  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    1/23

    MONTROSE AND CLARENDON

    A DEVELOPMENT of JDL DEVELOPMENT, LLCand

    THE HARLEM IRVING COMPANIESNovember 25, 2013

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    2/23

    PROPERTY

    N

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    3/23

    SITE PLAN - ENTIRE PROJECT

    N

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    4/23

    SITE PLAN - SOUTH PARCEL

    N

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    5/23

    Montrose and ClarendonBuilding Details

    Total Units - 749 (860)

    A. South Building - 499 (690)

    B. North Building - 250 (152)

    Total Parking - 554 (733)

    A. South Building - 451(660)

    B. North Building - 103 (73)

    Commercial Space - 26,000 Sq. Ft.

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    6/23

    SOUTH BUILDING

    Montrose and ClarendonUNIT MIX

    A. Studios - 20 (50)

    B. Convertible Studios - 76 (100)

    C. One Bedroom - 322 (414)

    D. Two Bedroom - 67 (117)

    E. Three Bedroom - 14 (9)

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    7/23

    NORTH BUILDING

    Montrose and ClarendonUNIT MIX

    A. Studios - 10 (10)

    B. Convertible Studios - 64 (40)

    C. One Bedroom - 161 (85)

    D. Two Bedroom - 15 (9)

    E. Three Bedroom - 0 (8)

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    8/23

    PARK PLAN - 4th Floor Roof

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    9/23

    TYPICAL FLOOR - South Tower

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    10/23

    260 (358)

    156 (107)

    EAST ELEVATION - North and South Buildings

    44 (38)

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    11/23

    260 (358)

    SOUTH ELEVATION - South Building

    Pocket Park

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    12/23

    NORTH ELEVATION - South Building

    205 Setback (100)

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    13/23

    WEST ELEVATION - North and South Buildings

    Green Screen

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    14/23

    WEST ELEVATION - North and South Buildings

    Green Screen

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    15/23

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    16/23

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    17/23

    ONE-WAY TRAFFIC

    W. SUNNYSIDE AVE.

    117.05' P.L.

    269.9

    9'P.L.

    269.9

    7'P.L.

    24'-0"PUBLICALLEY

    EXISTING

    FOURSTORY

    BUILDINGN.I.C.

    EXISTING

    FOURSTORY

    BUILDINGN.I.C.

    EXISTINGFOUR

    STORY BUILDING

    N.I.C.

    EXISTINGFOUR

    STORY BUILDING

    N.I.C.EXISTING

    FOUR

    STORY

    BUILDING

    EXISTING

    FOUR

    STORY

    BUILDING

    N.I.C.

    EXISTING

    FOUR

    STORY

    BUILDING

    N.I.C.

    EXISTINGFOURSTORY BUILDING

    N.I.C.

    EXISTING

    FOUR

    STORY

    BUILDING

    N.I.C.

    EXISTINGTHIRTEEN

    STORY BUILDINGN.I.C.

    EXISTINGFOURSTORY

    BUILDINGN.I.C.EXISTINGFOURSTORY

    BUILDINGN.I.C.

    117.05' P.L.

    269.9

    9'P.L.

    269.9

    7'P.L.

    LOADING

    PARKING

    GARAGE

    ENTRY

    RAMP UP

    [6'-6"]

    RAMPUP6%

    STORAGE

    TRASH

    RESIDENTIALLOBBY

    48 PARKING

    SPACES

    BICYCLEPARKING

    LOADING

    ENTRY

    MECHANICAL/

    STORAGE

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    18/23

    323.42' P.L.

    439.54' P.L.

    140.0

    8'P.L.

    2640

    8'PL

    124.0

    0'P.L.

    118.00' P.L.

    198 PARKING

    SPACES

    RAMP DN

    STAIR

    1

    STAIR 3

    STAIR 4

    STAIR 5STAIR

    2

    UNIT 05TOWNHOUSE1,500 SF TOTAL

    UNIT 06TOWNHOUSE1,500 SF TOTAL

    UNIT 07TOWNHOUSE1,500 SF TOTAL

    UNIT 08TOWNHOUSE1,500 SF TOTAL

    UNIT 14TOWNHOUSE1,800 SF TOTAL

    UNIT 04TOWNHOUSE1,500 SF TOTAL

    UNIT 03TOWNHOUSE1,500 SF TOTAL

    UNIT 01TOWNHOUSE1,500 SF TOTAL

    UNIT 02TOWNHOUSE1,500 SF TOTAL

    UNIT 10TOWNHOUSE1,500 SF TOTAL

    UNIT 11TOWNHOUSE1,500 SF TOTAL

    UNIT 12TOWNHOUSE1,500 SF TOTAL

    UNIT 13TOWNHOUSE1,500 SF TOTAL

    UNIT 09TOWNHOUSE1,500 SF TOTAL

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    19/23

    323.42' P.L.

    439.54' P.L.

    140.0

    8'P.L.

    2640

    8'PL

    124.0

    0'P.L.

    118.00' P.L.

    UNIT 101BR

    760 SF

    UNIT 051BR

    750 SF

    UNIT 071BR

    750 SF

    UNIT 061BR

    750 SF

    UNIT 041BR

    790 SF

    UNIT 081BR

    850 SF

    UNIT 111BR

    890 SF

    UNIT 121BR

    780 SF

    UNIT 02STUDIO

    500 SF

    UNIT 012BR

    1,230 SF

    UNIT 031BR

    740 SF

    UNIT 241BR

    820 SF

    UNIT 22STUDIO560 SF

    UNIT 211BR

    790 SF

    UNIT 23STUDIO

    560 SF

    UNIT 09STUDIO

    510 SF

    UNIT 202BR

    970 SF

    UNIT 191BR

    790 SF

    UNIT 131BR

    860 SF

    UNIT 14STUDIO

    510 SF

    UNIT 151BR

    760 SF

    UNIT 181BR

    760 SF

    UNIT 162BR

    900 SF

    UNIT 17

    1BR810 SF

    STAIR 3

    STAIR 5

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    20/23

    SCALE: 1" = 20'

    NORTH ELEVATION

    Montrose and ClarendonNovember 25, 20Chicago, IL

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    21/23

    SCALE: 1" = 20'

    EAST ELEVATION

    Montrose and ClarendonNovember 25, 20Chicago, IL

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    22/23

    SCALE: 1" = 20'

    SOUTH ELEVATION

    Montrose and ClarendonNovember 25, 20Chicago, IL

  • 8/13/2019 Proposal by JDL Properties to replace historic Cuneo Hospital, Nov. 25, 2013

    23/23

    SCALE: 1" = 20'

    WEST ELEVATION

    Montrose and ClarendonNovember 25, 20Chicago, IL