+ All Categories
Home > Documents > Proposed ERP Strategy - BCNET...Proposed ERP Strategy for the BC Public Post-Secondary Sector For...

Proposed ERP Strategy - BCNET...Proposed ERP Strategy for the BC Public Post-Secondary Sector For...

Date post: 26-Jan-2021
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
20
Proposed ERP Strategy for the BC Public Post- Secondary Sector For BCNET IT Conference April 27, 2016 Barry Coulson, ASDT ExecuFve Lead Jag Madan, Chief InformaFon Officer, Langara College Trevor Hurst, Chief InformaFon Officer, AVED
Transcript
  • ProposedERPStrategyfortheBCPublicPost-

    SecondarySector

    ForBCNETITConferenceApril27,2016

    BarryCoulson,ASDTExecuFveLead

    JagMadan,ChiefInformaFonOfficer,LangaraCollegeTrevorHurst,ChiefInformaFonOfficer,AVED

  • ERPVisionStatement

    Increasealignmentandintegra/onofSectorERPsolu/onstoenableenhancedservicedeliverytostudentpopula/ons,improvedcostmanagementandareduc/onofoverallrisk.

    2

  • 3

    Ø Background,driversandconsideraFons

  • ERPStrategyBackgroundØ  ERPsystemsintheBCpublicpost-secondarysectorconsistofmulFple

    soluFonsandconfiguraFons

    Ø  Somealignmentexistswithinthesector,butthereisanopportunityforincreasedcollaboraFonandefficiency

    Ø  Overthenext7-10years,allinsFtuFonswillneedtoimplementeitheracompletechangeofERPsystem,versionupgrades,orareplacementofcomponents

    Ø  FormanyinsFtuFons,thisworkincursconsiderableriskduetothelackofITresourcecapacity

    Ø  ASDTstruckaworkinggrouptorecommendaSectorERPStrategybyMarch31,2016–thispresentaFonrepresentstheworkinggroup’soutput

    4

  • DriversforasectorERPStrategyØ Businessrisk:

    Ø manyinsFtuFonsreportthatsomebusinessrequirementsarenotbeingmetbytheircurrentERPsoluFon

    Ø Somepartsofpurchasedproductsarenotbeingused

    Ø Technologyrisk:Ø DependenceonaginginfrastructureandlegacycustomERPsystemsthatarenolongersustainable

    Ø Challengeofa[racFngandretainingexperttechnicalresources

    Ø CustomizaFonhasincreasedthecomplexiFesofdatamanagementandcreatedabacklogofneededchanges

    5

  • DriversforasectorERPStrategy–ConFnued

    Ø Costandriskofreplacementorupgrade–replacementsystemswillbeasignificantcostandchangemanagementchallenge.ManyinsFtuFonswillapplyextensiveupgradesinthenearfuture.

    Ø TheriskofnothavingaSectorstrategy–SomeSectorcollaboraFonoccursthroughBCNETworkinggroupsandtheColleagueASCconsorFum,howeverwithoutaformalSectorERPStrategythereisariskofincreasedduplicaFonofeffortanddivergenceofsoluFons,witharesultantincreaseinSector-widemaintenanceandsupportcosts.

    6

  • AnFcipatedChange

    7

    FromanERPperspecFvetheSectorisabouttoembarkuponsignificantchange:ChangeItem Ins?tu?on(s)Impacted EST.Timeframe

    ThereplacementofLegacycustombuiltsystems

    VIU,Selkirk 2016-2018

    TheupgradetoBannerExtensibleEcosystem(XE)

    AllBannerinsFtuFons 2016–2018

    ThereplacementofanSISPeopleSoeupgrades/addiFons(withreducFonofcustomizaFons)

    UBCUBC,SFU(upgradein-process)

    2015-2019

    Theroll-outofColleaguetoFinanceandHR JIBC 2018-2019

    TheuptakeofBCNET’sEducloud UBC,NIC,CSBmembers,others… 2016………..

    TransiFoningfromPLNETtoBCNET Okanagan,EmilyCarr,others… 2016

    ImplemenFngfuncFonalitytosupportP2P PilotinsFtuFons(TBA) 2017

    ImplemenFngfuncFonalitytosupportCOAP All 2018-19

  • 8

    Ø ProposedERPStrategy

  • StrategyConsideraFonsFromaSectorperspecFveastrategicroadmapthatoutlinesprogresstowardsincreasedcollaboraFonandopFmizaFonisbeneficial.TherateofprogressforanindividualinsFtuFon,however,willbetemperedby:

    Ø  InsFtuFonalandGovernmentinvestmentplans.Ø  TheneedforflexibilitytoenabledifferenFaFonandallow

    InsFtuFonstosupportspecificprogramofferings.Ø  ThedifferentcapabiliFestoabsorbchangewithinthe

    Sector.Ø AvailablefundingandtheinsFtuFonalcostandbenefitsof

    incrementalchange.Ø AninsFtuFon’ssenseofurgencytochange.

    9

  • FiveYearGoal&ObjecFves

    10

    BUSINESS TECHNICAL

    GOALAlignERP-relatedbusinessprocessesacrosstheSectorwherereasonableandfeasible

    Op/mizeERPinfrastructureandplaDormsolu/ons

    OBJECTIVES•  Increaseresource,knowledgeandlicensesharing•  EstablishbestpracFcesandstandards•  OpFmizebusinessprocesses

    •  Replacelegacysystems•  ConsolidatehosFng•  OpFmizeERPversions(anddatalinkageswhereapplicable)

  • ERPStrategy:ObjecFves

    BusinessObjecFves

    ReplacementofLegacySystems

    Resource,KnowledgeandLicenseSharing

    BestPracFceStandards

    BusinessProcessOpFmizaFon

    HosFngConsolidaFon

    OpFmizingERPVersions

    CurrentState

    FutureOpFmizaFon

    FiveYearPeriod

    Inform

    edbyBu

    sinessC

    ase

    Supportedby:•  ASDTGovernance

    •  AnASDTadministraFveservicesdeliveryoffice•  JointSectorandMinistryfunding(TBD)

    TechnicalObjecFves

  • ERPStrategy:ProposedConFnuumFramework

    12

    Eachins?tu?ondeterminesitsop?mal5yrend-state

    (A)Mul?pleERPplaMormswithseparateinstances,somecommoninfrastructure

    (B)Mul?pleERPplaMormswithseparateinstances,butcommoninfrastructure,formalizedresourcesharingandconsistencyinbusinessprac?ce

    (C)StrategyGoal:Ara?onalized‘op?mal’numberofERPplaMormswithsharedbusinessprocessesandmoduleinstances

    PrevalentCommonInfrastructure(e.g.,BCNET’sEducloud)

    ResourceSharingSomeBusiness

    PracFceconsistency

    Other…

    .

    Colleague

    Banner

    SomeCommonInfrastructure

    PeopleSoe

    Colleague

    Banner

    PeopleSoe

    CloudCompuFngwithSaaS

    ResourceSharingSharedbusiness

    process

    Sharedmoduleinstanceandconfig

    ERPService#1

    ERPService#2

    ERPService#N

    (A)And(C)canbeconsideredasbookendsoftheconFnuumofpossibleend-states,(B)isanexampleofanendstate.TherearemulFplepossibleendstates

    Current Future(beyond5yrs)

  • ERPStrategicTimeline

    UpgradeBannerSystemstoXE

    ReplaceLegacysystemswithacommonERP(VIU,Selkirk)

    EstablishBCNETEducloud

    UpgradePeopleSoe(UBC)

    Feasibility&BusinessCase(foreachobjecFve)

    2016 2017 2018 2019

    ERPStrategy

    ReplaceSIS(UBC)

    SUPPORTSANDINFORMS

    2020

    UpgradePeopleSoe(SFU)

    ProjectServices

    ImplementaFonPlan

    Est.aresourcesharingservice

    DeterminebestpracFcestandards

    Est.avendormgmtservice

    OpFmizeERPVersion

    Sectorplannedorin-flightacFviFes

    AcFviFesTBDbyERPStrategy&ImplementaFonplan

    Legend

    MigratePSIstoEducloud

    Individu

    alPSIPar?cipa?

    on

    OpFmizebusinessprocess

  • 14

    Ø NextSteps

  • NextSteps•  FinalizeERPStrategythroughsectorinput

    •  SubmitERPStrategytoASDTSteeringCommi[eeforapproval

    •  ConfirmfundingforongoingprojectacFviFes:

    –  ConfirmGovernanceandidenFfyRolesandResponsibiliFesbetweenstakeholderorganizaFons(ASDT,BCNET,PSIs)

    –  Developahigh-levelprojectplan(inpartnershipwiththeSectorandBCNET)

    –  DevelopbusinesscaseforeachobjecFve

    15

  • 16

    Ø AddiFonalInformaFon

  • SomeDefiniFons

    17

    PlaMorm–anERP‘type’e.g.,Banner,Colleagueanddatabasetypee.g.,Oracle,SQLServerInstance–asingleoccurrenceofanERPsystemanditsdatabase(twoinsFtuFonscanhavethesameplarormandsoeware/databaseversionbutdifferentinstances)Version–avendordeterminedversionofaproducte.g.,BannerXE,PeopleSoev9.2andOracle12cModule–AsetoffuncFonswithinanERPdedicatedtosupportaparFcularbusinessarea(e.g.,ColleagueHR)CloudCompu?ng-CloudcompuFngsoluFonsprovideusersandenterpriseswithvariouscapabiliFestostoreandprocesstheirdataviatheinternetinthird-partydatacentresSaaS–SoewareasaService:isasoewarelicensinganddeliverymodelinwhichsoewareislicensedonasubscripFonbasisandiscentrallyhosted.SoYwareLicensing-isalegalinstrument(usuallybywayofacontract)governingtermsandcondiFonsfortheuseorredistribuFonofsoeware.Upgrade-isgenerallyareplacementofhardwareorsoewarewithanewerorbe[erversion,inordertobringthesystemuptodateortoimproveitscharacterisFcs.

  • ERPStrategy:ObjecFves

    BusinessObjecFves

    ReplacementofLegacySystems

    Resource,KnowledgeandLicenseSharing

    BestPracFceStandards

    BusinessProcessOpFmizaFon

    HosFngConsolidaFon

    OpFmizingERPVersions

    CurrentState

    FutureOpFmizaFon

    FiveYearPeriod

    Inform

    edbyBu

    sinessC

    ase

    TechnicalObjecFves

    Descrip?on:AnexercisetoreviewSectorBestPracFcesandcompileasetofBestPracFceStandards.Thisisapre-cursortoenableInsFtuFonstobeinformedwhenopFmizingbusinessprocessesBusinessDrivers- EstablishesthegroundworkforbusinessprocessopFmizaFon

    Descrip?on:ReplacementoflegacyERPsystemsfortwoInsFtuFons.Workincludes:- ProblemStatement- RiskAssessment- Business&TechnicalRequirements- ProcessImprovements- EstablishingInterimMeasures(forbusinessconFnuity)- SecuringFunding&Resourcing- IssuingRFPBusinessDrivers-CurrentsystemisincreasinglyunsupportableandarisktoserviceconFnuity

  • ERPStrategy:ObjecFves

    BusinessObjecFves

    ReplacementofLegacySystems

    Resource,KnowledgeandLicenseSharing

    BestPracFceStandards

    BusinessProcessOpFmizaFon

    HosFngConsolidaFon

    OpFmizingERPVersions

    CurrentState

    FutureOpFmizaFon

    FiveYearPeriod

    Inform

    edbyBu

    sinessC

    ase

    TechnicalObjecFves

    Descrip?on:InsFtuFonscollaboratetoshare:- Knowledge- LicensingCostsandVendormanagement

    BusinessDrivers- Reducecostsandrisks;Be[ervendoraccess- IncreaseeffecFvenessduetosharedknowledge- IncreasedcapacityforapplicaFonsupportandchanges- Improvedquality;IncreasedSectorstandardizaFon- IncreasedstaffretenFon

    Notes:-SomeinvestmentwillberequiredtosupportcrossteamcommunicaFon-sharedresourcingwillrequireanalignmentand/orcoordinaFonofprioriFes-governancemaybeachallenge

    Descrip?on:InsFtuFonsmigratetheirERPsystemstocommonhosFngservicespotenFallyleveragingcloudtechnologyBusinessDrivers:- Enablessystemalignment- Enablesenhancedresourcesharing(e.g.,DBAs,)- Lesssystem/serviceriskfortheinsFtuFon- Increasedscalabilityandavailability-AsharedTCONotes:-TheremaybemulF-tenancycontenFon,governancewillbeachallenge-Therewillneedtobeanupfrontinvestmentincludinganarchitectureeffort

  • ERPStrategy:ObjecFves

    BusinessObjecFves

    ReplacementofLegacySystems

    Resource,KnowledgeandLicenseSharing

    BestPracFceStandards

    BusinessProcessOpFmizaFon

    HosFngConsolidaFon

    OpFmizingERPVersions

    CurrentState

    FutureOpFmizaFon

    FiveYearPeriod

    Inform

    edbyBu

    sinessC

    ase

    TechnicalObjecFves

    Descrip?on:InsFtuFonsusethebestpracFcestandardstoestablishcommonbusinessprocessesBusinessDrivers- Enablessystemalignment- CouldenablesharedfuncFonalityandreducedmaintenancecosts

    Descrip?on:InsFtuFonssharethesameversionofanERPplarorm(samecodebasebutnotnecessarilythesameconfiguraFon–i.e.,thisisnottantamounttothesameinstance)BusinessDrivers:- Simplifiesmaintenanceandupgrades(althoughconfiguraFondifferenceswillsFllneedtobeaccommodatedfor)- Enablesenhancedtechnicalresourcesharing- Enablessharedmaintenance- Costsavings


Recommended