Spearheaded the RMS software development and implementation across projects in the Business Unit and UAE.
65
Resources Management System (RMS) UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 1 Resources Management System (RMS) UAE (Building and Infrastructure) Overtime Review Park Rotana, Abu Dhabi 02 October 2011
Transcript
Page 1: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 1

Resources Management System (RMS) UAE (Building and Infrastructure) Overtime Review

Park Rotana, Abu Dhabi

02 October 2011

Page 2: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 2

Presentation

I. RMS (Version 1) – Concept Design Presenter: Emad Elshorbagy, CPS, PMP, PS, RMP

II. RMS (Version 1) - Live Demo Presenter: Maritess Eguia, Ph.D.

Page 3: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 3

Presentation

I. RMS (Version 1) – Concept Design

Page 4: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 4

What is RMS

RMS is an innovative approach of managing the

mobilization and demobilization of resources

between projects and HR.

The software is web-based and linked with ERP

‘R’ ‘M’ ‘S’ stands for Resource Management System

RMS includes a Software, User Manual and Procedures

Page 5: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 5

Resource Life Cycle:

Future Resource (Forecast)

Planned Mobilization Date

Planned Demobilization Date

Forecast Mobilization Date

Forecast Demobilization Date

Baseline

Forecast

Page 6: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 6

Resource Life Cycle:

Future Resource (Forecast)

Planned Mobilization Date

Planned Demobilization Date

Forecast Mobilization Date

Forecast Demobilization Date

Page 7: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 7

Resource Life Cycle:

Requested Resource

Planned Mobilization Date

Planned Demobilization Date

Requested Mobilization Date

Forecast Demobilization Date

Mobilization Request

2 Months for Labour

3 Months for Staff

4 Months for Senior Staff

Page 8: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 8

Resource Life Cycle:

Actual Resource

Planned Mobilization Date

Planned Demobilization Date

Actual Mobilization Date

Forecast Demobilization Date

Page 9: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 9

Resource Life Cycle:

Actual Resource

Planned Mobilization Date

Planned Demobilization Date

Actual Mobilization Date

Forecast Demobilization Date Extension Request

Page 10: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 10

Resource Life Cycle:

Actual Resource

Planned Mobilization Date

Planned Demobilization Date

Actual Mobilization Date

Forecast Demobilization Date

Notification of Demobilization

Page 11: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 11

Resource Life Cycle:

Demobilized Resource

Planned Mobilization Date

Planned Demobilization Date

Actual Mobilization Date

Actual Demobilization Date

Page 12: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 12

Welcome admin Change Password Logout

Please Select

Project Details

HLG Resources Management System

UAE

Abu Dhabi

Building

275

276

278

279

280

281

HMR 828

Forecast

Mobilization

Actual Non-HLG

Extension

Demobilization

Baseline

Reports

Page 13: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 13

Welcome admin Change Password Logout

Please Select

Project Details

HLG Resources Management System

UAE

Abu Dhabi

Building

275

276

278

279

280

281

HMR 828

Forecast

Mobilization

Actual

Extension

Demobilization

Baseline

Reports

Staff Allocation

Mobilization & Demobilization

Histogram

Look-ahead

Page 14: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 14

Page 15: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 15

Page 16: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 16

Page 17: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 17

Page 18: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 18

0

50

100

150

200

250

Steel Fixers

Baseline Actual Forecast

Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Site XYZ

750

1500

2250

3000

Page 19: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 19

Steel Fixers

Baseline Actual Forecast

All Sites

0

50

100

150

200

250

300

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Page 20: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 20

The System Objectives

• Automating the Mobilization & Demobilization process.

• Monitoring & Controlling the process against Budget (Baseline)

• Optimizing Resource usage.

• Assisting in Long Term and Strategic Planning

• Allowing for What-If Scenarios

• Assisting indentifying proposed staff for projects under tendering

Page 21: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 21

Presentation

II. RMS (Version 1) – Live Demo

Page 22: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 22

Page 23: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 23

Page 24: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 24

Page 25: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 25

Page 26: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 26

Page 27: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 27

Page 28: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 28

Page 29: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 29

Page 30: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 30

Page 31: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 31

Page 32: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 32

Page 33: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 33

Page 34: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 34

Page 35: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 35

Page 36: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 36

Page 37: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 37

Page 38: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 38

Page 39: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 39

Page 40: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 40

Page 41: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 41

Page 42: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 42

Page 43: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 43

Page 44: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 44

Page 45: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 45

Page 46: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 46

Page 47: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 47

Page 48: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 48

Page 49: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 49

Page 50: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 50

Page 51: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 51

Page 52: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 52

Page 53: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 53

Page 54: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 54

Thank you.

Page 55: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 55

Objective

To ensure that on-going projects are equipped with pre-agreed

budgeted resources to meet timetables and milestones in

accordance with the stated contractual obligations and in

compliance with organizational policies.

To keep a record of resources for both deployed and released against

each budget item/resources to eventually assess availability of

resources and accurately plan staff and labor resource

requirements.

To standardize the process of communicating reports electronically on

manpower requisitions on the basis of site mobilization and

demobilization plan and maintain a consolidated database of the

overall manpower data inclusive of the project sites, business units

and corporate offices.

Note: This has reference to the Manpower Deployment on RMS

Page 56: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 56

RMS- Key Features

Baseline

Forecast

Mobilization

Actual

Demobilization

Extension

Report

Page 12 – RMS User Guide

Page 57: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 57

The Baseline

The Baseline Plan will

be maintained as the

baseline for all

Updated (Working)

Contract Schedules.

This shall be

developed to

accurately reflect the

Contract requirement

for each specific

project.

Page 13 – RMS User Guide

Page 58: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 58

The Forecast

Forecast Resources

are based from the

Project Completion

Plan of a fully-

resourced Clause 14

program, to generate

the 2-months/8-weeks

look ahead.

The Forecast shall be

aligned with the

Target Schedule

which is a realistic

and achievable

improvement against

the Contract/Baseline

Schedule.

Page 13 – RMS User Guide

Page 59: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 59

The Mobilization Notifications Project Resources

mobilization is a function

provided in the form of

new mobilization

notifications pre-

determined through

Resource Calendar Start

and End dates, for

scheduling, tracking and

resource allocation.

The pull-down menu of

Job Family and Master

Trade are resources

dictionary built-in the

RMS are mapped on

ERP-HR Trades List.

Page 17 – RMS User Guide

Page 60: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 60

The Actual Resources Actual Resources

screen shows the

actual number of

resources on board

for each project.

The actual resources

can also be viewed

through the search

engine from project

start date up to the

specified cut-off date.

Page 18 – RMS User Guide

Page 61: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 61

The Demobilization Notifications The Demobilization

Notifications portrays

the staff and labor

release plan, to enable

the Operations Team

to extract the

necessary manpower

required from

alternate HLG projects

in order to

complement the

existing manpower at

critical location(s) so

as to restore

efficiency and

increase productivity.

Page 20 – RMS User Guide

Page 62: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 62

The Extension Request The Extension Request

feature provides an

option to extend

resources beyond the

prescribed

demobilization dates.

Upon confirmation the

selected resources shall

be removed from the

released list of the

Demobilization Screen

with the corresponding

extension specified on

the Calendar Dates.

Page 24 – RMS User Guide

Page 63: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 63

The Reports

The Reports are classified as

Staff Allocation Report,

Mobilization & Demobilization

Report, Look Ahead Report

and Reports in Histograms.

Each report type can be

generated with the filters

provided such as the Resource

Type (All, HLG, Non-HLG),

Category (All, Staff, Labor), in

accordance with the Job

Family, Master Trade,

Employee Code, Employee

Name, Start Date, Roles etc.

Report Titles can also be

customized for each use.

Page 28 – RMS User Guide

Page 64: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 64

Pilot Project

HLG 280

ARZANAH MEDICAL CENTRE

Page 65: Proposed Resources Management System

Resources Management System (RMS) – UAE (Building and Infrastructure) Overtime Review| 02 October 2011 | 65

RMS Version 2 Phase II

Additional Features of the RMS

Budget

Actual Cost

Budget At Completion

Cost At Completion

Estimate At Completion

Contract Charges

Variance


Recommended