Date post: | 10-Feb-2018 |
Category: |
Documents |
Upload: | syed-ashique-hussain-hamdani |
View: | 220 times |
Download: | 0 times |
of 48
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
1/48
Sovereign Track Infrastructure Development Company
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
2/48
SOVEREIGN TRACK CORPORATION
Syed Ashique Hussian Hamdani
CEO
SOVEREIGN TRAC CORPORATION
NTN; 2681701-2
Email. [email protected]
Account: United Bank LimitedAccount No. 212104958. Branch Code0212(Main branch Rawalpindi Pakistan)Mob. +923450511960, +923121867948
Project Finance, Investment, Construction, Trade, Industrial Machinery, Chemicals and Mineral Supplies,Petroleum Products and Lubricants, Corporate Services, Worldwide Free Zones, Industrial and CommercialReal Estate, Media, Logistic Services
Haji Mohammad Arif Malik
Director (Department of
Logistic, Land Development,
Real Estate, Construction
Projects)
Cell +923121867947
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
3/48
Company Vision Establishing a company to bring innovated construction
technologies of insulated concrete forms, green energy,
water purifications, wastage management in Pakistan
for prosperous and healthiest life.
Constructing and developing special economic zones,
industrial zones, high-rise residential and commercial
buildings, logistic terminals, infrastructure projects
Benchmarking against international & national
standards, ensuring induction of best practices and
efficiencies towards implementation
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
4/48
Company Objectives To develop world-class construction and engineering
infrastructure development company for economic growth and
quality living
To create synergistic development opportunities with Federal,
Regional & Local Governments, foreign inventors and the
Private Sector
To undertake bankable project development, from concept to
commissioning stage
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
5/48
Company Approach Creation of a Business Plan of the opportunities:
Collaborate with Federal, provincial, regional and Local Government and its
Agencies to address infrastructure needs
Introduce rigorous project development to successfully commercialize private
sector led projects Engage in infrastructure enabling policy formulation
Assist in obtaining funds during project development and implementation
Sourcing innovative technologies in contraction, energy, waste management,
clean water
Techno-Economic Feasibility Studies, Financial Structuring Government Approval and Clearance Processes : Steering Committee,
Infrastructure Authority
Bid Documentation & Procurement Process for PSP: Marketing & Facilitation
role
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
6/48
Company Strength 10 Acres land located near to New Benazir Bhutto
International Airport Islamabad (Market Value: Rs. 24Million)
Commitment of 50,000 Acres along with Motorway(M1,M2)/GT Road
Pan sector knowledge, geographic presence, strongunderstanding of policies processes & marketpenetration
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
7/48
Special Economic Zone
According with Special Economic Zone Act 2012, Pakistan allows to establish Special EconomicZone on publicPrivate Partnership basis if the applicants owns a minimum land of 50 Acresand complying with technical and infrastructural requirement
Incentives once granted to an investor could not be withdrawn due to conflict of interests
Investors from a number of countries were eyeing enactment of law by the parliament to legally
protect their investments.
Economic zones would be created on the basis of public-private partnership
Local investors equally qualify to create special economic zones, and in this connection,chambers of commerce will also be contacted.
SEZs will enjoy a 10-year exemption from custom duties and taxes for all capital goods importedinto Pakistan for the development, operations and maintenance.
Exemption from all taxes on income accruable in relation to the development and operations ofthe SEZs will start from the date of signing of the development agreement.
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
8/48
Project: Logistic Terminal
Project Features
2000 Kinal land is available to construct sate of the art logistic terminal in JV
with Chinese and Afgan companies at Burhan Interchange Motorway M1,
linking with KKH, GT Road on the cross road links to China, Afghanistan,
Pakistans Seaports: Karachi, Gwadar
Project Status
Willingness of landowners to join the project on equity basis
Technical & Engineering Consultants are available
Company Role Company will undertaking entire, ownership and project development
activities
The scope interalia include; Technical studies, financial structuring, bid
process management, transaction advisors for financial closure
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
9/48
SEZ Logistic
Terminal Project Location:
Hasanabdal Pakistan.
Kashghar GwadarRoad/Railway trackjunction to China,
Afghanistan, Indiaand Indian Oceanseaports
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
10/48
SEZ Logistic Terminal; Key StrengthSEZ Project will create suitable economic growth, development and
opportunities:-
1. Residential zone: High-rise 40+stories tower buildings
2. Industrial Zone: Industrial production and assembling opportunities for local
and foreign investors
3. Commercial Zone: Commercial, financial and business services, outsourcing,
training, IT, and other soft industries, scientific and technological research
and development, media, event industry, outsourcing, trade center
4. Logistic & travelling Zone: Trans-Asia logistic, cargo, shipment hub for
product local and foreign industries from Pakistan, China, Central Asia,
Afghanistan, India and Integra Kashmir Transit Trade
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
11/48
ICF Prefab
ConstructionIndustrial and commercial age today needs anenvironmentally friendly construction becauseof the desire to reduce CO2 emissions, saveenergy resources, provide aesthetically pleasingand healthy surroundings and at the same timeminimize waste, durability, safety and
aesthetical living. and aesthetical living.Insulating Concrete Blocks ICB prefab buildingtechnologies, fortunately is capable to servewithh folowing chacteststics :-
Environmental Friendly
Ecological, Healthy
Comfortable
Economical,
Durable,
Safe
Easy Installation
Efficiency (Time, Management and Money!)
Energy Savings
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
12/48
DOMESTIC SEWAGE BIOLOGICAL
TREATMENT PLANTS Activated sludge aeration plants for
fine biological purification of sewagewith complete oxidation are
comprised of single-supporting tankmade of monolithic propylene. Theplant operation is completelyautomated and does not requiredaily maintenance.
The biological wastewaterpurification stations offer thefollowing advantages: Stationconnection within three hours-Smellabsence, Easy to assemble both inon and in-ground variants
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
13/48
Solar Water purification Drinking water by means of solar water desalination,
filters used in our WTPs removes iron andmanganese, decrease water hardness and softenwater; UV lamps remove bacteriological pollutantsand viruses.
Water is the most important part of our life. Ourreverse osmosis systems are easy to operate and canprovide both home and industry with potable water.
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
14/48
Hybrid Green Energy Systems combining wind, solar andDG sets to generate energy
integrated easily with a battery-backup
system that provides security in case ofenergy crisis.
Combining renewable resources hasnumerous positive benefits forhomeowners. Principal among them
are:A.) Increased and consistent energyproduction
B.) Less required space per installation
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
15/48
GAS-PISTON POWER PLANTS Cost-effective and easy-to-maintain, 30KW -
1MW power output, Automation Level I, II,III , run on such fuel types as natural gas,
the pipeline gas, pit methane, associatedpetroleum gas (with 20% minimummethane content, or up to 0.2% maximummass content of hydrogen supplied). Theycost 2.0 - 2.5 times cheaper than the foreign-made ones, thus affording a fast payback of
investment; they are easy to operate andeasy to start; they have a low noise emissionlevel and come in various modifications; fastentry into service, reliability and operationalcost effectiveness.
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
16/48
THE INDUSTRIAL OIL/WATER
WASTE; PURIFICATION SYSTEMS Oily waste (to remove petroleum
products, suspended matter, syntheticsurfactants, oils, fats and [partially]organic impurities);
Storm sewage water from industrialsites, petrol-filling stations, motortransport bases, parking areas,petroleum storage depots;
Wastewaters coming from the rollingstock washing
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
17/48
BIO-TOILET Bio-Toilet is a Membrane Bio-Reactor
System which turns all toilet waste intowater and carbon dioxide.
Systems have already been installed incountry parks hiking trails to replace
the old septic tanks which are all smelly,dirty and never really working right.
The Bio-Toilets are now in many villagesand rural areas also where no sewage
pipes are connected.
Bio-Toilet is economically, technicallyfeasible.
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
18/48
Construction Machinery Mobile Crane's (20 To 380Tons.)
40 Feet Flat Trailer Heavyand Light
Loader Truck 2 XL & 3 XLHeavy Duties Waste Tanker 5000 GLN /
10000GLN Water Tanker 5000 GLN /
10000 GLN
Fuel Tanker, Hi up Truck (2.5 Ton 4 Ton), Pickups (3 Ton To 10 Ton), Boom Loader (15M To 17M),
Shovel (936, 950, 966),Forklift (3 To 7 Ton),Bobcat, Boomlader 537,Boomlader 540, Dozer --D8,Excavator 320, Excavator----330,Excavator---336, Grader 14/,JCB, Shovel -966,Six Weel Truck 32 Meter Cube,Viratory Roller,
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
19/48
Technical Services Interior works gypsum, marble and other works and solution
best architects/ interior designers/ technicians,
Renovation; buildings, flats, hotels, commercial building,
wastage management, aluminum/wooden doors and window,
painting,
electrical installation,
venue structuring and related solutions.
Electro Mechanical, Plumbing & Sanitary, Air-Conditioning, Tiling, Plaster & Block works
Carpentry & Gypsum work,
Portioning
Wall Paper/Painting Contracting and Cleaning Services
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
20/48
Industrial building construction Mechanical installation; Plant, Electronic, Electromechanical,
Environmental Compliance Turbine Installation and commissioning Overhaul and Maintenance Oil and gas construction, Pipe fitting Electrical and Electronic installation MEMS Foundry , PCB Design and Layout OEM Usage In a
Variety Of Industrial sector; textile, mining, drilling, refining,reprocessing, rescaling, agriculture, transportation, medical,aerospace, marine, telecommunications, otherindustrial/commercial and specialty applications,
Coating Services and Finishing Services,
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
21/48
PLUMBING & SANITORY WORKS (PERTAINING TO INTERIOR WORKS), Fresh water &Sanitary line, Sanitary fixtures & accessories
CIVIL WORKS (PERTAINING TO INTERIOR WORKS), Masonry & Plastering (Brick,Aerocon), RCC Works, Screeding, Flooring/Cladding (Granite/Marble/All kinds of tiles)
FABRICATION WORKS, MS structures, Roofing, MS Grills & railings etc, Stainless steelworks
JOINERY WORKS, Partitions (Wood / Gypsum / QED), Paneling, Doors, Custom madefurniture, Storages & cabinets
FALSE CEILING, Modular grid ceiling, Gypsum board ceiling, POP designer ceiling,Metal ceiling, Wooden/glazed ceiling
MODULAR FURNICTURE, Modular work stations, Knock down furniture, Modularstorage units
SEATING SYSTEMS, All kind of chairs, Sofas & other lounge seating systems, Cafchairs
SOFT FURNISHING, Curtains & Blinds, Soft paneling, Wall papers
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
22/48
FLOORING, False flooring, Carpets, Wooden flooring, Granite/Marble/Tiles, Vinyl flooring, Epoxy flooring
PAINTING / TEXTURE, Painting, Polishing/Melamine, Duco finishing, Texture finishing
ELECTRICAL WORKS, Electrical fittings & fixtures, Internal electrification (Lighting/Power outlets/DBs &
Internal Panels/Earthing System/UPS Systems), External electrification (HT Sub-station/Main LTPanels/Earthing System /DG/EB / CEIG Clearances), HVAC, Comfort Air-conditioning(Split/Ductuable/Chiller plant/VAM), Precision Air-conditioning, Office ventilation, Ambiators, Toilet Blockventilation
DATA & VOICE NETWORKING, Structured cabling using Cat-6 and ECat-5 solutions, Design of DataCenters, Server Rooms and Telecommunication closets, Rack requirements, Telecommunication equipments,
Wireless network
FIRE ALARAM & FIGHTING, FA Systems (conventional or analogue addressable), Fire extinguishers,Sprinkler and hydrant systems, FM-200 & Energen based fire suppression systems,
ACCESS CONTROL,Access control (Biometric or Proximity), ID Cards
CCTV & ALARAM SYSTEM, Internal and external CCTV, Intrusion alarm system,
PA SYSTEMS, Integrated PA systems, Related equipments
LANDSCAPING, Hardscaping, Plantscaping, Water features
MISCELLANEOUS, Film/vinyl stickers, Signages, Glass block walls, Artifacts, plants & curios, Accessories.
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
23/48
Construction Business Approach
Land
Financial resources
Delivery
Need
Attract foreign and private investments forconstruction of industrial, residential, logistic,
commercial and infrastructure projects
Goal
Private Sector contribution for: Financial investments
Management practices
Efficiency in service delivery
Public Sector contribution limited to: Approval /licensing,
Providing institutional commitment to project
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
24/48
Training and Capacity Building Training on construction and Infrastructure Development is emerging as an
interesting project.
Product allows Company to:
Create an enabling environment for construction and engineering installationprojects
Sensitize the decision-makers to the risks in construction projects and the importanceof Project Development and open new markets
Enhance the reputation of Company as a pioneer in infrastructure development
Some important training assignments include
Training module on Constriction, Engineering, Technical Skill and PPP part of the in-house training program
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
25/48
Pakistan; FDI PriorityAreas/Region
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
26/48
FDI Priority Region; Punjab Small Industrial States Industrial Estate Sheikhupura Industrial Estate Khanewal Industrial Estate I Sialkot Industrial Estate Daska Road Sialkot
Industrial Estate 1 Lahore Kot Lakhpat Industrial Estate Lahore Lahore Kasur Road Industrial Estate
Lahore Industrial Estate Raiwind Road Lahore Industrial Estate Burewala Industrial Estate Gujrat Industrial Estate Shorkot Industrial Estate I Gujranwala Industrial Estate II Gujranwala Industrial Estate Jhelum
Industrial Estate Sahiwal
Industrial Estate Faisalabad
Industrial Estate Sargodha
Industrial Area Jauharabad
Industrial Estate Mandi Town Layyah
Industrial Estate Bahawalpur
Industrial Estate Chakwal
Industrial Estate Gujar Khan
Industrial Estate Bahatar Road Taxila
Industrial Estate Multan
Industrial Estate Musaverk Mian Chunnu
National Industrial Zone RCCI Industrial EstateIndustrial Area Bhakkar
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
27/48
FDI Priority Region; Sindh Site Karachi Site North Karachi Korangi Industries Area
Nooriabad Industries Estate Dadu
Small Industries Estate Dadu Industries Estate Hyderabad I
Industrial Estate Hyderabad II
Industries Estate Tando Adam I
Industries Estate Tando Adam II
Industries Estate Kotri
Industries Estate Sukkur
Industries Estate Nawabshah I
Industries Estate Nawabshah II
Industries Estate Larkana
Industries Estate Mirpurkhas
Industries Estate Mirpurkhas
Industries Park (IP) Mirpurkhas
Industries Estate SehwanIndustries Estate Shikarpur
Industrial Estate Kandh Kot
Industrial Estate Badin
Industrial Estate Sanghar
Industrial Estate Thatta
Industrial Estate Gambat
Industrial Estate Rohri
Karachi Export Processing Zone
Port Qasim Industrial Zones
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
28/48
FDI Priority Region; KPK,
Baluchistan Industrial Estate Peshawar Small Industrial Estate Phase I
Mardan
Small Industrial Estate Phase IIMardan
Small Industrial Estate Abbottabad
Small Industrial Estate Kohat Industrial Estate Hattar
Industrial Estate Gadoon Amazai
Industrial Estate D.I. Khan
Industrial Estate Nowshera
Risalpur Export Processing Zone
Industrial Estate Ghazi
Industrial Estate Mattani
Hub Industrial & Trading Estate (HITE)
Uthal Industrial EstateWindher Industrial & Trading Estate
Industrial Estate Dara Murad Jamali
Quetta Industrial & Trading Estate
Small Industrial Zone Quetta
Gadani Industrial Estate
Gwadar Industrial Zones
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
29/48
FDI Priority Region; Azad Kashmir,
Gilgit Baltistan New Industrial Area Mirpur
Small Industrial Estate
Bhimber
Small Industrial Estate
Mirpur
Mini Industrial Estate
Muzaffarabad
Mini Industrial Estate Kotli
Mini Industrial Estate
Rawalakot
Hydro power Projects
Gilgit-Baltistan
Tourism development
Gilgit Baltistan
Mineral sector of Gilgit-
Baltistan
Agriculture Projects in
Gilgit-Baltistan
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
30/48
FDI Priority Region; EPZ Karachi Export Processing Zone
Sialkot Export Processing Zone
Rawalpindi Export Processing Zone Saindak Processing Zone
Reko Dek Export Processing Zone
Risalpur Export Processing Zone
Korangi Creek Industrial Park Karachi
Bin Qasim Industrial Park Karachi
Rachna Industrial Park Lahore- Sheikhupura Road
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
31/48
FDI Priority Region; Dry Ports Lahore Dry Port Karachi Dry Port Quetta Dry Port
Peshawar Dry Port Multan Dry Port Rawalpindi Dry Port Sialkot Dry Port Faisalabad Dry Port NLC Dry Port at Thokar Niaz Beg Lahore NLC Dry Port at Quetta Dry Port Sosat
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
32/48
FDI; Other Sectors High-rise buildingSocial Infrastructure
Transport/ Ports (Air & Sea) Logistics
Terminal
Urban Infra and Municipal Services
Green Energy Solar, windmill
Wastage Management
Township Development
Rural development
Private investment and Assets management
Special Economic Zones
Free Trade Zones
Export Processing Zones
Free Economic Zones
Industrial Parks Industrial Estates
Free Ports
Urban Enterprise Zones
Economic Cities
Airports | Seaport Ports Zones
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
33/48
Industrial Infrastructure
Industrial Cluster Developments Textile Cluster
Foundry Cluster
Leather Cluster
Steel Cluster Industrial Cluster
Food Cluster
Medical Equipments/ Pharma Cluster
Sports Goods Cluster
Wooden product / furniture cluster
Building Cluster And many more
Industrial Park/ Satellite, IT, Computer Zones
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
34/48
Sovereign Track Infrastructure
Development Company
Organizational Structure
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
35/48
Formation Sovereign Track Infrastructure Development Company shall beprivate limited company
Shall have 100 shares
Each Share shall have value of values of Rs. 500,000
60% shares shall be owned by the current executants of company onthe basis 10 Acres land close to New Benazir Bhutto International
Airport Islamabad (Market Value: Rs. 24 Million)
40% shares shall be offered to investors (shareholder with status ofDirector in companys legal documents
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
36/48
Chief Executive Officer
Department Heads
Corporate Secretarial
Legal
Finance & Accounts
Corporate Review & Planning
Administration
Information Technology
Sectoral Leaders Territorial Leaders
Assignment Supervisors
Core Teams
Support Teams
Researchers
Support Staff
Human Resource
Chairman
Foreign InvestorsLocal Investors Board of Directors
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
37/48
Company Relationships
Joint Ventures
Land owners
Investors
Developers
InfrastructureConstruction solution
providers
FDI/PPP ventures
World Bank
UNDP
ADB
USAID
Other
Multilateral
Agencies
State/ Govt.
1. Investment Board/
Authorities in Punjab,
Sindh, Baluchistan, KPK,
Azad Kashmir, Gilgit
Baltistan, Islamabad/FATA
2. Urban and regional
development authorities
3. Small industrial states
ar et : cross t e nat on an
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
38/48
ar et : cross t e nat on aninternationally
GOVERNMENTSGovernment
Social SectorInternationalOrganizations
Private Sector Multilateral & Bilateral
Organizations
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
39/48
Project Development
Techno-Economic Viability : Financial Rate of Return
Risk Management : Identification , Mitigation, Allocation
Adequate Economic Rate of Return
Rigorous Environmental and Social Assessment
Conformity to public standards and transparency
Appropriateness of the Institutional and Legal Framework
BANKABLE PROJECTS BY ENSURING
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
40/48
Project Delivery Process
Project Bidding SPV formation
Selection of Operator/
Investors
Bankable Project
Project Marketing
Monitoring
Compliance with
Performance std.
Regulatory M/c
Auditing/Reporting
Project Transfer
Development
Financing Structures
Bidding Structures
Contractual Frameworks
Legal Documentation
Identification
Detailed Feasibility/
Structuring
Project SchedulingA Continuous Process
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
41/48
Activities Land sourcing andmanagement for industrial,commercial, residential andspecial economic zones inPakistan
Building & Construction
Architecture
Renewal - Renovations
Urban Equipment &Engineering
Roads, Bridges & Tunnels
Port and Airport Industries
Building Machinery
Heating - Air ConditioningKitchen & Bathroom
Swimming Pool, Sauna & Spa
Industrial Building
Household Appliances -Domestic Appliance Technology
Equipments
Building Material Supply
Construction machinery rental
Industrial Cleaning &
Maintenance
Software Tools for Building
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
42/48
Investor CategoriesInterested Parties can join or associate with Sovereign TrackInfrastructure Development Company using followingarrangements:
1. Shareholder; value of per share Rs.500,000, joiningcompany as a Director and working partner
2. Franchising partner; having 50 Acres are above land
ownership, complying SEZ Criteria
3. Private Investors: investing in land purchasing,construction or supplying projects
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
43/48
Partnering Categories1. Joint Venture (JV)/ Project Development Company (PDC), by
contributing equity
2. Project Development and Promotion Partnership (PDPP), an
institutional arrangement
3. Stand-alone Assignments or MoUs- Consultancy or fee
based assignments
4. Other
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
44/48
International Projects Targets
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
45/48
Gulf Projects As much as USD 2.54 trillion worth of projects are in the design, bidor construction stage in the GCC, according to Zawya projecttracking data.
The UAE will spend $329bn on construction projects between nowand 2030
$1bn or more and delivered over a short time frame, will peak in2016 with $40.4bn
Across the Middle East, more than $1 trillion will be splashed out oninfrastructure, energy, property and transport projects over thesame period of time of 2016, including $255bn in Saudi Arabia and$156.8bn in Qatar.
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
46/48
Expo 2020 Dubai 2020 project : US$120 billion Ongoing construction sector projects; US$ 368 billion
transport sector ; $33 billion
The InterContinental Hotel Group alone has eight hotels in thepipeline, with almost 2,000 rooms,
The event is likely to attract 25 million visitors betweenOctober 2020 and April 2021, 70 per cent of whom areforecast to be from outside the UAE
Dubai expects to add 80,000 new rooms by 2020
The event could generate more than 277,000 jobs between2013 and 2021
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
47/48
UAE Projects USD 528.41 billion worth of ongoing projects are in the
design, bid or construction stage
Mohammed Bin Rashid City include the world'sbiggest shopping mall, sprawling parks and more thana hundred hotels.
the expansion of the Dubai airport
AED 6 billion mixed-use Bluewaters islanddevelopment.
other mega-projects, including the AED 10 billion tobe spent on five theme parks
7/22/2019 Proposal for Investors Vision, Structure, Strengths and Services
48/48
Saudi Arabia Projects The improvement of transportation systems and
infrastructure projects
significant opportunity for international contractors toenter the market
King Abdullah Economic City and the Jizan EconomicCity as the country moves away from its oil focus.
heavily investing into social infrastructure such ashospitals, schools, commercial office space andhousing