Proposed Service ChangesKCATA Comprehensive Service Analysis
August 24, 2011
What Are We Doing?
Comprehensive evaluation to determine how to provide better transit within existing resources:
Assess existing conditions
Analyze the demand for transit
Analyze the effectiveness of existing services
Develop and analyze alternative service scenarios
Develop recommendations
2
02,0004,0006,0008,000
10,000
25 T
roos
t71
Pro
spec
t58
Mai
n S
treet
MA
X24
Inde
pend
ence
39 3
9th
Stre
et31
31s
t Stre
et28
Blu
e R
idge
12 1
2th
Stre
et10
1 M
inne
sota
/Sta
te …
47 R
oano
ke10
6 Q
uind
aro
108
Indi
ana
51 W
ard
Par
kway
54 A
rmou
r Pas
eo57
Sou
th O
ak53
Arm
our S
wop
e …27
27t
h S
treet
30 N
orth
east
142
Nor
th O
ak17
5 75
th S
treet
35 3
5th
Stre
et16
3 63
rd S
treet
173
Cas
ino
Cru
iser
156
Red
Brid
ge12
9 I-2
9 E
xpre
ss12
1 C
leve
land
/Ant
ioch
109
9th
Stre
et28
X B
lue
Rid
ge …
133
Viv
ion/
Ant
ioch
155
55th
Stre
et47
1 71
Hig
hway
…38
Mea
dow
broo
k22
9 Ti
ffany
Spr
ings
…11
0 …12
3 23
rd S
treet
296 …
55 R
ockh
ill12
6 E
ast 5
th S
treet
24X
Inde
pend
ence
…29
8 S
outh
Kan
sas …
102
Cen
tral
243
Ant
ioch
-B
arry
…37
XX N
. Bro
adw
ay …
251
TMC
Lak
ewoo
d …25
3 R
ayto
wn …
137
Met
ro N
orth
-…38
X M
eado
wbr
ook …
51X
War
d P
arkw
ay …
247
Wes
tsid
e …13
5 W
innw
ood
37 G
lads
tone
132
Gra
cem
or56
X R
ed B
ridge
…13
6 B
oard
wal
k -…
237
Gla
dsto
ne -…
133X
Viv
ion/
Ant
ioch
…
Wee
kday
Rid
ersh
ip
Why Are We Doing This Now?
Last comprehensive evaluation was in 1995.
Kansas City has changed significantly since that time.
Financial pressures are increasing.
Some services work very well, some need improvement.
Need to provide better service with fewer resources.
48% on top 5 routes
5% on bottom 27 routes
Ridership by Route
3
Goals – More Attractive & Productive Service
Improve the passenger experience and draw new riders.
Improve the functionality and performance of the KCATA route system and individual routes.
Opportunities to improve service on nearly all routes.– Make service easier to use.– Make service easier to understand– Make service more convenient.– Make service faster and more direct.– Improve efficiencies and productivity.
4
Critical Baseline Plan Inputs
Rider preference survey
Market analysis
Quantitative data – route level and system level
Fleet use
Formal service guidelines and performance measures
Stakeholder visits
Rider and public input
Coordination with Downtown AA Planning efforts
5
How Effective is Existing Service?
Systemwide, KCATA’s services are generally well matched to demand
Many opportunities to improve service and productivity
Proposals for route changes focused in KCMO– Some major– Most minor to moderate
6
What is the Demand for Transit in KCMO?
Transit demand largely driven by three factors:
1. Population and employment densities
2. Socio-economic characteristics
3. Travel flows
7
Where is Demand Highest?
Demand is highest in the core area south of the river
Demand is lowest in outer neighborhoods:– Most of the Northland
– Eastern neighborhoods
– Southern neighborhoods
>25% less likely
10 to 25% less likely
Near average (+10% to -10%)
10 to 25% more likely
>25% more likely
Likelihood to Use Transit
8
Service Strategies
Service Design Develop Key Corridor network Realign service to improve reliability and directness Expand service to new areas Consolidate duplicative services Improve express service Discontinue some very poorly utilized services
Schedule Service frequencies and spans to better match demand More consistent schedules Scheduled MetroFlex connections
9
Key Corridor Network
Major routes around which the the rest of the system would be reconfigured.
Frequent service from early morning until late night.
Main Street MAXTroost MAX12 Truman Road24 Independence31 31st Street39 39th Street51 Broadway71 Prospect101 State Avenue129 I-29142 North Oak
Key Corridor Network
10
More Frequent Main Street MAX Service
Consolidate Route 57 with Main Street MAX to improve Main Street MAX service:– From every 15
minutes to every10 minutes duringthe midday
– From every 30minutes to every 15 minutes at night
11
Boardings and alighting indicated in blue or orange are at MAX stops
Northland– New Mark
– Gashland
– Zona Rosa
– I-29 Corridor/Tiffany Springs
Hickman Mills/Ruskin Heights
Westside
Expand Service in Underserved Areas
12
Proposed Hickman Mills Service
New Northland Service
Streamline Service
Service that is simpler, more direct and faster:
13
EXAMPLES12 12th Street: Split into two routes, 12th Street and Truman Road 27 27th Street: Straighten through Hospital Hill and Crown Center24 Independence: Operate via Independence Ave into Independence35 35th Street: Operate via VA Hospital in both directions71 Prospect: Operate all service via Federal District173 Casino Cruiser: Operate via I-29/I-35 and discontinue deviations
Rt 27 Realignment
Streamline Service
Service that is simpler, more direct and faster:
14
EXAMPLE: TRUMAN ROAD CORRIDOR Split Route 12 Truman Road into two routes:
– 12 12th Street– 15 Truman Road
Adjust mix of short and long trips on Route 24 Independence. Replace Route 24X Independence Express with new Route 15 service.
Existing Truman Road Service
Streamline Service
Service that is simpler, more direct and faster:
15
EXAMPLE: TRUMAN ROAD CORRIDOR Split Route 12 Truman Road into two routes:
– 12 12th Street– 15 Truman Road
Adjust mix of short and long trips on Route 24 Independence. Replace Route 24X Independence Express with new Route 15 service.
Proposed Truman Road Service
Consolidate Duplicative Services
Consolidate to both improve service and reduce costs.EXAMPLES12 Truman Road24X Independence
37 Gladstone38X Meadowbrook Express133 Vivion/Antioch Express:
51X Ward Parkway Express56X Red Bridge Express:
53 Armour-Swope54 Armour Paseo108 Indiana:
Main Street MAX57 South Oak156 Red Bridge
Replace with new 15 Truman Road
Replace with new 36X North Broadway Express
Combine
Combine 53 & 54Extend Route 108
Consolidate inner end of 57 with Main Street MAXConsolidate outer end of 57 with 156
16
Consolidate to Improve Express Service
Faster and more service through consolidating duplicative routes.
Existing
EXAMPLEConsolidate• 37 Gladstone• 38X Meadowbrook Express• 133X Vivion/Antioch Express Into new:• 36X Metro North – Gladstone – Antioch Center –
Downtown:– More service on new route than any individual
routes.– Faster service via I-29/I-35.– Nearly all existing riders served.– One strong route versus three individual weak
routes
17
Consolidate to Improve Express Service
Faster and more service through consolidating duplicative routes.
EXAMPLEConsolidate• 37 Gladstone• 38X Meadowbrook Express• 133X Vivion/Antioch Express Into new:• 36X Metro North – Gladstone – Antioch Center –
Downtown:– More service on new route than any individual
routes.– Faster service via I-29/I-35.– Nearly all existing riders served.– One strong route versus three individual weak
routes
Proposed
18
Convert MetroFlex to Fixed-Route
To provide more consistent service, no reservations, and better integration with rest of system.
19
247 Westside MetroFlex 27 27th Street & 123 23rd Street
229 Tiffany Springs MetroFlex 129 KCI/Prairie View
Discontinue Very Low Ridership Service
Discontinue services that serve too few passengers:
Eliminate low ridership variants:
EXAMPLES55 Rockhill (120 riders; 13.3 pax/veh hour; Troost MAX option) 136 Boardwalk Connector Saturday service (20 riders; 5.7 pax/vehicle hour )243 Antioch/Barry Road Saturday service (60 riders; 7.2 pax/vehicle hour)
Note: Current system average = 31.7 passengers per revenue vehicle hour
EXAMPLES129 I-29 Express; Tiffany Springs Variant (0 riders on unique segment)133 Vivion/Antioch; Iron Road Variant (6 riders)
20
Balance Service Levels with Demand
Based on ridership, some routes provide too infrequent service while others provide too many trips.
Adjust service levels based on the new service guidelines:
21
More frequent service: 21 routes (often accomplished through route consolidation)Less frequent service: 6 routesService shifted between time periods: 6 routes
0.0
0.5
1.0
1.5
2.0
2.5
3.0
0
5
10
15
20
25
30
4:55
5:25
6:10
6:40
7:25
7:55
8:40
9:35
10:4
5
12:0
5
13:1
5
14:3
5
15:2
0
15:5
1
16:4
0
17:0
7
17:5
5
19:3
0
20:5
0
Bus
Trip
s pe
r H
our
Rid
ersh
ip b
y Tr
ipEXAMPLERoute 35 35th Street– Current: Too much service in
peaks; too little midday– Proposed: Less service in
peaks; more in midday
Current Proposed
0
5
10
15
20
25
5:38
6:11
6:22
6:59
7:29
8:08
9:12
10:2
3
11:3
3
12:4
3
13:5
3
15:0
3
15:3
8
16:1
0
16:4
5
17:2
0
17:5
5
18:2
6
Ride
rshi
p pe
r Trip
Adjust Spans of Service
Ridership analysis indicate that….– Some routes start too early or too late
– And, some end too early or too late.
Adjust start and end times using new service guidelines:
Longer spans: 11 routesShorter spans: 20 routes
EXAMPLERoute 133– Operate service from
6:00 AM to 6:00 PM
New Span of Service
22
Operate Service More Consistently
Many routes operate with inconsistent service frequencies.
Revise schedules to make service easier to remember and more convenient:
More consistent schedules: 16 routes
EXAMPLE: Route 47 Roanoke Service Frequencies (in minutes)Existing Proposed
Early AM 20 – 30 30AM Peak 17 – 45 30Midday 40 – 45 30PM Peak 28 – 35 30Evening 28 – 35 60
23
The Reality...Impacts: Route Design
Route alignments will be impacted as follows…
24
New Route:4 Routes (7%)
Elimination:2 Routes (3%)
No Change: 41 Routes
(71%)
Realignment:11 Routes
(19%)
The Reality...Impacts: Route Trips
25
As proposed, the number of trips per route includes…
More Service:25 Routes
(40%)
Less Service:17 Routes
(29%)Same Service:11 Routes
(22%)
New Service:4 Routes
(9%)
Impacts: Passenger’s Route Used
26
Same Route86%
Alternative Route14%
No Longer Served0.2%
As proposed, current passengers will have access to….
Estimated Impacts
Provide equal or better service to large majority (>80%) of existing riders.
Serve virtually all existing riders (99.8%).
Attract approximately 5-7% more riders.
Improve productivity, in terms of passengers per vehicle hour, by 15-19%.
Decrease operating costs per passenger by 10-13%.
27
Next Steps
Action Schedule
Solicit public/stakeholder input• Publish Plan on website• Comments by email, mail, recorded phone line• Open Houses in community• Stakeholder visits
September -October
Revise proposals based on public/stakeholder input Fall 2011
Present final recommendations for Board approval Fall/Winter 2011
Begin phased implementation Spring 2012
28