+ All Categories
Home > Documents > PROPOSED ROAD -...

PROPOSED ROAD -...

Date post: 21-Jun-2019
Category:
Upload: haphuc
View: 214 times
Download: 0 times
Share this document with a friend
1
END POINT 11/000 K.M. ST. POINT 2/800 K.M. PROPOSED ROAD EXECUTIVE ENGINEER TAPI ( R & B ) DIVISION VYARA DEPUTY EXECUTIVE ENGINEER VYARA ( R & B ) SUB DIVISION VYARA CONSTRUCTION OF SONGADH UKAI SHERULLA ROAD K.M. 2/800 TO 11/0 DIST. TAPI GUJARAT STATE
Transcript

END POINT 11/000 K.M.

21° - 14' - 16.6"73° - 24' - 09.0"

ST. POINT 2/800 K.M.

21° - 10' - 01.2"73° - 34' - 01.9"

PROPOSED ROAD

EXECUTIVE ENGINEERTAPI ( R & B ) DIVISION

VYARA

DEPUTY EXECUTIVE ENGINEERVYARA ( R & B ) SUB DIVISION

VYARA

CONSTRUCTION OF SONGADH UKAI SHERULLA ROADK.M. 2/800 TO 11/0 DIST. TAPI GUJARAT STATE

Recommended