PROPOSED CONVERSION OF MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL PMH PIKE McFARLAND HALL ASSOCIATES, INC. ARCHITECTS & PLANNERS October 9, 2017
Transcript

PROPOSED CONVERSION OF MYRTLE BEACH MIDDLE SCHOOL TO

MYRTLE BEACH ELEMENTARY SCHOOL

PMHPIKE McFARLAND HALL

ASSOCIATES, INC.ARCHITECTS & PLANNERS

October 9, 2017

PMHPROPOSED CONVERSION OF

MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL

EXISTING BUS ROUTE

BUS ROUTE EXTENSION

ELEMENTARY SCHOOL

DOUG SHAW MEMORIAL STADIUM

PEPPER GEDDINGSRECREATION CENTER

MIDDLE SCHOOL

PRIMARY SCHOOL

NEW SIDEWALK TO PEPPER GEDDINGSRECREATION CENTER

NEW SIDEWALKTO JOIN EXISTING CITY SIDEWALK

BUS ROUTE EXTENSION

EXISTING INTERMEDIATE

SCHOOL

HIGH SCHOOL

PMHPROPOSED CONVERSION OF

MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL

SITE PLAN

EXISTINGBUS LOOP

NEW FIRE LANE

NEW FIRE LANE

NEW FIRE LANE

PLAYGROUND28,520 SF

MYRTLE BEACH ELEMENTARY SCHOOL

NEW SIDE WALK

ENERGYPLANT

PMHPROPOSED CONVERSION OF

MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL

PROPOSED RENOVATION FLOOR PLAN

EXISTING AREA

RENOVATION AREAS

NEW HVAC SYSTEM

NEW FINISHES

NEW CEILINGS

NEW LIGHTS

100% NEW FIRE SPRINKLER

100% NEW FIRE ALARM

PMHPROPOSED CONVERSION OF

MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL

MEDIA CENTER

SUPPORT SPACES

ENCLOSED SQ. FT. 134,520

3rd = 18 x 21.5 = 3874th = 17 x 24.5 = 4165th = 17 x 24.5 = 416

1,219 Students

RES = 6 (+2 POSS)INTERV = 2ISS = 1AP = 2SELF CONT. = 4GUIDANCE = 2 + CONFSPEECH = 1ART = 1MUSIC = 1P.E. = 1COMPUTER LAB = 1

CIRCULATION & TOILETS

CLASSROOMS

EXPLORATORY PROGRAMS

FOOD SERVICE

ADMINISTRATION

COMPOSITE FLOOR PLAN

4th - 4

4th - 3

4th - 2

4th - 1

3rd -18

RES

RES RES

RES

4th -5

4th - 6

4th - 7

3rd -17

3rd -16

3rd -15

3rd -14

3rd -13

3rd -12

3rd -11

3rd -10

RE

S

3rd -9

3rd -8

AP

AP

3rd -7

3rd -6

3rd -5

3rd -4

3rd -3

3rd -2

3rd -1

SELF CONT

SELF CONT

SELF CONT

SELF CONT

4th - 8

4th - 9

4th - 10 4th - 11

INTER

COMPLAB INTER

MEDIA CENTER

5th - 3

5th - 2

5th - 1

4th - 17

4th - 16

4th - 15

4th - 14

4th - 13

4th - 12

5th - 4

5th - 5

5th - 6

5th - 7

SP ED

5th - 9

5th - 10 ART

ADMINISTRATION

5th - 8

5th - 11

5th - 12

5th - 13

5th -17

5th -16

5th -15

5th -14

RES

MUSIC

MUSICRES

CAFETERIA

KIT

GYM

PMHPROPOSED CONVERSION OF

MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL

SCHEDULE

PMHPROPOSED CONVERSION OF

MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL

SCHEDULE

PMHPROPOSED CONVERSION OF

MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL

ESTIMATE

Opinion of Probable Costsbased on discussions with Horry County Schools’ staff and evaluation of the existing Myrtle Beach Middle School to convert to new Myrtle Beach Elementary School (grades 3, 4 and 5):

BASIC BUILDING RENOVATION SCOPE

SITE WORK $ 1,156,859Bus Loop Extension , Fire Lane Extension, Sidewalks, Site Utilities(Fire Line, Backflow Preventer, Heater, Power, FDC Connection,6” Tap, Generator), Playground, Rough Grading, Signage,Contractors Overhead and Profit, Contingency (10%)

BUILDING CONVERSIONS $ 6,361,164Renovate Approximately 21,170 SF, New Millwork (52 Classrooms),Add Windows (8 Classrooms), Remove and replace existing Ceilingsand Grid (22,871 SF), Electrical for Smartboards (14 Classrooms)HVAC (14 Classrooms), New Sinks (20 Classrooms), Paint (21,170 SF)Flooring (no wax in Corridors), Carpet / Base (52 Classrooms), Locker RemovalFire Sprinkler System (133,701 SF), Convert Auditorium (into 2 Classrooms and2 Intervention Rooms), New Gang Toilets, Water Source Heat Pump HVAC (Gym and2 Classroom Wings), Energy Plant BuildingContractor’s Overhead and Profit, Contingency (10%)

PMHPROPOSED CONVERSION OF

MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL

ESTIMATE

OTHER FACILITY-WIDE RENOVATIONS $ 2,116,203Corridor Flooring, Gym Curtain Divider, Stage Curtains, Fire Alarm SystemReplace SCW doors in gang toilets with solid phenolic partitions, Add drinking fountains, Furniture Moving Allowance, Technology, Security /Surveillance / Access Control, HVAC Controls, Signage, Contractor’s Overhead and ProfitContingency (10%)

SOFT COSTS $ 2,995,820Fixtures, Furnishings and Equipment (FFE), (new student desks and chairs)

HCS Contingency (10%),A/E Fees, Surveying, Geotechnical Exploration, Special Inspections, Testing, etc. (15%)

TOTAL $ 12,630,046

PMHPROPOSED CONVERSION OF

MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL

LONG RANG NEEDSAdditional needs identified to be addressed in the near future - based on the Long Range Facilities Study.

CONSTRUCTION $ 7,879,117Replace Gym Floor, Paint Remainder of BuildingNew Carpet (Administration), Replace Plumbing FixturesReplace HVAC with Water Source Heat Pump (Remainder of Building),Replace Remainder of Ceilings and Grid, Replace Lights with LEDContingency (10%)

SOFT COSTS $ 1,969,780HCS Contingency (10%), A/E Fees, I.T., Special Inspections, Testing, etc.

TOTAL $ 9,848,897

SUMMARYBasic Building Renovation Scope $ 12,630,046Additional Needs $ 9,878,891

GRAND TOTAL $ 22,478,943

ESTIMATE

PROPOSED CONVERSION OF MYRTLE BEACH MIDDLE SCHOOL TO

MYRTLE BEACH ELEMENTARY SCHOOL

PMHPIKE McFARLAND HALL

ASSOCIATES, INC.ARCHITECTS & PLANNERS

October 9, 2017

PMHPROPOSED CONVERSION OF

MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL

PROPOSED RENOVATION FLOOR PLAN

ENCLOSED SQ. FT. 134,520

EXISTING AREA

RENOVATION AREAS

Square Footage Per Area:

A = 19,323 S.F.B = 18,111 S.F.C = 12,623 S.F.D = 3,724 S.F.E = 20,389 S.F.F = 14,486 S.F. G= 12,256 S.F.H = 15,068 S.F.J = 11,500 S.F.K = 5,700 S.F.

3rd = 18 x 21.5 = 3874th = 17 x 24.5 = 4165th = 17 x 24.5 = 416

1,219 Students

RES = 6 (+2 POSS)INTERV = 2ISS = 1AP = 2SELF CONT. = 4GUIDANCE = 2 + CONFSPEECH = 1ART = 1MUSIC = 1P.E. = 1COMPUTER LAB = 1

A

B

C

D

E

F

G JK

H


Recommended