NEIGHBORHOOD CONSERVATION ADVISORY COMMITTEE
FALL 2016 FUNDING SESSION
NEIGHBORHOOD CONSERVATION PROGRAM
PROPOSED PROJECTS
December 8, 2016
SARAH MCKINLEY, CHAIRMAN
ALEXANDRA BOCIAN, VICE CHAIR ROBERT SWENNES, DEPUTY-VICE CHAIR
ARLINGTON COUNTY DEPARTMENT OF COMMUNITY PLANNING HOUSING AND DEVELOPMENT
OFFICE OF NEIGHBORHOOD SERVICES NEIGHBORHOOD CONSERVATION PROGRAM
December 8, 2016
TO: Neighborhood Conservation Advisory Committee FROM: Neighborhood Conservation Staff SUBJECT: Fall 2016 Funding Round The following 5 first priority projects are submitted for your consideration under the first round of the 2016 Neighborhood Conservation Bond. All projects are shown in point ranking order by neighborhood. The NCAC points committee has also prioritized these projects and the ranking is presented on the Funding Recommendations Points Worksheet. The worksheet reflects project ranking based on adopted NCAC guidelines. The priority ranking is only a recommendation for funding. We recognize that the NCAC reserves the right to choose projects based on other criteria. The December NCAC meeting will include discussion and a vote on the first priority proposals, including a brief presentation by the representative of each sponsoring neighborhood and/or the project “block representative.” A representative and/or block representative MUST attend the NCAC meeting or your project will not be considered. The projects chosen by the NCAC this funding round are forwarded to the County Board for final funding approval at the February 2017 County Board Meeting. Projects are then assigned budget accounts and are forwarded to appropriate County departments for implementation. **Please Note: Virginia Public Procurement Act, 2.2-4342 Public inspection of certain records states, “Cost estimates relating to a proposed procurement transaction prepared by or for a public body shall not be open to public inspection.” The Arlington County Department of Management and Finance has instructed the NC Program that this statement applies to NC projects that will eventually be bid (as opposed to projects using a County contract), and that our cost estimates for those projects need to be very general (discussing the project in its entirety or in % of the whole) rather than specific.
Final Points Worksheet - December 8, 2016 NC Fall Funding SessionPo
ints
Ran
king
Prop
osed
Pro
ject
Num
ber
Nei
ghbo
rhoo
d
Loca
tion
Proj
ect T
ype
New
NC
Pla
n (3
5)(3
0)(2
5)(2
0)
Num
ber o
f rou
nds
with
an
unfu
nded
pro
ject
(10-
70)
1st p
roje
ct a
fter a
bra
nd n
ew
NC
pla
n (5
)A
lt. fu
ndin
g so
urce
w/w
ritte
n co
mm
itmen
t (5)
(10)
Smal
l pro
ject
bon
uses
-$80
K
or le
ss (1
0)/ $
80-$
150K
(5)
Follo
w-o
n pr
ojec
ts id
entif
ied
at th
e ou
tset
of a
n in
itial
pr
ojec
t (5)
Phas
e of
larg
e pr
ojec
t/pre
v.
desi
gn fu
nded
(5)
S/W
pro
ject
w/n
o ex
istin
g s/
w o
n ei
ther
sid
e w
/traf
fic
volu
me
of 1
500
cars
/day
(5)
S/W
pro
ject
whi
ch a
buts
any
A
rter
ial(s
)(5)
S/W
pro
ject
with
in 1
/4 m
ile
of a
ny s
choo
l(s) (
5)S/
W p
roje
ct w
here
pr
evio
usly
ther
e is
no
com
plet
e s/
w o
n ei
ther
sid
e Pa
rk P
roje
ct (5
)
POIN
TS T
OTA
L
0 1Long Branch Creek Neighborhood Sign Sign
1 2 Fairlington
31st St S - S. Randolph St to S. Woodrow St
Street Improvement/ Street Lights 30 40 10 80
2 3Foxcroft Heights
S. Oak, S. Ode, S. Orme Sts - Columbia Pike to Southgate Rd Street Lights 35 30 5 70
3 4 Penrose2nd St S @ S. Wayne, Uhle & Wise Sts
Intersection Improvements 60 5 65
3 5Waycroft Woodlawn
George Mason Dr - 11th St N to I-66
Street Improvement 30 30 5 65
qualified
qualified
qualified
qualified
FALL 2016 PRELIMINARY PROJECT LIST - DECEMBER 8, 2016
Page 1
Poin
ts
Prop
osed
Pro
ject
Num
ber
Nei
ghbo
rhoo
d
Loca
tion
Proj
ect T
ype
New
NC
Pla
n (3
5)(3
0)(2
5)(2
0)
Num
ber o
f rou
nds
with
an
unfu
nded
pro
ject
(10-
70)
1st p
roje
ct a
fter a
bra
nd
new
NC
pla
n (5
)A
lt. fu
ndin
g so
urce
w
/writ
ten
com
mitm
ent (
5)
(10)
Smal
l pro
ject
bon
uses
-$80
K
or le
ss (1
0)/ $
80-$
150K
(5)
Follo
w-o
n pr
ojec
ts
iden
tifie
d at
the
outs
et o
f an
initi
al p
roje
ct (5
)
Phas
e of
larg
e pr
ojec
t/pre
v.
desi
gn fu
nded
(5)
S/W
pro
ject
w/n
o ex
istin
g s/
w o
n ei
ther
sid
e w
/traf
fic
volu
me
of 1
500
cars
/day
(5)
S/W
pro
ject
whi
ch a
buts
an
y A
rter
ial(s
)(5)
S/W
pro
ject
with
in 1
/4 m
ile
of a
ny s
choo
l(s) (
5)S/
W p
roje
ct w
here
pr
evio
usly
ther
e is
no
com
plet
e s/
w o
n ei
ther
sid
e
Park
Pro
ject
(5)
POIN
TS T
OTA
L
0 Long Branch Creek Neighborhood Sign Sign
1 Rock SpringsWilliamsburg Blvd - Glebe Rd to 35th St N - PH II - Z240
Beautification/ Pedestrian Safety 30 70 5 105
2 Bluemont
Wilson Blvd West of George Mason Dr to the BCA boundary at Four Mile Run Stream - Z263 Street Improvement 35 60 5 5 105
3 Glencarlyn4th St S - S. Kensington St to S. Illinois St - Z280 Street Improvement 30 40 5 5 80
4 Long Branch Creek2700 Blk S. Troy St - S. Glebe Rd to S. Uhle St - Z282 Street Lights 35 40 5 80
5 Fairlington31st St S -S. Randolph St to S. Woodrow St - Z273
Street Improvement/ Street Lights 30 40 10 80
6Tara Leeway Heights
N. Harrison St - 15th St N to 16th St N - Z270 Street Improvement 20 50 5 75
7 Foxcroft Heights
S. Oak, S. Ode, S. Orme Sts - Columbia Pike to Southgate Rd - Z283 Street Lights 35 30 5 70
8 Penrose2nd St S @ S. Wayne, S. Uhle & S. Wise Sts - Z262
Intersection Improvements 60 5 65
9 Waycroft WoodlawnGeorge Mason Dr - 11th St N to I-66 Overpass - Z284
Street Improvement/ Pedestrian Safety 30 30 5 65
10 CherrydaleN. Monroe St - 17th St N to 3612 19th St N - Z290
Street Improvement Street Lights 35 20 5 60
11 Douglas Park12th St S - S. Glebe Rd to S. Highland St - Z286
Street Improvement Street Lights 30 10 5 5 5 55
12 Dominion HillsN. Larrimore St & 9th St N - Z272
Intersection Improvement 50 5 55
13Arlington East Falls Church
N. Little Falls Rd - N. Washington Blvd to N. Van Buren St - Z275 Street Improvement 40 5 5 5 55
14 Westover VillageN. Longfellow St & N. 16th St Corner Improvement - Z271 Street Improvement 50 50
15 Claremont
1300 blk of S. Buchanan St - George Mason Dr to Deadend - Z276 Street Lights 40 5 45
16 Arlington ForestEdison Park - N. Edison St - Z278 Park 40 5 45
17Highland Park Overlee Knolls
Highland Park - 14th St N & N. Ohio St - Z279 Trail in Park 40 5 45
18 Columbia ForestS. Buchanan St - S. George Mason Dr to Deadend - Z277 Street Lights 40 5 45
19 Arlington RidgeS. Kent St - 17th St S to 21st St S - Z288
Street Improvement Street Lights 25 20 45
20 Old Dominion24th St N and Old Dominion Dr - Z287
Landscape/ Beautification 30 5 35
21Clarendon Courthouse
11th St N & N. Danville St - Z293 Park 20 10 5 35
22Radnor Ft. Myer Heights
N. Pierce St - N. 16th St to N. 16th Rd N - Z294 Street Improvement 30 5 35
23 Waverly Hills Woodstock Park - Z297 Park 25 5 30
24 Columbia Heights 12th St S. & S. Scott St - Z285 Street Improvement 30 30
25 Madison Manor Madison Manor Park - Z289Park/Invasive Plants Removal 20 5 25
26 Boulevard Manor
N. Montague St - N. Nottingham St to 4th St N - Z295 Street Improvement 25 25
27 Leeway OverleeJohn Marshall Dr - 22nd Rd N to 23rd St N - Z291 Street Improvement 20 20
28 Aurora Highlands21st St S - S. Ives St to S. Joyce St - Z292 Street Improvement 10 10
29 Maywood Thrifton Hill Park - Z296 Park 5 5
30 Arlington Heights1st Rd S - S. Glebe Rd to Glebe Rd - Z298
Intersection Improvement 0
31 Yorktown
25th Pl N & 25th Rd N - N. George Mason Dr to N. Columbus St - Z299 Street Improvement 0
QUALIFY
QUALIFY
QUALIFY
QUALIFY
0 Proposed Project Number: 1 In Point Sheet Order
PROJECT DATA
Neighborhood
Project Name Primary Street
Secondary Street
Third Street This Project Includes: Curb Gutter Beautification Sidewalk Parks Improvement Streetlights Pedestrian Safety N-hood Signs Other
Entryways to Neighborhood
LONG BRANCH CREEK Neighborhood Priority Total Points Project Cost Alternate Funding Net Cost to Program Alt. Funding Source Block Representative NC Representative
$ 12,500.00
N/A
$ 12,500.00
Y
N/A
Mark Schlachter
PROJECT DESCRIPTION Neighborhood Sign – Project steps include: location and design by the community with staff assistance. Sign fabrication, sign installation and landscaping.
0 Proposed Project Number: 2 In Point Sheet Order
PROJECT DATA
Neighborhood Project Name Primary Street
Secondary Street
Third Street This Project Includes: Curb Gutter Beautification Sidewalk Park Improvements Streetlights Pedestrian Safety N-hood Signs Other
31st St S
31ST St S – S. Randolph St to S. Woodrow St
FAIRLINGTON
Neighborhood Priority Total Points Project Cost Alternate Funding Net Cost to Program Alt. Funding Source Block Representative NC Representative
1
80
$1,236,708.00
$ 199,000.00
$1,077,962.00 Neighborhood Traffic Calming (NTC)
S. Randolph St
S. Woodrow St
Y Y
Y
Ed Hilz
Ed Hilz
PROJECT DESCRIPTION
This is a neighborhood street improvement project to install sidewalk on the west side of 31st St S. from the bus shelter across from the Shirlington House Apartments to the Shirlington bus transfer station at S. Randolph Street. Replace cobra street lights with Carlyle Style LED street lights along 31st St S, between S. Woodrow Street and S. Randolph Street.
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
0 Proposed Project Number: 3 In Point Sheet Order
PROJECT DATA
Neighborhood Project Name Primary Street
Secondary Street
Third Street This Project Includes: Curb Gutter Beautification Sidewalk Park Improvements Streetlights Pedestrian Safety N-hood Signs Other
S. Oak, Ode & Orme Sts
S. Oak, S. Ode, S. Orme Sts – Southgate Rd
FOXCROFT HEIGHTS
Neighborhood Priority Total Points Project Cost Alternate Funding Net Cost to Program Alt. Funding Source Block Representative NC Representative
1
70
$492,336.00
NA
$492,336.00 NA
Columbia Pike
Southgate Rd
Y
Sandra Hernandez
Sandra Hernandez
PROJECT DESCRIPTION
Installation of new LED Carlyle Style streetlights on S. Oak, S. Ode, and S. Orme Streets between Southgate Rd to Columbia Pike.
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
0 Proposed Project Number: 4 In Point Sheet Order
PROJECT DATA
Neighborhood Project Name Primary Street
Secondary Street
Third Street This Project Includes: Curb Gutter Beautification Sidewalk Park Improvements Streetlights Pedestrian Safety N-hood Signs Other
2nd St S
2nd St S @ S. Wayne, Uhle & Wise Streets
PENROSE
Neighborhood Priority Total Points Project Cost Alternate Funding Net Cost to Program Alt. Funding Source Block Representative NC Representative
1
65
$1,116,572.00
$ 169,697.00
$1,116,572.00 Bio-retention
S. Wayne, S. Uhle, S. Wise
Y
Y
Maria (Pete) Durgan
Darcey Cuffman
PROJECT DESCRIPTION
The street improvement project is proposed to reconfigure the intersection at 2nd Street S with S Wayne Street, S Uhle Street and S Wise Street to simplify traffic movements. New ADA compliant ramps will be added. Stormwater and drainage will upgraded. A bio-retention facticity will be created in the resulting green space from the elimination of the slip lane in front of the 7-11. The existing neighborhood sign will be relocated. A new corner curb extension will be created on the south east corner of 2nd Street S and S Wayne Street. High visibility crosswalks will be added across 2nd Street S. Picnic tables/benches will be added to the greenspace.
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
0 Proposed Project Number: 5 In Point Sheet Order
PROJECT DATA
Neighborhood Project Name Primary Street
Secondary Street
Third Street This Project Includes: Curb Gutter Beautification Sidewalk Park Improvements Streetlights Pedestrian Safety N-hood Signs Other
George Mason Drive
George Mason Drive – 11th St N to I-66
WAYCROFT WOODLAWN
Neighborhood Priority Total Points Project Cost Alternate Funding Net Cost to Program Alt. Funding Source Block Representative NC Representative
1
65
$1,255,447.00
$ 145,000.00
$1,255,447.00 Bio-retention
11th St N
I-66
Y Y
Y
Y
Y
Sharon Dorsey
Tracie Morris
PROJECT DESCRIPTION
This is a pedestrian and street improvement on George Mason Drive, between 11th St N to 10th St N, just before the I-66. All improvements will be done within the existing Right of Way (ROW); provide safe crosswalks with ADA accessible ramps; provide 5’ bike lanes on both sides of George Mason Drive; upgrade existing 4-ft sidewalk to 6-ft sidewalk on both sides of G.M. Drive, and 5-ft sidewalk near the bike trail; driveway aprons upgraded as needed; tree plantings; bio-retentions in several areas; pavement, striping and signage as needed.
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet
st es NCAC Fall 2016 Project Fact Sheet