Document of
The World Bank
FOR OFFICIAL USE ONLY
Report No: RES12285
RESTRUCTURING PAPER
ON A
PROPOSED PROJECT RESTRUCTURING
OF
THE ADAPTATION TO CLIMATE CHANGE IMPACTS ON THE COASTAL WETLANDS
IN THE GULF OF MEXICO PROJECT (P100438)
GLOBAL ENVIRONMENT FACILITY TRUST FUND GRANT FROM THE SPECIAL
CLIMATE CHANGE FUND (SCCF) (TF 96681)
MAY 11, 2011
TO THE
UNITED MEXICAN STATES
OCTOBER 13, 2015
Mexico and Colombia Country Management Unit
Latin America and the Caribbean Region
Environment and Natural Resources Global Practice
This document has a restricted distribution and may be used by recipients only in the
performance of their official duties. Its contents may not otherwise be disclosed without
World Bank authorization.
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
ABBREVIATIONS AND ACRONYMS
ANP Natural Protected Area
(Área Natural Protegida)
CONAGUA National Water Commission
(Comisión Nacional del Agua)
CONANP National Commission of Protected Areas
(Comisión Nacional de Áreas Naturales Protegidas)
GEF Global Environment Facility
GEO Global Environmental Objectives
GoM Government of Mexico
(Gobierno de México)
IMTA Mexican Institute of Water Technology
(Instituto Mexicano de Tecnología del Agua)
INECC National Institute of Ecology and Climate Change
(Instituto Nacional de Ecología y Cambio Climático)
NAFIN National Development Banking Institution
(Nacional Financiera)
PDO Project Development Objectives
SHCP Minister of Finance and Public Credit
(Secretaría de Hacienda y Crédito Público)
SSCF Special Climate Change Fund
UNAM National Autonomous Mexican University
(Universidad Nacional Autónoma de México)
Regional Vice President: Jorge Familiar
Country Director: Gerardo M. Corrochano
Senior Global Practice Director:
Practice Manager:
Paula Caballero
Raúl Ivan Alfaro Pelico
Task Team Leader: Renán A. Poveda
DATA SHEET
Mexico
Adaptation to Climate Change Impacts on the Coastal Wetlands in the Gulf of Mexico (P100438)
LATIN AMERICA AND CARIBBEAN
Environment and Natural Resources
Report No: RES12285
Basic Information
Project ID: P100438 Lending Instrument: Specific Investment Loan
Regional Vice President: Jorge Familiar Original EA Category: Partial Assessment (B)
Country Director: Gerardo M. Corrochano Current EA Category: Partial Assessment (B)
Senior Global Practice
Director: Paula Caballero Original Approval Date: 23-Nov-2010
Practice
Manager/Manager: Raul Ivan Alfaro Pelico Current Closing Date: 31-Oct-2015
Team Leader(s): Renan A. Poveda
Borrower: United Mexican States
Responsible
Agency: Ecology and Climate Change National Institute - INECC
Restructuring Type
Form Type: Short Form Decision Authority: Country Director Approval
Restructuring
Level:
Level 2
Financing ( as of 1-Oct-2015 )
Key Dates
Project Ln/Cr/TF Status Approval
Date Signing Date
Effectiveness
Date
Original
Closing Date
Revised
Closing Date
P100438 TF-96681 Effective 10-May-2011 11-May-2011 07-Oct-2011 31-Oct-2015 31-Oct-2016
Disbursements (in Millions)
Project Ln/Cr/TF Status Currency Original Revised Cancelled Disbursed Undisbursed %
Disbursed
P100438 TF-96681 Effective USD 4.50 4.50 0.00 2.40 2.10 53
Policy Waivers
Does the project depart from the CAS/CPF in content or in other significant
respects? Yes [ ] No [ X ]
Does the project require any policy waiver(s)? Yes [ ] No [ X ]
A. Summary of Proposed Changes
This Restructuring Paper reflects the Government of Mexico (GoM) proposed changes to the Adaptation to
Climate Change Impacts on the Coastal Wetlands in the Gulf of Mexico Project (TF 96681, P100438),
financed through a Global Environmental Facility (GEF) grant. GoM’s request seeks to reflect the
following key modifications: (i) withdraw all activities and implementation arrangements associated to the
pilot site in Tamaulipas; (ii) reallocate grant proceeds in order to make use of the released funds from the
Tamaulipas pilot and enable remaining Project activities to be finalized; (iii) adjust the Project counterpart
from INE to INECC and modify the implementation arrangements accordingly; (iv) modify the definition
of operational cost and add training and workshops as an eligible expenditure in order to broaden eligible
expenses under this grant; (v) modify the definition of the proposed activities related to the pilot sites in
Laguna de Alvarado (Veracruz), and in the Sistema Lagunar Carmen-Pajonal-Machona (Tabasco); (vi)
adjust Project indicators in order to better reflect and measure the achievement of the Project’s
Development Objective (PDO) and Intermediate Results; and (vii) extend the closing date of the Project
for one additional year (October 31, 2016), in order to undertake key pending activities and attain the
Project’s Development Objectives (PDO) and the Global Environmental Objective (GEO). No changes
will be made to the PDO or safeguards arrangements.
B. Project Status
The Project was approved by the World Bank Board on November 23, 2010 and became effective on
October 7, 2011. The closing date is October 31, 2015. The $4.5 million grant has disbursed 53.3 percent
of its total amount, from a 15.3 percent in December 2014. The recent improvements in implementation
and disbursements have led to a Moderately Satisfactory upgrade of the “Progress towards achievement of
PDO” and “Overall Implementation Progress”.
Cumulative delays have been a result of several factors including: (i) the sequencing structure of Project
design which required that complex key studies be developed for the design of pilot activities
(reforestation, infrastructure works, land management plans, etc.) prior to the implementation of specific
investments; (ii) complex institutional arrangements agreed during negotiations which involve a number of
agencies with multiple responsibilities in the technical, administrative and decision making process
(including INECC, IMTA, NAFIN, CONANP, CONAGUA, and SHCP); (iii) changes within INECC’s
team composition which led to new institutional priorities and a revision of the work done so far and to a
new focus in terms of the studies and investments done; (iv) the cumbersome and long procurement
processes; and (v) weak teams at INECC and IMTA.
Most of the issues raised above, however, have been addressed through the following actions, which have
resulted in the recent notable progress in Project implementation: (i) a more agile and functioning
implementation system between INECC, IMTA and NAFIN (which have led to key agreements on how to
reduce the cumbersome lengthy process for issuing contracts from 9 to 6 months); (ii) periodic meetings
among the key agencies and the Bank in order to identify bottlenecks, mitigation measures and monitor
progress in implementation; (iii) adoption of a scheme of small scale adaptation measures which do not
require as a precondition the conclusions of complex key studies; and (iv) increased technical and
administrative capacity within the teams of both INECC and IMTA.
Progress in Project implementation has also been a result of a notable involvement and commitment from
all key government agencies, including from the Secretary of Finance (SHCP). Key staff has been
appointed and regular staff from INECC have been increasingly involved in the supervision and
implementation of the Project. INECC, NAFIN and SHCP have stated that this Project is a top priority for
the country, and that it is currently the only operation addressing adaptation efforts to the effects of climate
change. Counterpart funding in terms ($1.8 million from Japanese and US sources) allocated for technical
assistance, have been delivered.
Among the activities financed so far by the Project are: (i) Hydraulic models of data with climate
variables and scenarios for the pilot watersheds; (ii) Reports on lost temporal and spatial data in the pilot
watersheds; (iii) Geo-referencing of the climate station network in the pilot watersheds; (iv) Acquisition of
mareographs (tide-gages to be installed by UNAM); (v) development of management plans for wild life
conservation units (incorporating adaptation measures); (vi) design of small scale adaptation measures for
Veracruz and Tabasco; (vii) delivery of technical workshops; (viii) development of Ecological Land Zone
Planning for the pilots in Veracruz and Tabasco, and (ix) repopulation of Sian Ka’an’s coastal reefs.
C. Proposed Changes
Financing
Change in Loan Closing Date(s):
Explanation
Beyond the administrative delays encountered in processing contracts and the acquisition of goods, the
implementation of key activities (namely subprojects) has had encountered delays in implementation due
to atypical weather events in pilot sites. Based on the above, GoM has requested that the closing date of
the Project be extended for an additional twelve months until October 31, 2016. This is the first extension
requested for this Project and would allow the completion of eleven activities currently under
implementation which are at risk of not been able to finalize key outputs by Project closing, and processing
seven new strategic contracts (many that are under review by SHCP) which under the current schedule will
not able to be launched. Both the Bank and GoM agree that not completing these activities would put in
jeopardy the achievement of the PDO, the GEO and would hinder the ability to replicate key lessons and
activities of the Project.
In addition, granting an extension to the closing date would enable the development of the following
activities: (i) the systematization and dissemination of the material related to results, lessons learned and
findings developed through the Project (including disseminating the Project’s achievements to the 3 levels
of government strengthening the sustainability and replicability of the adaptation measures; (ii) assessing
and monitoring the evolution of the adaptation measures that have been concluded (or are close to
concluding) enhancing the knowledge base at INECC, IMTA and participating entities; (iii) delivering
training and workshops in participating communities to foster the ownership and maintenance of their
adaptation measures to promote its sustainability, but also in selected sites to encourage the expansion and
replicability of adaptation measures; (iv) development and implementation of a communications strategy to
broadly present the outcomes of the Project; and (v) undertake a review process of the key adaptation
studies and develop a strategy for its eventual implementation.
A work plan has been prepared and agreed among all counterparts for the implementation of the proposed
changes through the period remaining in the Project, and until October 2016, assuming the extension to the
closing date is granted. The work plan, has been reviewed and found to be acceptable by the Bank. The
work plan and disbursement projections focus on the fulfillment of key contracts by agreed dates and is
already is on track since 82 percent of key contracts of the Project are either completed or under
implementation. An assessment of the fulfillment of the revised Project indicators has been undertaken.
Ln/Cr/TF Status Original Closing
Date
Current Closing
Date
Proposed Closing
Date
Previous Closing
Date(s)
TF-96681 Effective 31-Oct-2015 31-Oct-2015 31-Oct-2016
Reallocations
Explanation
The proposed reallocation of grant proceeds reflects the withdrawal of the Tamaulipas pilot site, the
liberation of the respective budget, and a redistribution of resources among tasks according to Project
demands (namely to finance activities under component 2).
Ln/Cr/TF Currency Current Category of
Expenditure Allocation
Disbursement % (Type
Total)
Current Proposed Current Proposed
TF-96681 USD GO,CW,CS,Non-CS,OP
under Pt.1 744,400.00 673,600.00 100.00 100.00
GO,CW,CS,Non-CS,OP
under Pt.2(a) 900,000.00 0.00 100.00 100.00
GO,CW,CS,Non-CS,OP
under Pt.2(b) 730,000.00 1,130,000.00 100.00 100.00
GO,CW,CS,Non-CS,OP
under Pt.2(c) 785,000.00 1,236,000.00 100.00 100.00
GO,CW,CS,Non-CS,OP
under Pt.2(d) 541,200.00 711,000.00 100.00 100.00
GO,CW,CS,Non-CS,OP
under Pt.3 500,000.00 500,000.00 100.00 100.00
GO,CW,CS,Non-CS,OP
under Pt.4 299,400.00 249,400.00 100.00 100.00
Designated Account 0.00 0.00 0.00 0.00
Total: 4,500,000.00 4,500,000.00
ADAPTATION TO CLIMATE CHANGE IMPACTS ON THE COASTAL WETLANDS
IN THE GULF OF MEXICO PROJECT
CONTENTS
Page
DATA SHEET ...............................................................................................................................3
A. SUMMARY ............................................................................................................................8
B. PROJECT BACKGROUND ................................................................................................8
C. PROJECT STATUS ..............................................................................................................9
D. PROPOSED MODIFICATIONS .......................................................................................11
ANNEX 1: REALLOCATION OF GRANT PROCEEDS ......................................................14
ANNEX 2: MONITORING ADJUSTMENT TO PROJECT INDICATORS .......................15
ANNEX 3: UPDATED RESULTS FRAMEWORK AND MONITORING ..........................19
ANNEX 4: WORK PLAN ..........................................................................................................30
ANNEX 5: DISBURSEMENT PROJECTIONS ......................................................................39
ANNEX 6: FULFILLMENT OF REVISED PROJECT INDICATORS ...............................40
ADAPTATION TO CLIMATE CHANGE IMPACTS ON THE COASTAL WETLANDS IN
THE GULF OF MEXICO PROJECT
RESTRUCTURING PAPER
A. SUMMARY
1. This Restructuring Paper reflects the Government of Mexico (GoM) proposed changes to the
Adaptation to Climate Change Impacts on the Coastal Wetlands in the Gulf of Mexico Project
(TF96681, P100438), financed through a Global Environmental Facility (GEF) grant. GoM’s
request seeks to reflect the following key modifications: (i) withdraw activities and implementation
arrangements associated to the pilot site in Tamaulipas; (ii) reallocate grant proceeds in order to
make use of the released funds from the Tamaulipas pilot and enable remaining Project activities to
be finalized; (iii) adjust the project counterpart from INE to INECC and modify the implementation
arrangements accordingly; (iv) modify the definition of operational costs and add training and
workshops as an eligible expenditure in order to broaden eligible expenses under this grant; (v)
modify the definition of the proposed activities related to the pilot sites in Laguna de Alvarado
(Veracruz), and in the Sistema Lagunar Carmen-Pajonal-Machona (Tabasco); (vi) adjust Project
indicators in order to better reflect and measure the achievement of the Project’s Development
Objective (PDO) and Intermediate Results; and (vii) extend the closing date of the Project for one
additional year to October 31, 2016, in order to undertake key pending activities, and achieve the
Project’s Development Objectives (PDO) and the Global Environmental Objective (GEO). No
changes will be made to the PDO or safeguards arrangements.
2. Project performance has greatly improved in recent months after it has suffered a slow rate in
implementation and disbursements in the past years. This improvement is namely due to the recent
adoption of small scale adaptation measures to be implemented in the pilot sites, which do not
require the conclusion of the key studies (which suffered delays in the contracting process), but
which have facilitated overall disbursements. As of today, the US$4.5 million grant has disbursed
53 percent of its total amount. Furthermore, there has been a commitment from the key
government agencies to move forward Project implementation, in spite of institutional challenges
dating from Project design. The proposed restructuring is therefore not only justified, but necessary
to contribute to the achievement of the Project’s development objective and to provide the
necessary base to enable a realistic evaluation of the expected achievements and outcomes of this
Project.
B. PROJECT BACKGROUND
3. The objective of the Project is to promote adaptation to the consequences of climate impacts in the
coastal wetlands of the Gulf of Mexico, through the implementation of pilot measures that would
provide information on the costs and benefits of alternative approaches to reduce their vulnerability.
The Project also seeks to assess the overall impacts of climate change on national water resource
planning, including the identification of potential response options, with a focus on coastal
wetlands and associated watersheds. The experience from the Project pilots is intended to inform
the government's future adaptation strategy and development programs in the Gulf region.
4. The Project is implemented under four components: (1) Design of Selected Adaptation Measures
and Technical Coordination of the Project; (2) Implementation of Pilot Adaptation Measures in
Highly Vulnerable Wetlands; (3) Assessment of the Impacts of Climate Change on Water
Resources Planning at a National Level and in Coastal Wetlands including the Identification of
Potential Response Options, and (4) Project Management. Under component (2) there are four sub-
components, associated to each of the selected pilot sites: Sub-component 2.1: Wetlands Panuco-
Altamira (Tamaulipas); Sub-component 2.2: Wetlands of the Papaloapan Rivershed, Alvarado
Lagoon (Veracruz); Sub-component 2.3: Wetlands of Carmen-Pajonal-Machona (Tabasco); and
Sub-component 2.4: Sian Ka’an, Biosphere Reserve in Punta Allen (Quintana Roo).
5. The institutional arrangements for this Project consist in a close collaboration among three
agencies, with involvement of several partner agencies. The Ecology and Climate Change National
Institute (INECC) is responsible for the technical coordination of the Project and for the
implementation of components 1 and 2 (the Protected Areas National Commission– CONANP co-
implements sub-component 2.4). The Water Technology National Institute (IMTA) is responsible
for the administrative and financial controls of the Project, and for the implementation of
components 3 and 4 (component 3 is implemented in collaboration with the National Water
Commission -CONAGUA, and component 4 is co-implemented with INECC). Monitoring and
evaluation of Project outcomes/results (both intermediate and end-of-Project) are coordinated by
both, IMTA and INECC with the support of Nacional Financiera (NAFIN) while financial and
procurement management is led by IMTA. Financial information on inputs, outputs, budgeting,
treasury, accounting, and audits are monitored by IMTA and NAFIN.
C. PROJECT STATUS
6. The Project was approved by the Board on November 23, 2010 and became effective on October 7,
2011. The closing date is October 31, 2015. The $4.5 million grant so far has disbursed 53.3
percent of its total amount, from a 15.3 percent in December 2014 and committed amount is over
82 percent. The recent improvements in implementation and disbursements have led to a
Moderately Satisfactory upgrade of the “Progress towards achievement of PDO” and “Overall
Implementation Progress”.
7. Cumulative delays have been a result of several factors including: (i) the sequencing structure of
Project design which required that complex key studies be developed for the design for pilot
activities (reforestation, infrastructure works, land management plans, etc.) prior to the
implementation of specific investments; (ii) complex institutional arrangements which involves a
number of agencies with multiple responsibilities in the technical, administrative and decision
making process (including INECC, IMTA, NAFIN, CONANP, CONAGUA, and SHCP); (iii)
changes within INECC’s team which led to a change of institutional priorities and to a revision of
the work done so far and to a new focus in terms of the studies and investments done; (iv) the
cumbersome and long procurement processes; and (v) weak teams at INECC and IMTA.
8. Most of the issues raised above, however, have been addressed through the following actions,
which have resulted in the recent notable progress in Project implementation: (i) a more agile and
functioning implementation system between INECC, IMTA and NAFIN (which have led to key
agreements on how to reduce the cumbersome lengthy process for issuing contracts from 9 to 6
months); (ii) periodic meetings among the key agencies and the Bank in order to identify
bottlenecks, mitigation measures and monitor progress in implementation; (iii) adoption of a
scheme of small scale adaptation measures which do not require as a precondition the conclusions
of complex key studies; and (iv) increased technical and administrative capacity within the teams of
both INECC and IMTA. In addition, the Bank and GoM agreed to accelerate disbursements through
the identification and implementation of small scale adaptation measures/investments (with
currently existing information at INECC and at the states) without the benefit of fully fledged
adaptation studies. It was also agreed that the conclusions and recommendations of the design
studies (which are under implementation) could eventually be implemented by INECC with its own
resources beyond the closing date of the Project.
9. Progress in Project implementation has also been a result of a notable involvement and commitment
from all key government agencies, including from the Secretary of Finance (SHCP). Key staff has
been appointed and regular staff from INECC have been increasingly involved in the supervision
and implementation of the Project. INECC, NAFIN and SHCP have stated that this Project is a top
priority for the country, in that it is currently the only operation addressing adaptation efforts to the
effects of climate change. Counterpart funding in terms (US$1.8mln from Japanese and US
sources) allocated for technical assistance have been delivered.
10. Among the activities financed so far by the Project are: (i) Hydraulic models of data with climate
variables and scenarios for the pilot watersheds; (ii) Reports on lost temporal and spatial data in the
pilot watersheds; (iii) Geo-referencing of the climate station network in the pilot watersheds; (iv)
Acquisition of mareographs (tide-gages to be installed by the Mexico’s National Autonomous
University - UNAM); (v) development of management plans for wild life conservation units
(incorporating adaptation measures); (vi) design of small scale adaptation measures for Veracruz
and Tabasco; (vii) delivery of technical workshops; (viii) development of Ecological Land Zone
Planning for the pilots in Veracruz and Tabasco, and (ix) repopulation of Sian Ka’an’s coastal
reefs.
Table 1: Financing Status (as per September 11, 2015 from Portal)
Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed %
Disbursed
TF-96681 Effective USD 4,500,000 4,500,000 0.00 2,397,402 2,102,598 53.28
D. PROPOSED MODIFICATIONS
11. The following changes to the grant agreement are proposed by GoM:
(i) Withdrawal of the Tamaulipas Pilot. The pilot investment in Tamaulipas has been withdrawn
upon request from the state government based on the ongoing insecurity in the State. Therefore,
the related studies and investments within this pilot will be discontinued and the related
implementation arrangements will be removed from the grant agreement (IMTA will continue,
however, its hydrological analysis in the Tamaulipas wetland).
(ii) Reallocation of Grant Proceeds. The reallocation of grant proceeds reflects the withdrawal of
the Tamaulipas pilot site, the release of the respective budget, and a redistribution of resources
among tasks according to Project demands (namely for component 2). More specifically, the
reallocation of grant proceeds among categories will assure the successful implementation of
the remaining activities. The detailed reallocation proposal is attached (Annex I).
(iii)Adjustment from INE to INECC. During 2012 the General Climate Change Law was passed
congress and included additional institutional and technical attributions, including
administrative and legal autonomy, to the National Institute for Ecology (INE), which from this
date, became the National Institute for Ecology and Climate Change (INECC). This institutional
change, and the continuation of legal responsibilities of INECC to the Project need to be
reflected through the current amendment to the grant agreement.
(iv) Modification of the definition of operation costs. Upon request from GoM, the definition of
operational costs under the grant agreement would include the word “inter-alia” and the
inclusion of training and workshops as eligible expenditure is included in order to reflect a
broader range of eligible expenses.
(v) Adjustment to Project Indicators. After a thorough evaluation between the Bank and GoM, it
was agreed that while a number of the original indicators were either expected to be met or had
already been met, others needed to be adjusted or eliminated in order to allow for an adequate
evaluation of the Project´s activities and outcomes during the life of this grant. It was noted that
many of the indicators were neither realistic nor did they provide the elements to undertake an
accurate evaluation of the Project’s outcomes. The basis for the proposed changes in Project
indicators are described in Annex 2. Annex 3 reflects the updated Results Framework and
Monitoring. These changes would be reflected in the Project’s Operational Manual.
(vi) Adjustments to the definitions of the proposed activities for the Pilots in Laguna de
Alvarado (Veracruz), and in Cardenas (Tabasco). During Project design, a number of
activities were foreseen which, after a thorough assessment by GoM and the Bank, became no
longer relevant. The proposed modifications for subcomponents 2.2 and 2.3 focus on the
following:
(a) Change in the Operational Manual the focus and definition of the pilot in Alvarado
to reflect the elaboration of Ecological Territorial Zoning (instead of Protected Area
Management Plans) since there are no protected areas in the pilot area, but which
requires to include a conservation and management strategy; (b) elimination of proposed works (e.g. sand barriers) in Cardenas which are known to
have adverse collateral impacts, and replacing them with adaptation and
conservation measures in the pilot through equipment, reforestation of mangroves
and riparian forests, introduction of eco-technologies such as stilt housing and
rainwater harvesting systems, among other activities; and
(c) elimination of the term ‘buffer zone’ associated to the pilot in Veracruz, since there
are no protected areas (nor the foreseen creation of protected areas) in the proposed
pilot site.
(vii) Extension of the closing date of the Project. Beyond the administrative delays encountered
in processing contracts and the acquisition of goods that have been stated above, the
implementation of key activities (namely subprojects) have encountered delays in
implementation due to atypical weather events in pilot sites. Based on the above, GoM has
requested an additional twelve month extension of the closing date to October 31, 2016. This
extension would allow the completion of twelve activities currently under implementation
which are at risk of not being able to finalize key outputs by the Project closing date, and
processing seven new strategic contracts (many that are under review by SHCP) which will not
able to be launched without an extension. Both the Bank and GoM agree that not completing
these activities would put in jeopardy the achievement of the PDO, the GEO and would hinder
the ability to replicate key lessons and activities of the Project.
In addition, granting an extension to the closing date would enable the development of the
following activities: (i) the systematization and dissemination of the material related to results,
lessons learned and findings developed through the Project (including disseminating the
Project’s achievements to the 3 levels of government strengthening the sustainability and
replicability of the adaptation measures; (ii) assessing and monitoring the evolution of the
adaptation measures that have been concluded (or are close to concluding) enhancing the
knowledge base at INECC, IMTA and participating entities; (iii) delivering training and
workshops in participating communities to foster the ownership and maintenance of their
adaptation measures to promote its sustainability, but also in selected sites to encourage the
expansion and replicability of adaptation measures; (iv) development and implementation of a
communications strategy to broadly present the outcomes of the Project; and (v) undertake a
review process of the key adaptation studies and develop a strategy for its eventual
implementation.
12. A work plan has been prepared and agreed among all counterparts for the implementation of the
proposed changes through the period remaining in the Project, and until October 2016. The work
plan, has been reviewed and found to be acceptable by the Bank. The work plan (attached as
Annex 4) and disbursement projections (Annex 5) focuses on the fulfillment of key contracts by
agreed dates and is already is on track since 82 percent of key contracts of the Project are either
completed or under implementation. Without an extension, it is estimated that Project
disbursements would only reach 72.4 percent of total grant amount. An assessment of the fulfilment
of the revised Project indicators has been undertaken and is reflected in Annex 6.
Annex 1
Reallocation of Grant Proceeds
Disbursement Category
Actual Amount
of the Grant
Allocated
(expressed in
USD)
Proposed
Adjustment
Variation per
category
+ and -
(1) Goods, works, consultants’ services,
non consultant services, Training and
Workshops and Operational Costs
under Part 1 of the Project
744,400 673,600 -(70,800)
2 (a) Goods, works, consultants’ services,
non consultant services and
Operational Costs under Part 2(a) of
the Project
900,000 0 -(900,000)
2 (b) Goods, works, consultants’ services,
non consultant services, Training and
Workshops and Operational Costs
under Part 2(b) of the Project
730,000 1,130,000 +(400,000)
2 (c) Goods, works, consultants’ services,
non consultant services, Training and
Workshops and Operational Costs
under Part 2(c) of the Project
785,000 1,236,000 +(451,000)
2 (d) Goods, works, consultants’ services,
non consultant services, Training and
Workshops and Operational Costs
under Part 2(d) of the Project
541,200 711,000 +(169,800)
(3) Goods, works, consultants’ services,
non consultant services and
Operational Costs under Part 3 of the
Project
500,000 500,000 No change
(4) Goods, works, consultants’ services
(including external audits), non
consultant services and Operational
Costs under Part 4 of the Project
299,400 249,400 -(50,000)
TOTAL AMOUNT 4,500,000 4,500,000 -
Annex 2
Adjustment to Project Indicators
PDO Outcome Indicators Proposed Outcome Indicators Nature of proposed revision
(a) Design documents for pilot
adaptation measures that facilitate
prompt implementation and include
sustainability strategy as well as
monitoring provisions.
(b) Three wetland management plans,
a revised protected area management
plan, and land zoning regulations,
incorporating climate change
adaptation activities, discussed with
stakeholders, and at least one plan
submitted for approval to decision
making authorities and supported by
local and state institutions.
(c) A target of 15,000 ha presented to
Municipal Councils for consideration
to be entered into conservation status
in local land use plans; a target of
5,000 ha reforested with native
species that would add to climate-
resilience of coastal wetlands; a
target of 3,000 meters of coastal bars
stabilized addressing threat of sea
level rise; and increased thermal
resilience of coral populations in the
Biosphere Reserve Sian Ka’an
through repopulating genetically
diverse temperature resistant coral
genotypes in six areas of 25 m x 25 m
(3,750 m2) in selected locations.
(d) Production and dissemination of
practical guidance document on cost
and benefits of adaptation measures
in coastal wetlands as a basis for
replication efforts.
(e) Climate change impact scenarios
developed for selected basins and for
coastal wetlands supporting
knowledge base required to
mainstream CC into water resources
(a) Design documents for pilot
adaptation measures that facilitate
prompt implementation and include
sustainability strategy as well as
monitoring provisions developed.
(b) Two land use plans and a revised
protected area management program,
incorporating climate change
adaptation activities, discussed with
stakeholders, and at least one land
use planning program submitted for
approval to decision making
authorities and supported by local
and state institutions (depending on
the aptitude of the territory in each
pilot site, the land use planning will
incorporate conservation elements).
(c) More than 50 ha of mangrove
ecosystem and riparian zones
reforested, more than 70 ha of water
fluxes rehabilitated in Veracruz and
Tabasco, and at least six areas in the
Sian Ka’an Biosphere Reserve with
repopulated temperature-resistant
coral genotypes.
(d) Unchanged but moved to
intermediate indicators.
(e) Unchanged.
(b) The two wetland management
plans were substituted by two land
use plans, given that there are no
Natural Protected Areas (ANP) in
Veracruz or Tabasco to be
responsible of boosting a
conservation and management plan
for wetlands.
(c) The amount of 15,000 ha to be
considered for conservation status,
was eliminated because the
Government of Mexico, through
CONANP, has not planned to
establish ANP in Veracruz or
Tabasco. Conservation areas would
be defined by the land use plans,
which include considerations of
adaptation to climate change.
The objective of 5,000 ha to be
reforested, was modified because
this surface had been overestimated
in the initial project, and it was
observed that in some pilot sites it
was not viable to reforest this
amount of hectares due to the
characteristics of the soils and its
environmental conditions.
The construction of 3,000 m of
coastal barriers was eliminated
because the project has rethought the
objective focusing on “adaptation
based on ecosystems”, which
promotes the conservation of
biodiversity and ecosystem services
and wetland management and
planning.
as a strategy of adaptation to climate
change for human communities. This
approach includes the adoption of
adaptation measures that are
reversible, because the impacts of
climate change are uncertain. Due to
the uncertainty of the magnitude of
the effects of climate change and of
the sea level rise, building coastal
barriers results in an unviable and
ineffective measure.
There are multiple adaptation actions
that can be done but, since financial
resources are not enough conduct
them all, it was necessary to
prioritize and implement actions that
allow populations to adapt more
immediately.
Therefore, it was decided to develop
actions that contribute to the
adaptation of populations to floods,
lack of clean water, food security
issues, and mangrove conservation,
as in the case of the Management
Units for Wildlife Conservation
(UMA) for the sustainable use of
mangroves, in addition to equipment
and infrastructure, accompanied by
local training to reduce vulnerability
to climate change of populations by
strengthening its adaptive capacity.
CONANP specified that the reserve
does not have the stated surface of
3750 m2 of coral reefs, thus, this
amount of coral to be replanted was
removed and it will be determined in
the design and implementation
proposal currently in development
by Oceanus, A.C.
The activities programmed for
Tampico have been eliminated.
(d) The indicator serves better to
measure intermediate outcomes.
Intermediate Outcomes Intermediate Outcome
Indicators
Comments
Component 1: Design of Selected
Adaptation Measures and Technical
Coordination of the Project
• At least 3 pilot adaptation
measures count with sound
technical design documents
The contemplated activities are: (i)
to design adaptation measures for
Tabasco and Veracruz, (ii) to replant
• Experience gained in incorporating
climate change in plans and a
program, and designing
interventions to increase resilience.
• Wetland monitoring capabilities
strengthened as input to improved
management of sensitive and
vulnerable ecosystems.
• Facilitate the development of long-
term management and monitoring of
selected ecosystems.
including analysis of financial,
economic, social and
environmental aspects and are
ready for implementation.
• Modeling, generation of data,
analysis, and access to
information and long-term
remote sensing.
• Pilot adaptation measures will
include a sustainability strategy.
• Two management plans for
Wildlife Conservation,
Management, and Sustainable
Utilization Units (UMA) in
mangrove ecosystems
developed.
• Infrastructure and equipment to
reduce vulnerability to CC
applied in pilot sites.
• Strengthening capacities for
adaptation to CC in at least three
municipalities.
corals resistant to high temperatures
and rehabilitate water flow in Sian
Ka’an, (iii) to reforest mangrove and
dredge canals in Tabasco and
Veracruz, and (iv) to enable
ecotecnias for Tabasco.
The use of ALOS images was
eliminated as these are no longer in
operation. Currently, the
Government of Mexico has SPOT
images.
The technical reports will be
included as sustainability strategies
in each of the adaptation measures.
Component 2: Implementation of Pilot
Adaptation Measures in Highly
Vulnerable Wetlands
• Increased knowledge of estimated
cost and benefits of adaptation in
coastal wetlands in Mexico.
• Increased ability to mainstream
climate change considerations in
land use planning.
• Increased competence to incorporate
wetlands protection in municipal
land use planning.
Papaloapan:
• Alvarado Municipality under
land use planning incorporating
CC impacts as well as adaptation
and conservation measures.
• Reforestation of mangrove
ecosystem and riparian zones for
a target of at least 30 ha.
• Infrastructure and equipment
(cleaning, desilting and
rehabilitation of at least 3 km of
water fluxes; and one tide gauge
and meteorological instruments)
to reduce vulnerability to CC.
• One management plan for
Wildlife Conservation,
Management, and Sustainable
Utilization Units (UMA) in
mangrove ecosystems.
• Strengthening capacities for
adaptation to CC in at least one
location.
Tabasco:
The term buffer zone was removed,
as these areas are defined for the
creation of an ANP, and the
establishment of these has not been
considered for the mentioned pilot
sites.
• Land use planning updated
incorporating CC impacts as well
as adaptation and conservation
measures.
• Reforestation of mangrove
ecosystem and riparian zones for
a target of at least 20 ha.
• Infrastructure and equipment
(cleaning, desilting and
rehabilitation of at least 3 km of
water fluxes; one tide gauge and
meteorological instruments; and
at least two stilt houses and one
rainwater harvesting) to reduce
vulnerability to CC.
• One management plan for
Wildlife Conservation,
Management, and Sustainable
Utilization Units (UMA) in
mangrove ecosystems.
• Strengthening capacities for
adaptation to CC in at least one
location.
Sian Ka’an:
• Protected area monitoring
system strengthened including
climate change parameters.
• Protected area management
program revised to include
climate change considerations.
• A target of repopulating
genetically diverse temperature-
resistant coral genotypes in six
areas.
• Infrastructure and equipment
(one tide gauge and
meteorological and
oceanographic instruments) to
reduce vulnerability to CC.
• Rehabilitation of water fluxes of
El Playón mangrove ecosystem
for a target of at least 70 ha.
Component 3: Assessment of the
Impacts of Climate Change on Water
Resources Planning at a National Level
and in Coastal Wetlands including the
• Climate change impact scenarios
developed for national water
resources and for coastal
wetlands including identification
Identification of Potential Response
Options
• Support the strengthening of the
knowledge base required to
mainstream climate change in water
resources management and planning.
of response options.
Component 4: Project Management
• Coordination of the administrative,
financial management, procurement,
and safeguard aspects of the Project.
• Established processes for
articulation and coordination
among the agencies involved.
Time reduction of drafting
contracts and administrative
processes.
Annex 3
Updated Results Framework and Monitoring
*(Given delays in implementation the first years are left blank for some of the indicators)
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection Design
documents for
pilot adaptation
measures that
facilitate
prompt
implementation
and include
sustainability
strategy as well
as monitoring
provisions
No adaptation
measures in
selected coastal
wetlands
* * *
Three design
documents
under
preparation
Three
design
documents
with
specific
measures
under
preparation
Three design
documents
completed.
Annual
supervision
reports
Annual review,
supervision visits,
photographic
records, satellite
images, land cover
and land use data,
GIS
INECC with
local
coordinators
Two Land Use
Planning
Programs
(LUPP) and a
revised
protected area
management
program,
incorporating
climate change
adaptation
activities,
discussed with
stakeholders,
and at least one
LUPP
submitted for
approval to
Limited
availability of
Wetlands
Management
Plans (exception
Sian Ka’an);
existing ones do
not consider CC
information or
expected impacts
* * *
The Sian
Ka’an
protected area
management
program
revised to
include
climate
change
considerations
LUPP of
Alvarado
Lagoon under
implementatio
n
LUPP of
LUPP of
Alvarado
Lagoon
submitted
for approval
to deciding
authorities
At least two
LUPPs of
approved by
deciding
authorities
Annual
reports
Annual review,
photographic
records, satellite
images, land cover
and land use data,
GIS
INECC with
local
coordinators
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection decision
making
authorities and
supported by
local and state
institutions
(depending on
the aptitude of
the territory in
each pilot site,
the LUPP will
incorporate
conservation
elements)
Tabasco
revamped
Two
management
plans for
Wildlife
Conservation,
Management,
and Sustainable
Utilization
Units (UMA)
in mangrove
ecosystems
There is no
sustainable use of
mangrove
* * * *
At least 2
UMA’s
established
At least 2
UMA’s
established in
mangrove
ecosystems
Annual
report
Annual review,
photographic
records, satellite
images, land cover
and land use data,
GIS
INECC with
local
coordinators
Strengthening
capacities at a
local level
Communicatio
n and training
for local actors
on adaptation
to CC
Limited
information about
CC
* * *
Pre-scanning
workshops
concluded
Three
workshops
concluded
Follow-up
workshops
Capacities at a
local level
strengthened
and
communicatio
n strategy and
training/works
hops for local
actors on
adaptation to
CC delivered.
Annual
report
Supervision visits,
and photographic
records
INECC with
local
coordinators
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection Actions
initiated for
reforestation of
mangrove
ecosystem and
riparian habitat
for a target of
at least 50 ha,
reforested with
native species
that would add
to climate-
resilience of
coastal
wetlands
No adaptation
measures in pilot
sites
Local initiatives
with limited
effectiveness
* * * *
Reforestatio
n of at least
50 ha
initiated
Completion of
at least 50 ha
of reforestation
of mangrove
ecosystems
and riparian
habitats.
Annual
report,
reforestatio
n plan
Annual review,
photographic
records,
satellite images,
land cover and
land use data, GIS
INECC with
local
coordinators
Increased
thermal
resilience of
coral
populations in
the Biosphere
Reserve Sian
Ka’an through
repopulating
genetically
diverse
temperature-
resistant coral
genotypes in at
least six areas
No adaptation
measures in pilot
sites
Coral bleaching in
the Biosphere
Reserve Sian
Ka’an
* * *
Repopulation
program
designed and
selection of
adequate
species and
nurseries
developed
Start with
the
establishme
nt of
genetically
diverse
temperature
-resistant
coral
patches
At least six
areas of the
Sian Ka’an
Biosphere
Reserve have
been
repopulated
with
genetically
diverse
temperature-
resistant coral.
Bi-annual
and annual
reports,
repopulatio
n plan
Bi-annual and
annual review,
photographic
records,
satellite images,
supervision visits,
GIS
INECC with
local
coordinators
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection Infrastructure
and equipment
(cleaning,
desilting and
rehabilitation
of water fluxes;
tide gauges and
meteorological
instruments;
and stilt
houses) to
reduce
vulnerability to
CC
Limited
infrastructure and
equipment
* * * *
Start with
the
infrastructur
e and
equipment
implementat
ion
At least 70 ha
of water
fluxes
rehabilitated
through
infrastructure
and
equipment.
Annual
report
Annual review,
photographic
records,
supervision visits,
satellite images
INECC with
local
coordinators
Production and
dissemination
of practical
guidance
document on
cost and
benefits of
adaptation
measures in
coastal
wetlands as a
basis for
replication
efforts
Limited
information * * *
Data
collection
initiated
Cost and
benefits of
adaptation
approaches
in wetlands
and are
compiled in
a guidance
document
Document
is being
disseminate
d and serves
as basis for
replication
efforts
Completion
and
dissemination
of guideline
Draft and
final
Guidance
document
Final document INECC
Climate change
impact
scenarios
developed for
selected basins
No response
options defined
yet on cc impacts
in national water
resources
Scenarios
of CC
impacts
on
national
Response
options
identified
4° report
IPCC
Response
options
identified 4°
report IPCC
Response
options
identified 5°
report IPCC
Supporting
At least one
national
water
resources
managemen
Climate
change impact
scenarios
developed for
selected basins
Annual
report,
minutes of
meetings
with IMTA
List of viable
policy options
IMTA/
CON-AGUA
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection and for coastal
wetlands
supporting
knowledge
base required
to mainstream
CC into water
resources and
wetland
management
and planning
management water
resources
develope
d
studies at one
emblematic
basin
concluded
t response
option
identified
that
considers
CC impact
scenarios
and for costal
wetlands.
Supporting
knowledge
base to
mainstream
CC into water
resources and
wetland
management
planning
developed
/CON-
AGUA
Intermediate Outcome Indicators
Component 1: Design of Selected Adaptation Measures and Technical Coordination of the Project
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection At least three
pilot adaptation
measures count
with sound
technical
design
documents
including
analysis of
financial,
economic,
social and
environmental
aspects and are
ready for
implementation
Pilot sites do not
consider
adaptation yet
* * *
Three
measures
under design
At least
three
measures
under
execution
At least three
pilot
adaptation
measures
implemented
Annual
report,
design
progress
reports,
costs and
benefits
Final design
INECC with
local
coordinators
Modeling,
generation of
data, analysis,
and access to
information
and long-term
remote sensing
Limited
monitoring of
pilot wetlands,
limited
monitoring of CC
data in pilot site
areas
* * *
Satellite
images
acquisition
and capacity
to store and
assess data
and images
Modeling,
generation
of data,
analysis,
and access
to
information
and long-
term remote
sensing
Finalization of
the modeling,
generation of
data, analysis,
and access to
information
and long-term
remote sensing
Wetland
monitoring
programs
Satellite images,
other monitoring
data
INECC
Designs on
pilot adaptation
measures will
include a
sustainability
strategy.
No adaptation
pilots * * *
Three
measures
under desing.
Sustainabilit
y strategy
updated
based on
Project
results
seeking
continuation
of results
Designs on
pilot
adaptation
measures
completed
Sustainabilit
y
incorporate
d
Preparation and
supervision
reports
INECC
Component 2: Implementation of Pilot Adaptation Measures in Highly Vulnerable Wetlands Site 2 Conservation * * * * LUPP of LUPP of Annual Annual review, INECC with
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection Papaloapan:
Alvarado
Lagoon under
Land Use
Planning
Program
(LUPP)
incorporating
CC impacts as
well as
adaptation and
conservation
measures
management plans
do not take CC
impacts into
consideration and
unsustainable land
use practices in
the buffer zone
prevail
Alvarado
Lagoon
submitted
for approval
to deciding
authorities
Alvarado
Lagoon
approved
report,
reforestatio
n plan
photographic
records, satellite
images, land
cover and land
use data, GIS
local
coordinator
Site 2
Papaloapan:
Actions
initiated for
reforestation of
mangrove
ecosystem and
riparian zones
for a target of
at least 30 ha.
No buffer zone
around the
Lagoon
* * * *
Reforestatio
n of at least
30 ha
initiated
Reforestation
of at least 30
ha completed
Annual
report
Annual review,
photographic
records,
satellite images,
land cover and
land use data, GIS
INECC with
local
coordinator
Site 2
Papaloapan:
Infrastructure
and equipment
(cleaning,
desilting and
rehabilitation
of at least 3 km
of water fluxes;
and one tide
gauge) to
reduce
vulnerability to
CC
Limited
infrastructure and
equipment
* * *
*
Infrastructur
e and
equipment
implementat
ion initiated
At least 3 kms
of water fluxes
rehabilitated
through
Infrastructure
and equipment
completed.
Annual
report
Annual review,
photographic
records,
supervision visits,
satellite images
INECC with
local
coordinator
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection Site 2
Papaloapan:
One
management
plan for
Wildlife
Conservation,
Management,
and Sustainable
Utilization
Units (UMA)
in mangrove
ecosystems
There is no
sustainable use of
mangrove
* * * *
At least one
UMA’s
established
At least one
UMA’s
established
Annual
report
Annual review,
photographic
records, satellite
images, land
cover and land
use data, GIS
INECC with
local
coordinator
Site 2
Papaloapan: Strengthening
capacities for
adaptation to
CC in at least
two locations
Limited
information about
CC
* * *
Pre-scanning
workshops
concluded
One
workshop
concluded
Follow-up
workshops
Capacities for
adaptation to
CC
strengthened in
at least two
locations
through
follow-up
workshops
Annual
report
Supervision
visits, and
photographic
records
INECC with
local
coordinator
Site 3
Tabasco:
Land Use
Planning
Program
(LUPP)
revamped
incorporating
CC impacts as
well as
adaptation and
conservation
measures
Deforestation and
land conversion
are frequent
* * *
LUPP of
Tabasco
revamped
LUPP for
Tabasco
approved
Annual
reports
Annual review,
photographic
records, satellite
images, land
cover and land
use data, GIS
INECC with
local
coordinators
Site 3
Tabasco:
Limited
infrastructure and * * * *
Infrastructur
e and
At least 3 kms
of water fluxes
Annual
report
Annual review,
photographic
INECC with
local
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection Infrastructure
and equipment
(cleaning,
desilting and
rehabilitation
of at least 3 km
of water fluxes;
one tide gauge;
and at least two
stilt houses) to
reduce
vulnerability to
CC
equipment equipment
implementat
ion initiated
rehabilitated
through
Infrastructure
and equipment
completed.
records,
supervision visits,
satellite images
coordinator
Site 3
Tabasco:
One
management
plan for
Wildlife
Conservation,
Management,
and Sustainable
Utilization
Units (UMA)
in mangrove
ecosystems
There is no
sustainable use of
mangrove
* * * *
At least one
UMA
established
At least one
UMA
established
Annual
report
Annual review,
photographic
records, satellite
images, land
cover and land
use data, GIS
INECC with
local
coordinator
Site 3
Tabasco:
Strengthening
capacities for
adaptation to
CC in at least
one location
Limited
information about
CC
* * *
Pre-scanning
workshops
concluded
One
workshop
concluded
Follow-up
workshops
Capacities for
adaptation to
CC
strengthened in
at least two
locations
through
follow-up
workshops
Annual
report
Supervision
visits, and
photographic
records
INECC with
local
coordinator
Site 4 Sian
Ka’an:
Monitoring of
wetland does not * * *
CC data
identified and
CC data part
of
Monitoring
systems with
Monitoring
program
Supervision,
annual review and
INECC and
CONANP
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection Protected area
monitoring
system
strengthened
including
climate change
parameters
include CC data collection
program and
protocols
defined
monitoring
program of
the wetland
CC parameters
developed for
Sian Ka’an
with CC
data;
semiannual
Project
reports
climate models with local
coordinator
Site 4 Sian
Ka’an:
Protected area
management
program
revised to
include climate
change
considerations
Protected area
management plan
does not include
CC data
Identifica
tion of
CC
impacts
initiated
The Sian
Ka’an
protected area
management
program
revised to
include
climate
change
considerations
Protected area
management
program
revised to
include climate
change
considerations
Protected
area
managemen
t program
and the
monitoring
system with
CC data;
semiannual
Project
reports
Supervision, and
annual review,
INECC and
CONANP
with local
coordinator
Site 4 Sian
Ka’an:
A target of
repopulating
genetically
diverse
temperature-
resistant coral
genotypes in
six areas
Repopulation not
included in coral
reef conservation
programs
* * *
Repopulation
program
designed and
selection of
adequate
species and
nurseries
developed
A target of
genetically
diverse
temperature
-resistant
coral
patches
established
in 6
locations
achieved
At least six
areas in the
Sian Ka’an
Biosphere
Reserve with
repopulated
temperature-
resistant coral
genotypes.
Bi-annual
and annual
reports,
repopulatio
n plan
Bi-annual and
annual review,
photographic
records,
satellite images,
supervision visits,
GIS
INECC and
CONANP
with local
coordinator
Site 4 Sian
Ka’an:
Rehabilitation
of water fluxes
and restoration
of El Playón
mangrove
ecosystem for a
Degraded
mangrove
community
* * * *
Reforestatio
n of at least
70 ha
initiated
Rehabilitation
of water fluxes
and restoration
of El Playón
mangrove
ecosystem in at
least 70 ha.
Annual
report,
reforestatio
n plan
Annual review,
photographic
records,
satellite images,
land cover and
land use data, GIS
INECC and
CONANP
with local
coordinator
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection target of at
least 70 ha.
Site 4 Sian
Ka’an:
Infrastructure
and equipment
(one tide gauge
and
meteorological
instruments) to
reduce
vulnerability to
CC
Limited
infrastructure and
equipment
* * * *
Infrastructur
e and
equipment
implemente
d
Infrastructure
and
meteorological
instruments to
reduce
vulnerability to
CC
Annual
report
Annual review,
photographic
records,
supervision visits,
satellite images
INECC with
local
coordinator
Site 4 Sian
Ka’an:
Strengthening
capacities for
adaptation to
CC in at least
one location
Limited
information about
CC
* * *
Pre-scanning
workshops
concluded
One
workshop
concluded
Follow-up
workshops
Capacities for
adaptation to
CC
strengthened in
at least two
locations
through
follow-up
workshops
Annual
report
Supervision
visits, and
photographic
records
INECC with
local
coordinator
Component 3: Assessment of the Impacts of Climate Change on Water Resources Planning at a National Level and in Coastal Wetlands
including the Identification of Potential Response Options
Climate change
impact
scenarios
developed for
national water
resources and
for coastal
wetlands
including
identification
of response
options
National policies
do not yet
incorporate cc
impacts on water
availability
Scenarios
of CC
impacts
on
national
water
resources
develope
d
Response
options
designed
(IPCC
fourth
assessmen
t report)
Response
options
identified
(IPCC
fourth
assessment
report)
Response
options
identified
(IPCC fifth
assessment
report)
Supporting
studies at one
emblematic
basin
concluded
At least one
national
water
resources
management
response
option
identified
that
considers CC
impact
scenarios
Climate
change impact
scenarios for
national water
resources and
for coastal
wetlands
including
identification
of response
options,
developed
Annual
report;
studies;
CC data
on
national
and
priority
watershe
d level
List of viable
policy options
IMTA/
CONAGUA
Target Values Data Collection and Reporting
Project
Outcome
Indicators
Baseline YR1 YR2 YR3 YR4 YR5 YR6
Frequenc
y and
Reports
Data
Collection
Instruments
Responsib
le for
Data
Collection
Component 4: Project Management
Established
processes for
articulation and
coordination
among the
agencies
involved.
Reduced time
in issuing
contracts and
administrative
processes.
N/A
The
Project
Impleme
ntation
Team
(PIT) is
consolida
ted.
Establish
ed
Institutio
nal
arrangem
ents.
Strengthen
ing PIT
Institution
al
arrangeme
nts.
Strengtheni
ng PIT
Mid-term
Review is
performed
and, if
appropriate,
restructurin
g is
processed
Monitoring
and
evaluation
from project
activities
Strengthening
PIT
Decreased
administrative
time
Monitoring
and evaluation
including
counterpart
funding is on
track
Final
evaluation
finds the
project
management
satisfactory
Final
evaluation
finds project
management
satisfactory
Biannual
progress
reports,
the MTR
report,
the final
report
Bank’s
Supervision
INECC, IMTA,
Bank
Annex 4
Action Plan
1 Repoblamiento de Coral (TDR-17) 2 d Contratado 04-sep-13 03-oct-15 a) Retraso en la obtención de
resultados de análisis y estudios
realizados por otras instituciones ajenas
al proveedor. b)
Retraso en el repoblamiento por
condiciones climáticas adversas.
c) Se recalendarizarán actividades.
a) Al menos tres medidas piloto de
adaptación (1 en Sian Ka'an) cuentan con
documentos de diseño técnico, incluyendo
análisis de aspectos financieros,
económicos, sociales y ambientales y
están listas para ser implementadas
b) Los diseños de las medidas piloto de
adaptación incluyen una estrategia de
sustentabilidad
c) Repoblamiento con genotipos de coral
resistentes a altas temperaturas en seis
áreas
Entrega de Productos
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
2 Diseño de medidas de adaptación en
Tabasco (TDR-09)
2 c Contratado 18-dic-14 17-oct-15 a) Se prevé una demora en la
integración del informe final, ya que
considera el procesamiento de una
cantidad importante de información.
b) Adicionalmente, incluye el análisis de
la información generada en los talleres
e integración de un sistema de
información geográfica.
a) Al menos tres medidas piloto de
adaptación (1 en Tabasco) cuentan con
documentos de diseño técnico, incluyendo
análisis de aspectos financieros,
económicos, sociales y ambientales y
están listas para ser implementadas
b) Los diseños de las medidas piloto de
adaptación incluyen una estrategia de
sustentabilidad
c) Fortalecimiento de capacidades para la
adaptación al cambio climático en al menos
dos localidades
Entrega de Productos
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
3 Diseño de medidas de adaptación en
Veracruz (TDR-10)
2 b Contratado 23-dic-14 22-oct-15 Se prevé una demora en la integración
del segundo informe y del informe final,
ya que considera el procesamiento de
una cantidad importante de información.
Adicionalmente, incluye el análisis de la
información generada en los talleres e
integración de un sistema de
información geográfica.
a) Al menos tres medidas piloto de
adaptación (1 en Veracruz) cuentan con
documentos de diseño técnico, incluyendo
análisis de aspectos financieros,
económicos, sociales y ambientales y
están listas para ser implementadas
b) Los diseños de las medidas piloto de
adaptación incluyen una estrategia de
sustentabilidad
c) Fortalecimiento de capacidades para la
adaptación al cambio climático en al menos
dos localidades
2015 2016
2015 2016
Entrega de Productos
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
4 Ordenamiento ecológico territorial de
Veracruz (TDR-15)
2 b Contratado 14-ene-14 13-oct-15 a) Se requiere la vinculación entre los
tres niveles de gobierno y la firma
consultora, para avanzar en las etapas
de pronóstico y propuesta del OET. Las
agendas gubernamentales son
complejas de manejar y coordinar.
b) Se prevé retrasos en la integración
de una gran cantidad de información
generada.
La Laguna de Alvarado con un OET que
incorpora los impactos del cambio
climático, así como medidas de adaptación
y conservación
Entrega de Productos
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
5 Implementación de exposición itinerante (ET-
39)
2 c Contratado 07-jul-15 06-oct-15 a) La exposición debe incluir imágenes
de las medidas de adaptación ya
concluidas en los tres sitios piloto, y
algunas medidas concluiran al final del
primer trimestre del 2016. b)
Adicionalmente que la exposición sera
montada en distintas ubicaciones de los
sitios piloto incluyendo la Ciudad de
México.
Comunicación y entrenamiento de actores
locales en adaptación al cambio climático
Entrega de Productos (1 Y 2)
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
6 Instalación de equipo mareográfico (ET-34) 2 d Contratado 01-jul-15 30-sep-15 a) Debido a que aún no se tiene
definido el sitio de instalación en Sian
Ka'an, se requerirá más tiempo para
concluir la consultoría. b) Se prevé
realizar un modificación al contrato para
incrementar el periodo en 6 meses. c)
Debido a que posiblemente se requiera
instalar el mareógrafo en otro tipo de
estructura, es probable un incremento
en el monto del contrato, de ser así, se
requiere tramitar una exención de MIA.
Infraestructura y equipamiento (un
mareógrafo e instrumentos meteorológicos
en cada sitio piloto) para reducir la
vulnerabilidad al cambio climático
2015 2016
Entrega de Productos
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
7 Taller de diagnóstico y vulnerabilidad en
Sian Ka'an (ET-28)
2 d Contratado 01-jul-15 26-sep-15 Se requiere ampliar el contrato por dos
meses adicionales, para sistematizar e
integrar los resultados de los talleres.
Fortalecimiento de capacidades a nivel
local
Comunicación y entrenamiento de actores
locales en adaptación al cambio climático
Entrega de Productos
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
8 Ecotecnias en el sistema lagunar Carmen-
Pajonal-Machona, Tabasco (Palafitos) (ET-
32)
2 c Contratado 05-feb-15 04-ago-15 a) Riesgos climáticos que pueden
demorar la habilitación de los palafitos.
b) La contratación de Ingenieros sin
Fronteras aún no se ha concretado, y su
participación es necesaria para certificar
los palafitos
Los diseños de las medidas piloto de
adaptación incluyen una estrategia de
sustentabilidad
Infraestructura y equipamiento (al menos
dos palafitos) para reducir la vulnerabilidad
al cambio climático
Entrega de Productos
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
9 Diseño de material de difusión (TDR-05) 2 c Contratado 01-nov-14 30-sep-15 La encuesta final se deberá realizar una
vez que las medidas de adaptación
esten concluidas y se requiere más
tiempo para procesar la información
Comunicación y entrenamiento de actores
locales en adaptación al cambio climático
Entrega de Productos
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
10 Implementación de medidas en el Playón
(ET-18)
2 d Contratado 04-dic-14 03-sep-15 Considerando los riesgos climáticos que
ocasionan demoras en las actividades
de rehabilitación del flujo hídrico, se
solicitará una ampliación al plazo del
contrato.
Los diseños de las medidas piloto de
adaptación incluyen una estrategia de
sustentabilidad
Rehabilitación del flujo hídrico en el
manglar de El Playón en al menos 70 ha
Entrega de Productos
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
2015 2016
11 Coordinación de la logística para el
fortalecimiento y fomento de las
capacidades adaptativas Tabasco (ET-50)
2 c Contratado Riesgos climáticos que pueden demorar
la habilitación de la protección y
fortalecimiento del sistema de captación
de agua de lluvia.
Infraestructura y equipamiento (un sistema
de captación de agua de lluvia) para
reducir la vulnerabilidad al cambio climático
Entrega de Productos
Convenio Modificatorio
Nuevo plazo de entrega de productos
Pagos al proveedor
Desembolso
12 Protección y fortalecimiento del sistema de
captación de agua de lluvia (ET-51)
2 c Contratado Riesgos climáticos que pueden demorar
la habilitación de la protección y
fortalecimiento del sistema de captación
de agua de lluvia.
Infraestructura y equipamiento (un sistema
de captación de agua de lluvia) para
reducir la vulnerabilidad al cambio climático
INECC Presente Justificación
IMTA Realizar procedimiento
NAFIN Registro de procedimiento
Contrato
Entrega de Productos
Pagos al proveedor
Desembolso
13 Coordinación de logística para talleres en
Veracruz y Tabasco (ET-27)
2 b No contratado Los talleres de resultados se deben de
realizar una vez concluidas las medidas
de adaptación en ambos sitios piloto,
una vez realizados se debe compilar y
analizar la información obtenida.
a) Fortalecimiento de capacidades a nivel
local. b) Comunicación y entrenamiento de
actores locales en adaptación al cambio
climático
INECC Presente documentación
IMTA Realizar procedimiento
NAFIN Registro de procedimiento
Contrato
Entrega de Productos
Pagos al proveedor
Desembolso
2015 2016
14 Adquisición e instalación de torres para
montar antenas de radiocomunicación (ET-
47)
2 c No contratado Bienes sujetos a la autorización de la
Secretaría de la Función Pública y de la
Secretaría de Hacienda y Crédito
Público, con la restricción de
adquisición durante el ejercicio fiscal
vigente, por los tiempos de entrega
establecidos por los proveedores es que
se programa la adquisición.
a) Fortalecimiento de capacidades a nivel
local. b) Comunicación y entrenamiento de
actores locales en adaptación al cambio
climático
Autorización de la SHCP
IMTA Realizar procedimiento
NAFIN registre el procedimiento
Contrato
Entrega de bienes
Pagos al proveedor
Desembolso
15 Adquisición de radios de comunicación (ET-
48)
2 c No contratado Bienes sujetos a la autorización de la
Secretaría de la Función Pública y de la
Secretaría de Hacienda y Crédito
Público, con la restricción de
adquisición durante el ejercicio fiscal
vigente, por los tiempos de entrega
establecidos por los proveedores es que
se programa la adquisición.
a) Fortalecimiento de capacidades a nivel
local. b) Comunicación y entrenamiento de
actores locales en adaptación al cambio
climático
Autorización de la SHCP
IMTA Realizar procedimiento
NAFIN gestione NO
BM otorgue NO
Contrato
Entrega de bienes
Pagos al proveedor
Desembolso
16 Perfilador de corrientes (ET-42) 2 d No contratado Bienes sujetos a la autorización de la
Secretaría de Hacienda y Crédito
Público, con la restricción de
adquisición durante el ejercicio fiscal
vigente, actualmente se espera la
autorización, sin embargo por los
tiempos de entrega se considera
necesaria la ampliación.
Infraestructura y equipamiento
(instrumentos oneanográficos) para reducir
la vulnerabilidad al cambio climático
Autorización de la SHCP No contratado
INECC Presente documentación
IMTA Realizar procedimiento
NAFIN Registro
Contrato
Entrega de bienes
Pagos al proveedor
11-ago-15
2015 2016
Desembolso
17 Sonda Multiparamétrica (ET-44) 2 d No contratado Bienes sujetos a la autorización de la
Secretaría de Hacienda y Crédito
Público, con la restricción de
adquisición durante el ejercicio fiscal
vigente, actualmente se espera la
autorización, sin embargo por los
tiempos de entrega se considera
necesaria la ampliación.
Infraestructura y equipamiento
(instrumentos oneanográficos) para reducir
la vulnerabilidad al cambio climático
Autorización de la SHCP No contratado
INECC Presente documentación
IMTA Realizar procedimiento
NAFIN Registro
Contrato
Entrega de bienes
Pagos al proveedor
Desembolso
18 Adquisición de No Breaks (ET-43) 1,3 y 4 Bienes sujetos a la autorización de la
Secretaría de Hacienda y Crédito
Público, con la restricción de
adquisición durante el ejercicio fiscal
vigente, actualmente se espera la
autorización, sin embargo por los
tiempos de entrega se considera
necesaria la ampliación.
Indicadores del componente a) Diseño de
medidas de adaptación y coordinación
técnica del proyecto
Autorización de la SHCP
IMTA Realizar procedimiento
NAFIN Registro
Contrato
Entrega de bienes
Pagos al proveedor
Desembolso
19 Adquisición de pizarrones (ET-45) 1 Clasificados como bienes por lo que
estan sujetos a la autorización de la
Secretaría de Hacienda y Crédito
Público, con la restricción de
adquisición durante el ejercicio fiscal
vigente
Indicadores del componente a) Diseño de
medidas de adaptación y coordinación
técnica del proyecto
Autorización de la SHCP
IMTA Realizar procedimiento
NAFIN Registro
Contrato
Pagos al proveedor
Desembolso
11-ago-15
2015 2016
20 Actividades de divulgación (GO), Asistencia
a congresos, cursos y/o talleres Nacionales
3 Prevista 01-oct-15 31-oct-15 Se requiere realizar la difusión de los
procesos, resultados y productos
generados en el proyecto en foros
nacionales e internacionales.
Escenarios de impacto del cambio climático
sobre el recurso hídrico y los humedales
costeros, incluyendo la identificación de
opciones de respuesta.
Registro SEPA y aprobación SEPA
Congresos Nacionales
Pagos al proveedor
Desembolsos
21 Capacitación (GO) 3 Prevista 01-oct-15 31-oct-15 La falta de capacitación en el uso y
manejo de la plataforma donde se
implementan los modelos hidrológicos
puede reducir el beneficio de realizar
análisis complementarios en la
evaluación del escurrimiento al
considerar ciertas medidas de
adaptación.
Escenarios de impacto del cambio climático
sobre el recurso hídrico y los humedales
costeros, incluyendo la identificación de
opciones de respuesta.
Registro SEPA y aprobación SEPA
Cursos especializados
Pagos al proveedor
Desembolsos
22 Consultor de apoyo a la coordinación
general (TDR-23) Continuidad de funciones
1 Prevista 01-nov-15 31-oct-16 Se requiere la continuidad para
seguimiento técnico y administrativo,
consistente entre otros temas: a)
revisión de documentos y reportes; b)
asistencia a talleres, comités eventos y
reuniones previstas; c) elaborar
informes de conclusión del proyecto
para INECC, SEMARNAT, SHCP y
SRE; d) ordenar y clasificar toda la
información generada en el proyecto.
A los indicadores de los componentes 1 y
2: a) Diseño de medidas de adaptación y
coordinación técnica del proyecto
b) Implementación de medidas piloto de
adaptación en humedales altamente
vulnerables
Recontratación por continuidad
Entrega de productos
Pagos al proveedor
Desembolso
2015 2016
23 Consultor de apoyo administrativo (TDR-26)
Continuidad de funciones
1 Prevista 01-nov-15 31-oct-16 Se requiere la continuidad para
seguimiento técnico y administrativo,
consistente entre otros temas: a)
revisión de documentos y reportes; b)
asistencia a talleres, comités eventos y
reuniones previstas; c) elaborar
informes de conclusión del proyecto
para INECC, SEMARNAT, SHCP y
SRE; d) ordenar y clasificar toda la
información generada en el proyecto.
A los indicadores de los componentes 1 y
2: a) Diseño de medidas de adaptación y
coordinación técnica del proyecto
b) Implementación de medidas piloto de
adaptación en humedales altamente
vulnerables
Registro SEPA y aprobación SEPA
Recontratación por continuidad
Entrega de productos a octubre 2016
Pagos al proveedor
Desembolso
24 Desarrollo Portal Web 3 Prevista 01-nov-15 31-oct-16 Se requiere contemplar el desarrollo de
una herramienta que apoye la difusión
de resultados y productos generados a
través de un portal Web y que cuente
con funciones básicas utilizadas en un
visor geográfico.
Escenarios de impacto del cambio climático
sobre el recurso hídrico y los humedales
costeros, incluyendo la identificación de
opciones de respuesta.
Registro SEPA y aprobación SEPA
IMTA Realizar procedimiento
NAFIN Registro de procedimiento
Contrato
Entrega de Productos (12 meses)
Pagos al proveedor
Desembolso
25 Impresión de libro para publicación 3 Prevista 01-jun-16 30-sep-16 Se prevé para realizar la difusión de los
procesos, resultados y productos
generados en el proyecto.
Escenarios de impacto del cambio climático
sobre el recurso hídrico y los humedales
costeros, incluyendo la identificación de
opciones de respuesta.
Registro SEPA y aprobación SEPA
IMTA Realizar procedimiento
NAFIN Registro de procedimiento
Contrato
Entrega de Productos (12 meses)
Pagos al proveedor
Desembolso
2015 2016
26 Capacitación (GO) 3 Prevista 01-oct-15 01-nov-15 La falta de capacitación en el uso y
manejo de la plataforma donde se
implementan los modelos hidrológicos
puede reducir el beneficio de realizar
análisis complementarios en la
evaluación del escurrimiento al
considerar ciertas medidas de
adaptación.
Escenarios de impacto del cambio climático
sobre el recurso hídrico y los humedales
costeros, incluyendo la identificación de
opciones de respuesta.
Registro SEPA y aprobación SEPA
Cursos especializados
Pagos al proveedor
Desembolsos
27 Actividades de divulgación (GO), Asistencia
a congresos, cursos y/o talleres Nacionales
e Internacionales
3 Prevista 01-nov-15 31-oct-16 Se requiere realizar la difusión de los
procesos, resultados y productos
generados en el proyecto en foros
nacionales e internacionales.
Escenarios de impacto del cambio climático
sobre el recurso hídrico y los humedales
costeros, incluyendo la identificación de
opciones de respuesta.
Registro SEPA y aprobación SEPA
Congresos
Pagos al proveedor
Desembolsos
28 Asesor de Adquisiciones (Continuidad de
funsiones)
4 Prevista 01-nov-15 31-oct-16 Se preve la continuidad de funciones
del asesor para realizar las
adquisiciones previstas y el seguimiento
Coordinación de la gestión administrativa,
financiera , adquisiciones, y salvaguardar
los aspectos del Proyecto
Registro SEPA y aprobación SEPA
IMTA Realizar procedimiento
NAFIN Gestión de NO
BM otorgue NO
Contrato
Entrega de Productos
Pagos al proveedor
Desembolso
29 Auditoria Externa para el ejercicio 2015 4 Prevista 01-nov-15 31-oct-16 Se preve la auditoria del ejercicio fiscal
2015
Coordinación de la gestión administrativa,
financiera , adquisiciones, y salvaguardar
los aspectos del Proyecto
Registro SEPA y aprobación SEPA
SHCP instruye a la contratación del
Despacho designado
IMTA Realizar procedimiento
Contrato
Entrega de Productos
Pagos al proveedor
Desembolso
Annex 5
Disbursement Projections until October 2016
EJERCICIO
DESEMBOLSADO
A SOL. 15 USD
PARA DESEMBOLSO EN
JUL-SEP 2015
PARA DESEMBOLSO EN
OCTUBRE-CIERRE 2015
PARA DESEMBOLSO EN ENE-MAR 2016
PARA DESEMBOLSO EN
ABR-JUN 2016
PARA DESEMBOLSO EN
JUL-SEP 2016
PARA DESEMBOLSO EN OCT-CIERRE 2016
2011 -
2012
97,115.05
2013
106,854.33
2014
725,211.00
2015
1,303,504.43 462,941.56
562,862.37
273,466.72 648,697.47
125,124.98
194,222.08
MONTO ACUMULADO
2,232,684.81 2,695,626.37
3,258,488.74 3,531,955.47 4,180,652.94
4,305,777.92
4,500,000.00
MONTO DONATIVO
4,500,000.00
% EJERCIDO 49.62% 59.90% 72.41% 78.49% 92.90% 95.68% 100.00%
MONTO POR EJERCER
2,267,315.19 1,804,373.63
1,241,511.26
968,044.53 319,347.06
194,222.08
-
Annex 6
Fulfillment of Revised Project Indicators