+ All Categories
Home > Documents > Proposed FWP request for 2012 Gyorgy Rethy. Background Currently 30 CRs are open, by experience we...

Proposed FWP request for 2012 Gyorgy Rethy. Background Currently 30 CRs are open, by experience we...

Date post: 27-Mar-2015
Category:
Upload: ashton-buckley
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
3
Proposed FWP request for 2012 Gyorgy Rethy
Transcript
Page 1: Proposed FWP request for 2012 Gyorgy Rethy. Background Currently 30 CRs are open, by experience we expect ~20 new CRs by the end of the year TTCN-3 standards.

Proposed FWPrequest for 2012

Gyorgy Rethy

Page 2: Proposed FWP request for 2012 Gyorgy Rethy. Background Currently 30 CRs are open, by experience we expect ~20 new CRs by the end of the year TTCN-3 standards.

Background

Currently 30 CRs are open, by experience we expect ~20 new CRs by the end of the yearTTCN-3 standards consists now 14 documents, altogether almost 1300 pages (including the 2 new extension packages)Many users, like Ericsson, using the language heavily that gene-rates needs for clarifications, extensions and bug correctionsTTCN-3 is THE standard test script language used in several standards organization3GPP requests continuous maintenanceTesting practice is facing new paradigms as MBT and using high-level test definition that needs to be considered and answered in TTCN-3 as well

2

Page 3: Proposed FWP request for 2012 Gyorgy Rethy. Background Currently 30 CRs are open, by experience we expect ~20 new CRs by the end of the year TTCN-3 standards.

Proposed FWP request

Purpose:- TTCN-3 language maintenance and extensions as normally (on user request, working on CRs)- Discuss and prepare proposals for TTCN-3 presentation format for MBT, and Graphical format for TP specification and logging Requested resource: 82 Mdays(4 experts, 4*1 week sessions, plus 2 days for dministration)1 expert travel to T3UC 2012 and 1 expert travel to MTS mtg.


Recommended