Prop 1, Sustainable Groundwater Planning Grant Program Grant Proposal For Upper Ventura River Groundwater Sustainability Agency and Plan Preliminary Review Draft, August 2017 Prepared by Walter Consulting & Grant Writing
Transcript
Page 1: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

Prop 1, Sustainable Groundwater Planning Grant Program Grant Proposal For Upper Ventura River Groundwater Sustainability Agency and Plan

Preliminary Review Draft, August 2017

Prepared by Walter Consulting & Grant Writing

Page 2: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

Table of Contents GrantProposalOnlineForm............................................................................................................................1Attachment1.AuthorizingDocumentation.....................................................................................................5Attachment2.EligibilityDocumentation........................................................................................................6

ApplicantOrganization.......................................................................................................................................6CASGEMCompliance..........................................................................................................................................6UrbanWaterManagementCompliance.............................................................................................................6AgriculturalWaterManagementCompliance....................................................................................................6SurfaceWaterDiversionCompliance.................................................................................................................6

Attachment3.ProjectJustification.................................................................................................................7ProposalSummary..............................................................................................................................................7

ProjectAreaMap............................................................................................................................................8TechnicalNeed...................................................................................................................................................9

DataGaps.......................................................................................................................................................9GroundwaterSustainabilityPlan....................................................................................................................9

FinancialNeed..................................................................................................................................................10ProjectSupport.................................................................................................................................................11

LegalAgreements.........................................................................................................................................11CommunicationwithNeighboringGSAs......................................................................................................11OBGMAMeetings.........................................................................................................................................11CommunicationwithBeneficialUsers..........................................................................................................11

Attachment4.WorkPlan..............................................................................................................................16Task1.GSADevelopment&Support...............................................................................................................17

1.1StakeholderEngagement(85%complete).............................................................................................171.2BasinBoundaryModification(100%complete).....................................................................................181.3FormJointPowersAuthorityandGroundwaterSustainabilityAgency(78%).......................................18

Task2.NewDataCollection&TechnicalAnalysis............................................................................................182.1EstablishandAnalyzeDataFromWellMonitoringNetwork(12%Complete).......................................182.2HistoricWet/DryStreamReachData(0%Complete)............................................................................192.3IrrigationEstimateviaInfraredAerialImagery(66%Complete)............................................................192.4ComparisonAnalysisofWaterYears2011and2017(27%Complete)..................................................192.5SanAntonioCreekInflowMonitoring(0%Complete)...........................................................................202.6VenturaRiverInflowMonitoring(0%Complete)...................................................................................202.7CasitasSpringsSurfaceFlowMonitoring(0%Complete).......................................................................212.8WellInventoryDatabase(0%Complete)................................................................................................212.9EstimateofNaturalHabitatEvapotranspiration(0%Complete)............................................................21

Task3.GSPPlanning(61%complete)...............................................................................................................22Task4.GSPChapter2:PlanAreaandBasinSetting.........................................................................................22

4.1DescriptionofPlanArea(0%Complete)................................................................................................224.2BasinSetting...........................................................................................................................................234.3StakeholderInvolvement,CoordinationwithSWRCB&DraftReviews(0%Complete)........................24

Task5.GSPChapter3:SustainableManagementCriteria...............................................................................245.1SustainabilityGoal(0%Complete).........................................................................................................245.2UndesirableResults(0%Complete).......................................................................................................245.3MinimumThresholds(0%Complete).....................................................................................................245.4MeasurableObjectives(0%Complete)..................................................................................................25

Page 3: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

5.5MonitoringNetwork(25%Complete)....................................................................................................255.6StakeholderInvolvement,CoordinationwithSWRCB&DraftReviews(0%Complete)........................25

Task6.GSPChapter4:ProjectsandManagementActions..............................................................................256.1ProjectsandManagementActions(0%Complete)................................................................................256.2StakeholderInvolvement,CoordinationwithSWRCB&DraftReviews(0%Complete)........................25

Task7.GSPChapter5:PlanImplementation...................................................................................................257.1ImplementationSchedule,Costs,Reporting&Evaluations(0%Complete)...........................................257.2AdaptiveManagement(0%Complete)..................................................................................................267.3StakeholderInvolvement(0%Complete)...............................................................................................267.4StakeholderInvolvement&DraftReviews(0%Complete)....................................................................26

Task8.GSPIntroduction,ExecutiveSummaryReferences&Appendices(0%Complete)...............................26Task9.GSPReviewsandApprovalsandPreparationofFinalDocument(0%Complete)................................26Task10.ProjectManagement&Reporting(0%Complete).............................................................................27PermissionLetters............................................................................................................................................28

Attachment5.Budget...................................................................................................................................30BudgetNarrative...............................................................................................................................................32

Attachment6.Schedule................................................................................................................................34Attachment7.NewDataCollectionMaps.....................................................................................................36

NewWellMonitoringNetworkMap(Task2.1)................................................................................................36NewInflowandSurfaceFlowMonitoringLocationsMap(Tasks2.5–2.7).....................................................37

Note:Yellowhighlightedtextinthedocumentindicatesinformationthatshouldbeupdated/checkedpriortofinalgrantproposalsubmittal.

Page 4: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 1

Grant Proposal Online Form

APPLICANTINFORMATION

x OrganizationName UpperVenturaRiverGroundwaterAgencyx TaxID 82-2316329

x ProposalName UpperVenturaRiverBasinGroundwaterSustainabilityAgencyandPlan

x ProposalObjective ObjectivesforthedevelopmentoftheUpperVenturaRiverGroundwaterSustainabilityPlan(GSP)include:1)FormtheGroundwaterSustainabilityAgency(GSA)fortheUpperVenturaRiverBasinandestablishagencysystemsandproceduresthatsupporteffectiveandcost-efficientimplementationoftheGSP.2)FillKeyDataGaps:

a.Gathergeophysical,geological,groundwaterlevel,surfacewaterflow,andotherdatatoaddressdatadeficienciesandcontributetotheaccuratecharacterizationandmodelingofthebasin’shydrology.b.Establishanexpandedlong-termgroundwatermonitoringnetworkusingnewandexistingwellstosupportassessmentofprojectactionsthroughadaptivemanagement.c.Usenewandexistingdatatorefineaconceptualgroundwaterbasinmodel.d.SharegroundwatermonitoringandotherdatawiththeStateWaterResourcesControlBoardfortheirworkontheVenturaRiverWatershedSurfaceWater-GroundwaterInteractionandNutrientTransportModelingProject(beingconductedbetween2017and2020)toensureitsmodelisasaccurateaspossiblegiventheirlimitedfieldworkbudget.

3)ProduceaGSP:a.Expandandmaintainengagementwiththebasin’sstakeholdersthroughouttheplandevelopmentprocess.b.Formulatewisegroundwatermanagementstrategiesthataddressthebasin’schallengesinawaythatreliablysupportsecosystemandhuman(includingurbanandagricultural)needsinthewatershednowandinthefuture.c.ProduceaGSPthatmeetsDepartmentofWaterResourcesguidelines.

BUDGET

x OtherContribution Zero

x LocalContribution(CostShare)

$493,080

x FederalContribution Zero

x In-kindContribution (seeLocalContribution)

x AmountRequested $493,080

Page 5: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 2

x TotalProjectCost $1,018,791

GEOGRAPHICINFORMATION

x Latitude DD34 MM25

SS45

x Longitude DD-119MM17SS46

x Longitude/LatitudeClarification

http://itouchmap.com/latlong.html

x Location VenturaRiverWaterDistrictHeadquarters

x County VenturaCounty

x GroundwaterBasin VenturaRiverValley-UpperVenturaRiver#4-003.1

x HydrologicRegion SouthCoast

x Watershed VenturaRiverWatershed

LEGISLATIVEINFORMATION

x StateAssemblyDistrict 37

x StateSenateDistrict 19

x U.S.CongressionalDistrict 26

PROJECTINFORMATION

x ProjectName UpperVenturaRiverBasinGroundwaterSustainabilityAgencyandPlan

x ImplementingOrganization UpperVenturaRiverGroundwaterAgency

x SecondaryImplementingOrganization

x ProposedStartDate Jan1,2016

x ProposedEndDate March30,2022

x ScopeofWork TheUpperVenturaRiverGroundwaterAgencywillprepareagroundwatersustainabilityplan,includingdevelopingdataandanalysesneededtounderstandthebasin’shydrologyanddeveloprequiredobjectives,thresholds,andmanagementactions.FundingwillalsosupporttheestablishmentofthenewGSAandstakeholderoutreach.

Page 6: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 3

x ProjectDescription(2000characters)

TheUpperVenturaRiverGroundwaterBasinislocatedintheVenturaRiverwatershedinVenturaCounty.Thebasin’sfourmainwatersuppliersandVenturaCountyproactivelyrespondedtothestate’sGroundwaterSustainabilityAct,usingaJointPowersAuthoritytoformtheUpperVenturaRiverGroundwaterAgency(UVRGA)inDec2016.ItbecameaGSAinJul2017.TheVenturaRiverwatershedreliessolelyonlocalwatersources,withgroundwatermakinguproughlyhalfofthosesupplies.Surfacewaterandgroundwaterareintricatelylinkedinthebasin;however,thenatureofthatlinkisnotwellunderstood.StreamflowsthatrechargethebasinmustalsobeavailableforthemigrationofendangeredCaliforniasteelhead.Themaingoalofthegrantprojectisdevelopmentofagroundwatersustainabilityplan.Beforewritingtheplan,additionalgroundwatermonitoring,surfaceflowgauging,andrelatedanalysesareneededtofillkeydatagaps.Thesedatawillenablethedevelopmentanaccurateconceptualgroundwatermodel.Thesemonitoringdatawillalsosupportastate-leveleffortthatisunderwaytostudyandultimatelyenhancestreamflowsintheVenturaRiverinsupporthabitatforanadromousfish.TheVenturaRiverisoneoffivestreamsystemsinthestatecalledoutinthe2014CaliforniaWaterActionPlanasthefocusoftheseefforts.Fromthebeginning,theUVRGAhasactivelyengagedstakeholdersandhasbeentransparentandsensitivetoconcernsandsuggestions.Thecommunityservedbythebasinisrelativelysmall,andhasalonghistoryofworkingtogethertomanagepreciouslocalwatersupplies.ThroughouttheprocessofdevelopingtheGSP,theUVRGAwillcontinuetomaintainrobuststakeholderengagement.TheUVRGAiscommittedtowisegroundwatermanagementstrategiesthatwilladdressthebasin’schallengesinawaythatreliablysupportsecosystemandhuman(includingurbanandagricultural)needsinthewatershednowandinthefuture.

x ProjectObjective(500) Theprojectobjectiveisto1)formtheGSAfortheUpperVenturaRiverBasin,and2)developagroundwatermanagementplanfortheUpperVenturaRiverBasinbasedonaccuratehydrogeologicaldata,andthataddressesthebasin’schallengesinawaythatreliablysupportsecosystemandhuman(includingurbanandagricultural)needsinthewatershednowandinthefuture.

QUESTIONSTAB

x Q1.ProjectDescription(25words)

Onceformed,theUpperVenturaRiverGroundwaterAgencywillgatherhydrogeologicaldata,developagroundwaterhydrologymodel,involvestakeholders,andproduceagroundwatersustainabilityplan.

Page 7: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 4

x Q2.ProjectRepresentative

BruceKueblerBoardChair,UpperVenturaRiverGroundwaterAgencyPOBox1779,Ojai,CA93023805/[email protected]

x Q3.ProjectManager BruceKuebler[ChangetoBondyorotherGSPprojectmgr]BoardChair,UpperVenturaRiverGroundwaterAgencyPOBox1779,Ojai,CA93023805/[email protected]

x Q4.Eligibility–CASGEM Yes,CASGEMcompliant.

x Q5.Eligibility–AgSupplier

N/A.Applicantisnotawatersupplier.

x Q6.Eligibility–UrbanWaterSupplier

N/A.Applicantisnotawatersupplier.

x Q7.Eligibility–SurfaceWaterDiverter

N/A.Applicantisnotasurfacewaterdiverter.

x Q8.Eligibility–Includeanyoflistofactivities.

No.Theprojectdoesnotincludeanyofthelistedactivities.

Q9.DACorEDACostShareWaiverorReduction

NotapplyingforcostsharewaiverorreductionasaDAC.

x Q10.ProjectAreaMap ProjectAreaMapattached.

APPLICATIONATTACHMENTS

O Attachment1:AuthorizingDocumentation

Att1_2017SGWPC2_AuthDoc_1of2.pdfAtt1_2017SGWPC2_AuthDoc_2of2.pdf(resolution)

x Attachment2:EligibleApplicantDocumentation

Att2_2017SGWPC2_EligDoc_1of1.pdf

x Attachment3:ProjectJustification

Att3_2017SGWPC2_ProjJus_1of2Att3_2017SGWPC2_ProjJus_2of2(JPAAgreement)

x Attachment4:WorkPlan Att4_2017SGWPC2_WrkPlan_1of2Att4_2017SGWPC2_WrkPlan_2of2(permissionletters)

x Attachment5:Budget Att5_2017SGWPC2_Budget_1of1

x Attachment6:Schedule Att6_2017SGWPC2_Schedule_1of2Att6_2017SGWPC2_Schedule_2of2

Page 8: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 5

Attachment 1. Authorizing Documentation

AresolutiondesignatinganauthorizedrepresentativetosubmitthisgrantapplicationandexecuteanagreementwiththeStateofCaliforniafora2017SGWPGrantwasadoptedbytheUpperVenturaRiverGroundwaterAgencyonSeptemberxx,2017.Acopyofthatresolutionisattached(Att1_2017SGWPC2_AuthDoc_2of2.pdf).

Page 9: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 6

Attachment 2. Eligibility Documentation

ApplicantOrganization

TheapplicantistheUpperVenturaRiverGroundwaterAgency(UVRGA),anewpublicagency.TheUVRGAofficiallybecameaGroundwaterSustainabilityAgency(GSA)onJuly20,2017.Itsgoverningbodyiscomprisedofonerepresentativefromeachofthefollowingfivelocalpublicagencies:CasitasMunicipalWaterDistrict,theCityofVentura,theCountyofVentura,theMeinersOaksWaterDistrict,andtheVenturaRiverWaterDistrict.Additionally,twoBoardseatsareheldbynon-agencyrepresentatives,onerepresentingagriculturalstakeholdersandanotherrepresentingenvironmentalinterests.

CASGEMCompliance

TheUpperVenturaRiverBasinisamedium-prioritybasininVenturaCountyandisincompliancewithCASGEM.TheVenturaCountyWatershedProtectionDistrict(VCWPD)conductsgroundwatermonitoringthroughoutthecounty,includingintheUpperVenturaRiverBasin.VCWPDcompilesthewaterleveldatagatheredbycountystaffwiththatgatheredbyotheragenciesanduploadsthattotheCASGEMwebsitesemi-annually.VCWPDwillcontinueinthisroleandprovidedataconsistentwiththeCASGEMprogram.

UrbanWaterManagementCompliance

Theapplicant,UVRGA,isnotanurbanwatersupplier.

AgriculturalWaterManagementCompliance

Theapplicant,UVRGA,isnotanagriculturalwatersupplier.

SurfaceWaterDiversionCompliance

Theapplicant,UVRGA,isnotasurfacewaterdiverter.

Page 10: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 7

Attachment 3. Project Justification

ProposalSummary

ThisproposalisfortheformationoftheUpperVenturaRiverGroundwaterAgency(UVRGA)andtheagency’sdevelopmentofagroundwatersustainabilityplan(GSP)fortheentireUpperVenturaRiverBasin.

Background.TheUpperVenturaRiverGroundwaterBasin(basin)(DWR#4-003.1)isamedium-prioritybasinlocatedintheVenturaRiverwatershedinVenturaCounty.Thebasin’sfourmainwatersuppliersandVenturaCountyproactivelyrespondedtothestate’sGroundwaterSustainabilityAct,usingaJointPowersAuthoritytoformtheUVRGAinDec2016.UVRGAbecameaGSAonJul20,2017.

UnlikemosturbanizedareasofsouthernCalifornia,theVenturaRiverwatershedreliessolelyonlocalsourcesofwater,withgroundwatermakinguproughlyhalfofthosesupplies.

TheunconfinedbasinisarelativelyshallowalluvialbasinthatunderliestheVenturaRiver.Surfacewaterandgroundwaterareintricatelylinkedinthebasin;however,thenatureofthelinkbetweengroundwaterandstreamflowintheVenturaRiverisnotwellunderstood.

TheflowsoftheVenturaRiverthatrechargethebasinmustalsobeavailableforthemigrationofendangeredsouthernCaliforniasteelhead.Steelheadareconsideredanindicatorspeciesofthewatershed’soverallecologicalhealth.ANOAABiologicalOpinionhasguidedsteelheadwaterdiversionssince2005.Anewsurfacewater-groundwaterinteractionstudytobetterunderstandtheriver’shydrologywasinitiatedthisyearbytheStateWaterResourcesControlBoardandisexpectedtobecompletedin2020,andtheirfindingscouldresultinarequirementtoincreaseinstreamflows.

CurrentNeed.InordertoproduceaGSPthataccuratelyreflectsthebasin’shydrologyandwaterbudget,itwillbenecessarytomeasuregroundwaterlevelsaswellasinflowsandoutflowsfromthebasinovertime.Dataloggersinanetworkofwellswillaccuratelymeasuregroundwaterlevelsinthebasin.Formeasuringinflow,adetailedreviewofdata(includingonenewgroundwaterwell)isneededatthebasin’smostsignificantsubsurfaceinflowlocation.Groundwaterextractionisanimportantelementoftheoutflow.Whiledatafromwaterprovidersareavailable,theamountofwaterextractedfromprivatewellsisnotwellknown.Aerialinfraredimagerycombinedwithanirrigatedlandscapeanalysiswillprovideacost-effectiveparcel-levelestimateofwaterdemandfromthesewells.OutflowfromevapotranspirationfrominvasiveArundodonaxandnativeriparianvegetationisanimportantpartofanaccuratewaterbudget.Amorepreciseestimateofdiurnalandnocturnalfluctuationsinevapotranspirationfromriparianvegetationwillbedevelopedusingdataloggersinkeywellspairedwithsurfaceflowgauges.Amorerobustconceptualgroundwatermodel,withspecificmodelelements(e.g.,basinrechargeandextraction)willbedevelopedfromtheseandotherdata.

StakeholderEngagement.Fromthebeginning,theUVRGAhasactivelyengagedstakeholdersandhasbeentransparentandsensitivetoconcernsandsuggestions.Thecommunityservedbythebasinisrelativelysmall,andhasalonghistoryofworkingtogethertomanagepreciouslocalwatersupplies.TheUVRGABoardmembersareactiveparticipantsintheVenturaRiverWatershedCouncil.ThecouncilrecentlyproducedacomprehensivewatershedmanagementplanandisaneffectiveforumforcommunicationaboutissuesintheVenturaRiverwatershed.

ThroughouttheprocessofdevelopingtheGSP,theUVRGAwillcontinuetomaintainarobustprogramofengagementwithstakeholdersandtheWatershedCouncil.Bycollectingandanalyzingtherequireddataandinvolvinginterestedpartiesateverystep,weexpectthefinalGSPtobescientificallysoundandpubliclyaccepted.Thedocumentwillalsobeevolvingwitheachupdate,informedbyadditionaldataandunderstanding.

Page 11: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 8

ProjectAreaMap

Page 12: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 9

TechnicalNeed

DataGapsTheproject’sWorkPlanincludesanumberoftasksthatwillsupplydatathatiscriticaltodevelopingamoresophisticatedconceptualgroundwatermodeloftheUpperVenturaRiverBasin.ThesedatawillalsobesharedwiththeStateWaterResourcesControlBoard(SWRCB)fortheirworkontheVenturaRiverWatershedSurfaceWater-GroundwaterInteractionandNutrientTransportModelingProjecttoensureitsmodelisasaccurateaspossiblegiventheirlimitedfieldworkbudget.Newmonitoringequipmentwillalsoprovidealong-termgroundwater-monitoringnetworkfortheUVRGA’songoingmanagementofthebasin.

WellMonitoringNetwork/DataLoggers.Dataloggerswererecentlyinstalledinsixwellsinordertoacquiregroundwaterhydrographsbasedonmultipledailyreadingsatkeylocationsextendingovera6-milereachofthebasin.Theloggerswillprovidewaterlevelandtemperaturereadingsat15-minuteintervals.

InflowData.SubsurfaceinflowattheconfluenceofSanAntonioCreekandtheVenturaRiverisknowntobesignificant,buttheamountofinflowhasneverbeenmonitored.Installationofamonitoringwellatthisimportantlocationwillprovidelong-neededdataonthebasin’shydrology,aswellasneededinformationondepthofalluviumandgroundwatergradient.Anotherlocationofnotableinflow,thetopofthebasin,isalsonotmonitored.Atthislocation,dataloggerswillbeinstalledinexistingwellstocalculateinflow.

SurfaceFlowData.UnlikemostoftheVenturaRiveroverthebasin,thereachoftheriveratCasitasSpringsisagainingreachandtypicallyflowsyear-round.AbigmanagementissuefortheURVGA,especiallyrelatedtosteelheadhabitat,iskeepingwaterinthisreach.Surfacewaterismonitoredabove(onSanAntonioCreekneartheconfluence)andbelowthisreach,butisnotmonitoredinthisreach.Thisrepresentsasignificantdatagap.

IrrigationEstimateviaInfraredImagery.Therearemanyprivatewellsinthebasinandthequantityofgroundwaterpumpedfromthemisunknown.Anautomatedtechnologythatusesinfraredimageryandacorrespondingirrigatedlandscapeanalysiswillprovideacost-effectiveparcel-levelestimateofirrigationwaterdemand.

NaturalHabitatEvapotranspirationAnalysis.ThegroundwaterdemandfromArundodonaxandnativeriparianvegetationisnotwellunderstood,yetisimportanttodevelopinganaccuratewaterbudgetandtotheanalysisofgroundwater-dependentecosystems.

ConceptualGroundwaterModel.Fromtheseandotherdata,amorerobustconceptualgroundwatermodelwillbedevelopedtoguideplanningandmanagementofthebasin.Representingthesurfacewater-groundwaterrelationshipaccuratelywillbecentraltodevelopmentofthismodel.

GroundwaterSustainabilityPlanThebasinisinawatersheddependentsolelyonlocalwatersupplies,withgroundwatercomprisingabouthalfofthosesupplies.TherelativelyshallowalluvialbasinunderliestheupperVenturaRiver,mostofwhichiscomprisedofa“dryreach”wheresurfaceflowsdisappearundergroundexceptafterstormsinmostyears.Thebasinisinanareaoflowrainfall,themedianrainfallisonly19.2inchesayear,andrainfallishighlyvariablefromyeartoyear.Whiletherainsof2017broughtrelieftomuchofCalifornia,anddidrefillthebasin,watersuppliesinLakeCasitas,thewatershed’ssurfacewaterreservoir,remainat40%ofcapacity.

StreamflowsthatrechargethebasinmustalsobeavailableforthemigrationofendangeredCaliforniasteelhead,andthereisthepotentialthatrequirementsforinstreamflowmayincrease.TheVenturaRiverisoneoffivestreamsystemsinthestatecalledoutinthe2014CaliforniaWaterActionPlanasthefocusofstateeffortstoenhancestreamflowsforanadromousfish.TheCaliforniaDepartmentofFishandWildlifeandSWRCBarenowstudyingtheriversystem,andtheirfindingscouldleadtothedevelopmentofaflowobjectivefortheriver.

TheUVRGAismandatedtoprepareaGSPbyJan2022.Giventhelimitedwatersuppliesinthewatershedandcompetingdemandsforthosesupplies,abetterunderstandingofthebasin’sgroundwaterhydrologyandwaterbudget,andathoughtfulapproachtogroundwatermanagementislongoverdue.

Page 13: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 10

FinancialNeed

AbsentSustainableGroundwaterPlanninggrantfunding,theUVRGAwouldneedtousepumpingfeestoraisenecessaryfundstoprepareaGSP.TheUpperVenturaRiverBasinisarelativelysmallbasin.Itssafeannualyieldisestimatedat9,482acre-feet.Approximately20%ofthegroundwaterusedinthebasinisforagricultural(i.e.,orchard)irrigation.Thereareonlyabout120wells.

Giventhesmallvolumeofwaterusedinthebasin,togeneratetheneededrevenuetomeetthemanymandatedtechnicalrequirementsoftheGSP,averyhighpumpingfeewouldbenecessary.Giventhatgrowersuseone-fifthofthebasin’swater,impositionofahighpumpingfeecouldhavesignificantnegativeimpactsonagricultureinthebasin.Thisisanimportantpointbecauseofthepotentialfororchardlandconversions.Ifexistingorchardscannotbemaintainedbecausewateristooexpensive,convertingtootherincome-makinglanduseswilllikelybeconsideredbylandowners.Potentialalternativelanduses,suchasdifferentcroptypes,livestockoperations,horseboarding,andhousing,couldsignificantlyaffectwaterdemand,andwaterquality,inthebasin.

InadditiontousingpumpingfeestopreparetheGSP,theUVRGAwouldhavetoforgosomeofthemoreexpensivetasksintheWorkPlanintendedtofilllong-standingdatagapsinunderstandingofthebasin’shydrology.Thebasinhashighlycomplexhydrology,withlittleunderstoodsurfacewater-groundwaterinteractions;withouttheactualmeasurementsthatcaninformanaccurategroundwatermodelofthebasin,managementdecisionswillnecessarilybelesstechnicallysoundand,forthesamereason,morecontroversial.

Thiswouldobviouslybeverydetrimentaltoameaningfulattemptatsustainablegroundwatermanagement.

Page 14: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 11

ProjectSupport

LegalAgreementsThefivepublicagenciesthatcomprisetheUVRGAinitiallyformedaJointPowersAuthority(JPA)onDecember12,2016.TheJPAfilednoticetobecomeaGSAonApril21,2017,andbecameaGSAonJuly20,2017.TheoriginalJPAremainsthelegalinstrumentthatoutlinesgovernanceandrelevantrolesandresponsibilitiesoftheparties.AcopyoftheJPAincludedasaseparateattachment(Att3_2017SGWPC2_ProjJus_2of2).

CommunicationwithNeighboringGSAsTheOjaiValleyBasinisadjacenttotheUpperVenturaRiverBasintotheeast,andtheLowerVenturaRiverBasinisadjacenttothesouth.TheLowerVenturaRiverBasinisrankedasaverylowprioritybyCASGEM,sonoworkisunderwayformanagementofthatbasin.TheOjaiValleyBasinhasbeenmanagedlocallybytheOjaiBasinGroundwaterManagementAgency(OBGMA)since1991.

VenturaRiverWatershedCouncil.TheVenturaRiverWatershedCouncilisanengagedwatershedcouncil,andmembersoftheOBGMAandthefivememberagenciesoftheUVRGAareactiveparticipantsinthecouncil.Theregularmeetingsofthecouncilincludeupdatesbyparticipants,aswellasspecialpresentationsandreportsaboutprojectsorsubjectsofinterest.TheVenturaRiverwatershedcoordinator,thefacilitatorofthecouncil,alsomaintainsawebsitewithlocalupdatesandsendse-newsletterstoparticipantswithnewsandannouncements.

Participationinthecouncilhasbeeninstrumentalinkeepinggroundwatermanagersabreastoftheprojects,interestsandconcernsofothergroundwatermanagersinthewatershed,aswellasofotherstakeholderactivitiesthatmayhaveanexuswithgroundwater.Asaresult,relationshipsbetweenwatermanagersandotherstakeholdersaregenerallystrong.Membersofthepublicarealsowelcomeandengagedatcouncilmeetings.

OBGMAMeetingsCoordinationwithOBGMAhasbeencontinualduringformationofUVRGAthroughtoday.TheprimarypointofcontactisBruceKuebler,wholeadUVRGA’sformationandiscurrentlyUVRGABoardChair.HeregularlyattendedandstillattendsOBGMABoardmeetingsanddiscussesinterbasinmatters,suchasacoordinationagreementandissuesarisingfromthehydrologicconnectionbetweenbasins.UVRGAandOBGMAhaveagreedtoshareofficespaceandanadministrativemanager.InformalcoordinationoccursthroughUVRGABoardmemberMaryBergen,whoservesasanalternateontheOBGMABoard.Fortechnicalmatters,coordinationoccursthroughJordanKear,hydrogeologist,whoprovidedconsultingforthebasinboundarymodificationsforbothbasins.HehasdoneworkfortwowaterdistrictsinUpperVenturaRiverBasinandisthetechnicalconsultanttoOBGMA.

CommunicationwithBeneficialUsersMembersoftheUVRGAhaveconsideredtheinterestsofbeneficialusersinmindfromtheveryfirstorganizationalmeetings.DuringdevelopmentoftheJPA,themembersheldnumerouspublicmeetingstodiscussimportanttermstobeincludedintheJPAagreement.ThemembersalsoheldmultiplestakeholderoutreachmeetingstoengageandeducatestakeholderswithinthebasinabouttherequirementsoftheSustainableGroundwaterManagementAct,theJPAagreement,andtheintentiontoformaGSAfortheBasin.

TheadoptedJPAdictatedthattwooftheagency’ssevenboardofdirectorsrepresentkeystakeholders/beneficialusers,specificallyagriculturalandenvironmental.Nomineesforthosepositionsweresolicitedandcandidatesinterviewed.TheagriculturalandenvironmentalrepresentativesjoinedtheBoardinFebruary2017.TheseboardmembersarecountedontosolicitinputfromtheintereststheyrepresentonrelevantGSAbusinessandkeeptheBoardinformedofanyconcernsorotherfeedback.

AnearlyactiontakenbytheGSAorganizerswastodevelopawebsiteande-newsletterinordertosolicitthenamesandcontactinformationofstakeholdersinterestedintheGSAprocess.Thewebsiteande-newsletterwerelaunchedinApril2016,andthedistributionlistnowstandsat115people.Asamplee-newsletterandawebsitescreenshotshowingpublicmeetingannouncementsareincludedbelow.

Page 15: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 12

Finally,activeparticipationintheVenturaRiverWatershedCouncil(describedabove)bymembersoftheGSAisanothersignificantmeansbywhichcommunicationwithinterestedstakeholdersandbeneficialusersisachieved.PresentationsonGSAformationeffortsdatebacktoMarch2015(seeagendabelow).ThecouncilisalsotheforuminwhichthebusinessoftheVenturaCountyIntegratedRegionalWaterManagementProgramisdiscussedinthewatershed,socommunicationwiththatimportantwatermanagementprogramalsooccursviathecouncil.

Page 16: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 13

FirstE-NewsletterofUVRGA-Screenshot

Page 17: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 14

EarlyStakeholderOutreachatVenturaRiverWatershedCouncilMeeting

Page 18: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 15

PublicMeetingsAnnouncedonWebsite-Screenshot

Page 19: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 16

Attachment 4. Work Plan

Theproject’sWorkPlaniscomprisedofthreeoverallobjectives:

1.CreatetheGSA.Thisworkislargelyalreadycomplete.

2.Fillkeydatagaps.Thisworkhasrecentlybegunandwillconsumemostofthefirstyearof2018.ThesedatawillimprovecharacterizationofhydrogeologicconditionsandexpandtheUVRGA’smonitoringprogram,bothofwhichwilldirectlyservegroundwaterplanningandmanagementactivities.

3.PrepareafinalGSP.Thiswillcomprisethebulkoftheeffortandisexpectedtobecompletedbytheendof2021.

TheUpperVenturaRiverBasinandSustainability.UnderstandingthecharacteroftheUpperVenturaRiverBasin,andthecentralinterrelationshipswithsurfaceflowandsurfacewatersupplies,isimportantwithregardtoachievingsustainabilityasdefinedbyDWR.Thebasinisshallow,largelyunconfined,dynamicallyconnectedwiththeVenturaRiver,andhasaverylonghistoryintermsofmonitoring.Theselong-termrecordshaveprovidedgroundwatermanagerswithafairlystrongunderstandingofthebasin’sgeneralpatternofregulardepletionindryyearsfollowedbyrapidrechargeingoodwetyears.

Forexample,theVenturaRiverWaterDistrict,oneoftwowaterdistrictsthathavewaterwellsintheriverintheupperpartofthebasin,hasfoundthatthesectionofthebasinwhereitpumpstendstoholdaboutan18-monthsupplyofwater(estimatedfrompumpingduringanextendeddryspellfollowingagoodrainfallwinter).Conversely,thebasincangofromemptytofullinthreemonthsinanaveragewinter.

Becauseofthisdynamicdepletion/rechargepattern,mostwellusershaveabackupaconnectiontosurfacewaterviatheCasitasMunicipalWaterDistrict.Itislong-time,standardoperatingproceduretoswitchtoCasitaswaterwhenlevelsdroptolow,orwhennitrateconcentrationsgettoohigh.Whentherainscomeandrechargethebasin,pumpingresumes.

Giventhissituationinthebasin,thefirsttwo“undesirableresults”⎯chronicloweringofgroundwaterlevelsandunreasonablereductionofstorage⎯maynotbeasmeaningfulforsustainability.Seawaterintrusionisnotanissueasthebasiniswellinland,landsubsidenceisnotasignificantfactorgiventhenatureoftheareassubstrates,andtheprimarywaterqualityconcern–nitrates–ismonitoredandmanagedbydiscontinuingpumpingandswitchingtosurfacewatersourceswhenconcentrationsgettoohigh.Therefore,thesecondthreeundesirableresultsaresimilarlynotasmeaningfulforthebasin’ssustainability.

Ofthesixundesirableresults,byfarofgreatestconcernisthatof“depletionsofinterconnectedsurfacewaterthathavesignificantandunreasonableadverseimpactsonbeneficialusesofthesurfacewater.”Formingabetterunderstandingofsurfacewater-groundwaterinteractionswillbeacentralfocusoftheworkofdevelopinganaccurateGSPformanagingthisUpperVenturaRiverBasinforsustainability.

EnvironmentalComplianceandPermitting.Basedonthenatureofthework,scientificdatacollection,analysis,andplanpreparation,allprojectrelatedactivitiesqualifyforanexemptionundertheCaliforniaEnvironmentalQualityAct.Onemonitoringwellwillbedrilledaspartofthisproject.AsdescribedunderSubtask2.5below,thewellwillbepermittedasamonitoringwellthroughtheCountyofVentura.MonitoringwellsarecategoricallyexemptfromCEQA.TheCountyofVentura’swellpermitisministerial,requiringsignaturesfromthepropertyowner,welldriller,andregisteredinspector.Typicallythesepermitsarecompletewithin7to10daysofapplication.Nootherpermitsareanticipatedforthisproject.

StakeholderCommunication.TheUVRGA’sexistingmethodsofongoingstakeholdercommunicationwillcontinuethroughouttheGSP’sdevelopment.Theseincluderegulare-newsletters,announcementsandpresentationsatVenturaRiverWatershedCouncilmeetings,periodicpublicmeetings,andkeepinganup-to-dateinformativewebsite.Inaddition,aStakeholderAdvisoryCommitteewillbeestablishedatthebeginningoftheplandevelopmentprocessandthatgroupwillbecalledupontogiveinputandfeedbackondraftsectionsoftheplanastheyaredeveloped.

TheWorkPlanMilestones/Deliverablestablebelowsummarizestheprojectsdeliverablesandcompletiondates.

Page 20: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 17

WorkPlanMilestones/DeliverablesTableTask Milestones/DeliverablesSchedule Complete1 GSADevelopment&Support JPAAgreement. 12-2016

2 NewDataCollection&TechnicalAnalyses Newdataloggerquarterlyreport. 12-2017 SurfaceWater-GroundwaterInterfaceReportandassociatedmap. 03-2018 IrrigatedLandscapeAnalysisSummaryReport. 03-2018 ComparisonAnalysisofWaterYears2011and2017. 06-2018

SanAntonioCreek1)InflowGeologicCrossSectionMap,2)InflowEstimateReport,and3)ConfluenceGeotechnicalReport.

06-2018

VenturaRiver:1)InflowGeologicCrossSectionMap,2)VenturaRiverInflowEstimateReport. 06-2018 CasitasSpringsSurfaceFlowquarterlyreport. 09-2018 Awellinventorydatabase. 06-2018 NaturalHabitatEvapotranspirationReport. 06-20183 GSPPlanning GSPAdvisoryCommitteeroster,andStakeholderEngagementPlan. 06-20184 GSPChapter2:PlanAreaandBasinSetting Draftof“Chapter2:PlanAreaandBasinSetting.” 09-20195 GSPChapter3:SustainableManagementCriteria Draftof“Chapter3:SustainableManagementCriteria.” 03-20206 GSPChapter4:ProjectsandManagementActions

Draftof“Chapter4:ProjectsandManagementActions.” 09-20207 GSPChapter5:PlanImplementation Draftof“Chapter5:PlanImplementation.” 03-2021

8 GSPIntroduction,ExecutiveSummaryReferences&Appendices

Draftsof“Chapter1:Introduction,”“ExecutiveSummary,”“References,”and“Appendices.” 03-2021

9 GSPReviewsandApprovals FinalGSP. 12-2021

10 ProjectManagement&Reporting

Quarterlyandfinalreports.Quarterly&03-2022

Task1.GSADevelopment&Support

1.1StakeholderEngagement(85%complete)ThistaskincludesdevelopingandmaintainingarobuststakeholderoutreachandengagementprogramrelatedtotheformationoftheURVGA,andhaslargelyalreadybeenimplemented.StakeholderoutreachmeetingsabouttheGSAformationandpresentationsattheVenturaRiverWatershedCouncilbeganin2015.InApril2016,acomprehensivewebsitewasdevelopedtoexplaintheprocessandthebasin,andtosolicitparticipation.Atthattimemembersofthepublicwereinvitedtosignupforane-newslettermailinglist.AsofAug2017thereare115peopleregistered.Thewebsitehasannouncementsaboutpublicmeetingsaswellasagendasandsupportingmaterial.GSAorganizersattendedmeetingsoftheOjaiValleyGroundwaterManagementAgency(OBGMA),theGSAfortheadjacentbasin,

ThecommitmenttostakeholderengagementisreflectedinthecompositionoftheUVRGA’sseven-memberboard,whichincludestwostakeholderseats:oneforagriculturalinterestsandoneforenvironmentalinterests.

Page 21: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 18

Remainingworkincludescontinuingtokeepstakeholdersinformedabout,andseekingtheirinputon,thedevelopingpolicies,procedures,andprogramsoftheUVRGAviawebsiteupdates,e-newsletters,presentations,andothervenues.StakeholderengagementrelativetotheGSPisaddressedintherelevantGSPdevelopmenttasksbelow.

1.2BasinBoundaryModification(100%complete)ThistaskincludesgoingthroughDWR’sprocesstomodifytheUpperVenturaRiverBasinboundary,andhasalreadybeenimplemented.Thisinvolvedconductingthenecessaryresearch,compilingthetechnicaljustificationandrequireddocumentation,creatingthenewboundarymaps,coordinatingwiththeOBGMAandotherlocalagencies,holdingpublicmeetings,filinganoticewithDWRfortheboundarymodification,andrespondingtocomments.

Deliverables:None:ApprovedboundarymodificationisverifiedonDWR’swebsite.

1.3FormJointPowersAuthorityandGroundwaterSustainabilityAgency(78%)ThistaskinvolvesorganizinglocalagenciesintoanewagencyformanagementoftheUpperVenturaRiverBasin,andissubstantiallycomplete.TheseagenciesincludeCasitasMunicipalWaterDistrict,theCityofVentura,theCountyofVentura,theMeinersOaksWaterDistrict,andtheVenturaRiverWaterDistrict.Preliminarystepsincludeddiscussionswithpotentialagencies,holdinginitialexploratorymeetings,andmakingpresentationsabouttheGSAformationatotherrelevantlocalorganizations.OrganizerstookadvantageofDWRsprogramofferingfreeprofessionalfacilitationservicesfromtheCenterforCollaborativePolicy.Thefacilitatorwascatalyticindevelopinggroupconsensus,andherassistancemadetheeffectivenessofearlymeetingsanddecisionsrelatedtoorganizationandstructuresignificantlymoreproductiveandefficient.Stakeholderoutreachthroughouttheprocesswasrobust,asdescribedaboveinSubtask1.1.

ManymeetingsandadhocsubcommitteemeetingswereheldtoworkoutthelanguageanddetailsofaJointPowersAuthority(JPA)agreement,whichwassignedDec12,2016.TheJPAcollectedfeesfromeachofthefiveparticipatingpublicagencies,hiredlegalcounsel,heldpublicmeetings,andcompletedDWR’sdocumentationandfilingrequirementsforGSAstatus.TheUVRGAofficiallybecameaGSAonJuly20,2017.

RemainingtasksincludeestablishinginitialUVRGAadministrativeactivities,suchasdevelopingbookkeepingprocedures,retainingconsultants,andsettinguptechnicalcommittees;anddevelopingfoundationalpoliciesandproceduresthatwillguideandsupporttheorganization,suchasagencybylawsandfundingmechanisms.

Deliverables:JPAagreement.(ApprovedGSAstatusisverifiedonDWR’swebsite.)

Task2.NewDataCollection&TechnicalAnalysis

Task2involvesgatheringandanalyzingcriticaladditionaldata,primarilyhydrogeologicaldata,neededtoadequatelycharacterizeandassessthegroundwaterbasin’shydrologyinordertodevelopsustainablegroundwatermanagement.

Thisexpandedmonitoringandcharacterizationwilladdressdeficiencies,especiallyintheunderstandingofthebasin’sdynamicsurfacewater-groundwaterinteractions,whicharenowobstaclesindetermininganaccuratewaterbudgetforthebasinaswellasarefinedconceptualgroundwatermodel.Collectionandanalysisofthesenewdataovertimewillreducethecurrentuncertaintyaboutbasinhydrology.

2.1EstablishandAnalyzeDataFromWellMonitoringNetwork(12%Complete)InMayof2016,theUVRGAinstalleddataloggersinsixwellswithlong-termrecordstoacquiregroundwaterhydrographsbasedonmultipledailyreadingsatkeylocationsextendingovera6-milereachofthebasin.Theloggerswillprovidewaterlevelandtemperaturereadingsat90-minuteintervals.Thedatafromtheseloggerswillbepartofalong-termmonitoringprogramandwillbecriticaltorefiningtheUVRGA’sconceptualgroundwatermodelaswellascalibratingtheSWRCB’ssurfacewater-groundwatermodel.Frequentdailyreadingsarenecessarytobetterunderstandhistoricalrecords,whichwereonlybasedonbi-monthlyorquarterlydata.

AllwellownersprovidedwrittenpermissionallowingtheUVRGAanditsconsultantsaccesstoinstalltheloggersandperiodicallymonitorthewells.

Page 22: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 19

Deliverables:Newdataloggerquarterlyreport.

2.2HistoricWet/DryStreamReachData(0%Complete)ThesoutherlyportionofVenturaRiverisusuallyagainingreachandthenortherlyportionalosingreach.Whenandwheresurfacewaterceasesflowingabovegroundandwhenandwhereitappearsagainareimportantdataformodelinginteractionofsurfacewaterandgroundwater.TwowateragenciesontheUVRGABoardhavebeenconductingregularon-the-groundrivermonitoringthatincludes1)mappingthesouthernedgeoftheriver’ssurfaceflowinthelosingreach(beguninJanuary2014)and2)notingat100-meterintervalsalonggainingandlosingreacheswheretheriverbediswet,dry,orintermittent(beguninFebruary2008forassessmentofsteelheadpassageflows).

Thistaskinvolvescompiling,reconciling,andanalyzingthesemonitoringdatawithdataloggerinformationtohelprefinetheconceptualgroundwatermodelandtohelpcalibratetheSWRCBsurfacewater-groundwatermodel.

Areportwillbedevelopeddescribingthedynamicoccurrenceandmovementofthesurfacewater-groundwaterinterface,includingananimatedGISmapshowingwheregroundwaterisdaylightingand/orsurfaceflowsarepercolatingundergroundovertime.

Deliverables:SurfaceWater-GroundwaterInterfaceReportandassociatedmap.

2.3IrrigationEstimateviaInfraredAerialImagery(66%Complete)Thereareabout120wellsintheUpperVenturaRiverBasin.Itisnotknownhowmuchwaterispumpedfromeachwellexceptforthepublicwatersupplywells.Torefinethebasin’swaterbudgetandtohelpintheanalysisofUVRGA’sfeestructure,itisnecessarytoestimatetheamountofgroundwaterpumpedbywellownerssothefeewillbeproportionaltousageandwillexcludedeminimiswellowners.Oneofthemostcost-effectivemethodstodeterminewaterusageifmetersarenotpresentisinfrared(IR)aerialphotographywithautomatedirrigatedlandscapeanalysis.ArecenttestbytheCaliforniaDepartmentofWaterResources(DWR)ofEagleAerial’ssystem,verifiedthattheaccuracyoftheirtechnologywaswithinthesametoleranceashandmeasurementsofirrigatedareas.

TheUVRGAcontractedwithEagleAerialtohavethebasinflownduringJuly2017andidentifyeachparcelthathasawell.ThevendorprovidesESRI-compatibleparcelpolygonsindicatingtypesofirrigatedvegetationandimpervioussurfaces;andacorrespondingExceldatafileindicatingthesquarefootageofvegetation(turf,trees,bushes&flowerbeds)andimpervioussurfacesforeachpolygon.WiththeIRimageryandcorrespondingirrigatedlandscapeanalysis,theUVRGAcanapplytheappropriateevapotranspirationratetodeterminethequantityofwaterusedperyearperparcelforirrigation.Additionallyaninventoryofwellswithmeterscanbemade,andusedtoground-truthwateruseincontrolparcelsandthenappliedtoun-meteredwells.

Areportwillbeproduceddescribingtheamountofwaterusedbyprivatepumpersforirrigation,includingthemethodologyandanalyticalapproach.

Deliverables:IrrigatedLandscapeAnalysisSummaryReport.

2.4ComparisonAnalysisofWaterYears2011and2017(27%Complete)Thistaskfocusesonthesurfacewater-groundwaterinteractionselementsoftheconceptualgroundwatermodel.Wateryears(WY)2011and2017representthetwomostrecentyearswhenthebasinfilledcompletely.Bycomparingtherateofdrawdownoftheaquiferineachoftheseyears,andfactoringinknowndifferencesbetweentheyears⎯suchaslesspumpingduetodroughtconditionsandlessevapotranspirationduetoArundodonaxremoval⎯significantadvanceswillbemadeinunderstandingtherelationshipofthebasin’ssurfacewaterandgroundwater.ThiswillalsoassistwithcalibrationoftheSWRCBmodel.

PreliminaryworkonthistaskhasbeenconductedbytheUVRGA’sBoardchairandretiredcivilengineer,whoproducedawhitepapertitled“UnderstandingMoreAboutSurfaceandGroundwaterintheUpperVenturaRiverBasinBetweenMeinersOaksandOakView”inJune2016.

Page 23: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 20

Itwasadetailedlookatsurfaceflow,groundwaterpumping,andwaterlevelchangesatfivekeywellsforthenine-yearperiodfromwateryear2006through2014,andincludedestimatesofgroundwaterrecharge,storagechange,riverbedpercolation,andgroundwaterflow.

BecausetheSWRCB’ssurfacewater-groundwatermodelofthebasinmaynotbecompleteuntilaslateas2021,thecomparativeanalysiswillessentiallyprovidetheUVRGAwithaninterimsurfacewater-groundwaterinteractionframeworkthatwillbeessentialtomovingforwardwithmanagementofthebasinuntiltheSWRCB’smodelisfinished.

Deliverables:ComparisonAnalysisofWaterYears2011and2017.

2.5SanAntonioCreekInflowMonitoring(0%Complete)SurfaceandgroundwaterinflowsfromSanAntonioCreekintotheVenturaRiverrepresenthydrologicconnectionwithotherportionsofthewatershed,includingtheOjaiValleyGroundwaterBasinandtheUpperOjaiBasin,andaresignificantwaterinputstothebasin.TheCountyofVenturamonitorssurfaceflowsatthislocation;however,groundwaterinflowshaveneverbeenmonitored.Thisrepresentsanimportantdatagap.

Thistaskinvolvesdrillingonemonitoringwellattheconfluenceandcollectingdatafromtwoexistingnearbywellstoprovidegroundwatergradientdata.TheinflowmonitoringwellisintendedtoprovideatriangulatedflowmonitoringpointinconjunctionwithtwoexistingproductionwellstomonitorgroundwaterflowfromtheSanAntonioCreekintotheUpperVenturaRiverBasin.

ThemonitoringwellwillalsoallowtheUVRGAtoacquireboringandsampledatathatwillfillgeologicaldatagapsatthisstrategiclocationandallowforaccuratemappingofthecontactofthealluviumandbedrockandestablishmentofthealluvialcross-sectionalarea.Groundwaterflowwillthenbecalculated.

ThisSanAntonioCreekgeologicandsubsurfaceinflowdataareimportanttotheconceptualgroundwatermodelandiskeytocalibratingtheSWRCB’ssurfacewater-groundwatermodel.

Themonitoringwellwillconsistofa4"diameterPVCcasingsurroundedbyagravelpackwithinthetargetaquiferandacementsealintheupper10feetoftheannulus.Thewellwillbedrilledto10feetbelowthecontactbetweenalluviumandbedrock,withperforationsadjacenttoalluvialaquifermaterial.Estimatedtotaldepthis50ft.Thewellwillbedrilledbyatruck-mountedmobiledrillrigusinghollow-stemauger,sonic,orotherfluid-freedrillingtechnology.

ThewellwillbepermittedasamonitoringwellthroughtheCountyofVentura.MonitoringwellsarecategoricallyexemptfromCEQA.TheCountyofVentura’swellpermitisministerial,requiringsignaturesfromthepropertyowner,welldriller,andregisteredinspector.Typicallythesepermitsarecompletewithin7to10daysofapplication.Nootherpermitsareanticipatedforthisproject.Acounty-registeredinspectorwillobservetheannularsealingofthewell.Hisreport,alongwiththeDWRformwellcompletionreport,willbesubmittedtotheCountyofVenturaandtheStatewithin30daysofwellcompletion.

Themonitoringwellwillbeusedprimarilyforwaterlevelmonitoring.Operationswillconsistofoccasionalaccess,measurements,andwellheadsecuring.Nomaintenanceisanticipated.

TheprivatelandownerhasprovidedwrittenpermissionfortheUVRGAtodrillthewellontheirproperty(Att4_2017SGWPC2_WrkPlan_2of2).AccesstothewellwillbevialandownedbytheOjaiValleyLandConservancy,andtheirwrittenpermissiongrantingaccessisincludedinthatattachment.

Deliverables:SanAntonioCreek1)InflowGeologicCrossSectionMap,2)InflowEstimateReport,and3)ConfluenceGeotechnicalReport.

2.6VenturaRiverInflowMonitoring(0%Complete)ThemajorsurfacewaterinflowtothebasinisVenturaRiverjustaboveCaminoCieloBridge,themostnorthernandup-gradientpointofthebasin.TheCountyofVenturamaintainsasurfaceflowgaugeatthislocation;however,groundwaterinflowshaveneverbeenmonitored.

Page 24: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 21

Thistaskinvolvesmonitoringwaterlevelsinanexistingwellatthislocation,alongwithresearchingthearea’ssubsurfacealluvialgeologytomoreaccuratelyquantifygroundwaterinflowtothebasin.ThisinflowdataisanotherimportantdatapointforrefiningUVRGA’sconceptualgroundwatermodelandcalibratingtheSWRCB’ssurfacewater-groundwatermodel.

Writtenpermissionwillbesoughtfromtheownerofanexistingwellatthislocation.Ifpermissioncannotbeobtained,theflowwillbeestimatedusingthedatafromthegeotechnicalborings,bridgeconstruction,andassumptionsregardinggradientandsaturatedthicknessbasedonalluvialtopographyassumedtobesaturatedandinbalancewiththesurfacewaterthroughthiswell-definedchannel.

Deliverables:VenturaRiver:1)InflowGeologicCrossSectionMap,and2)VenturaRiverInflowEstimateReport.

2.7CasitasSpringsSurfaceFlowMonitoring(0%Complete)TheCasitasSpringsareaisimportantforbothsurfacewaterandgroundwaterproductionintheVenturaRiverwatershed.BecauseofthesignificantcontributionofwaterfromSanAntonioCreekandnarrowingofthebasin,thestretchoftheVenturaRiverbetweentheSanAntonioCreekconfluenceandthebottomofthebasinisagainingreach,referredtoas“thelivereach.”Unlikemostoftheriveroverthebasin,thisreachoftherivertypicallyflowsyear-roundexceptinmulti-yeardryperiods.Thisisalsoanareaofsignificanthistoricalsurfacewaterdiversionandgroundwaterextraction.

AbigmanagementissuefortheURVGA,especiallyrelatedtosteelheadhabitat,iskeepingwaterinthisreach.SurfacewaterismonitoredonSanAntonioCreekneartheconfluencewithVenturaRiveranditismonitoredattheverybottomofthebasin,butitisnotmonitoredinthisreach.Thisrepresentsasignificantdatagap.Itpreventsestimatingthecontributionofgroundwatertotheriverinthiscriticalperenniallyflowingreach,andtherebypreventsanaccuratesurfacewater-groundwaterinteractionmodel.

Thistaskinvolvesestablishinglong-termsurfaceflowmonitoringinthisreach.DatafromthismonitoringwillbeusedtodeveloptheconceptualgroundwatermodelandcalibratingtheSWRCB’ssurfacewater-groundwatermodel.

Deliverables:CasitasSpringsSurfaceFlowquarterlyreport.

2.8WellInventoryDatabase(0%Complete)Aninventoryofwellswithmetersinthebasinisneededtounderstandcurrentgroundwaterextractionandmeteringneeds.Thistaskinvolvesacquiringexistingwellmeterinformationfrompropertyownersviamailrequestsandfieldvisits.InformationgatheredwillincludeGPSlocationsofwellsandmetermodels.Thedatabaseofwellswithmeterswillalsobeusedforafutureanalysisofoptionsforongoingwellextractiondatareporting.

Deliverables:Wellinventorydatabase.

2.9EstimateofNaturalHabitatEvapotranspiration(0%Complete)Amajorcomponentofbasinoutputisthetranspirationofgroundwaterfromnativeandnon-nativevegetationthroughoutthewatershed.Arundodonaxisaninvasivespecieswithveryhighwaterusage.ItisimportanttounderstandtheeffectvegetationhasonwatertablefluctuationsandoccurrenceofsurfaceflowinrefiningtheconceptualgroundwatermodelandcalibratingtheSWRCBsurfacewater-groundwatermodel.Surfacewaterandgroundwaterresponsescanonlybeseeninhigh-frequencymonitoringdata.

Toevaluatethis,UVRGAwillequipkeywellsinthesectionofthebasinwheregroundwaterandsurfacewaterareinbalance,connected,andlackunsaturatedseparationbetweensurfaceandgroundwaterwithhigh-frequencydataloggersandmonitorsurfaceflowandtemperaturetoestimatethetimingandintensityofdiurnalandnocturnalfluctuationsinevapotranspirationandhydrologicresponse.ThesedatawillbeanalyzedandareportproducedwithhydrographsandtemperaturegraphsofgroundwaterandsurfacewaterintheCaminoCieloarea(losingreach)andthegainingreachfortheperiodofobservation,estimatedtobeonewateryear(e.g.,October12017toSeptember30,2018).

Thisanalysiswillexpandonestimatesinanearlierreport,whichusedadistributedparameterwatershedmodelofevapotranspiration.

Page 25: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 22

Deliverables:NaturalHabitatEvapotranspirationReport.

Task3.GSPPlanning(61%complete)

Thistaskinvolvestheplanninginvolvedinlaunchingamulti-yearefforttoprepareacomprehensivegroundwatermanagementplan.Someworkhasalreadybegun.TheUVRGABoardwasprovidedguidanceonlegalconsiderationsrelatedtoGSPdevelopmentattheirMay2017boardmeeting,andboarddiscussiononthetopichascontinuedsincethen.PreliminaryplanningforGSPdevelopmentbeganinJuly2017,andaGSPprojectmanagerwashiredinAug2017.Additionally,preparationofthisgrantproposalwasasignificantstepinGSPplanning.

NextstepsincludeformationofaGSPStakeholderAdvisoryCommittee,andpreparingawrittenstatementforthegeneralpublicdescribingthemannerinwhichtheymayparticipateindevelopmentoftheGSP.SpecialoutreachwillbefocusedonthecommunityofCasitasSprings,whichistheonlydisadvantagedcommunityintheUVRGA’sservicearea.Aplanfornoticing,communicatingwith,andhandlinginputfromcommitteemembers,relevantpublicagencies,andotherstakeholderswillbedeveloped.Similarly,theVenturaRiverWatershedCouncilwillbeaskedtoplayaformalroleinongoingstakeholderengagementthroughoutGSPdevelopment.TheUVRGAwillstriveforaprocessthatistransparent,inclusive,andresponsivetoconcernsraisedbystakeholders.Writtenandoralcommunicationsreceivedorgeneratedbytheprojectwillberetained.

ThistaskalsoincludessubmittingaplaninitiationnoticetoDWR,developingrelevantdataandrecordsmanagementsystems,retainingotherexpertiseneededontheGSPPreparationTeam,andassessmentofthefundingplanoverthetermoftheproject.PlanningmeetingswillbeheldwiththeUVRGABoard,StakeholderAdvisoryCommittee,andGSPprojectmanagertoreviewandmodifythedraftGSPWorkPlan.

Deliverables:GSPAdvisoryCommitteeroster,andStakeholderEngagementPlan.

Task4.GSPChapter2:PlanAreaandBasinSetting

ThistaskinvolvesresearchingandwritingtheGSP’s“PlanAreaandBasinSetting”chapter.Asofthiswriting,thisisexpectedtoincludethesectionsdescribedbelow.

4.1DescriptionofPlanArea(0%Complete)

4.1.1RegionalContextThissectionoftheGSPprovidesanoverviewofthecontextoftheplanareaandtheplanningeffort.Itwillincludesummarysections,alongwithmapswhereappropriate,ofthephysicalsettingofthebasin,theclimate,theareacoveredbyGSP,otherrelevantagencieswithinthebasin,andrelevantjurisdictionalboundaries.Thissectionwillalsodescribeandillustrateexistinglandusesinthebasin,anddiscusstrendsinlanduse.

4.1.2WaterResourcesMonitoringandManagementProgramsThissectionwillincludeanoverviewofthearea’swaterresources,includingsurfaceandgroundwaterhydrology,historicalandprojectedwaterdemandsandsupplies;waterusers(e.g.,beneficialusers)andwaterrights;conjunctiveuseprograms;andwaterconservationandmanagementprograms.Amapofdensityofwellspersquaremilewillbeincluded.

Existingwatermonitoringprogramswillbedescribed,includingthetypeofmeasurementsandfrequencyateachlocation,forprecipitation,surfaceflows,groundwaterelevation,groundwaterquality,landsubsidence,andsurfacewater-groundwaterinteraction.Forgroundwaterquantityandquality,asummaryofmonitoringinformationsuchaswelldepth,screened intervals,andaquiferzonesmonitored,andasummaryofthetypeofwellsreliedonfortheinformation,includingpublic,private,municipal,irrigation,domestic,industrial,andmonitoringwellswillbeincludedaswell asmonitoringprocedures.

Existingpoliciesandregulationsrelatedtowellswillbesummarized,includingwellheadprotection,wellabandonmentanddestruction,andwellconstruction.

Page 26: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 23

4.1.3LandUseandWaterResourcesPlansandPoliciesThissectionwillincludeadiscussiononthelanduseplanningpoliciesoftheCountyofVenturathatcouldhaveabearingonorbeimpactedbytheGSPplanningeffort.(Thebasinliesoutsideofcityjurisdiction.)ThesepoliciesincludetheVenturaCountyGuidelinesforOrderlyDevelopment,VenturaCountySOAROrdinance,VenturaCountyGeneralPlan,andVenturaCounty’sOjaiValleyAreaPlan.

Waterresources-relatedplansandprogramswithinthebasinwillalsobedescribedalongwithanassessmentofhowtheGSPmayaffectthoseplans.TheseplansincludetheVenturaRiverWatershedManagementPlan,UrbanWaterManagementPlan,theVenturaCountyIntegratedRegionalWaterManagementPlan,RoblesFishPassageFacilitiesBiologicalOpinion,SouthernCaliforniaSteelheadRecoveryPlan,MatilijaDamEcosystemRestorationProject,ConditionalWaiverofWasteDischargeRequirementsforDischargesfromIrrigatedLandswithintheLosAngelesRegion(OrderR4-2010-0186).

Deliverables:Draftof“DescriptionofPlanArea”section.

4.2BasinSetting

4.2.1CurrentandHistoricalGroundwaterConditions(0%Complete)ThissectionoftheGSPincludesbackgroundinformationonthebasin,itscontextinthewatershed,waterusersandsuppliers,hydrogeologicalpropertiesoftheaquifersystemunderlyingthebasin,thebasin’sgroundwaterelevations,waterstorage,waterquality,inelasticlandsurfacesubsidence,surfacewaterhydrologyandsurfacewater-groundwaterinteractions,andgroundwater-dependentecosystems.MuchofthisinformationhasalreadybeensummarizedintheVenturaRiverWatershedManagementPlanorisavailableinotherwatershedandgroundwaterdocuments,andcanbereadilycompiled.

Thehydrogeologicsummarieswillincludecharacterizationofgeologicunitsandvariationsingeologyacrossthebasin,adescriptionofthedepositionalenvironments,geologicstructureandflowbarriers,underflowbetweenbasinsandtheocean,andverticalgradientsbetweenaquifersystems.Thehorizontalandverticaldistributionofwaterbearingunitswillbesummarized,aswellasthedegreeofconfinement,andotherhydrogeologicproperties.Groundwaterleveltrendsandseasonalcycles,andcontributingfactorswillbeidentified.ThesedescriptionswillbebasedonexistingdataalongwithnewdatadevelopedinTask2.

Thesurfacewater-groundwaterinteractionsdescriptionwillbeanewanalysisincorporatingthenewdataproducedinTask2.Theidentificationofgroundwater-dependentecosystemswillalsobeanewanalysis,andwillbeinformedbythemethodologyunderdevelopmentbyTheNatureConservancyinpartnershipwiththeFoxCanyonGroundwaterManagementAgency.

Indescribingwaterqualityissues,theUVRGAwillseektocollaboratewiththeVenturaCountyAgricultureIrrigatedLandsGroup(VCAILG),whichwilllikelybeconductinggroundwaterqualityanalysisinthebasinbythattime.VCAILGactsasoneunifieddischargergroupforagriculturallandownersandgrowersforthepurposeofcompliancewiththeLosAngelesRegionalWaterQualityControlBoard’sConditionalWaiverprogram.Aspartofthatprogram,growersinthebasinmustcomplywithrequirementsrelatedtogroundwaterqualitytrackingandtrendmonitoringofgroundwaterbeneathirrigatedagriculturallands.

4.2.2WaterBudget(0%Complete)Adetailedwaterbudgetforthebasinwillbedevelopedthatincludesallsurfacewaterandgroundwaterinflowsandoutflows,subsurfaceinflowsandoutflows,totalgroundwaterpumping,returnflows,consumptiveuse,andnetchangeingroundwaterstorage.Thiswaterbudgetwillbuilduponandrefineanexisting,high-levelcoarsewaterbudgetanalysis,andwillbegreatlyenhancedbythenewdatadevelopedinTask2,including:estimatesoflandscapeirrigationviainfraredimagery,SanAntonioCreekandVenturaRiverinflowdata,andCasitasSpringssurfaceflowmonitoringdata.

Thewaterbudgetwillincludeahistoricallookatactualtrendsinthebasinwaterbudgetfromhistoricaldata,aswellasaforecastbaseduponassumptionsaboutfuturetrendsinwaterusesandsupplies.Thehistoricalwater

Page 27: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 24

budgetwillbecalibratedagainsthistoricalgroundwaterelevationdatatoensureitsrelativeaccuracyforuseasabasin-widetool.Climatechangeanditspotentialimpactsonthewaterbudgetwillalsobeaddressed.Thesustainableyieldwillbediscussedintermsofthebasin’sshallowunconfinedaquiferwithitsregularcyclesofdischargeandrecharge.

4.2.3ConceptualGroundwaterModel(0%Complete)Thistaskincludesdeveloping,anddescribingintheGSP,aconceptualgroundwatermodel.Themodelwillbuildoffofasimpleexistinggroundwatermodel,andintegratethenewdatadevelopedinTask2,including:estimatesoflandscapeirrigationviainfraredimagery,estimatesofnaturalhabitatevapotranspiration,dataloggerhydrographs,thecomparisonanalysisofwateryears2011and2017,SanAntonioCreekandVenturaRiverinflowdata,historicwet/drystreamreachdata,andCasitasSpringssurfaceflowmonitoringdata.

The“ConceptualGroundwaterModel”sectionoftheplanwillsummarizeexistinggroundwatermodelspreparedandusedin thepast,andthosecurrently indevelopment.Itwillincludeaclear,qualitative,descriptionofthegroundwateranditsflowinthebasin,thebestavailableinformationregardingsurfacewater-groundwaterinteraction,sustainableyield,andfuturegroundwaterconditionprojections.Itwillincludemapsofthebasin’sphysicalcharacteristics,geologiccross-sectiondiagrams,andphotosofassociatedsurfaceflowconditions.

TheconceptualgroundwatermodelwillformthebasisoftheGSPuntilsuchtimeasrelevantnewdatabecomesavailable,suchasfromthenumericalsurfacewater-groundwatermodelbeingdevelopedbySWRCB.

4.3StakeholderInvolvement,CoordinationwithSWRCB&DraftReviews(0%Complete)Thistaskinvolvescoordinationwithstakeholdersthroughoutthechapter’sdevelopment,andcoordinatingwithSWRCBontheirsurfacewater-groundwatermodelingeffortasitappliestothechapter.CommentsonthepreliminarydraftofChapter2willbesoughtfromtheStakeholderAdvisoryCommitteeandUVRGABoardandthedraftupdated.Additionally,becausetheconceptualgroundwatermodelissofoundationaltotheGSP,anditsfindingscoulddirectlyimpactstakeholders,aspecialpublicmeetingwillalsobeheldtoaddressthisoneelementofGSP.

ThereviseddraftofChapter2willbepostedonUVRGA’swebsiteforaccessbythepublic.

Deliverables:Draftof“Chapter2:PlanAreaandBasinSetting.”

Task5.GSPChapter3:SustainableManagementCriteria

5.1SustainabilityGoal(0%Complete)InthissectiontheUVRGA’sbasin-specificdefinitionofsustainabilitywillbedeveloped.Includedwillbeadescriptionofhowthegoalwasestablished,andhowitislikelytobeachievedwithin20yearsofplanimplementationaswellasmaintainedthroughtheplanningandimplementationhorizon.

5.2UndesirableResults(0%Complete)AsdiscussedintheintroductiontothisWorkPlan,ofthesixundesirableresultsidentifiedbytheState,theissueofsurfacewater-groundwaterinterconnectionisofprimaryconcerngiventhecharacteristicsoftheUpperVenturaRiverBasin.Depletionofsurfacewaterinthe“livereach”oftheriver,which,unlikemostoftherestoftheriveroverthebasingenerallystaysperenniallywet,isapotentialundesirableresultthatmayaffectbiologicalresourcesandotherbeneficialuses.However,inthissectioneachofthesustainabilityindicatorswillbeevaluatedtodeterminethepotentialforundesirableresults.Thedataandrationalefordeterminingifanindicatorwillnotproduceundesirableresultswillbepresented.Forindicatorsthatmayproduceundesirableresults,theindicatorandpotentialthreatswillbedescribed.

5.3MinimumThresholds(0%Complete)Thissectionwillincludeadescriptionofeachminimumthresholdandhowtheywereestablishedforeachrelevantsustainabilityindicator;therelationshipbetweeneachsustainabilityindicator;adescriptionofhowminimumthresholdshavebeenselectedtoavoidcausingUndesirableResults;adescriptionofhowminimumthresholdsmay

Page 28: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 25

affecttheinterestsofbeneficialusesandusers,standardsrelatedtosustainabilityindicators,andhoweachminimumthresholdwillbequantitativelymeasuredforeachrelevantsustainabilityindicator.

5.4MeasurableObjectives(0%Complete)MeasurableobjectiveswillbedevelopedtotrackandevaluatetheprogresstowardsachievingtheGSPssustainabilitygoals.Measurableobjectivedescriptionswillincludehowthemeasurableobjectiveswereestablishedforeachrelevantsustainabilityindicator,whowillbeinvolvedintheobjective,whatthedesiredoutcomeis,andthemetricsthatwillbeusedtoverifyprogress.Milestonesthatarequantitativeandmeasurablewillbedevelopedforfiveyears,10years,and15yearsafterGSPimplementation.

5.5MonitoringNetwork(25%Complete)Thissectionwillprovideacomprehensivecharacterizationofthemonitoringnetworkinthebasin.ThischaracterizationwillcomplywiththespecificrequirementsdetailedintheWaterCode,includingadescriptionofthemonitoringnetwork,monitoringprotocolsfordatacollectionandmonitoring,representativemonitoring,andanassessmentoftheneedforimprovementofthemonitoringnetwork.

TheUVRGArecentlyinstalleddataloggersinasixkeywellstoestablishawellmonitoringnetwork.Thesewellsarespacedalongbasin,givegoodcoverageofthebasin,andallhavelong-termrecords.Thedataloggersnowproducereadingsevery90minutes.Newsupplementalsurfacewatermonitoringisalsoplanned.Themonitoringnetworkwillbeevaluatedandadditionalmonitoringwilloccurasneedarisesthroughadaptivemanagement.

5.6StakeholderInvolvement,CoordinationwithSWRCB&DraftReviews(0%Complete)Thistaskinvolvescoordinationwithstakeholdersthroughoutthechapter’sdevelopment,andcoordinatingwithSWRCBontheirsurfacewater-groundwatermodelingeffortasitappliestothechapter.CommentsonthepreliminarydraftofChapter3willbesoughtfromtheStakeholderAdvisoryCommitteeandUVRGABoardandthedraftupdated.

Deliverables:Draftof“Chapter3:SustainableManagementCriteria.”

Task6.GSPChapter4:ProjectsandManagementActions

6.1ProjectsandManagementActions(0%Complete)Thistaskfocusesondescribingspecificprojectsandmanagementactions(projects)designedtomeetGSPobjectivesandachievesustainabilitywithin20yearsofplanimplementation.Projectswillincludebothcurrentandplannedprojects,aswellaslocalandregionalprojects.

Projectdescriptionswillincludehowtheprojectwillbeaccomplished,thetimingofimplementation,estimatedcosts,andpotentialdifficulties.PotentialprojectswillbeanalyzedbasedonthemeasurableobjectivesdevelopedinChapter3,theabilitytoimplement,andotherfactors.

6.2StakeholderInvolvement,CoordinationwithSWRCB&DraftReviews(0%Complete)Thistaskinvolvescoordinationwithstakeholdersthroughoutthechapter’sdevelopment,andcoordinatingwithSWRCBontheirsurfacewater-groundwatermodelingeffortasitappliestothechapter.CommentsonthepreliminarydraftofChapter4willbesoughtfromtheStakeholderAdvisoryCommitteeandUVRGABoardandthedraftupdated.

Deliverables:Draftof“Chapter4:ProjectsandManagementActions.”

Task7.GSPChapter5:PlanImplementation

7.1ImplementationSchedule,Costs,Reporting&Evaluations(0%Complete)Thistaskinvolvesdescribingtheapproach,schedule,andapproximatecostsofimplementingtheplan.Strategiesforobtainingfundingwillbeoutlined. Effortsrequiredandspecificresponsibilitiesforimprovingdataandforrefiningthe GSP's uncertaintiestomanageable levelswill be identified.

Page 29: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 26

Aplanforcomplyingwiththeannualreportingrequirementwillalsobepresented.Theplanwillincludeamonitoringplanforhydrologicparametersincludingwaterlevels(andhistorichydrographs),groundwaterextractionsandmethodsofmeasurement,waterquality,surfacewatersupplyanduse,climatedatafortheyear,changesingroundwaterstorage,andotherparametersasrequiredbytheregulations.UVRGA’sprocessforcomplyingwiththerequirementforperiodicevaluationsbyDWRwillalsobedescribed.

7.2AdaptiveManagement(0%Complete)Thissectionwilladdresshowtheplanninggoals,objectives,and/oractionsoftheUVRGA’sGSPmaybefurtherdeveloped,modified,orreplacedbasedonthediscoveryofnewknowledgeinresponsetochangingphysicalconditionsorreductionofuncertainty.Thissectionwillspecifyaframeworkforapplicationofadaptivemanagementstrategiestocorrectchangestoprojectedoutcomes.Identificationoffuturedataneedswillbeincludedinthissection.

7.3StakeholderInvolvement(0%Complete)ThissectionwilldescribeUVRGA’splansforkeepingstakeholdersinformedandengagedonanongoingbasisastheyimplementtheGSP.Thiswillincludestakeholderinvolvementinthedecision-makingprocess,andthemeansbywhichUVRGAwillkeepthepublicinformedonGSPimplementationprogress.

7.4StakeholderInvolvement&DraftReviews(0%Complete)Thistaskinvolvescoordinationwithstakeholdersthroughoutthechapter’sdevelopment.CommentsonthepreliminarydraftofChapter5willbesoughtfromtheStakeholderAdvisoryCommitteeandUVRGABoardandthedraftupdated.

Deliverables:Draftof“Chapter5:PlanImplementation.”

Task8.GSPIntroduction,ExecutiveSummaryReferences&Appendices(0%Complete)

ThistaskinvolvesresearchingandwritingtheGSP’s“Introduction”chapter.TheIntroductionwillsummarizethevariouschaptersoftheplan,andwillhaveoverviewsectionsincluding:thepurposeoftheplan,theUVRGA’ssustainabilitygoal,theUpperVenturaRiverGroundwaterAgency(itshistory,members,decision-makingprocess,andfunding),theplanningprocess,andpublicandpartnerinvolvement.

Thistaskalsoinvolvespreparingthedocument’sReferencesandAppendices,andExecutiveSummary.Appendixinformationwillinclude:contactinformationforplanmanagerandtheUVRGA’smailingaddress,alistofpublicmeetings,thecommentsandresponsesreceivedduringtheGSP’s90-daypublicreviewperiod,conceptualgroundwatermodeldocumentation,andothertechnicaldocumentation.

Reviewofthesechaptersandelementsoftheplanwilloccuraspartoffinalplanreview(seeTask9).

Deliverables:Draftsof“Chapter1:Introduction,”“ExecutiveSummary,”“References,”and“Appendices.”

Task9.GSPReviewsandApprovalsandPreparationofFinalDocument(0%Complete)

ThistaskinvolvespreparingapreliminaryfinalGSPdocument,ensuringthatallinformationrequiredbytheSGMAlegislationisaddressed.ThepreliminaryfinaldraftwillbereviewedbytheStakeholderAdvisoryCommittee,andafterbeingupdatedinresponsetotheircomments,thedraftwillbepresentedtotheUVRGABoard.OnceapprovedbytheBoard,thedraftfinalGSPshallbepostedontheUVRGA’swebsiteanda90-daypubliccommentperiodinitiated.Duringthe90-daypubliccommentperiod,apublicmeetingwillbeheldtoanswerquestionsregardingthedraftfinalGSP.Allstakeholdercommentsreceivedduringthe90-daycommentperiodandresponsestothesecommentswillbedocumented.

AfteronemoreroundofmeetingswiththeStakeholderAdvisoryCommitteeandUVRGABoardtoreviewrevisionsmadeinresponsetocomments,thefinalGSPwillbesubmittedtotheBoardforapproval.AfterreceivingapprovalfromtheBoard,thefinalGSPwillbesubmittedtoDWRandpostedonUVRGA’swebsite.

Deliverables:FinalGSP.

Page 30: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 27

Task10.ProjectManagement&Reporting(0%Complete)

Thistaskinvolvesgeneralgrantprojectmanagementandcoordinationactivities,includingsettingupaprojectexecutionstrategy;contracting;settingupfinancialtrackingsystems;preparinggrantprogressandfinalreports;cost,budget,andscheduletracking;invoicing;teammeetings;andcoordinationwithDWR.InadditiontoattendingtheUVRGABoardmeetingsaspartofGSPtasksdescribedabove,theprojectmanagermayalsobeaskedtoattendorprovideupdatesatotherboardmeetingsoverthecourseoftheproject,aswellastoattendotherrelevantmeetingswithpartnerorganizationsorregulatoryagencies.Theprojectmanagerwillalsomaintainadatamanagementsystem.

Deliverables:Requiredgrantreports.

Page 31: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 28

PermissionLetters

LettergrantingpermissiontousepropertyforinstallationofSanAntonioCreekconfluencemonitoringwell.

[insertHarrisonletter]

Page 32: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 29

LettergrantingpermissiontousepropertyforaccesstoSanAntonioCreekconfluencemonitoringwell.

Page 33: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 30

Attachment 5. Budget

ProjectBudgetUpperVenturaRiverGroundwaterSustainabilityAgencyandPlanProjectservesaneedofaDAC?:YesCostShareWaiverrequest?:No

Tasks

(a) (b) (c) (d)

RequestedGrant

Amount

CostShare:Non-StateSource1

OtherCostShare

TotalCost

1 GSADevelopment&Support 1.1StakeholderEngagement $- $26,258 $26,258 1.2BasinBoundaryModification $- $24,410 $24,410

1.3FormJointPowersAuthorityandGroundwaterSustainabilityAgency

$1,080 $240,190

$232,410

2 NewDataCollection&TechnicalAnalyses 2.1EstablishWellMonitoringNetworkinKeyWells $26,850 $6,997 $33,847 2.2HistoricWet/DryStreamReachData $15,680 $4,300 $19,980 2.3IrrigationEstimateviaInfraredAerialImagery $370 $20,550 $20,920 2.4ComparisonAnalysisofWaterYears2011and2017 $19,865 $13,100 $32,965 2.5SanAntonioCreekInflowMonitoring $41,540 $2,800 $44,340 2.6VenturaRiverInflowMonitoring $7,940 $2,800 $10,740 2.7CasitasSpringsSurfaceFlowMonitoring $12,525 $2,800 $15,325 2.8WellInventoryDatabase $24,370 $7,480 $31,850 2.9NaturalHabitatEvapotranspirationAnalysis $7,940 $2,800 $10,7402 GSPPlanning $12,840 $46,546 $59,3864 GSPChapter2:PlanAreaandBasinSetting 4.1DescriptionofPlanAreas 4.1.1RegionalContext $1,330 $2,920 $4,250

4.1.2WaterResourcesMonitoringandManagement

Programs $2,090 $2,152 $4,242

4.1.3LandUseandWaterResourcesPlansandPolicies $1,490 $1,768 $3,258 4.2BasinSetting 4.2.1CurrentandHistoricalGroundwaterConditions $4,075 $3,304 $7,379 4.2.2WaterBudget $10,500 $4,000 $14,500 4.2.3ConceptualGroundwaterModel $17,425 $5,152 $22,577

4.3StakeholderInvolvement,Coordw/SWRCB&DraftReviews

$8,910 $5,900 $14,810

5 GSPChapter3:SustainableManagementCriteria 5.1SustainabilityGoal $6,980 $3,000 $9,980 5.2UndesirableResults $59,160 $2,800 $61,960 5.3MinimumThresholds $37,470 $2,800 $40,270 5.4MeasurableObjectives $12,200 $3,800 $16,000 5.5MonitoringNetwork $10,100 $4,336 $14,436

5.6StakeholderInvolvement,Coordw/SWRCB&DraftReviews

$19,800 $12,000 $31,800

Page 34: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 31

6 GSPChapter4:ProjectsandManagementActions 6.1ProjectsandManagementActions $26,320 $2,480 $28,800

6.2StakeholderInvolvement,Coordw/SWRCB&DraftReviews $16,180 $6,440 $22,620

7 GSPChapter5:PlanImplementation 7.1ImplementationSchedule,Costs,Reporting&Evaluations $8,680 $1,000 $9,680 7.2AdaptiveManagement $1,330 $1,000 $2,330 7.3StakeholderInvolvement $825 $1,000 $1,825 7.4StakeholderInvolvement&DraftReviews $6,730 $3,940 $10,670

8 GSPIntroduction,ExecutiveSummary,References&Appendices

$8,665 $588 $9,253

9 GSPReviewsandApprovalsandFinalDocumentPrep $21,640 $8,440 $30,08010 ProjectManagement&Reporting $40,180 $54,720 $94,900 TOTALS $493,080 $525,711 $1,018,791

1Sourcesoffunding:1)UpperVenturaRiverGroundwaterAgencyJPABoardmembersandagencies(CountyofVentura,CityofVentura,CasitasMunicipalWaterDistrict,MeinersOaksWaterDistrict,andVenturaRiverWaterDistrict)forin-kindstafftime,andadministrative,outreach,legal,andhydrogeologicalexpertisecosts;2)otherUpperVenturaRiverGroundwaterAgencyBoardmemberin-kind-stafftime.

Page 35: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 32

BudgetNarrative

Thetotalprojectbudgetis$1,018,791,with$493,080inrequestedgrantfunds.

Thebudgetincludesaslocalcostshareexpensesfortechnical,administrative,andgovernanceworkalreadyconductedaspartofGSAformation,beginninginJanuary2016.Thecostshareforpastworkamountsto$290,711.Theremaining$235,000incostsharewillbemetthroughthecontributionoflegal,administrative,andGISexpenses,alongwiththein-kindstafftimefromUVRGAmemberagenciesandBoardmembers.Giventhatthesecostshareexpenseswillbefairlyevenlyspacedoverthefour-yeartermofthegrant,meetingthisobligationiswellwithintheUVRGA’scapacity.

EstimatedcostsinthebudgetarebasedontheexperienceofUVRGABoardmembers,theagency’shydrogeologistconsultant,andreviewofworkplansandbudgetsofothergroundwatermanagementplanningefforts.

Everyefforthasbeenmadetoberealisticinestimatingthecoststhatwillberequiredtocompletetheproject.AsstatedaboveintheSchedulesection,thisisalong-termproject,apotentiallycontroversialproject,andthefirstattemptatmeetingaveryambitioussetofnewStaterequirements.Unforeseencostswillcertainlyarise.GivenwhatisknownatthistimeabouttheGSPmandate,theestimatedcostsarebelievedtobesufficient.

BudgetDetailTable1belowsummarizestheprojectbudgetbythemainprojectobjectives,plusprojectmanagement.

BudgetDetailTable1

Tasks %ofTotalCost TotalCost

Task1 GSADevelopment&Support 28.2% $287,698Task2 NewDataCollection&TechnicalAnalyses 21.7% $220,707

Tasks3-9 GSPDevelopment 40.5% $415,486Task10 ProjectManagement&Reporting 9.3% $94,900

TOTAL $1,018,791

BudgetDetailTables2and3belowsummarizeprojectcostsbycategory.Asshown,consultant,staff,andotherlaborcostscomprisethemajorityofthebudget.

BudgetDetailTable2

Labor/ConsultantType Rate %ofTotalLaborCost

TotalLaborCost

Hydrogeologist $200-240/hr 30.1% $298,770GSAMemberAgenciesandBoardMembers $100/hr(avg) 22.5% $223,621LegalServices $325-565/hrdependingonissue 15.5% $153,987ProjectManager/Hydrogeologst $185/hr 10.6% $106,560AdministrativeSupport $35/hr 8.0% $79,148Writing/Editing&Graphics $60-80-/hr 6.9% $68,040OutreachCoordinator $80/hr 2.6% $25,600WebsiteCreation/Maintenance $60/hr 1.4% $13,886InfraredImageryConsultant Perflight 1.4% $13,750GISTechnician $96/hr 0.9% $8,832 TOTAL 100.0% $992,194

Page 36: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 33

BudgetDetailTable3

OtherCostCategories Rate TotalCost

CapitalCosts Drillingonemonitoringwell $10,000Surfaceflowmonitoringequipment $2,000Sixdataloggers(monitoringnetwork) $4,197 Rent&utilities(fractionallocatedtoGSP) $200/mo.For52months. $10,400

TOTAL $26,597

Page 37: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 34

Attachment 6. Schedule

AschedulefortheUpperVenturaRiverGroundwaterSustainabilityAgencyandPlanProjectisprovidedbelowandgraphicallyinattachmentAtt6_2017SGWPC2_Schedule_2of2.ThetasksshownareconsistentwiththetasksintheprojectWorkPlanandBudget.

Workontheprojecthasbeenunderwaysince2015.ThisincludesmostoftheeffortinvolvedinformationoftheGSA.DevelopmentofaGSP⎯theprimarygoaloftheproject⎯isscheduledforcompletionbyDec31,2021.

EstimateddatesarebasedontheseasonedexperienceofUVRGABoardmembers,theagency’shydrogeologistconsultant,andtherecentlyhiredGSPprojectmanager.Thesearepeoplewithextensiveknowledgeofthebasin,thewatershed,thelocalwatermanagementplayers,andtheavailabletechnicaldata,publications,andotherrelevantresources.Thescheduleisalsobasedonprecursorydatacollectiontasks,explainedintheWorkPlan,specifictotheprojectandoccurringorplannedpriortohavingatheprojectstartdate.

Theproposedscheduleisbelievedtoberealistic,reasonable,andaccomplishable.Atthesametime,itisunderstoodthatoverthecourseofafour-yearproject,theremaybeunforeseenscheduledelays,especiallygiventhepotentiallycontroversialnatureofestablishinggroundwatermanagementwherenoneexistedbefore.Additionally,DWRisstilldevelopingsomeofthecriteriathatmustbeusedinplandevelopment,whichmeansthatassumptionshadtobemadewithregardtotheseexternalfactors.Toaddressthiscontingency,thescheduleisgenerouswiththeassumptionoftimepertask.

KeyScheduleDependencies

CompletingtheComparisonAnalysisofWaterYears2011and2017reportisdependentupondatacollectedinTasks2.1,2.2,and2.3.

Creatinganupdatedconceptualgroundwatermodelandwaterbudget(partofTask4)isdependentuponcollectingandanalyzingnewdata(Task2).Notethatdatamonitoringwillcontinuethroughouttheproject,andgroundwatermodelandwaterbudgetassumptionswillcontinuetobecalibratedagainstnewdata.

Developingappropriatesustainabilitycriteria(Task5)andmanagementactions(Task6)aredependentupontheimprovedgroundwatermodelandwaterbudget(Task4).

PlandevelopmentTasks3,4,5,6,7,8,and9arealsogenerallysequentialinnature,withthedataandinformationdevelopedineachprecedingTaskneededforcompletionofthenextTask.

ScheduleDetailTable–Start/CompleteDatesTask TasksSchedule Start Complete1 GSADevelopment&Support 01-2016 06-2018 1.1StakeholderEngagement 01-2016 06-2018 1.2BasinBoundaryModification 01-2016 06-2016 1.3FormJPAandGSA 01-2016 06-2018

2 NewDataCollection&TechnicalAnalyses 04-2016 12-2021 2.1Establish/AnalyzeDataFromWellMonitoringNetwork 04-2016 12-2021 2.2HistoricWet/DryStreamReachData 01-2017 03-2018 2.3IrrigationEstimateviaInfraredAerialImagery 07-2017 03-2018 2.4ComparisonAnalysisofWYs2011&2017 04-2016 06-2018 2.5SanAntonioCreekInflowMonitoring 01-2018 12-2021 2.6VenturaRiverInflowMonitoring 01-2018 12-2021

2.7CasitasSpringsSurfaceFlowMonitoring 01-2018 12-2021 2.8WellInventoryDatabase 01-2018 06-2021 2.9NaturalHabitatEvapotranspirationAnalysis 04-2018 12-20183 GSPPlanning 04-2017 06-2018

Page 38: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 35

Task TasksSchedule Start Complete4 GSPChapter2:PlanAreaandBasinSetting 01-2018 06-2021 4.1DescriptionofPlanArea 01-2018 09-2019 4.2BasinSetting 01-2018 09-2019 4.3StakeholderInvolvement,Coordw/SWRCB&DraftReviews 04-2019 09-2019

5 GSPChapter3:SustainableManagementCriteria 07-2018 03-2020 5.1SustainabilityGoal 07-2018 03-2020 5.2UndesirableResults 07-2018 03-2020 5.3MinimumThresholds 07-2018 03-2020 5.4MeasureableObjectives 07-2018 03-2020

5.5MonitoringNetwork 07-2018 03-2020 5.6StakeholderInvolvement,Coordw/SWRCB&DraftReviews 03-20206 GSPChapter4:ProjectsandManagementActions 10-2019 09-2020 6.1ProjectsandManagementActions 10-2019 09-2020 6.2StakeholderInvolvement,Coordw/SWRCB&DraftReviews 04-2020 09-20207 GSPChapter5:PlanImplementation 01-2020 03-2021 7.1ImplementationSchedule,Costs,Reporting&Evaluations 01-2020 03-2021

7.2GSA&StakeholderReviewofDraft&CommentsIntegrated 10-2020 03-20218 GSPIntroduction,ExecutiveSummaryReferences&Appendices 10-2019 03-20219 GSPReviewsandApprovals 04-2021 12-202110 ProjectManagement&Reporting 01-2018 03-2022

SeetheWorkPlanDeliverables/MilestonestableintheWorkPlanforasummaryofmilestonesbydate.

Page 39: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 36

Attachment 7. New Data Collection Maps

NewWellMonitoringNetworkMap(Task2.1)

Page 40: Prop 1, Sustainable Groundwater Planning Grant Program Grant … · 2017. 8. 21. · Sustainability Plan (GSP) include: 1) Form the Groundwater Sustainability Agency (GSA) for the

DRAFT:UpperVenturaRiverGroundwaterSustainabilityAgencyandPlan 37

NewInflowandSurfaceFlowMonitoringLocationsMap(Tasks2.5–2.7)