pvt). Ltd - - Yes Yes 7.56

201 29/Jun/2018 13115241431006 14 A1b(03) T 12.19 PITCO Pvt. Limited - - Yes Yes 12.19

202 29/Aug/2018 12115410928300 5 A1b(03)T 18 Hadron Solar (Pvt) Ltd - - Yes Yes 18

203 11/Jul/2018 12115441853700 9 A1b(03) T 7 Ercon Energy - - Yes Yes 7

204 01/Oct/2018 14115255703254 11 A1b(03)T 5.46 Premier Energy Pvt. Ltd - - Yes Yes 5.46

205 08/Aug/2018 15115258210400 17 A1b(03) T 8.06 Creative electronics (Pvt). Ltd - - Yes Yes 8.06

206 11/Jul/2018 13115131246101 5 A1b(03) T 5.18 M/s solar Tech (Pvt.) Limited - - Yes Yes 5.18

207 13/Aug/201812112121813100 Old

12112721813100 New8 A1b(03) T 5.58 Read Solar Pvt. LTD - - Yes Yes 5.58

208 14/Sep/2018 10115241095200 8 A1b(03)T 7.04 M/s Sky Electric (Private) Limited - - Yes Yes 7.04

Page 8 of 31

Page 9: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

209 28/Aug/2018 14115261814500 9 A1a(01) 10.24 Premier Energy Pvt. Ltd - - Yes Yes 10.24

210 13/Aug/2018 15115258385203 11 A1b(03) T 10.725 Read Solar Pvt. LTD - - Yes Yes 10.725

211 15/Aug/201802112170228400 Old

02112730228400 New5 A1a(03)T 4.275 M/s Sky Electric (Private) Limited - - Yes Yes 4.275

212 12/Sep/2018 15112360921024 5 A1b(03)T 4.8 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.8

213 17/Aug/2018 11112331112330 4 A1a(01) 6.3 Ercon Energy - - Yes Yes 6.3

214 09/Oct/201814112391280230 old

14112631280230 New9 A1b(03)T 3.3 Read Solar Pvt. LTD - - Yes Yes 3.3

215 29/May/2018 1115230003919 5 A-1b(03)T 3.25 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 3.25

216 27/Aug/2018 14115241479700 10 A1a(01) 5.4 Pantera Energy Pvt. Ltd. - - Yes Yes 5.4

217 24/Sep/2018 11115261053601 5 A1a(01) 4.875 Premier Energy Pvt. Ltd - - Yes Yes 4.875

218 26/Sep/2018 13115421257701 10 A1b(03)T 9.92 M/s Sky Electric (Private) Limited - - Yes Yes 9.92

219 11/Oct/201802112170231700 Old

02112730231700 New5 A1b(03)T 10.24 Premier Energy Pvt. Ltd - - Yes Yes 10.24

220 24/Sep/2018 15115231928400 9 A1b(03)T 9 HISEL Power Pakistan Pvt Ltd - - Yes Yes 9

221 01/Oct/2018 10115151148200 5 A1b(03)T 4.72 Read Solar Pvt. LTD - - Yes Yes 4.72

222 01/Oct/2018 15115241645500 6 A1b(03)T 4.25 Read Solar Pvt. LTD - - Yes Yes 4.25

223 29/Jun/2018 24115240012800 130 A1b(03) T 28.35 ADAPTIV Technologies Pvt. Ltd. - - Yes Yes 28.35

224 24/Sep/2018 15112182302500 9 A1b(03)T 8.96 Premier Energy Pvt. Ltd - - Yes Yes 8.96

225 03/Sep/2018 14117112080004 19 A1b(03)T 18 Power Highway - - Yes Yes 18

226 02/Oct/2018 12115262807500 17 A1b(03)T 9.6 Sky Electric (PVT) Ltd - - Yes Yes 9.6

227 14/Sep/2018 46113552126813 18 B1b(09)T 16.2 Read Solar Pvt. LTD - - Yes Yes 16.2

228 12/Sep/201804112120600700 Old

04112720600700 New9 A1b(03)T 3.855 Read Solar Pvt. LTD - - Yes Yes 3.855

229 01/Oct/201801112120109300 Old

01112720109300 New6 A1b(03)T 5.2 Solar Sigma Ltd - - Yes Yes 5.2

230 03/Sep/201808112121200101 Old

08112721200101 New5 A1a(01)T 3.12 M/s Sky Electric (Private) Limited - - Yes Yes 3.12

231 11/Sep/2018 6112520620400 13 A1b(03)T 4.8 ADAPTIV Technologies Pvt. Ltd. - - Yes Yes 4.8

232 12/Sep/2018 15112521645300 4 A1a(01) 5.2 M/s Sky Electric (Private) Limited - - Yes Yes 5.2

233 24/Sep/201814112341429402 old

14112621429402 new15 A1b(03)T 3.18 Albario Engineering (PVT) Ldt. - - Yes Yes 3.18

234 15/Aug/201815112351373525 old

15112641373525 New9 A1a(03)T 5.2 M/s Sky Electric (Private) Limited - - Yes Yes 5.2

Page 9 of 31

Page 10: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

235 03/Sep/2018 12115231086105 10 A1b(03)T 10.8 TESLA Industries Pvt. Limited - - Yes Yes 10.8

236 24/Sep/2018 15115256310700 11 A1b(03)T 9.18 TESLA Industries Pvt. Limited - - Yes Yes 9.18

237 29/Jun/2018 14115261731900 18 A1a(01) 6.24 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes Yes 6.24

238 11/Oct/2018 14115261726900 14 A1a(01) 12.28 Hadron Solar (Pvt) Ltd - - Yes Yes 12.28

239 11/Oct/2018 13115410999000 3 A1a(01) 9.75 Hadron Solar (Pvt) Ltd - - Yes Yes 9.75

240 03/Oct/2018 15115411160100 26 A1b(03)T 13.515 HISEL Power Pakistan Pvt Ltd - - Yes Yes 13.515

241 24/Sep/201813112171610800 Old

13112731610800 New10 A2a(04) 6.24 Hadron Solar (Pvt) Ltd - - Yes Yes 6.24

242 11/Oct/201811112111132102 Old

11112711132102 New5 A1b(03)T 3.2 HISEL Power Pakistan Pvt Ltd - - Yes Yes 3.2

243 11/Sep/2018 24115159009601 125 A2C(06)T 20 Premier Energy Pvt. Ltd - - Yes Yes 20

244 03/Oct/2018 13115261660600 9 A1a(01) 8.32 HISEL Power Pakistan Pvt Ltd - - Yes Yes 8.32

245 04/Sep/2018 24115359993100 62 B2b(12)T 48.96 Creative electronics (Pvt). Ltd - - Yes Yes 48.96

246 01/Oct/2018 5115130428107 8 A1b(03)T 7.68 Read Solar Pvt. LTD - - Yes Yes 7.68

247 01/Oct/2018 12115241340700 6 A1a(01) 3.9 Premier Energy Pvt. Ltd - - Yes Yes 3.9

248 03/Oct/2018 6115240624001 5 A1b(03)T 4.77 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.77

249 22/Oct/2018 15115460581207 5 A1b(03)T 9.92 Pantera Energy Pvt. Ltd. - - Yes Yes 9.92

250 12/Oct/201810112340863300 old

10112620863300 New22 A1b(03)T 10.26 HISEL Power Pakistan Pvt Ltd - - Yes Yes 10.26

251 03/Oct/2018 15115250653600 11 A1b(03)T 4.77 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.77

252 03/Oct/2018 15115256349600 11 A1b(03)T 10.6 HISEL Power Pakistan Pvt Ltd - - Yes Yes 10.6

253 22/Oct/2018 13115241440400 12 A1a(01) 9.9 Creative electronics (Pvt). Ltd - - Yes Yes 9.9

254 02/Oct/2018 24115411142102 50 A1b(03)T 13.44 Premier Energy Pvt. Ltd - - Yes Yes 13.44

255 12/Jul/2018 24112251007003 163 B2b(12)T 32.175 Premier Energy Pvt. Ltd - - Yes Yes 32.175

256 14/Sep/201814112391280150 old

14112631280150 New9 A1b(03)T 8.64 M/s Sky Electric (Private) Limited - - Yes Yes 8.64

257 15/Oct/201814112391280030 old

14112631280030 New20 A1b(03)T 8.26 HISEL Power Pakistan Pvt Ltd - - Yes Yes 8.26

258 15/Oct/201814112391281250 old

14112631281250 New14 A1b(03)T 4.16 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.16

259 11/Sep/2018 15115470822135 5 A1b(03)T 4.08 M/s Sky Electric (Private) Limited - - Yes Yes 4.08

260 22/Oct/2018 44114111262603 5 A1b(03)T 5 Pantera Energy Pvt. Ltd. - - Yes No

Page 10 of 31

Page 11: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

261 15/Oct/2018 13115421237600 8 A1b(03)T 7.65 Premier Energy Pvt. Ltd - - Yes Yes 7.65

262 13/Dec/201809112121368700 Old

09112721368700 New9 A1b(03)T 5.12 Read Solar Pvt. LTD - - Yes Yes 5.12

263 16/Oct/2018 13112521386500 31 A1b(03)T 30.69 Premier Energy Pvt. Ltd - - Yes Yes 30.69

264 02/Oct/2018 14115261720556 18 A1b(03)T 18 Premier Energy Pvt. Ltd - - Yes Yes 18

265 02/Oct/2018 12115262918002 17 A1b(03)T 15.08 Sky Electric (PVT) Ltd - - Yes Yes 15.08

266 01/Nov/2018 5113470381505 8 A1b(03)T 11.84 Inverex power Solution - - Yes Yes 11.84

267 24/Oct/2018 14115231801500 10 A1a(01) 4.48 Premier Energy Pvt. Ltd - - Yes Yes 4.48

268 22/Oct/2018 14115231716001 12 A1b(03)T 10.71 Premier Energy Pvt. Ltd - - Yes Yes 10.71

269 12/Nov/2018 14115255334700 11 A1b(03)T 5.94 M/s Renewable Stars (PVT.) Limited - - Yes Yes 5.94

270 12/Oct/2018 14115255526100 11 A1b(03)T 5.035 Read Solar Pvt. LTD - - Yes Yes 5.035

271 12/Nov/2018 8115250258415 14 A1b(03)T 7.8 Premier Energy Pvt. Ltd - - Yes Yes 7.8

272 03/Dec/2018 15115256530300 17 A1b(03)T 3.36 Read Solar Pvt. LTD - - Yes Yes 3.36

273 03/Dec/2018 15115257766500 11 A1b(03)T 5.6 Read Solar Pvt. LTD - - Yes Yes 5.6

274 16/Oct/2018 24112520096000 77 A1a(01) 76.89 Premier Energy Pvt. Ltd - - Yes Yes 76.89

275 04/Jan/2019 15115111409700 8 A1b(03)T 11.88 Read Solar Pvt. LTD - - Yes Yes 11.88

276 04/Dec/2018 14115411039600 22 A1b(03)T 20.355 Premier Energy Pvt. Ltd - - Yes Yes 20.355

277 01/Nov/2018 13115441890000 5 A1b(03)T 5 Power Highway - - Yes No

278 04/Dec/2018 24115411136307 70 A1b(03)T 17.8 Hadron Solar (Pvt) Ltd - - Yes Yes 17.8

279 22/Oct/2018 14115261723900 17 A1b(03)T 10 Read Solar Pvt. LTD - - Yes No

280 23/Oct/2018 12115262627105 11 A1b(03)T 5.12 Sky Electric (PVT) Ltd - - Yes No

281 24/Oct/2018 12115262619801 11 A1b(03)T 5.12 Power Highway - - Yes Yes 5.12

282 06/Mar/2017 2711412 0615001 6 A2c(06)T 7.5M. Saad Muzamil

Pantera Energy- - Yes No

283 05/Nov/2018 24116130751605 160 B2b(12)T 75.26 Read Solar Pvt. LTD - - Yes Yes 75.26

284 11/Oct/2018 6112330574501 5 A1b(03)T 5.3 Power Highway - - Yes Yes 5.3

285 11/Oct/2018 5112330427200 5 A1b(03)T 4.875 Sky Electric (PVT) Ltd - - Yes Yes 4.875

286 03/Dec/2018 13112331334402 12 A1b(03)T 12.025 Premier Energy Pvt. Ltd - - Yes Yes 12.025

Page 11 of 31

Page 12: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

287 03/Dec/2018 13112331334401 12 A1b(03)T 12.025 Premier Energy Pvt. Ltd - - Yes Yes 12.025

288 02/Nov/2018 13115441937000 5 A1b(03)T 4.76 Read Solar Pvt. LTD - - Yes No

289 01/Nov/2018 14115442019000 5 A1b(03)T 5 Power Highway - - Yes No

290 12/Nov/2018 14115421301300 6 A1b(03)T 9.6 Premier Energy Pvt. Ltd - - Yes Yes 9.6

291 03/Dec/2018 15115256731200 11 A1b(03)T 5.6 Read Solar Pvt. LTD - - Yes Yes 5.6

292 02/Nov/2018 12115262500180 11 A1b(03)T 5.6 Read Solar Pvt. LTD - - Yes Yes 5.6

293 12/Oct/2018 24111420850701 38 B2b(12)T 15 Read Solar Pvt. LTD - - Yes Yes 15

294 04/Oct/201812112351295010 old

12112641295010 new9 A1b(03)T 11.5 ATS Engineering Sales & Service - - Yes Yes 11.5

295 22/Oct/201815112351376216 Old

15112641376216 new8 A1b(03)T 10.4 Premier Energy Pvt. Ltd - - Yes No

296 22/Oct/201815112351376810 Old

15112641376810 New14 A1b(03)T 5.12 Sky Electric (PVT) Ltd - - Yes No

297 12/Nov/2018 10115230881710 7 A1b(03)T 10 Msquare R Engineering Services - - Yes Yes 10

298 12/Nov/2018 14112211400487 9 A1b(03)T 9.5 Msquare R Engineering Services - - Yes Yes 9.5

299 12/Nov/2018 14112211400299 9 A1b(03)T 9.5 Msquare R Engineering Services - - Yes Yes 9.5

300 23/Oct/2018 9115240915800 5 A1b(03)T 6.76 Sky Electric (PVT) Ltd - - Yes Yes 6.76

301 07/Jan/2019 15115241635800 14 A1b(03)T 15.275Catkin engineering Sales and Services Pvt.

Ltd. - - Yes Yes 15.275

302 22/Nov/201805112120748100 Old

05112720748100 New5 A1b(03)T 6.5 Msquare R Engineering Services - - Yes Yes 6.5

303 12/Nov/201802112170156505 Old

02112730156505 New5 A1b(03)T 5.005 Premier Energy Pvt. Ltd - - Yes Yes 5.005

304 22/Nov/2018 11115231058800 14 A1a(01) 10.24 HISEL Power Pakistan Pvt Ltd - - Yes Yes 10.24

305 14/Dec/2018 15115241674904 12 A1b(03)T 20.48 HISEL Power Pakistan Pvt Ltd - - Yes Yes 20.48

306 11/Dec/2018 15115257247800 5 A1b(03)T 7.25 Power Highway - - Yes Yes 7.25

307 14/Dec/2018 15115258216400 17 A1b(03)T 10.4 Premier Energy Pvt. Ltd - - Yes Yes 10.4

308 23/Oct/201810112370422808 Old

10112610422808 New11 A1b(03)T 5.12 Sky Electric (PVT) Ltd - - Yes No

309 24/Oct/201811112370441900 Old

11112610441900 New5 A1b(03)T 10.4 Premier Energy Pvt. Ltd - - Yes No

310 04/Dec/2018 12115231082500 9 A1b(03)T 7.98 Premier Energy Pvt. Ltd - - Yes Yes 7.98

311 22/Nov/2018 14115261758302 9 A1a(01) 9 HISEL Power Pakistan Pvt Ltd - - Yes Yes 9

312 16/Nov/201814112370562303 Old

14112610562303 New5 A1b(03)T 3.12 HISEL Power Pakistan Pvt Ltd - - Yes No

Page 12 of 31

Page 13: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

313 03/Dec/2018 1115220085592 5 A2a(04) 4.8M/s JD Aviation Sourcing & Engineering

Service Pvt.Ltd- - Yes No

314 15/Jan/2019 15115257982700 11 A1b(03)T 8.96 Creative electronics (Pvt). Ltd - - Yes Yes 8.96

315 03/Dec/2018 15115256735000 17 A1b(03)T 15.36 HISEL Power Pakistan Pvt Ltd - - Yes Yes 15.36

316 04/Jan/2019 9115250532102 6 A1b(03)T 4.8 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.8

317 27/Dec/2018 14115231843605 7 A1b(03)T 7 HISEL Power Pakistan Pvt Ltd - - Yes Yes 7

318 13/Dec/2018 11115161478200 11 A1b(03)T 10.56 Premier Energy Pvt. Ltd - - Yes Yes 10.56

319 04/Feb/2019 13115151543300 12 A1a(01) 10.56 Premier Energy Pvt. Ltd - - Yes Yes 10.56

320 04/Dec/2018 10115241125400 10 A1b(03)T 15.12Catkin engineering Sales and Services Pvt.

Ltd. - - Yes Yes 15.12

321 27/Dec/2018 12115265010000 11 A1b(03)T 12.6 Zorays (SMC-PVT.) Ltd. - - Yes Yes 12.6

322 01/Aug/2018 27114120366703 5 A2c(06)T 4.5 Pantera Energy Pvt. Ltd. - - Yes No

323 05/Dec/2018 24117149002606 450 B2b(12)T 600.32 Reon Energy Limited - - Yes Yes 600.32

324 05/Dec/2018 24117149002600 990 B3(14)T 998.4 Reon Energy Limited - - Yes Yes 998.4

325 14/Jan/2019 44115241030300 6 A2c(06)T 3.5 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 3.5

326 21/Jan/2019 14115231705600 7 A1b(03)T 3.9 Nizam Energy - - Yes Yes 3.9

327 17/Dec/2018 12115265702900 9 A1b(03)T 9 Sky Electric (PVT) Ltd - - Yes Yes 9

328 17/Dec/2018 12115263016300 11 A1b(03)T 10.07 Sky Electric (PVT) Ltd - - Yes Yes 10.07

329 14/Jan/2019 12115262652407 18 A1b(03)T 10.24 Sky Electric (PVT) Ltd - - Yes Yes 10.24

330 26/Nov/2018 13113471941504 10 A1b(03)T 10 Read Solar Pvt. LTD - - Yes Yes 10

331 24/Oct/2018 13115261667300 9 A1a(01) 8.77 Sky Electric (PVT) Ltd - - Yes Yes 8.77

332 27/Dec/2018 4115260296908 5 A1b(03)T 4.86 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.86

333 21/Jan/2019 14115261748101 9 A1b(03)T 9 HISEL Power Pakistan Pvt Ltd - - Yes Yes 9

334 28/Jan/2019 24116410008102 950 B3(14)T 440.64 CSUN Energy Pakistan (Pvt.) Limited - - Yes Yes 440.64

335 04/Jan/2019 4115110585402 5 A1b(03)T 4.48 JAFFER BROTHERS PVT LIMITED - - Yes Yes 4.48

336 27/Dec/2018 14115255594400 5 A1b(03)T 14.4 Zorays (SMC-PVT.) Ltd. - - Yes Yes 14.4

337 21/Jan/2019 15115257715200 17 A1b(03)T 4.94 Creative electronics (Pvt). Ltd - - Yes Yes 4.94

338 02/Oct/201808112121117200 Old

08112721117200 New9 A1b(03)T 7.15 Sky Electric (PVT) Ltd - - Yes No

Page 13 of 31

Page 14: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

339 12/Oct/201805112170537100 Old

05112730537100 New8 A1b(03)T 5.12 Sky Electric (PVT) Ltd - - Yes Yes 5.12

340 13/Dec/201807112170895300 Old

07112730895300 New5 A1b(03)T 6.4 TESLA Industries Pvt. Limited - - Yes Yes 6.4

341 01/Jan/201908112170966800 Old

08112730966800 New9 A1a(01) 8.775 HISEL Power Pakistan Pvt Ltd - - Yes Yes 8.775

342 18/Sep/2018 24114230259504 453 B3(14)T 307 Reon Energy Limited - - Yes Yes 307

343 21/Dec/2018 24112149004100 112 A2c(06)T 8.96 ATS Engineering Sales & Service - - Yes Yes 8.96

344 28/Jan/2019 7112330650803 12 A1b(03)T 17.875 Power Highway - - Yes No

345 24/Oct/2018 15115241670116 7 A1b(03)T 8.77 Sky Electric (PVT) Ltd - - Yes No

346 14/Jan/2019 10115241172700 6 A1b(03)T 10.07 Sky Electric (PVT) Ltd - - Yes No

347 14/Jan/2019 9115230804901 14 A1b(03)T 10.3 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 10.3

348 22/Jan/2019 11115230967400 6 A1b(03)T 7 HISEL Power Pakistan Pvt Ltd - - Yes Yes 7

349 21/Dec/2018 24115159250673 130 A1b(03)T 129.9JD Aviation Sourcing and Engineering

Services- - Yes Yes 129.9

350 11/Jan/2019 5113460592013 5 A1b(03)T 2.76 Hadron Solar (Pvt) Ltd - - Yes No

351 04/Jan/2019 14112141366500 5 A1b(03)T 4.5 Read Solar Pvt. LTD - - Yes No

352 24/Jan/2019 1112140000500 6 A1b(03)T 8.58 Creative electronics (Pvt). Ltd - - Yes Yes 8.58

353 01/Jan/2019 15115256307400 17 A1b(03)T 6.175 Sky Electric (PVT) Ltd - - Yes Yes 6.175

354 01/Feb/2019 15115241601024 7 A1b(03)T 3.6 Premier Energy Pvt. Ltd - - Yes No

355 12/Feb/2019 10115241128500 7 A1b(03)T 10.24 Read Solar Pvt. LTD - - Yes No

356 08/Jan/2019 9115240906200 7 A1b(03)T 10.24 Read Solar Pvt. LTD - - Yes No

357 27/Dec/2018 15115162791700 9 A1b(03)T 3.1 Premier Energy Pvt. Ltd - - Yes Yes 3.1

358 13/Feb/2019 14115261877300 18 A1a(01) 11.55 HISEL Power Pakistan Pvt Ltd - - Yes Yes 11.55

359 24/Sep/2018 24113539000114 69 A2c(06)T 9 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 9

360 28/Jan/2019 13115241384500 8 A1b(03)T 2.97 HISEL Power Pakistan Pvt Ltd - - Yes

361 13/Feb/2019 15115241641500 14 A1a(01) 4.8 HISEL Power Pakistan Pvt Ltd - - Yes

362 11/Feb/2019 12115410895700 10 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes Yes 10.075

363 22/Jan/201924112399000131 old

24112639000131 New160 B-2b(12)T 32 HISEL Power Pakistan Pvt Ltd - - Yes Yes 32

364 13/Feb/2019 13115441889600 5 A1b(03)T 4.8 JAFFER BROTHERS PVT LIMITED - - Yes No

Page 14 of 31

Page 15: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

365 04/Feb/2019 13115411004300 16 A1b(03)T 15.6 Premier Energy Pvt. Ltd - - Yes Yes 15.6

366 08/Jan/2019 14115255356400 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes Yes 10.075

367 11/Feb/2019 15115257731200 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes Yes 10.075

368 28/Jan/2019 6115261570600 5 A1a(01) 4.8 Premier Energy Pvt. Ltd - - Yes No

369 11/Feb/2019 27115240671110 13 A2c(06)T 17.16 Nizam Energy - - Yes No

370 03/Dec/2018 14115255318700 11 A1b(03)T 5.2 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes Yes 5.2

371 12/Feb/2019 15115256523800 11 A1b(03)T 10.88 Read Solar Pvt. LTD - - Yes Yes 10.88

372 22/Jan/2019 15115257210420 11 A1b(03)T 9.75 Sky Electric (PVT) Ltd - - Yes Yes 9.75

373 11/Jan/2019 44115311204218 5 A2c(06)T 5.12 Hadron Solar (Pvt) Ltd - - Yes Yes 5.12

374 21/Jan/2019 11115130215000 8 A1b(03)T 5 HISEL Power Pakistan Pvt Ltd - - Yes No

375 12/Feb/2019 7115130716600 8 A1b(03)T 11.84 Read Solar Pvt. LTD - - Yes No

376 15/Jan/2019 11115161553401 5 A1b(03)T 5.04 Read Solar Pvt. LTD - - Yes Yes 5.04

377 21/Jan/2019 11115320271015 30 A1b(03)T 24 Read Solar Pvt. LTD - - Yes Yes 24

378 24/Jan/2019 12115241343301 14 A1a(01) 10.075 Sky Electric (PVT) Ltd - - Yes No

379 21/Feb/2019 13115410947700 9 A1b(03)T 10.24 DWP Technologies (Pvt.) Limited - - Yes Yes 10.24

380 29/Mar/2019 9115230823802 7 A1b(03)T 9.6 Read Solar Pvt. LTD - - Yes No

381 03/Apr/2019 14115255701350 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes Yes 10.075

382 22/Nov/2018 1112210127567 9 A1b(03)T 8.84 Sky Electric (PVT) Ltd - - Yes No

383 21/Feb/2019 9115250375302 30 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes Yes 10.075

384 29/Mar/2019 12115262811900 17 A1b(03)T 9.76 Sky Electric (PVT) Ltd - - Yes No

385 01/Feb/2019 11112711076001 8 A1b(03)T 11.8 Hadron Solar (Pvt) Ltd - - Yes No

386 01/Feb/2019 11112711077900 9 A1b(03)T 5.94 Hadron Solar (Pvt) Ltd - - Yes No

387 24/Jan/2019 12115264062000 11 A1b(03)T 5.2 Sky Electric (PVT) Ltd - - Yes No

388 04/Feb/2019 15115120146200 6 A1b(03)T 3.2 Premier Energy Pvt. Ltd - - Yes No

389 02/Apr/2019 13112210858510 15 A1b(03)T 4.55 Sky Electric (PVT) Ltd - - Yes Yes 4.55

390 02/Apr/2019 11115241211901 5 A1b(03)T 7.15 Sky Electric (PVT) Ltd - - Yes No

Page 15 of 31

Page 16: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

391 25/Mar/2019 14115255734401 11 A1b(03)T 7.8Catkin engineering Sales and Services Pvt.

Ltd. - - Yes Yes 7.8

392 13/Mar/2019 12112641292947 5 A1b(03)T 4.48 Maxell Power Pvt. Limited - - Yes No

393 25/Jan/2019 14112182175000 13 A1b(03)T 10.24 HISEL Power Pakistan Pvt Ltd - - Yes No

394 22/Jan/2019 27112210333107 8 A-2c(06)T 5.04 HISEL Power Pakistan Pvt Ltd - - Yes No

395 21/Dec/2018 24112429000902 420 A3(66) 76.85 Premier Energy Pvt. Ltd - - Yes Yes 76.85

396 04/Feb/2019 5112540426102 8 A1b(03)T 11.84 Premier Energy Pvt. Ltd - - Yes No

397 21/Dec/201813112370519800 Old

13112610519800 New8 A1b(03)T 5.32 Read Solar Pvt. LTD - - Yes No

398 14/Feb/2019 15115332014000 9 A1b(03)T 11.88 Premier Energy Pvt. Ltd - - Yes Yes 11.88

399 18/Feb/2019 15115411125100 6 A1b(03)T 8.64 Premier Energy Pvt. Ltd - - Yes No

400 08/Apr/2019 13115421216200 10 A1b(03)T 10.44 Renewable stars pvt. Ltd. - - Yes Yes 10.44

401 01/Apr/2019 15115262007771 5 A1b(03)T 5.12 Zorays (SMC-PVT.) Ltd. - - Yes No

402 28/Jan/2019 15115256535900 11 A1b(03)T 10.2 Sky Electric (PVT) Ltd - - Yes Yes 10.2

403 21/Feb/2019 15115257814700 11 A1b(03)T 7.68 DWP Technologies (Pvt.) Limited - - Yes Yes 7.68

404 15/Mar/2019 14115261819900 7 A1a(01) 5.2 Sky Electric (PVT) Ltd - - Yes No

405 04/Mar/2019 24115331000053 91 B2b(12)T 12.8 Hadron Solar (Pvt) Ltd - - Yes Yes 12.8

406 22/Jan/2019 11112210642730 9 A1b(03)T 8.68 Creative electronics (Pvt). Ltd - - Yes No

407 22/Feb/2019 24112211011804 65 A2c(06)T 22.08 Read Solar Pvt. LTD - - Yes No

408 04/Mar/2019 14112210916815 9 A1b(03)T 8.77 ADAPTIV Technologies Pvt. Ltd. - - Yes No

409 28/Feb/2019 3112330248700 5 A1b(03)T 3.96 Read Solar Pvt. LTD - - Yes No

410 28/Feb/2019 3112330248701 5 A1b(03)T 3.96 Read Solar Pvt. LTD - - Yes No

411 01/Feb/2019 10115230869201 6 A1a(01) 5.25 Sky Electric (PVT) Ltd - - Yes No

412 14/Feb/2019 12115231135900 5 A1b(03)T 6.4 Smart Sense - - Yes No

413 20/Feb/2019 12115231086107 12 A1b(03)T 5.04 JKS Pvt. Limited - - Yes No

414 15/Feb/2019 24115258029601 259 A1b(03)T 92.4 Solis Energy solutions Pvt. Limited - - Yes No

415 14/Feb/2019 14115261824202 9 A1a(01) 10.24 Smart Sense - - Yes No

416 01/Mar/2019 14115261830700 8 A1a(01) 10 Premier Energy Pvt. Ltd - - Yes No

Page 16 of 31

Page 17: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

417 01/Mar/2019 15115442100101 5 A1b(03)T 7.28 Read Solar Pvt. LTD - - Yes No

418 19/Apr/2019 12115231142206 6 A1b(03)T 5.12 Siddiq Renewable Energy Pvt. Ltd - - Yes No

419 08/Apr/2019 12115241334400 5 A1a(01) 6 Read Solar Pvt. LTD - - Yes No

420 21/Mar/2019 44115160321909 20 A2c(06)T 9.92 Premier Energy Pvt. Ltd - - Yes No

421 11/Mar/2019 14115231695700 11 A1b(03)T 11.25 Premier Energy Pvt. Ltd - - Yes No

422 15/Mar/2019 10115230882212 8 A1b(03)T 4.55 Sky Electric (PVT) Ltd - - Yes No

423 15/Jan/2019 9115240964402 5 A1b(03)T 3.2 Read Solar Pvt. LTD - - Yes No

424 25/Feb/2019 11115241191607 7 A1b(03)T 8.48 HISEL Power Pakistan Pvt Ltd - - Yes No

425 25/Mar/2019 13115261640435 9 A1b(03)T 10.08 Zi solar Pvt. Limited - - Yes No

426 27/Mar/2019 12115262306700 17 A1b(03)T 10.88 Indus Solar International Pvt.Limited - - Yes No

427 11/Sep/2018 24115331000059 325 B2b(12)T 64.175 Premier Energy Pvt. Ltd - - Yes Yes 64.175

428 15/Mar/2019 15115411152600 5 A1b(03)T 5 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes No

429 25/Mar/2019 14115255712200 11 A1b(03)T 15.275Catkin engineering Sales and Services Pvt.

Ltd. - - Yes Yes 15.275

430 01/Apr/2019 10112710191430 9 A1b(03)T 13.43 Hadron Solar (Pvt) Ltd - - Yes No

431 12/Feb/2019 8112721156100 5 A1b(03)T 5 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes No

432 12/Feb/2019 14112742123201 5 A1b(03)T 4.68 Creative electronics (Pvt). Ltd - - Yes No

433 23/May/2019 15112731875400 8 A1b(03)T 10.01 Read Solar Pvt. LTD - - Yes No

434 14/May/2019 9115420978900 5 A1b(03)T 4.8 DWP Technologies (Pvt.) Limited - - Yes No

435 14/May/2019 14115421340917 10 A1b(03)T 12.8 DWP Technologies (Pvt.) Limited - - Yes No

436 22/Apr/2019 10115130093602 8 A1b(03)T 10.45 Power Highway - - Yes No

437 02/Apr/2019 5115130393200 8 A1a(01) 10.26 Hadron Solar (Pvt) Ltd - - Yes No

438 12/Mar/2019 14115261771201 9 A1b(03)T 8.84 Read Solar Pvt. LTD - - Yes No

439 02/May/2019 10115230885302 14 A1b(03)T 9.6 Sleek Solar International Pvt.Limited - - Yes No

440 15/Mar/2019 14115261741301 9 A1a(01) 9.1 Sky Electric (PVT) Ltd - - Yes No

441 12/Mar/2019 15115258615900 11 A1b(03)T 5.94 Premier Energy Pvt. Ltd - - Yes No

442 16/Apr/2019 8112721096800 8 A1b(03)T 11.9 Read Solar Pvt. LTD - - Yes No

Page 17 of 31

Page 18: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

443 15/Feb/2019 24112739008657 426 A2c(06)T 91 Solis Energy solutions Pvt. Limited - - Yes No

444 15/Feb/2019 24115469000104 220 A1b(03)T 91 Solis Energy solutions Pvt. Limited - - Yes No

445 02/Apr/2019 14115255701406 17 A1b(03)T 10.4 Premier Energy Pvt. Ltd - - Yes No

446 04/Apr/2019 12115151456100 5 A1b(03)T 7.04 HISEL Power Pakistan Pvt Ltd - - Yes No

447 20/Feb/2019 15115162817300 6 A1b(03)T 3.36 Sky Electric (PVT) Ltd - - Yes No

448 03/Apr/2019 13115261652100 9 A1b(03)T 11.7 Premier Energy Pvt. Ltd - - Yes No

449 01/Apr/2019 13115261640293 9 A1b(03)T 7.84 HISEL Power Pakistan Pvt Ltd - - Yes No

450 08/May/2019 9115130056200 5 A1b(03)T 7 Creative electronics (Pvt). Ltd - - Yes No

451 01/Apr/2019 10112610405511 40 A1a(01) 10.88 TESLA Industries Pvt. Limited - - Yes No

452 22/May/2019 12112641294924 10 A1b(03)T 8.32 Read Solar Pvt. LTD - - Yes No

453 06/May/2019 14115255326000 11 A1b(03)T 10.56 Read Solar Pvt. LTD - - Yes No

454 02/May/2019 7112520738800 6 A1b(03)T 6.5 Premier Energy Pvt. Ltd - - Yes No

455 23/Apr/2019 10112710191460 9 A1b(03)T 13.43 Hadron Solar (Pvt) Ltd - - Yes No

456 29/Apr/2019 12112711201104 8 A1b(03)T 4.62 Hadron Solar (Pvt) Ltd - - Yes No

457 06/May/2019 13115261661000 9 A1b(03)T 13 Read Solar Pvt. LTD - - Yes No

458 26/Apr/2019 12115264101501 8 A1b(03)T 11.7 Premier Energy Pvt. Ltd - - Yes No

459 17/Apr/2019 15115331713900 9 A1b(03)T 4.95 Hadron Solar (Pvt) Ltd - - Yes No

460 21/Mar/2019 12115161611400 5 A1b(03)T 6.5 Msquare R Engineering Services - - Yes No

461 16/May/2019 14115231704600 8 A1b(03)T 11.7 ATS Engineering Sales & Service - - Yes No

462 02/May/2019 12115262314200 11 A1b(03)T 6.4 Power Highway - - Yes No

463 06/May/2019 3112720417200 5 A1b(03)T 4.9 Premier Energy Pvt. Ltd - - Yes No

464 23/Apr/2019 46112132972600 14 B1b(09)T 12.4 Mak Pumps Company (Pvt.) ltd. - - Yes No

465 26/Apr/2019 15115261862800 9 A1b(03)T 12.35 Premier Energy Pvt. Ltd - - Yes No

466 16/Apr/2019 12115262601401 17 A1b(03)T 14.96 Read Solar Pvt. LTD - - Yes No

467 01/Feb/2019 14115331502968 7 A1b(03)T 4.68 Creative electronics (Pvt). Ltd - - Yes No

468 02/May/2019 6115261570500 5 A-1a(01) 5.8 Premier Energy Pvt. Ltd - - Yes No

Page 18 of 31

Page 19: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

469 24/Apr/2019 15115256966500 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes No

470 16/Apr/2019 15115231975400 10 A1a(01) 8.58 Read Solar Pvt. LTD - - Yes No

471 01/Mar/2019 14115255768700 5 A1b(03)T 7.15 Sky Electric (PVT) Ltd - - Yes No

472 22/Apr/2019 15115257729600 9 A1b(03)T 11.22 Hadron Solar (Pvt) Ltd - - Yes No

473 02/May/2019 15115256947200 11 A1b(03)T 10.4 Sky Electric (PVT) Ltd - - Yes No

474 11/Jun/2019 15115261959900 18 A1b(03)T 9.9 Hadron Solar (Pvt) Ltd - - Yes No

475 27/May/2019 13115241374001 12 A1b(03)T 17.55 Power Highway - - Yes No

476 29/May/2019 15115257213330 11 A1b(03)T 10.5 Premier Energy Pvt. Ltd - - Yes No

477 23/May/2019 9112521063401 7 A1b(03)T 10.24 Read Solar Pvt. LTD - - Yes No

478 11/Jun/2019 15115261976100 9 A1b(03)T 9.9 Hadron Solar (Pvt) Ltd - - Yes No

479 27/Mar/2019 15115258231000 11 A1b(03)T 4.55 Sky Electric (PVT) Ltd - - Yes No

480 22/Apr/2019 10112610405512 40 A-1a(01) 10.4 Power Highway - - Yes No

481 13/Mar/2019 12112641295029 5 A1b(03)T 5.13Catkin engineering Sales and Services Pvt.

Ltd. - - Yes No

482 27/May/2019 12112641293089 7 A1b(03)T 10 Allied Solar (Pvt.) Limited - - Yes No

483 23/May/2019 8112710926600 7 A1b(03)T 10.4 Read Solar Pvt. LTD - - Yes No

484 26/Mar/2019 13112210838128 9 A1b(03)T 6.48 HISEL Power Pakistan Pvt Ltd - - Yes No

485 08/May/2019 13115231571500 5 A1b(03)T 4.86 JKS Pvt. Limited - - Yes No

486 19/Jun/2019 14115231858100 9 A1b(03)T 6.5 Sky Electric (PVT) Ltd - - Yes No

487 23/Apr/2019 44115241298910 10 A-2c(06)T 14.85 Hadron Solar (Pvt) Ltd - - Yes No

488 08/May/2019 13115241432500 5 A1b(03)T 6.5 JKS Pvt. Limited - - Yes No

489 28/May/2019 15115421378301 10 A1b(03)T 8.32 Premier Energy Pvt. Ltd - - Yes No

490 11/Jun/2019 11115261047400 9 A1b(03)T 4.6 Premier Energy Pvt. Ltd - - Yes No

491 15/May/2019 15115256336501 11 A1b(03)T 5.16Catkin engineering Sales and Services Pvt.

Ltd. - - Yes No

492 06/May/2019 15115257517600 11 A1b(03)T 10.2 Read Solar Pvt. LTD - - Yes No

493 29/May/2019 6115251253404 5 A1b(03)T 3.96 Read Solar Pvt. LTD - - Yes No

494 15/May/2019 15115411163700 15 A1b(03)T 10.24Catkin engineering Sales and Services Pvt.

Ltd. - - Yes No

Page 19 of 31

Page 20: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

495 29/May/2019 14115411039900 9 A1b(03)T 5.04Catkin engineering Sales and Services Pvt.

Ltd. - - Yes No

496 11/Jun/2019 15115421377836 9 A1b(03)T 10.5 Premier Energy Pvt. Ltd - - Yes No

497 14/Jun/2019 15115421365501 7 A1b(03)T 10.5 Premier Energy Pvt. Ltd - - Yes No

498 18/Jun/2019 12115262500400 17 A1b(03)T 12.35 Read Solar Pvt. LTD - - Yes No

499 01/Oct/2018 24111212402702 1500 C2a(28) 139.425 Power Highway - Ripe - - Generation License issued.

500 04/Jan/2019 13113551146256 5 A1b(03)T 4.9 HISEL Power Pakistan Pvt Ltd - Ripe - - Sent to M&T for testing

501 25/Jan/2019 11115241207216 15 A1b(03)T 6.4 HISEL Power Pakistan Pvt Ltd - Ripe - - Sent to M&T for testing

502 15/Oct/201824112150252805 Old

24112740252805 New25 A2c(06)T 13.16 HISEL Power Pakistan Pvt Ltd - Ripe - - Generation License issued. Meter Allocated

503 04/Mar/2019 24115119005511 280 A1b(03)T 137.6 TESLA Industries Pvt. Limited - Ripe - - Bi-Directional MDI meter to be provided by Applicant

504 25/Feb/2019 24113330602901 41 A2c(06)T 23.68 Read Solar Pvt. LTD - Ripe - - Bi-Directional MDI meter to be provided by Applicant

505 04/Mar/2019 24115119005500 450 A1b(03)T 168.04 TESLA Industries Pvt. Limited - Ripe - - Bi-Directional MDI meter to be provided by Applicant

506 12/Mar/2019 12115262914401 11 A1b(03)T 13.5 Premier Energy Pvt. Ltd - Ripe - - Generation License issued. Meter Allocated

507 08/Mar/2019 24115239012301 66 A1b(03)T 32.175 Premier Energy Pvt. Ltd - Ripe - - Bi-Directional MDI meter to be provided by Applicant

508 28/Feb/2019 6112730737901 5 A1b(03)T 5.4Catkin engineering Sales and Services Pvt.

Ltd. - Ripe - - Generation License issued. Meter Allocated

509 18/Mar/2019 12113430396605 5 A1b(03)T 7.29 Power Highway - Ripe - - Generation License issued. Meter Allocated

510 18/Mar/2019 12113430396600 5 A1b(03)T 7.29 Power Highway - Ripe - - Generation License issued. Meter Allocated

511 22/Jan/2019 24111520085002 30 A1b(03)T 26 Albario Engineering (PVT) Ldt. - Ripe - - Bi-Directional MDI meter to be provided by Applicant

512 26/Mar/2019 7112610092600 5 A1a(01) 11.7 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated

513 12/Mar/2019 3112220140730 5 A1b(03)T 4.88 Read Solar Pvt. LTD - Ripe - - Generation License issued. Meter Allocated

514 15/Mar/2019 24115421244003 36 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Bi-Directional MDI meter to be provided by Applicant

515 24/Oct/2018 12115263007402 17 A1b(03)T 15 TESLA Industries Pvt. Limited - Ripe - - Generation License issued. Meter Allocated

516 03/Apr/2019 10112210639575 9 A1b(03)T 4.32 Maxell Power Pvt. Limited - Ripe - - Generation License issued. Meter Allocated

517 27/Mar/2019 4115150457600 7 A1b(03)T 3.84 Power Highway - Ripe - - Generation License issued. Meter Allocated

518 17/Apr/2019 12115241335300 10 A1a(01) 6.6 Hadron Solar (Pvt) Ltd - Ripe - - Meter Received in M&T

519 17/Apr/2019 10115241162900 6 A1b(03)T 5 Read Solar Pvt. LTD - Ripe - - Generation License issued. Meter Allocated

520 02/Apr/2019 15111653006560 5 A1b(03)T 4.62 HISEL Power Pakistan Pvt Ltd - Ripe - - Generation License issued. Meter Allocated

Page 20 of 31

Page 21: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

521 27/Mar/2019 4112520351101 6 A1b(03)T 7.15 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated

522 08/May/2019 12112721806600 7 A1b(03)T 5 JKS Pvt. Limited - Ripe - - Generation License issued. Meter Allocated

523 16/Apr/2019 10112620834600 13 A1b(03)T 17.16 Read Solar Pvt. LTD - Ripe - - Generation License issued. Meter Allocated

524 02/May/2019 14115421332900 6 A1b(03)T 7.15 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated

525 03/May/2019 7112720926300 9 A1b(03)T 4.95 JKS Pvt. Limited - Ripe - - Generation License issued. Meter Allocated

526 24/Apr/2019 46115350753602 17 B1b(09)T 5.36 Zorays (SMC-PVT.) Ltd. - Ripe - - Generation License issued. Meter Allocated

527 08/May/2019 15115241657600 9 A1a(01) 4.55 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated

528 06/May/2019 15115262007510 5 A1b(03)T 3.84 Read Solar Pvt. LTD - Ripe - - Generation License issued. Meter Allocated

529 13/May/2019 13115231533100 9 A1b(03)T 4.55 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated

530 16/May/2019 15115421374845 12 A1b(03)T 15.6 Sky Electric (PVT) Ltd - Ripe - - Bi-Directional meter to be provided by Applicant

531 16/May/2019 12115151470902 5 A1b(03)T 6.5 Sky Electric (PVT) Ltd - Ripe - - Bi-Directional meter to be provided by Applicant

532 22/Apr/2019 12115251513354 8 A1b(03)T 10 Msquare R Engineering Services - Ripe - - Bi-Directional meter to be provided by Applicant

533 14/May/2019 15115258420900 11 A1b(03)T 9.88Catkin engineering Sales and Services Pvt.

Ltd. - Ripe - - Bi-Directional meter to be provided by Applicant

534 26/Mar/2019 15112450613703 5 A1b(03)T 2.65 Read Solar Pvt. LTD - Ripe - - Bi-Directional meter to be provided by Applicant

535 02/May/2019 15115257201026 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated

536 21/Mar/2019 14112141332300 8 A1b(03)T 10.5 Premier Energy Pvt. Ltd - Ripe - - Generation License issued. Meter Allocated

537 26/Apr/2019 15115258221000 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated

538 06/May/2019 15115257712211 11 A1b(03)T 5.2 Pantera Energy Pvt. Ltd. - Ripe - - Site attented on 29-7-19 and found site not completed

539 06/May/2019 13115261693000 9 A1a(01) 12.42 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

540 29/May/2019 12115262616801 11 A1b(03)T 3.575 Allied Solar (Pvt.) Limited - Ripe - - Meter not Provided by Applicant

541 23/May/2019 271151110553401 6 A2c(06)T 7.26 Read Solar Pvt. LTD - Ripe - - Meter Received in M&T

542 20/May/2019 13115241413000 6 A1b(03)T 6.5 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

543 28/May/2019 15115160057101 10 A1b(03)T 5.04 HISEL Power Pakistan Pvt Ltd - Ripe - - Meter not Provided by Applicant

544 28/May/2019 10115230883861 7 A1b(03)T 14.58 Maxell Power Pvt. Limited - Ripe - - Meter not Provided by Applicant

545 16/May/2019 24112520139040 105 A2c(06)T 26.6 Maxell Power Pvt. Limited - Ripe - - Meter not Provided by Applicant

546 23/May/2019 1112730116200 7 A1b(03)T 8 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

Page 21 of 31

Page 22: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

547 29/May/2019 7112520730600 5 A1a(01) 4.57Catkin engineering Sales and Services Pvt.

Ltd. - Ripe - - Meter not Provided by Applicant

548 29/May/2019 12115262616802 11 A1b(03)T 3.575 Allied Solar (Pvt.) Limited - Ripe - - Meter not Provided by Applicant

549 23/May/2019 15115258234801 8 A1b(03)T 4.55 Sky Electric (PVT) Ltd - Ripe - - Meter not Provided by Applicant

550 27/May/2019 15115262008921 9 A1b(03)T 13.5 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

551 13/May/2019 12115251516508 10 A1b(03)T 10.7 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

552 06/May/2019 8112721095500 9 A1b(03)T 4 Creative electronics (Pvt). Ltd - Ripe - - Meter not Provided by Applicant

553 08/Jan/2019 14115241473000 10 A1a(01) 11.55 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

554 11/Jun/2019 9115230811600 10 A1b(03)T 10.04 Siddiq Renewable Energy Pvt. Ltd - Ripe - - Site attented on 23-7-19 and found site not completed

555 21/May/2019 3112740354500 5 A1b(03)T 4.94 SPEL TECHNOLOGY SUPPORT PVT Ltd. - Ripe - - Meter not Provided by Applicant

556 29/May/2019 12115251513011 8 A1b(03)T 10 SPEL TECHNOLOGY SUPPORT PVT Ltd. - Ripe - - Meter not Provided by Applicant

557 28/May/2019 24112610405508 50 A1b(03)T 20.48 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

558 21/May/2019 3112140247302 5 A1b(03)T 4.68 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

559 16/May/2019 15112722238600 7 A1b(03)T 4.875 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

560 11/Jun/2019 15115241658703 5 A1b(03)T 4.87 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

561 27/May/2019 9112210550412 9 A1b(03)T 4.48 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

562 28/May/2019 10115111073000 8 A1b(03)T 10.8 AYK (Pvt.) Limited - Ripe - - Meter not Provided by Applicant

563 25/Mar/2019 44111450600800 8 A2c(06)T 11.52 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

564 13/Jun/2019 9115230805902 14 A1b(03)T 12.72 Siddiq Renewable Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

565 13/Jun/2019 5115130462200 6 A1b(03)T 5.12 Creative electronics (Pvt). Ltd - Ripe - - Meter not Provided by Applicant

566 11/Jun/2019 5117250294104 22 A1b(03)T 33.5 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

567 21/May/2019 13115151585500 8 A1b(03)T 4.8 DWP Technologies (Pvt.) Limited - Ripe - - Meter not Provided by Applicant

568 02/May/2019 6113460606806 12 A1b(03)T 12 Power Highway - Ripe - - Meter not Provided by Applicant

569 29/May/2019 12115265622700 11 A1b(03)T 4.55 Sky Electric (PVT) Ltd - Ripe - - Meter not Provided by Applicant

570 23/May/2019 15115241680800 8 A1a(01) 7.15 Sky Electric (PVT) Ltd - Ripe - - Meter not Provided by Applicant

571 23/May/2019 14113471961301 8 A1a(01) 7.68Catkin engineering Sales and Services Pvt.

Ltd. - Ripe - - Meter not Provided by Applicant

572 22/Apr/2019 4113470302903 5 A1b(03)T 7.02 Power Highway - Ripe - - Meter not Provided by Applicant

Page 22 of 31

Page 23: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

573 06/May/2019 44112140152101 7 A-2c(06)T 9.9 Creative electronics (Pvt). Ltd - Ripe - - Meter not Provided by Applicant

574 28/May/2019 11115161472900 10 A1b(03)T 11.04 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

575 29/May/2019 14115255171000 9 A1b(03)T 11.88 Hadron Solar (Pvt) Ltd - Ripe - - Meter not Provided by Applicant

576 28/May/2019 11115161472800 6 A1b(03)T 8.9 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

577 13/May/2019 15112731865605 8 A1b(03)T 10.4 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

578 11/Jun/2019 13115261670325 9 A1b(03)T 4.48 Hadron Solar (Pvt) Ltd - Ripe - - Meter not Provided by Applicant

579 14/Jun/2019 27118322600667 37 A3(66) 34.02 Siddiq Renewable Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

580 13/Jun/2019 15115262007568 5 A1b(03)T 5.6Catkin engineering Sales and Services Pvt.

Ltd. - Ripe - - Meter not Provided by Applicant

581 14/Jun/2019 6115310503646 5 A1b(03)T 4.62 Creative electronics (Pvt). Ltd - Ripe - - Meter not Provided by Applicant

582 27/May/2019 15112742341100 9 A1b(03)T 12.8 Albario Engineering (PVT) Ldt. - Ripe - - Meter not Provided by Applicant

583 29/May/2019 45115410681600 7 A2c(06)T 3.06 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

584 12/Jun/2019 3112720354100 7 A1b(03)T 10.4 Dynamic Green Solutions Pvt. Limited - Ripe - - Meter not Provided by Applicant

585 21/May/2019 9111150858900 5.4 A1b(03)T 6.5 Solis Energy solutions Pvt. Limited - Ripe - - Meter not Provided by Applicant

586 24/May/2019 13115451510500 6 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

587 23/May/2019 14115255346200 11 A1b(03)T 10.4 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

588 14/Jun/2019 11115320157612 5 A1b(03)T 6.4 Siddiq Renewable Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

589 23/May/2019 4115131143501 5 A1b(03)T 7.1 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

590 23/May/2019 12112641293084 7 A1b(03)T 10.32 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

591 11/Jun/2019 12115262821600 11 A1b(03)T 12.8 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

592 11/Jun/2019 12115264322300 5 A1b(03)T 7.5 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant

593 11/Jun/2019 7115130708300 4 A1a(01) 4.48 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

594 08/May/2019 10117111692004 5 A1b(03)T 4.64 Power Highway - Ripe - - Meter not Provided by Applicant

595 29/May/2019 14115231721500 14 A1a(01) 20.8 AYK (Pvt.) Limited - Ripe - - Meter not Provided by Applicant

596 18/Jun/2019 15115261952800 9 A1a(01) 11.985 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant

597 24/Jun/2019 14115261747401 9 A1b(03)T 11.73 Nizam Energy - Ripe - - Generation License issued.

598 17/Jun/2019 8115130731300 5 A1b(03)T 4.68 JKS Pvt. Limited - Ripe - - Generation License issued.

Page 23 of 31

Page 24: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

599 21/Jun/2019 12115262616803 17 A1b(03)T 4.55 Allied Solar (Pvt.) Limited - Ripe - - Generation License issued.

600 17/Jun/2019 12115265010301 11 A1b(03)T 4.95 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.

601 14/Jun/2019 2112710532701 5 A1b(03)T 3.96 Msquare R Engineering Services - Ripe - - Generation License issued.

602 17/Jun/2019 11112610438200 12 A1a(01) 13.2 JKS Pvt. Limited - Ripe - - Generation License issued.

603 18/Jun/2019 13115231603400 14 A1a(01) 5.2 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.

604 17/Jun/2019 13115241433206 8 A1b(03)T 10.725 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.

605 17/Jun/2019 13115241433205 14 A1a(01) 19.5 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.

606 13/Jun/2019 13115151613400 5 A1b(03)T 4.68 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.

607 17/Jun/2019 10115241115704 14 A1b(03)T 10.26 Allied Solar (Pvt.) Limited - Ripe - - Generation License issued.

608 17/Jun/2019 9115230831401 13 A1a(01) 10.56 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.

609 17/Jun/2019 8115130731200 7.5 A1b(03)T 11 JKS Pvt. Limited - Ripe - - Generation License issued.

610 13/Jun/2019 15115421378100 6 A1b(03)T 8.45 Power Highway - Ripe - - Generation License issued.

611 18/Jun/2019 13115231516000 14 A1b(03)T 4.875 Albario Engineering (PVT) Ldt. - Ripe - - Generation License issued.

612 21/Jun/2019 15115256932000 11 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.

613 26/Jun/2019 8115250278802 5 A1b(03)T 4.95 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.

614 25/Jun/2019 14115261856500 9 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.

615 13/Jun/2019 8112610109000 8 A1b(03)T 4.95 JKS Pvt. Limited - Ripe - - Generation License issued.

616 24/Jun/2019 13115410952403 8 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.

617 24/Jun/2019 14115255913500 11 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.

618 26/Jun/2019 14115255107000 11 A1b(03)T 7.92 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.

619 01/Jul/2019 14115411029703 10 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.

620 01/Jul/2019 44115269001503 24 A-2c(06)T 9 M/s EBR Energy Pakistan (Pvt).Limited - Ripe - - Generation License issued.

621 01/Jul/2019 15115256365300 11 A1b(03)T 12.4 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.

622 01/Jul/2019 7115250083503 15 A1b(03)T 22.5 M/s EBR Energy Pakistan (Pvt).Limited - Ripe - - Generation License issued.

623 13/Jun/2019 15115421378000 6 A1b(03)T 8.45 Power Highway - Ripe - - Generation License issued.

624 13/Jun/2019 15115256906501 17 A1b(03)T 10.56 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.

Page 24 of 31

Page 25: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

625 26/Jun/2019 11112610245400 8 A1b(03)T 9.9 Maxell Power Pvt. Limited - Ripe - - Generation License issued.

626 25/Jun/2019 15115262009161 5 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.

627 26/Jun/2019 9115230814701 7 A1b(03)T 7.92 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.

628 17/Jun/2019 14115411033928 5 A1b(03)T 4.55 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.

629 13/Jun/2019 13115261611800 9 A1b(03)T 6.98 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.

630 27/May/2019 9112721293900 5 A1b(03)T 3.99 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.

631 14/Jun/2019 13115261618803 9 A1b(03)T 10.56 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.

632 21/Jun/2019 15115162837503 6 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.

633 13/Jun/2019 15115256985401 7 A1b(03)T 4.95 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.

634 27/Jun/2019 15115241611700 9 A1b(03)T 11.7 Zi solar Pvt. Limited - Ripe - - Generation License issued.

635 01/Jul/2019 44115231760008 7 A-2c(06)T 7.9 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.

636 13/Jun/2019 10115241123507 14 A1b(03)T 11.88Catkin engineering Sales and Services Pvt.

Ltd. - Ripe - - Generation License issued.

637 21/Jun/2019 15115256540500 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.

638 04/Dec/2018 14115231771903 5 A2a(04) 7.68 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

639 26/Mar/2019 15112450608618 5 A1b(03)T 3.588 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

640 29/May/2019 24116230011011 925 B3(14)T 983 Reon Energy Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

641 26/Jun/2019 12115262510700 17 A1b(03)T 14.95 Nizam Energy Unripe - - - - Sent to NEPRA for issuance of Generation License

642 13/Jun/2019 15115256901002 11 A1b(03)T 10.56 Creative electronics (Pvt). Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

643 20/May/2019 15115162808001 5 A1b(03)T 4.62 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

644 24/Jun/2019 9115230806300 11 A1b(03)T 10.6 Siddiq Renewable Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

645 24/Jun/2019 11115111122300 6 A1b(03)T 3.08 Renewable stars pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

646 01/Jul/2019 13115241429700 5 A1b(03)T 6 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

647 01/Jul/2019 1112210124919 13 A1b(03)T 4.69 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

648 25/Jun/2019 9112521047700 8 A1b(03)T 11.8 Allied Solar (Pvt.) Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

649 01/Jul/2019 15115256350200 11 A1b(03)T 15.1 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

650 25/Feb/2019 4113330422700 5 A1b(03)T 7.36 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

Page 25 of 31

Page 26: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

651 29/May/2019 11115241267700 5 A1b(03)T 7.26 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

652 26/Jun/2019 14115241549804 12 A1b(03)T 10 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

653 05/Jul/2019 14115255779600 9 A1b(03)T 3.96 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

654 05/Jul/2019 15115258601621 11 A1b(03)T 4.68 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

655 01/Jul/2019 4115110503000 5 A1b(03)T 7.48 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

656 01/Jul/2019 13115410956502 5 A1b(03)T 7.15 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

657 28/May/2019 24112540120004 65 A2c(06)T 21 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

658 03/Jul/2019 14115255117100 9 A1b(03)T 8.45 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

659 21/Jun/2019 24112211007300 450 B2b(12)T 241.7 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

660 24/Jun/2019 24112211004401 490 B2b(12)T 89.9 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

661 17/Jun/2019 7112520663400 5 A1b(03)T 5.94 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

662 21/Jun/2019 10112620849000 9 A1b(03)T 4.8 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

663 08/Jul/2019 15115231973101 8 A1a(01) 13.7 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

664 21/Jun/2019 4113470278300 15 A1b(03)T 10.56 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

665 04/Jul/2019 12112311189630 5 A1b(03)T 5.2 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

666 05/Jul/2019 15115257875800 11 A1b(03)T 10.4 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

667 11/Jul/2019 13115251605900 12 A1b(03)T 16.5 Nizam Energy Unripe - - - - Sent to NEPRA for issuance of Generation License

668 02/Jul/2019 11115161475900 6 A1b(03)T 8.77 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

669 02/Jul/2019 7115160962000 6 A1b(03)T 4.87 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

670 08/Jul/2019 7115251343510 14 A1b(03)T 14.62 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

671 08/Jul/2019 14115231704313 7 A1b(03)T 9.75 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

672 08/Jul/2019 11115230991801 10 A1a(01) 6.5 Inverex power Solution Unripe - - - - Sent to NEPRA for issuance of Generation License

673 04/Jul/2019 14115441970500 5 A1b(03)T 3.08 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

674 10/Jul/2019 10115241098500 6 A1b(03)T 5.28 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

675 03/Jul/2019 44113341351000 15 A-2c(06)T 19.8 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

676 08/Jul/2019 12115241342901 14 A1a(01) 7.8 Hadron Solar (Pvt) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

Page 26 of 31

Page 27: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

677 04/Jul/2019 14115421287802 10 A1b(03)T 10.4 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

678 03/Jul/2019 14112212100500 5 A1b(03)T 5.12 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

679 11/Jul/2019 12115263305105 5 A1b(03)T 4.76 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

680 01/Jul/2019 24115122061310 160 B2b(12)T 29.9 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

681 01/Jul/2019 15112122236801 5 A1b(03)T 7.26 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

682 11/Jul/2019 15115421387420 25 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

683 10/Jul/2019 8112721158800 10 A1b(03)T 11.88 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

684 08/Jul/2019 11112610437414 8 A1b(03)T 8 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

685 05/Jul/2019 14115255521700 11 A1b(03)T 9.66 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

686 01/Jul/2019 5115130469200 5 A-1a(01) 3.2 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

687 11/Jul/2019 13115261599000 18 A1b(03)T 14.3 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

688 10/Jul/2019 15112541373506 5 A1b(03)T 7.47 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

689 10/Jul/2019 15115442300426 8 A1b(03)T 9.75 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

690 10/Jul/2019 24115169039300 69 B2b(12)T 18.2 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

691 01/Jul/2019 14115231695800 8 A1b(03)T 11.7 AYK (Pvt.) Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

692 11/Jul/2019 4115110508400 5 A1b(03)T 7.5 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

693 01/Jul/2019 9115130858900 6 A1b(03)T 4.55 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

694 11/Jul/2019 7115250083500 21 A1b(03)T 22.8 M/s EBR Energy Pakistan (Pvt).Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

695 03/Jul/2019 10112620865900 15 A1b(03)T 14.85 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

696 04/Jul/2019 12115161646800 12 A1b(03)T 14.85 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

697 25/Jun/2019 15112733206600 9 A1b(03)T 5.2 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

698 16/Jul/2019 15115160037300 5 A1b(03)T 7.47 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

699 08/Jul/2019 14112641341275 5 A1b(03)T 7.47 Power Highway Unripe - - - - Sent to NEPRA for issuance of Generation License

700 02/Jul/2019 15115258213500 17 A1b(03)T 5 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

701 19/Jul/2019 14112710253400 5 A1b(03)T 6.72 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

702 24/Jun/2019 44112734414100 9 A2c(06)T 11.22 Dynamic Green Solutions Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

Page 27 of 31

Page 28: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

703 10/Jul/2019 11112731431000 8 A1b(03)T 5.28 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

704 17/Jul/2019 15115256514000 11 A1b(03)T 14.4 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

705 01/Jul/2019 15115256109900 11 A1b(03)T 15.84 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

706 16/Jul/2019 12115265003105 9 A1b(03)T 4.875 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

707 19/Jul/2019 14115261754600 9 A1a(01) 12.42 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

708 24/Jul/2019 6112520623100 7 A1a(01) 10.24Catkin engineering Sales and Services Pvt.

Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

709 17/Jul/2019 6112520504008 5 A1b(03)T 10.24 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

710 11/Jul/2019 11115241191900 9 A1b(03)T 10.56 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

711 04/Jul/2019 3112730369000 5 A1b(03)T 2.24 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

712 11/Jul/2019 12112721802001 9 A1b(03)T 5 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

713 11/Jul/2019 44112724432100 12 A2c(06)T 13.44 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

714 11/Jul/2019 15115241674905 20 A1b(03)T 20.46 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

715 11/Jul/2019 12115262718500 17 A1b(03)T 13.35 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

716 22/Jul/2019 12115262316500 17 A1b(03)T 7.26 Hadron Solar (Pvt) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

717 22/Jul/2019 12115241283400 6 A1b(03)T 4.875 Hadron Solar (Pvt) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

718 23/Jul/2019 13112182008600 5 A1b(03)T 4.68 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

719 21/Jun/2019 15115460630162 5 A1b(03)T 6.5 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

720 11/Jul/2019 7117260452313 4 A1a(01) 7.15 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

721 16/Jul/2019 11115230970400 5 A1b(03)T 7.475 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

722 22/Jul/2019 7115250087708 9 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

723 23/Jul/2019 15115255925000 11 A1b(03)T 10.08 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

724 23/Jul/2019 11115230980602 14 A1b(03)T 9.9 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

725 26/Jun/2019 12115264205800 9 A1b(03)T 9.9 Renewable stars pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

726 26/Jul/2019 3112740429600 6 A1b(03)T 9 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

727 29/Jul/2019 15115256969600 17 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

728 29/Jul/2019 15115256926500 9 A1b(03)T 4.55 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

Page 28 of 31

Page 29: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

729 25/Jul/2019 15115256990400 11 A1b(03)T 9.9 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

730 17/Jul/2019 15115241612900 9 A1b(03)T 9.88 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

731 23/Jul/2019 9112721304300 9 A1b(03)T 3.99 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

732 25/Jul/2019 24115132107500 50 A1b(03)T 27.5 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

733 23/Jul/2019 46115442372911 18 B1b(09)T 3.36 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

734 23/Jul/2019 15115442300528 8 A1b(03)T 9.9 Hadron Solar (Pvt) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

735 29/Jul/2019 10115230881853 7 A1b(03)T 10.4 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

736 29/Jul/2019 9115240926100 9 A1b(03)T 5.2 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

737 29/Jul/2019 15115256750100 11 A1b(03)T 5.28 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

738 29/Jul/2019 13112210838294 9 A1b(03)T 7.2 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

739 01/Jul/2019 13115417319297 5 A1b(03)T 7.26 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License

740 01/Aug/2019 9115130053801 9 A1b(03)T 13.2 Hadron Solar (Pvt) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License

741 06/Aug/2019 11115230992501 30 A1b(03)T 19.8 M/s EBR Energy Pakistan (Pvt).Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

742 25/Jun/2019 13115261590600 9 A1b(03)T 10.56 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

743 25/Jun/2019 13115261590500 9 A1b(03)T 10.4 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

744 01/Jul/2019 11112720355400 9 A1b(03)T 11.7 AYK (Pvt.) Limited Unripe - - - - Sent to NEPRA for issuance of Generation License

745 10/Jul/2019 12115262810200 17 A1b(03)T 20.48 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

746 17/Jul/2019 14115162768300 9 A1b(03)T 7.7 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

747 26/Jul/2019 15115162777600 9 A1b(03)T 7.7 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

748 26/Jul/2019 24112610405513 125 A1b(03)T 29.25 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License

749 23/Aug/2016 24113340075008 50 (A2c(06)T 70 0 Unripe - - - -Cancelled Application As Requested by Applicant

Dated 06/04/2018

750 04/Jan/2017 24115320024411 488 B2b(12)T 1260HELMUT FUGEMANN

M/s German Green Power Solution Unripe - - - -

Cancelled due to documents not provided by Applicant

after repeated reminders

751 02/Aug/2017 13115241427602 14 A1b(03)T 9Amir Mehmood

SAN Network Pvt. Ltd.Unripe - - - -

Cancelled due to documents not provided by Applicant

after repeated reminders

752 13/Apr/2016 24112520090500 1600 A2c(06)T 3Khuzaima Aslam

Creative Electronics Pvt. Ltd.Unripe - - - -

Cancelled due to documents not provided by Applicant

after repeated reminders

Page 29 of 31

Page 30: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

753 11/Jan/201809112171178800 Old

09112731178800 New12 A1b(03) T 10.5

Sami Ullah

Premier EnergyUnripe - - - -

Cancelled due to documents not provided by Applicant

after repeated reminders

754 11/Jan/2018 15115331502080 7 A1b(03) T 6.49 Ercon Energy Unripe - - - -Cancelled due to documents not provided by Applicant

after repeated reminders

755 25/Jun/2019 24112619003400 975 B3(14)T 431.43 Premier Energy Pvt. Ltd Unripe - - - - Under Process

756 01/Jul/2019 7112520817300 10 A1b(03)T 10.56 Maxell Power Pvt. Limited Unripe - - - - Under Process

757 01/Jul/2019 13112381305091 5 A1b(03)T 4.24 HISEL Power Pakistan Pvt Ltd Unripe - - - - Under Process

758 11/Jul/2019 15115262007714 5 A1b(03)T 7.475 Sky Electric (PVT) Ltd Unripe - - - - Under Process

759 11/Jul/2019 10112610419304 12 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process

760 16/Jul/2019 12115421196700 13 A1b(03)T 13.8 Creative electronics (Pvt). Ltd Unripe - - - - Under Process

761 16/Jul/2019 10112711028136 8 A1b(03)T 4 Creative electronics (Pvt). Ltd Unripe - - - - Under Process

762 16/Jul/2019 9112210547975 9 A1b(03)T 5.28 Premier Energy Pvt. Ltd Unripe - - - - Under Process

763 17/Jul/2019 14112641343824 12 A1b(03)T 3.5 JKS Pvt. Limited Unripe - - - - Under Process

764 23/Jul/2019 46117530829603 22 A2c(06)T 14.04 Read Solar Pvt. LTD Unripe - - - - Under Process

765 23/Jul/2019 15112722243601 7 A1b(03)T 10.22 Power Highway Unripe - - - - Under Process

766 23/Jul/2019 2112210213214 30 A1b(03)T 10.4 Premier Energy Pvt. Ltd Unripe - - - - Under Process

767 23/Jul/2019 4112220140932 9 A1b(03)T 6.6 Creative electronics (Pvt). Ltd Unripe - - - - Under Process

768 25/Jul/2019 24112449001703 276 A2c(06)T 19.5 Read Solar Pvt. LTD Unripe - - - - Under Process

769 26/Jul/2019 24113169003512 320 B-2b(12)T 236.54 JKS Pvt. Limited Unripe - - - - Under Process

770 26/Jul/2019 24113169003511 490 B-2b(12)T 104 JKS Pvt. Limited Unripe - - - - Under Process

771 26/Jul/2019 9112210548917 9 A1b(03)T 10.56 Albario Engineering (PVT) Ldt. Unripe - - - - Under Process

772 26/Jul/2019 7113120269070 5 A1b(03)T 4.825 AYK (Pvt.) Limited Unripe - - - - Under Process

773 29/Jul/2019 15115421383500 10 A1b(03)T 10.4 Sky Electric (PVT) Ltd Unripe - - - - Under Process

774 29/Jul/2019 10115241140200 8 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process

775 29/Jul/2019 12115241363906 14 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process

776 29/Jul/2019 24114142641801 350 A-3(66) 85.15 Premier Energy Pvt. Ltd Unripe - - - - Under Process

777 01/Aug/2019 10112610422300 8 A1b(03)T 7 JKS Pvt. Limited Unripe - - - - Under Process

Page 30 of 31

Page 31: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case

Yes No YesGeneration

(kW)No

Billing Started

Reason for Unripe Case

PROMOTION OF NET METERING IN LESCO

Sr.

No.

Date of

ApplicationReference No.

Sanctioned

Load /

Connected

Load (kW)

Required Load

for Net Metering

(kW)

Name of VenderUnripe

Cases

Ripe

Cases

Connections

InstalledTariff

778 01/Aug/2019 15115160058300 5 A1b(03)T 7.26 JKS Pvt. Limited Unripe - - - - Under Process

779 01/Aug/2019 15115162782500 9 A1b(03)T 5.92 JKS Pvt. Limited Unripe - - - - Under Process

780 01/Aug/2019 14112641340661 7 A1b(03)T 4.8 JKS Pvt. Limited Unripe - - - - Under Process

781 02/Aug/2019 15115241621500 8 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process

782 02/Aug/2019 4115320135619 5 A1b(03)T 7.475 Sky Electric (PVT) Ltd Unripe - - - - Under Process

783 02/Aug/2019 12115241317400 10 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process

784 02/Aug/2019 12112231199001 5 A1b(03)T 4.55 Sky Electric (PVT) Ltd Unripe - - - - Under Process

785 05/Aug/2019 1112720105200 5 A1b(03)T 4.68 Read Solar Pvt. LTD Unripe - - - - Under Process

786 05/Aug/2019 8111520815403 5 A1b(03)T 6.5 Read Solar Pvt. LTD Unripe - - - - Under Process

787 05/Aug/2019 15112182393302 7 A1b(03)T 3.25 Read Solar Pvt. LTD Unripe - - - - Under Process

788 05/Aug/2019 12115262712300 17 A1b(03)T 14.3 Power Highway Unripe - - - - Under Process

789 05/Aug/2019 14115255590700 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process

790 05/Aug/2019 13115421226500 9 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process

791 05/Aug/2019 14112731826300 9 A1b(03)T 12.54 Maxell Power Pvt. Limited Unripe - - - - Under Process

792 05/Aug/2019 46112211806103 24 B1b(09)T 15.18 Maxell Power Pvt. Limited Unripe - - - - Under Process

793 05/Aug/2019 7115440985710 5 A1b(03)T 5.28 Maxell Power Pvt. Limited Unripe - - - - Under Process

794 05/Aug/2019 13115261659000 9 A1a(01) 14.9 Premier Energy Pvt. Ltd Unripe - - - - Under Process

795 05/Aug/2019 24118340002100 69 B2b(12)T 16.25 Read Solar Pvt. LTD Unripe - - - - Under Process

796 06/Aug/2019 3115260296304 5 A1b(03)T 5.28 Pantera Energy Pvt. Ltd. Unripe - - - - Under Process

797 06/Aug/2019 12115231072600 5 A1a(01) 7.15 Sky Electric (PVT) Ltd Unripe - - - - Under Process

798 06/Aug/2019 12115410856703 10 A1b(03)T 12.025 Sky Electric (PVT) Ltd Unripe - - - - Under Process

799 06/Aug/2019 11112610236200 5 A1b(03)T 5.85 Read Solar Pvt. LTD Unripe - - - - Under Process

800 06/Aug/2019 10115230883415 7 A1b(03)T 10.24 Read Solar Pvt. LTD Unripe - - - - Under Process

Page 31 of 31


Recommended