+ All Categories
Home > Documents > Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA...

Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA...

Date post: 31-Dec-2019
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
74
Chatsworth High School Rev. 9-30-09 Los Angeles Unified School District Chatsworth High School Program Improvement Single Plan for Student Achievement Superintendent Ramon C. Cortines Board Members Mónica Garcia, Board President Marguerite Poindexter LaMotte Tamar Galatzan Steve Zimmer
Transcript
Page 1: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School Rev. 9-30-09

Los Angeles Unified School District Chatsworth High School

Program Improvement

Single Plan for Student Achievement

SuperintendentRamon C. Cortines

Board MembersMónica Garcia, Board PresidentMarguerite Poindexter LaMotte

Tamar GalatzanSteve Zimmer

Yolie Flores AguilarNury Martinez

Richard Vladovic

Page 2: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School Rev. 9-30-09

TABLE OF CONTENTSSchool Information........................................................................................................................................................................................ 1

School Program Identification (All Schools)................................................................................................................................................. 1School Site Council Composition (All Schools)............................................................................................................................................2Committee Recommendations and Assurances (All Schools).....................................................................................................................3

Key Findings From School's Data Analysis and Action Plans (All Schools Based on PI Status).........................................................4SPSA Evaluation Insert (All Schools)...........................................................................................................................................................6Goals for Action Plans: (All Schools—WASC for High Schools Only, if applicable)...................................................................................11District and School Program Improvement Exit Priorities (All Schools).....................................................................................................12Action Plan: English/Language Arts & Math (Based on Subgroup Data and PI Status)............................................................................13Action Plan: Graduation Rate (High Schools Only)....................................................................................................................................28Action Plan: Personalized/College Career Ready:.....................................................................................................................................31Action Plan: Parent and Community Engagement:....................................................................................................................................35

Program Improvement Section 1116 Requirements Implementation Page (All PI Schools)................................................................36Evidence/Monitoring (All PI Schools)........................................................................................................................................................ 37Attachments (All PI Schools)......................................................................................................................................................................38

Update Table of Contents regularly when pages are deleted or when they expand.

Page 3: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School SCHOOL INFORMATION

SCHOOL PROGRAM IDENTIFICATION

School Name: Chatsworth High School Local District: OneDistrict CDS Code: 1964733 School CDS Code: 19-64733-1931708

For additional information on our school programs contact the following:

Principal: Timothy Guy E-mail address: [email protected] Person: Steve West Position: Title I Coordinator E-mail address: [email protected]: 10027 Lurline Ave, Chatsworth, CA 91311 Telephone Number: 818-678-3457

Elementary School Middle School X High SchoolIndicate which of the following Federal, State and Local Programs are consolidated in this plan:

X Program Improvement (PI) * Indicate PI: Year 1 XX Title I Schoolwide Program (SWP) Year 3

Title I Targeted Assistance School (TAS) Year 4X School Based Coordinated Program (SBCP) Year 5

Year 5+

The District Governing Board approved this Revision to Update the Single Plan for Student Achievement on:

Date

The Local District staff has reviewed the School Plan with the principal and agreed to support and provide feedback for implementation.

Signature Signature

Local District Director of School Services Date Local District Superintendent or Designee Date

* Section 1116(b)(3) The school plan shall cover a two year period.

1

Page 4: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

School Site Council Composition (SSC)EC 52012, 52852

* A School Site Council at the middle school may, but is not required to, include student representatives (EC 33133-C).Part A – School Staff Part B – Parents/Community

Name Principal Classroom Teacher

Other Personnel Name Parent Community Student

Timothy Guy X Sheri Osborne XGlenn Shockley X Lucia Thurman XDell Goodman X Thelma Rodriguez X

Amy Aviv X Laura Iniguez XKathie Donner X Veronica Corral X

Ed LeVine X Monica Fink XAllyne Lawson X Kim Eder XMichael Taweel X Liza Zhou XEllen Modecki X Christine Lau X

Rosie Montague X Joanna Kwok X

Total number in each column 1 6 3 Total number in each columnTotal number in Part A 10 Total number in Part B 10

Glenn Shockley TeacherName of SSC Chairperson Position (e.g., Parent, Teacher) Signature of SSC Chairperson Date

Timothy GuyName of Principal Signature of Principal Date

Use SSC certification form to complete this page (BUL 4148.1).

2

The membership of the council shall be no fewer than 10 members.

The membership of the council shall be no fewer than 12 members. *

Page 5: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolCOMMITTEE RECOMMENDATIONS AND ASSURANCES

The school site council recommends this Program Improvement school plan and its related expenditures to the district governing board for approval and assures the board of the following:

1. School site councils have developed and approved a plan, to be known as the Single Plan for Student Achievement Program Improvement for schools participating in programs funded through the consolidated application process.

2. School plans must be developed “with the review, certification, and advice of any applicable school advisory committees.”

The school site council sought and considered all recommendations from the following groups or committees before adopting this plan. Signatures are requested for those advisory committees/groups providing input in the development of this plan.

CommitteesChairperson Check Date of review of

recommendationPrint Name Signature Parent Staff

Compensatory Education Advisory Committee Cary Tylka X 11/17/09

English Learner Advisory Committee Patricia Mercado X 11/17/09

UTLA Chapter Chair or Chapter Chair’s Designee Glenn Shockley X 11/3/09

Other (list)

3. The content of the plan must be aligned with school goals for improving student achievement.

4. The plan must be reviewed annually and updated, including proposed expenditures of funds allocated to the school through the consolidated application, by the school site council.

5. Plans must be reviewed and approved by the governing board of the local educational agency “whenever there are material changes that affect the academic programs for students covered by programs” funded through the consolidated application.

6. This school plan was adopted by the school site council on:

Date

Attested:

Glenn ShockleyTyped name of SSC chairperson Signature of SSC chairperson Date

Timothy GuyTyped name of school principal Signature of school principal Date

Documentation from the SSC and Advisory Committees (i.e., agendas, sign-ins and recommendations if applicable) must remain on file for five years at the school site.

3

Page 6: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolKEY FINDINGS FROM SCHOOL’S DATA ANALYSIS

Directions: Analyze the data provided to complete the chart below and use the questions in each section to determine the Key Findings/Conclusions.

Adequate Yearly Progress (AYP)Participation Rate

English/Language Arts MathematicsParticipation Rate

Target: 95% Identify the subgroup(s) that DID NOT meet the required target. Check “All Subgroups met” if all subgroups made the participation rate of 95%.

Participation Rate Target: 95%

Identify the subgroup(s) that DID NOT meet the required target. Check “All Subgroups met” if all subgroups made the participation rate of 95%.

Subgroup(s) Subgroup(s)

Schoolwide Pacific Islander Schoolwide Pacific Islander

African American White (not of Hispanic origin) African American White (not of Hispanic origin)

American Indian/Alaskan Native Socioeconomically-disadvantaged American Indian/Alaskan Native Socioeconomically-disadvantaged

Asian English learners Asian English learners

Filipino X Students with Disabilities Filipino X Students with Disabilities

Hispanic or Latino All Subgroups met Hispanic or Latino All Subgroups met

Question KEY FINDINGS / Conclusions from Data Analysis

Which of the subgroups did not meet the participation rate in English/language arts and/or mathematics?

Students with special needs did not meet participation rates for ELA and mathematics.

4

Page 7: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolKEY FINDINGS FROM SCHOOL’S DATA ANALYSIS

Directions: Analyze the data provided to complete the chart below and use the questions in each section to determine the Key Findings/Conclusions.

Adequate Yearly Progress (AYP)Proficiency Rate

Elementary and Middle School High SchoolPercent Proficient in

English/Language ArtsAnnual Measurable Objective (AMO)

Target: 46.0% for 2008—2009Target: 56.8% for 2009—2010Target: 67.6% for 2010—2011

Percent Proficient in Mathematics

Annual Measurable Objective (AMO) Target: 47.5% for 2008—2009Target: 58.0% for 2009—2010

Target: 68.5% for 2010—2011

Percent Proficient in English/Language Arts

Annual Measurable Objective (AMO)Target: 44.5% for 2008—2009Target: 55.6% for 2009—2010Target: 66.7% for 2010—2011

Percent Proficient in Mathematics

Annual Measurable Objective (AMO)Target: 43.5% for 2008—2009Target: 54.8% for 2009—2010Target: 66.1% for 2010—2011

English/Language Arts Percent Proficiency Rate Identify the subgroup(s) that DID NOT meet the required target. Check “All Subgroups met” if all subgroups made the proficiency rate.

Mathematics Percent Proficiency Rate Identify the subgroup(s) that DID NOT meet the required target. Check “All Subgroups met” if all subgroups made the proficiency rate.

Subgroup(s)

Subgroup(s)

Schoolwide Pacific Islander Schoolwide Pacific Islander

African American White (not of Hispanic origin) African American White (not of Hispanic origin)

American Indian/Alaskan Native Socioeconomically-disadvantaged American Indian/Alaskan Native Socioeconomically-disadvantaged

Asian X English learners Asian X English learners

Filipino Students with Disabilities Filipino Students with Disabilities

X Hispanic or Latino All Subgroups met X Hispanic or Latino All Subgroups met

Questions: KEY FINDINGS / Conclusions from Data Analysis

1. Which of the subgroups DID NOT meet the percent proficiency targets in English/language arts and/or mathematics based on 2008-09 data?

2. Using the AYP report, what new subgroup(s) of students might need additional assistance in meeting proficiency targets in English/language arts and/or mathematics in 2009-10 and/or 2010-11?

3. What key findings/conclusions may be written based on the CAHSEE data reports (high schools only)?

Did not meet targets:Hispanics/LatinoEnglish LearnersAdditional Assistance:White (Mathematics)Socioeconomically Disadvantaged (Both)Students with Disabilities (Close to becoming a significant subgroup)CAHSEE Findings (weakness):ELA:Writing Strategies, Writing ApplicationsMath:Algebra and Functions, Measurement and Geometry, Probability and Statistics, Algebra One

Update the Table of Contents when the page expands to a second page.

5

Page 8: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

SPSA EvaluationLOS ANGELES UNIFIED SCHOOL DISTRICT

FEDERAL AND STATE EDUCATION PROGRAMS BRANCH SINGLE PLAN FOR STUDENT ACHIEVEMENT (SPSA)

ANNUAL EVALUATION 2008-2009

Education Code Section 64001(g) requires that the School Site Council (SSC) must evaluate, at least annually, the effectiveness of the goals and activities/strategies found in the SPSA. Complete the table below and answer the questions that follow below to determine if the goals and activities/strategies described in the school’s SPSA are effective or need modification to increase student achievement.

Chatsworth High SchoolSection I: FUNDING

Check which of the following supplemental personnel and material support was purchased using categorical funds in the boxes below.1. Please check any of the following supplemental support personnel that was purchased through Title I (7S046) Teacher/ES/Sec/Bil. Teacher, Auxiliary,

Sec Teacher X/Z time Class-size

Reduction Teacher* Coordinator Day to Day Substitutes Counselor

*Schoolwide schools only

Professional Expert

Differential District Sponsored

Training Rate Consultants PSA Nurse Psychologist

Psychiatric Social Worker

Paraprofessional Library Aide Micro Computer Support

Assistant Parent Community

Representative

Office Technician Student Aide Clerical Overtime Custodial Overtime Other

Total Cost of Expenditures in this Section:

2. Please check any of the following supplemental program support that was purchased through Title I (7S046) Parent

training/workshops Conferences Professional

Development IMA

Staff Conference Attendance

Curricular Trips

Contracted Services Rental of Equipment Audio Visual

Equipment

Maintenance of Equipment Other Equipment

Total Cost of Expenditures in this Section:

3. Please check any of the following supplemental resources that were purchased through Title I Program Improvement (70A56) (If Applicable) Teacher X/Z time Day to Day

Substitutes Mileage Conference

Attendance Professional

Development

Professional Expert District Sponsored

Training Rate Contracted

Instructional Services Independent

Contract

Total Cost of Expenditures in this Section:

4. Please check any of the following supplemental resources that were purchased through Title I Parent Involvement IA-SCE (7E046) Parent

training/workshops Conferences IMA Clerical Overtime

Custodial Overtime Professional Expert

(Certificated) Community

Representative Parent Resource

Liaison

School Advisory Committee

Independent Contract

Contracted Services Audio Visual

Equipment Other

Total Cost of Expenditures in this Section:

6

335 529

28 024

0

12 024

Page 9: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

7

Page 10: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

5. Please check any of the following supplemental support personnel that was purchased through Title III (7S176) Teacher X/Z time Day to Day Substitutes Custodial Overtime

Professional Expert District Sponsored

Training Rate Clerical Relief Clerical Overtime

Teacher Assistant Relief

Administrator Z/X

Total Cost of Expenditures in this Section:

6. Please check any of the following supplemental program support that was purchased through Title III (7S176) IMA Reprographics

Advisory Committee Expense Contracted Services Parent Training Allowance

Total Cost of Expenditures in this Section:

7. Please check any of the following supplemental support personnel that was purchased through EIA-SCE (7S539) Teacher/ES/Sec/Bil. Teacher, Auxiliary,

Sec Teacher X/Z time Coordinator Day to Day

Substitutes Counselor

Professional Expert Differential District Sponsored

Training Rate Consultants PSA Nurse Psychologist

Psychiatric Social Worker

Paraprofessional Library Aide Micro Computer

Support Assistant Parent Community

Representative

Office Technician Student Aide Clerical Overtime Custodial Overtime Other

Total Cost of Expenditures in this Section:

8. Please check any of the following supplemental program support that was purchased through EIA-SCE (7S539) Parent

training/workshops Conferences Professional

Development IMA

Staff Conference Attendance

Curricular Trips

Contracted Services Rental of Equipment Audio Visual

Equipment

Maintenance of Equipment Other EquipmentTotal Cost of Expenditures in this Section:

9. Please check any of the following supplemental support personnel that was purchased through Supplemental (7N539) Teacher/ES/Sec/Bil. Teacher, Auxiliary,

Sec Teacher X/Z time Class size Reduction Day to Day Substitutes Counselor

Professional Expert District Sponsored

Training Rate PSA Nurse Psychologist

Psychiatric Social Worker

Paraprofessional Micro Computer

Support Assistant Parent Community

Representative PSA

Total Cost of Expenditures in this Section:

8

12 573

10 491

5 570

400

55 061

Page 11: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

9

10. Please check any of the following supplemental program support that was purchased through Supplemental (7N539) Parent

training/workshops Conferences Professional

Development IMA

Staff Conference Attendance

Curricular Trips

Contracted Services

Total Cost of Expenditures in this Section:

11. Please check any of the following supplemental support personnel that were purchased through EIA-LEP (7S536)

Teacher/ES/Sec/Bil. Teacher, Auxiliary,

Sec Teacher X/Z time Class-size Reduction

Teacher* Coordinator Day to Day

Substitutes Counselor

Professional Expert District Sponsored

Training Rate PSA Nurse Psychologist

Psychiatric Social Worker

Paraprofessional Micro Computer Support

Assistant Parent Community

Representative

Office Technician Student Aide Clerical Overtime Custodial Overtime Other

Total Cost of Expenditures in this Section:

12. Please check any of the following supplemental program support that were purchased through EIA-LEP (7S536)

Parent training/workshops Conferences Professional

Development IMA

Staff Conference Attendance

Curricular Trips

Contracted Services Rental of Equipment Audio Visual

Equipment

Maintenance of Equipment Other Equipment

Total Cost of Expenditures in this Section:

13. Please check any of the following supplemental support personnel that were purchased through EIA-LEP Supplemental (7N536)

Teacher/ES/Sec/Bil. Teacher, Auxiliary,

Sec Teacher X/Z time Class size Reduction Day to Day Substitutes Counselor

Professional Expert District Sponsored

Training Rate PSA Nurse Psychologist

Psychiatric Social Worker

Paraprofessional Micro Computer

Support Assistant Parent Community

Representative

Total Cost of Expenditures in this Section:

14. Please check any of the following supplemental program support that were purchased through EIA-LEP Summplemental (7N536)

Parent training/workshops

Conferences Professional

Development IMA

Staff Conference Attendance

Curricular Trips

Contracted Services

Total Cost of Expenditures in this Section:

13,874

116,446

6,239

24,778

6,426

Page 12: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

10

Linking Goals, Strategies, and Actions from the SPSA to Increased Students Achievement

Directions: Answer the questions below in small groups/committees to consider if the strategies, actions and expenditures written in the SPSA are increasing students’ achievement.

1a. Examine the data that has been downloaded. Has the proficient or advanced proficient group grown over the last 5 years in English/Language Arts?

(If yes, answer question 1b. If no, answer question 1c) Except for CAHSEE profociency levels of specific subgroups (EL Learners and Hispanic/Latino Students)

Has the proficient or advanced proficient group grown over the last 5 years in mathematics?(If yes, answer question 1b. If no, answer question 1c) Except for CAHSEE profociency levels of specific subgroups (EL Learners and Hispanic/Latino Students)

1b. Which of the expenditures increased growth in the proficient or the advanced proficient group and are linked to the strategies/activities found in the SPSA? What data supports this finding?

TA’s, Intervention Tutoring, X-Time, IMA

1c. Which of the expenditures did not increase growth in the proficient or the advanced proficient group and are linked to the strategies/activities found in the SPSA? What data supports this finding?

We do not correlate any one expenditure to the lack of growth for specific subgroups in reaching proficiency for the 2008-09 school

year 2. How did research-based professional development (70A56) lead to academic growth? (For PI Schools only)

Not Applicable

3. What other evidence (ie. other performance data) exists that shows an increase in student learning?

API, CAHSEE, Reduction in D’s and F’s in core content courses

4. Using local data (parent trainings, parent volunteers, parent centers, etc.), describe the expenditures from 7E046 that resulted in increased parental involvement.

Increased communication through the website and through monthly paper mailings translated in Spanish

5. What changes in strategies/activities including budget will occur ?

Teacher planning time through X-Time and staff development rate Support for the AVID program through conferences and on-site teacher training Increased use of technology Increased intervention, including use of instructional coaches

Page 13: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolKEY FINDINGS FROM SCHOOL’S DATA ANALYSIS

Directions: Analyze the data provided to complete the chart below and use the questions in each section to determine the Key Findings/Conclusions.

Academic Performance Indicator (API) Questions: KEY FINDINGS / Conclusions from Data Analysis

1. Did the school’s API meet the one (1) point API requirement?

2. What was the change in the schoolwide API from the previous year?

Yes. Our schools met the one-point API Requirement

704 improved to 706

Directions: Complete this section only if Graduation Rate was not met (for high schools only).

Graduation RateQuestions: KEY FINDINGS / Conclusions from Data Analysis

1. Did the school meet the graduation rate?

2. What change occurred in the rate of students graduating between 2008 and 2009?

Yes. Our school met the graduation requirement

93.2% reduced to 85%

11

Page 14: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolGOALS FOR ACTION PLANS

The Goals have been provided as targets for guiding the actions and resources to improve student achievement in accordance with State: LEA (Local Educational Agency—LAUSD) and Federal: AYP (Adequate Yearly Progress) guidelines.

PI LEA Year 3 Corrective Action: Annual Measurable Achievement Objectives (AMAO) Goal: School Organization and Support Structure Goals: Institute and fully implement the core curriculum

that is based on State academic content standards, including providing appropriate professional development based on scientifically-based research for all relevant staff that offers substantial promise of improving educational achievement for high priority pupils.

70%+ of English Learners will score in the appropriate performance range on the CST for English/Language Arts according to the District Progress Benchmarks for English Learners.

70%+ of English learner will progress one ELD level per year. 70%+ of English learners will score an overall ELD level of 4 or

5 on the CELDT after 4-5 years of instruction.

All schools will be organized to support the academic needs of students.

All schools will have effective support structures to address student needs that impact learning.

Participation Rate Proficiency Rate Safe Schools The school will achieve a 95%

participation rate for all state assessments.

English/Language ArtsElementary and Middle Schools: The percentage of students

scoring proficient or above on the California Standards Test (CST) and the California Alternate Performance Assessment (CAPA) in English/ Language Arts 2009-10 will equal or exceed 56.8% and for 2010-11 will equal or exceed 67.6%.

High Schools: The percentage of students scoring

proficient or above on the 10th grade administration of the CAHSEE and the California Alternate Performance Assessment (CAPA) in English/ Language Arts for 2009-10 will be equal or exceed 55.6% and for 2010-11 will equal or exceed 66.7%.

MathematicsElementary and Middle Schools: The percentage of students

scoring proficient or above on the California Standards Test (CST) and the California Alternate Performance Assessment (CAPA) in Mathematics 2009-10 will equal or exceed 58.0% and for 2010-11 will equal or exceed 68.5%.

High Schools: The percentage of students scoring

proficient or above on the 10th grade administration of the CAHSEE and the California Alternate Performance Assessment (CAPA) in Mathematics for 2009-10 will be equal or exceed 54.8% and for 2010-11 will equal or exceed 66.1%.

Schools must implement LAUSD Discipline Policy. Staff and students must meet 95% attendance target each

month.

API All schools will meet the API goal of 680

for the 2009-10 school year or increase by 1 point from the previous year. The API goal for 2010-2011 is 710 or show a 1 point growth from the previous year.

Personalization/College Ready Counseling provided to meet the A-G requirement

opportunities Students are aware of college careers School identified one of the following models:

-Small Learning Community-Personalized Learning Environment-Professional Learning Community

Graduation RateHigh Schools: A

ll schools will meet the Graduation Rate Criteria by meeting one of the following options:o Option 1: Have a graduation rate of at

least 83.2% for 2009-10.o Option 2: Show improvement in the

rate from 2008-09 of at least 0.1%.o Option 3: Show improvement in the

average two-year graduation rate of a least 0.2%.

Parent Engagement School demonstrates increased and improved parent

partnerships and welcoming environments. School provided meaningful training and learning for

parents on how to support the academic achievement in the home.

School offers parents the opportunity to participate in councils, committees, and parent organizations.

School provides information in a language that parents can understand.

High Schools only (if applicable):

ESLRsAttach or list Expected Schoolwide Learning Results (ESLRs):Effective Communicators, Critical Thinkers, Collaborative Workers, Self-Directed Goal-Oriented Individuals, Responsible Citizens

List the WASC Recommendations that correspond with the Key Findings on the data pages:Provide teachers with current student achievement data and provide trainings in using assessment data to drive curriculum and instruction.Insure that regular analysis of the performance data directly drives the instructional program.Create a coordinated professional development plan that is on-going, schoolwide, data-driven and research-based.Develop common benchmarks schoolwide for assessing student mastery of standards.Provide academic interventions during the school day.Identify research-based practices in order to enhance student learning (ie-differentiated instruction, AVID strategies).

12

Page 15: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolUpdate the Table of Contents when the page expands to a second page.

13

Page 16: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

District and School Program Improvement Exit Priorities

All schools are required to address the priorities (listed below) established in the District’s Program Improvement Local Education Agency Year 3—Corrective Action Plan. Schools may develop additional exit priorities and accompanying professional development, if needed.

1 Maximize the impact of core instruction for all students, including utilizing professional development time for collaborative lesson plan development and the developing of departmental common formative and summative assessments.

2 Identify using quantitative measures (CAHSEE, CST), students who fall into the three categories described by LAUSD “RTI2,” and establish professional development to address the academic and behavioral needs of the RTI2-identified students.

3 Develop a pull-out program in math and ELA (utilizing the Literacy and Math Coaches, and Intervention Support, Special Ed, Title I, and Bilingual Coordinators) to address specific subgroup instructional needs in regards to 10th grade CAHSEE performance.

4 Maintain continued focus on Chatsworth High School WASC 2009 Action Plan and Visiting Team recommendations.

District and School Program Improvement Professional Development Priorities

1 Provide professional development to assist local district and school site staff with full implementation of the District’s Framework for Response to Instruction and Intervention (RtI2).

2 Use data to ensure instruction is provided at the intensity necessary for all students to succeed.

3 Implement curriculum-based measures (i.e., Periodic Assessments, SOAR) to inform instruction and maximize student exposure to that instruction.

4

Title I and Title III professional development allocations must be used to support the training needed for teachers and paraprofessionals to implement the exit priorities.

Update the Table of Contents when the page expands to a second page.

14

Page 17: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

Los Angeles Unified School DistrictSingle Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

List the subgroups. Identify strategies/activities that will improve English Language Development. Describe the supplemental intervention services provided before, during, and after the school day for students not meeting grade level standards. Include support personnel that will assist in implementing these strategies/activities.

Identify the resources needed to implement the strategies, activities, and/or support described in the left hand column.

Periodic AssessmentSee monitoring indicators from CST section below increase the median API score.

Who participates and/ or who is responsible for monitoring of the specific strategies/ activities and/or support?

Indicate when the strategy will be implemented and projected date of completion.

Increase the number of schools that meet or exceed their API targets

2008-09282 out of 613 = 46%

10%

Not Applicable

Increase percentage of students in grades 2-11 scoring proficient or advanced on the CST in ELA and Math

% Proficient/Adv CST ELA by grade:

2008 2009 ChangeDistrict 34% 38% +4%Grade 2 – 44% 48% +4%Grade 3 – 29% 34% +5%Grade 4 – 45% 51% +6%Grade 5 – 37% 42% +5%Grade 6 – 33% 37% +4%Grade 7 – 34% 38% +4%Grade 8 – 31% 31% 0%Grade 9 – 31% 32% +1%Grade 10 – 29% 31% +2%Grade 11 – 27% 31% +4%

10%Schoolwide

Hispanic Students

English Learners

Students with Disabilities

Professional Development will be directed at developing and implementing strategies to improve writing conventions across the curriculum.

Content area experts will receive Thinking Maps training to serve as school-site trainers

School site Thinking Maps trainers will create and facilitate staff development that will focus on integrating Thinking Map Organizers to develop writing conventions

Teachers will be trained on SDAIE strategies and the use of Thinking Maps

Professional Development will be provided for Paraprofessionals in SDAIE strategies and the use of Thinking Maps to support teachers

Differentiated Instruction directed at developing writing conventions across the curriculum:

Teachers will integrate SDAIE strategies into lessons developed through common planning time

Professional Development Teacher Regular will be funded to release teachers to attend Thinking Maps and SDAIE training as well as provide time for teacher teams to meet during the school day to develop common lessons using Thinking Maps and SDAIE strategies(Title I PI Funds)

Staff Conference Attendance will be funded to send teachers to Thinking Maps and SDAIE training (TMTC, Trainer of Trainers, Preparate)(Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of Thinking

Students ‘on track’ at the end of each grade or critical grade-level span in reading, writing, and mathematics

Core Department-developed Formative Writing Assessments

Periodic Assessments

Quarterly Grade marks

Monthly Department Common Planning Meeting Agendas and Minutes

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Pre-Kindergarten (SRLDP):% of students at the “Building” or “Integrating” level on the California Desired Results Developmental Profile (DRDP-R) Measures related to: Not Applicable

Language: Meaning Comprehension Following Complex Instructions Use of Language for Self-Expression Use of Language in Conversation

Literacy: Letter and Word Knowledge Emerging Writing Concept of Print

Administrators

Literacy Coach

Bilingual Coordinator

Title I Coordinator

Intervention Support Coordinator

SLC Coordinator

Special Education Coordinator

Dept Chairs

SLC Leads

Fall 2009-Ongoing

15

Page 18: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

Teachers will integrate Thinking Maps into lessons developed through common planning time

Freshman Academy will pilot Cross-curricular writing project

AVID strategies including Cornell Note usage

Professional Development will be provided for teachers to begin to implement RTI2 and will consist of training focused on data analysis to plan for Tier I Core Instruction

MyData interpretation CELDT interpretation CST interpretation Periodic Assessment

interpretation

Professional Development will be

Maps and SDAIE strategies (Title I PI Funds)

Teacher X-Time will be used to provide teacher teams time to meet after school and on Saturdays to develop common lessons using Thinking Maps and SDAIE strategies(Title I PI Funds)

Professional Development Teacher Regular will be funded to release teachers to attend Tier I RTI training as well as provide time for teacher teams to meet during the school day to develop common lessons using findings from the analysis of data(Title I Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of data to improve instruction (Title I PI Funds)

Teacher X-Time will be used to provide teacher teams time to meet after school and on Saturdays to develop common lessons using data to improve instruction

Phonological Awareness

Math: Quantity and Counting Shapes Time Classification Measurement Patterning

16

Page 19: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

conducted for teachers of English Learners in Applications of the use of Translation Glossaries design to provide students better access to the content standards

(Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of Translation Glossaries(Title I PI Funds)

Increase percentage of students in grades 2-11 scoring proficient or advanced on the CST in ELA and Math (continued)

% Proficient/Adv CST Math by grade:

2008 2009 ChangeDistrict 35% 37% +2%Grade 2 – 56% 57% +1%Grade 3 – 57% 60% +3%Grade 4 – 58% 59% +1%Grade 5 – 48% 53% +5%Grade 6 – 31% 35% +4%Grade 7 – 28% 28% 0%Gen Math – 15% 17% +2%Algebra 1 – 17% 19% +2%Geometry – 11% 14% +3%Algebra 2 – 13% 14% +1%HS Math – 29% 30% +1%

Schoolwide

Hispanic Students

English Learners

Students with Disabilities

Professional Development will be provided for teachers of Algebra and Geometry in the areas of Algebra Functions, Measurement and Geometry and Probability and Statistics. Strategies will include:

Differentiating Instruction Common lesson planning Common assessment

development Benchmark Assessment

development Lesson Spiraling

Professional Development will be provided for Paraprofessionals in math skill development strategies to support teachers

Instruction directed at implementing differentiation strategies:

Via common lessons, math teachers will choose a differentiation strategy as a focus for each month

Math teachers will integrate spiraling techniques into lessons developed through common planning time

Professional Development Teacher Regular will be funded to release teachers to attend Differentiated Instruction training in mathematics as well as provide time for teacher teams to meet during the school day to develop common lessons using differentiated instruction in math (Title I PI Funds)

Staff Conference Attendance will be funded to send teachers to Differentiating Instruction in Mathematics training (CMC, LACOE)(Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of

At each assessment period:

Math Department-developed Formative Assessments

Periodic Assessments

Quarterly Grade marks

Monthly Math Department Common Planning Meeting Agendas and Minutes

Kindergarten:% of students at benchmark or above.Language Arts: Upper and Lowercase Letter names Phonemic Awareness (oral blending,

segmentation, and rhymes) Basic high-frequency words CVC words

Math: Most recent periodic assessment in math

Grades 1, 2, 3, 4, 5/6:Language Arts: % of students at benchmark on the most

Administrators

Math Coach

Math Dept Chair

Title I Coordinator

Bilingual Coordinator

Intervention Support Coordinator

Special Education Coordinator

SLC Coordinator

SLC Lead Teachers

Fall 2009-Ongoing

17

Page 20: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

Professional Development will be provided for teachers to begin to implement RTI2 and will consist of training focused on data analysis to plan for Tier I Core Instruction

MyData interpretation CST interpretation Periodic Assessment

interpretation MDPT Diagnostic Test

interpretation

differentiated instruction in math(Title I PI Funds)

Teacher X-Time will be used to provide teacher teams time to meet after school and on Saturdays to develop common lessons using differentiated instruction in math(Title I PI Funds)

Professional Development Teacher Regular will be funded to release teachers to attend RTI training as well as provide time for teacher teams to meet during the school day to develop common lessons using findings from the analysis of data(Title I Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of data to improve instruction (Title I PI Funds)

Teacher X-Time will be used to provide teacher teams time to meet after school and on Saturdays to develop common lessons using data to improve instruction

recent fluency, vocabulary, and comprehension assessments

Writing: Increase the # of students that receive a 3

or 4 based on standards/rubric on the writing periodic assessment

Math:Increase the # of students that are proficient on the mathematics periodic assessment by 6%

Grades 6/7-8: % of student scoring proficient or above on

the Periodic Assessments

Grades 9-12: Increase the number of students on-track

in terms of credits earned. % of student scoring proficient or above on

the Periodic Assessments

18

Page 21: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

(Title I PI Funds) % Proficient/Adv CST Science and Social Science: 2008 2009 ChangeBiology 24% 24% 0%Chemistry 12% 14% +2%Earth Sci. 21% 26% +5%Physics 19% 20% +1%Integ. Sci1 7% 8% +1%Integ. Sci2 2% 0% -2%Integ. Sci3 3% 7% +4%Soc. Sci. 23% 28% +5%World Hist. 18% 23% +4%U.S. Hist. 25% 32% +7%

% Proficient/Adv CST History / Social Science by grade:

Social Science 2008 2009 ChangeGrade 8 25% 30% +5%

World History 2008 2009 ChangeGrade 9 16% 19% +3%Grade 10 19% 24% +5%Grade 11 8% 8% 0%

U.S. History 2008 2009 ChangeGrade 11 25% 32% +7%

10%

Schoolwide

Hispanic Students

English Learners

Students with Disabilities

Professional Development will be directed at developing and implementing strategies to improve access to the standards-based curriculum. Strategies will include:

Differentiating Instruction SDAIE Techniques AVID Methodologies Interpreting and using data

to guide instruction Using technology effectively

in the classroom Cornell Notes Jig Saw Grouping Reciprocal Teaching Anticipation Guides Document-based Instruction Socratic Exchange Context Essays Developing Common

laboratory Write-up Formats Developing teacher leaders

to present professional development

Professional Development Teacher Regular will be funded to provide time for teacher teams to meet during the school day to develop common lessons using differentiated instruction, SDAIE techniques, AVID methodologies, data analysis, and implementation of technology to improve instruction (Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing the skills necessary to deliver effective professional development to colleagues(Title I PI Funds)

See monitoring indicators for CST on pages 13 and 14

Department-developed Formative Assessments

Periodic Assessments

Quarterly Grade marks

Monthly Department Common Planning Meeting Agendas and Minutes

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Teacher-interest-driven Monthly Professional Development Workshop Agendas and Evaluations

Administrators

Bilingual Coordinator

Title I Coordinator

Intervention Support Coordinator

SLC Coordinator

Special Education Coordinator

Dept Chairs

SLC Leads

Fall 2009-Ongoing

19

Page 22: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

Teacher X-Time will be used to provide teacher teams time to meet after school and on Saturdays to develop common lessons using differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction (Title I PI Funds)

Reduce the percentage of students in grades 2-11 scoring Far Below Basic and Below Basic on the CST in ELA and Math

07-08 08-09 ChangeELA 33% 31% -2%MATH 42% 40% -2%

-10

Schoolwide

Hispanic Students

English Learners

Students with Disabilities

Professional Development will be provided for math and English teachers in strategies to reduce the number of students falling below the basic proficiency level. Strategies will include:

Using CST, CAHSEE and MYData to identify individual students and subject content strands requiring attention

Differentiating Instruction SDAIE Techniques AVID Methodologies Personalization and

motivational techniques Collaborative Planning Cooperative Learning

Differentiated Instruction directed at implementing strategies to provide standards-based content access to FBB and BB students. Strategies will

Teacher X-Time will be used to provide teacher teams within Content Departments and Small Learning Communities time to meet after school and on Saturdays to develop common lessons employing differentiated instructional strategies and intervention programs directed at reducing the number of students falling below the basic proficiency level (Title I PI Funds)

Professional Development Teacher Regular will be used to provide release time for

See monitoring indicators for CST on pages 13 and 14

Department-developed Formative Assessments

Periodic Assessments

Quarterly Grade marks

Monthly Department Common Planning Meeting Agendas and Minutes

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Teacher-interest-driven Monthly Professional Development Workshop Agendas and Evaluations

Administrators

Literacy Coach

Math Coach

Bilingual Coordinator

Title I Coordinator

Intervention Support Coordinator

SLC Coordinator

Special Education Coordinator

Dept Chairs

SLC Leads

Fall 2009-Ongoing

20

Page 23: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

include: Via interdisciplinary lessons,

teachers will choose a SDAIE strategy as a focus for each month

Teachers will integrate Thinking Maps into lessons developed through common planning time

Via common lessons, math teachers will choose a differentiation strategy as a focus for each month

Math teachers will integrate spiraling techniques into lessons developed through common planning time

Standards-based content warm-ups in math and English

Intervention Program-planned

informational and motivational assemblies for students performing FBB and BB

Small Learning Community weekly Peer Tutoring

“Accessing Success” after school tutoring program

Supplemental materials for students not meeting grade level standards

CAHSEE and CST Awareness program through homeroom

schoolwide teacher teams to collaborate in analyzing student performance data and developing between-the-bell intervention assemblies and after school intervention programs aimed at reducing the percentage of students scoring FBB and BB on the CST in ELA and Math(Title I Funds)

Increase the number of students identified as Gifted to a minimum of 6% of the school site’s population.

07-08 08-09 Change9.3% 9.2% -.1%

Increase the total percentage of each site’s African-American and Hispanic students identified as Gifted to a minimum of 6% of

varies by

schoolSchoolwide

African American Students

Professional Development will be directed at developing and implementing strategies to increase the identification and success of students,

Teacher X-Time will be used to provide teacher teams within Content Departments

Number of state identified Gifted students

Teacher Response Surveys Identifying Potentially Gifted Students

Quarterly Grade marks

Administrators

Counselors

College

21

Page 24: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

each subgroup’s total population.

07-08 08-09 ChangeAfrican Americans 6.6% 6.6% .0%Hispanics 6.9% 7.0% .1%

varies by

school

Hispanic Students

English Learners

Students with Disabilities

particularly underrepresented students, in college preparatory courses and the gifted program. Strategies will include:

Using MyData to identify and monitor potentially gifted students

Differentiating Instruction SDAIE Techniques AVID Methodologies College Counselor-led staff

training in supporting underrepresented students in the College Preparatory Program

Intervention Program-planned

informational and motivational assemblies for underrepresented students identified as potentially gifted

Small Learning Community weekly Peer Tutoring

“Accessing Success” after school tutoring program

Peer College Counselor student advisors

and Small Learning Communities time to meet after school and on Saturdays to develop common lessons employing differentiated instructional strategies and intervention programs directed at increasing the identification of potentially gifted students (Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing the skills necessary to deliver effective professional development to colleagues(Title I PI Funds)

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Motivational Assembly and Small Group Interviews

Counselor

Literacy Coach

Math Coach

Bilingual Coordinator

Title I Coordinator

Intervention Support Coordinator

SLC Coordinator

Special Education Coordinator

Dept Chairs

SLC Leads

Accelerate the performance for all African-American, Hispanic, Standard English Learners, and Students with Disabilities

See monitoring indicators for CST on pages 13 and 14

22

Page 25: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

Prof/Adv CST ELA Subgroups:

07-08 08-09 ChangeAfrican American 25% 27% +2%Hispanic 31% 33% +2%English Learners 20% 23% +3%Sts. w/ Disabilities 11% 12% +1%

10%African American Students

Hispanic Students

English Learners

Students with Disabilities

Professional Development will be directed at developing and implementing strategies to improve access to the standards-based curriculum. Strategies will include:

Staff training in the implementation of CRRE

Differentiating Instruction SDAIE Techniques AVID Methodologies Interpreting and using data

to guide instruction Using technology effectively

in the classroom Developing teacher leaders

to present professional development

Intervention The Village, C-House, and

La Familia academic awareness and motivational assemblies

Small Learning Community weekly Peer Tutoring

“Accessing Success” after school tutoring program

Teacher X-Time will be used to provide teacher teams within Content Departments and Small Learning Communities time to meet after school and on Saturdays to develop common lessons employing differentiated instructional strategies and intervention programs directed at increasing performance for at-risk student groups (Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing the skills necessary to deliver effective professional development to colleagues(Title I PI Funds)

Department-developed Formative Assessments

Periodic Assessments

Quarterly Grade marks

Monthly Department Common Planning Meeting Agendas and Minutes

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Teacher-interest-driven Monthly Professional Development Workshop Agendas and Evaluations

Motivational Assembly and Small Group Interviews

Accelerate the performance of Standard English Learners (SEL)

*We need to be able to identify SELs and disaggregate data for this group of students.

10%

Not Applicable See monitoring indicators for CST on pages 13 and 14

23

Page 26: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

AMAO 1 – Meet or exceed the percentage of English Learners making annual progress in learning English

07-08 08-09 Change54.8% 55.7% +0.9%

2007-2008 State Target was 50.1%2008-2009 State Target is 51.6%2009-2010 State Target is 53.1%

3%

English Learners

Professional Development will be provided for teachers of English Learners in developing and implementing strategies to improve access of English Learners to the standards-based curriculum. Strategies will include:

Differentiating Instruction Academic reading

instruction for the EL SDAIE Techniques Think-Pair-s-Share Interpreting and using data

to guide instruction Using technology effectively

in the classroom

Intervention Program-planned academic

awareness and motivational assemblies for English Learners

Small Learning Community weekly Peer Tutoring

“Accessing Success” after school tutoring program

Bilingual College Field Trip Program

Peer Tutoring CSUN Chicano Studies

Mentor Program Data-specific Writing

Instruction

Teacher X-Time will be used to provide teacher teams within Content Departments and Small Learning Communities time to meet after school and on Saturdays to develop common lessons employing differentiated instructional strategies and intervention programs directed at increasing performance for English Learners (Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing the skills necessary to deliver effective professional development to colleagues(Title I PI Funds)

ELD Portfolios (K-12) High Point Curriculum/Assessments (6-12) ELD Practicum/Into English Assessments (K-5)

EL Teacher -developed Formative Assessments

Periodic Assessments

Quarterly Grade marks

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Teacher-interest-driven Monthly Professional Development Workshop Agendas and Evaluations

Motivational Assembly and Small Group Interviews

After School Tutoring Follow-up Interviews

AMAO 2 – Meet or exceed the percentage of English Learners scoring early advanced

Teacher X-Time will be used to provide

See monitoring indicators for AMAO 1 on

24

Page 27: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

and advanced on the CELDT

% Early Adv/Adv 07-08 08-09 Change

36.3% 39.3% +3%

2008-2009 State Target was 30.6%2009-2010 State Target was 32.2%

5% English Learners

Intervention Program-planned academic

awareness and motivational assemblies for English Learners

Ongoing CELDT Preparation activities within the ESL classes

Integration of Bilingual Paraprofessionals within the ESL classes

teacher teams within Content Departments and Small Learning Communities time to meet after school and on Saturdays to develop common lessons employing differentiated instructional strategies and intervention programs directed at increasing performance for English Learners (Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing the skills necessary to deliver effective professional development to colleagues(Title I PI Funds)

page 11

EL Teacher -developed Formative Assessments

Periodic Assessments

Quarterly Grade marks

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Teacher-interest-driven Monthly Professional Development Workshop Agendas and Evaluations

Motivational Assembly and Small Group Interviews

After School Tutoring Follow-up Interviews

AMAO 3 – Meet or exceed the percentage of English Learners scoring proficient on the CELDT and CST

07-08 08-09 ChangeELA 24.3 27.0 +2.7%Math 34.1 36.3 +2.1%

English Learners

Intervention Program-planned academic

awareness and motivational assemblies for English

Teacher X-Time will be used to provide teacher teams within Content Departments and Small Learning Communities time to meet after school and on Saturdays to

ELD Portfolios (K-12)

EL Teacher -developed Formative Assessments

Periodic Assessments

Quarterly Grade marks

25

Page 28: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

Learners Two-week CELDT boot

camp Ongoing CELDT

Preparation activities within the ESL classes

Integration of Bilingual Paraprofessionals within the ESL classes

10th grade English Language Skills class

Monthly Latino Parent Involvement Workshops

develop common lessons employing differentiated instructional strategies and intervention programs directed at increasing performance for English Learners (Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing the skills necessary to deliver effective professional development to colleagues(Title I PI Funds)

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Motivational Assembly and Small Group Interviews

After School Tutoring Follow-up Interviews

Increase EL reclassification rates at the elementary, middle, and high school levels

07-08 08-09 Change EL 13.5 15.8 +2.3MS 22.4 20.8 +8.4HS 10.3 12.4 +2.1

5%English Learners

Professional Development will be provided for English teachers and teachers of EL students in developing and implementing strategies to increase reclassification rates. Strategies will include:

Using CELDT data to identify students who have passed 1 or more of the 3 criteria

Identification of CELDT-specific skill sets

Teacher X-Time will be used to provide teacher teams within Content Departments and Small Learning Communities time to meet after school and on Saturdays to develop common lessons employing differentiated instructional strategies and intervention programs

EL monitoring rosters, and where possible EL students not moving or reclassifying

RFEP Monitoring Rosters

26

Page 29: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

directed at increasing performance for English Learners (Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing the skills necessary to deliver effective professional development to colleagues(Title I PI Funds)

Increase the percentage of SWD performing at Basic and beyond on the ELA and Math CSTs 07-08 08-09 Change ELA 25% 27% +2%MATH 26% 27% +1%

35% ELA35% Math Students with

DisabilitiesProfessional Development will be provided to content area teachers in the application of modifications, accommodations and use of alterative materials in the delivery of instruction. Strategies will include:

Cornell note taking Graphic Organizers Use of manipulatives Use of technology

o White boardso Graphing

Calculators Algebra Tiles

Professional Development will be

Teacher X-Time will be used to provide teacher teams time to meet after school and on Saturdays to develop common lessons using alternative materials in the delivery of instruction and behavioral strategies to improve achievement of SWD(Title I PI Funds)

Staff Training Rate

See monitoring indicators for CST on pages

13 and 14

Administrators

Literacy Coach

Math Coach

Bilingual Coordinator

Title I Coordinator

Intervention Support Coordinator

SLC Coordinator

27

Page 30: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

High Academic Achievement Action Plan

Accountabilities LAUSD Target

Subgroup(s)

Strategies/Activities

Resources/Proposed Funding Sources

Means of Evaluating Progress

Staff Responsible

Start/Completion Date

provided to content area teachers in behavioral strategies to manage delivery of instruction. Strategies will include:

Progressive Discipline Scaffolding Methods for

instruction and assessment

Professional Development will be provided to Paraprofessionals on the recognition and reinforcement of Power Standard and SDAIE techniques. Strategies will include:

Best practices Scaffolding methods Building math and

English skills

will be used to train teachers outside of the regular school day in the application of modifications, accommodations and use of alternative materials in the delivery of instruction as well as the development of behavioral strategies to improve achievement of SWD(Title I PI Funds)

Special Education Coordinator

Dept Chairs

SLC Leads

28

Page 31: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

Los Angeles Unified School DistrictSingle Plan for Student Achievement Accountability Matrix

Graduation Rate

Accountabilities LAUSD Target

Subgroup(s) Strategies/Activities Resources/Proposed Funding Sources

Means of Evaluating Progress Staff Responsible

Start/Completion Date

List the subgroups. Identify strategies/activities that will improve English Language Development. Describe the supplemental intervention services provided before, during, and after the school day for students not meeting grade level standards. Include support personnel that will assist in implementing these strategies/activities.

Identify the resources needed to implement the strategies, activities, and/or support described in the left hand column.

Periodic AssessmentSee monitoring indicators from CST section below increase the median API score.

Who participates and/ or who is responsible for monitoring of the specific strategies/ activities and/or support?

Indicate when the strategy will be implemented and projected date of completion.

Graduation rate will increase

06-07 07-08 Change67.1% 72.4% +5.3%

8%Schoolwide

African American Students

Hispanic Students

English Learners

Students with Disabilities

Professional Development will be directed at developing and implementing strategies to improve success in the standards-based curriculum. Strategies will include:

Development of staff teams to work with each specific student subgroup

Analysis of subgroup-specific data to plan intervention

Development of motivational assemblies to address individual subgroup needs

Intervention Two subgroup-specific

Motivational Assemblies during the year where students are presented with their test scores and academic marks

Personalized interview and meeting with students who show discrepancy between CST score and academic grade

Ongoing monitoring and Pullout Program for 11th and 12th graders who have graduation credits but have not passed the CAHSEE

Teacher X-Time will be used to provide teacher teams within Content Departments and Small Learning Communities time to meet after school and on Saturdays to develop common lessons employing differentiated instructional strategies and intervention programs directed at increasing academic performance schoolwide (Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing the skills necessary to deliver effective professional development to colleagues

Increase graduation rate by sub-groups (e.g. ELs, AA, Latino/Hispanic)

Decrease rate of drop-outs Increase the percentage of 9th to 10th grade

students accumulating 55 credits 4-year longitudinal graduation rate (9th grade

to graduation)

Administrators

Literacy Coach

Math Coach

Bilingual Coordinator

Title I Coordinator

Intervention Support Coordinator

SLC Coordinator

Special Education Coordinator

Dept Chairs

SLC Leads

29

Page 32: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

Graduation Rate

Accountabilities LAUSD Target

Subgroup(s) Strategies/Activities Resources/Proposed Funding Sources

Means of Evaluating Progress Staff Responsible

Start/Completion Date

(Title I PI Funds)Increase percent of 10th graders passing both parts of CAHSEE on the first attempt

07-08 08-09 Change57% 60% +3%

6%

Schoolwide

African American Students

Hispanic Students

English Learners

Students with Disabilities

Professional Development will be provided to 9th and 10th grade ELA teachers in the application of writing conventions and writing strategies across the curriculum, and to math teachers in the application of algebra functions. Strategies will include:

Use of rubrics to evaluate CAHSEE diagnostic essay

Use of CAHSEE diagnostic data to inform instruction

Developing CAHSEE warm-up activities through common planning

Intervention Warm up activities reflecting

the CAHSEE ELA and algebras standards

Classroom applications using CAHSEE released questions

CAHSEE 10th grade Parent Orientation Night for both math and English

10th grade supplemental resources - meeting the California challenge in ELA and math

Math and ELA CAHSEE preparation study guides for the home

CAHSEE Diagnostic exam for all 9th and 10th graders in February

Coaches visit the 9th and 10th grade classes for motivational talks

Teacher X-Time will be used to provide 9th and 10th grade math and ELA teacher teams time to meet after school and on Saturdays to develop common lessons employing CAHSEE instructional strategies and intervention programs directed at increasing performance on the 10th grade CAHSEE(Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of CAHSEE instructional strategies. (Title I PI Funds)

Department-developed Formative Assessments

Periodic Assessments

Quarterly Grade marks

Monthly Department Common Planning Meeting Agendas and Minutes

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Teacher-interest-driven Monthly Professional Development Workshop Agendas and Evaluations

Motivational Assembly and Small Group Interviews

Administrators

Literacy Coach

Math Coach

Bilingual Coordinator

Title I Coordinator

Intervention Support Coordinator

SLC Coordinator

Special Education Coordinator

Dept Chairs

SLC Leads

Dropout rate will decrease.

06-07 07-08 Change31.7% 26.4% -5.3%

6%Not Applicable

Monitor students at risk: 85% of students are in attendance for 96% or

more of the time Increase in pass rates in English and/or math

courses Increase in number of students receiving an

E or S in Work Habits or Cooperation Increase attendance rates for both students

30

Page 33: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

Graduation Rate

Accountabilities LAUSD Target

Subgroup(s) Strategies/Activities Resources/Proposed Funding Sources

Means of Evaluating Progress Staff Responsible

Start/Completion Date

and teachers to 96%.

31

Page 34: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

Los Angeles Unified School DistrictSingle Plan for Student Achievement Accountability Matrix

Personalization/College Career Ready

Accountabilities LAUSD Target

Subgroup(s) Strategies/Activities Resources/Proposed Funding Sources

Means of Evaluating Progress Staff Responsible

Start/Completion Date

List the subgroups. Identify strategies/activities that will improve English Language Development. Describe the supplemental intervention services provided before, during, and after the school day for students not meeting grade level standards. Include support personnel that will assist in implementing these strategies/activities.

Identify the resources needed to implement the strategies, activities, and/or support described in the left hand column.

Periodic AssessmentSee monitoring indicators from CST section below increase the median API score.

Who participates and/ or who is responsible for monitoring of the specific strategies/ activities and/or support?

Indicate when the strategy will be implemented and projected date of completion.

Increase in the number of students graduating having completed A-G requirements, and thus having their choice of a Career Pathway.

07-08 08-09 Change25% TBD% +__%

80%

Schoolwide

African American Students

Hispanic Students

English Learners

Students with Disabilities

Professional Development will be directed at developing and implementing strategies to increase the identification and success of students, particularly underrepresented students, in college preparatory courses and the gifted program. Strategies will include:

Using MyData to identify and monitor potentially gifted students

Differentiating Instruction SDAIE Techniques AVID Methodologies College Counselor-led staff

training in supporting underrepresented students in the College Preparatory Program

Teacher X-Time will be used to provide teacher teams within Content Departments and Small Learning Communities time to meet after school and on Saturdays to develop common lessons employing differentiated instructional strategies and intervention programs directed at increasing student success in the college preparatory program (Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing

A-G enrollment and passing rates Decrease the number of students receiving

Fails in A-G courses by 10%. Increase the percent of students earning C's

or higher in A-G courses.

Monthly Department Common Planning Meeting Agendas and Minutes

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Teacher-interest-driven Monthly Professional Development Workshop Agendas and Evaluations

Motivational Assembly and Small Group Interviews

Administrators

Intervention Support Coordinator

Title I Coordinator

Bilingual Coordinator

SLC Coordinator

College Counselor

Career Advisor

32

Page 35: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

Personalization/College Career Ready

Accountabilities LAUSD Target

Subgroup(s) Strategies/Activities Resources/Proposed Funding Sources

Means of Evaluating Progress Staff Responsible

Start/Completion Date

the skills necessary to deliver effective professional development to colleagues(Title I PI Funds)

Increase the enrollment in Advanced Placement course

07-08 08-09 Change1.8% 1.9% + .1%

Increase pass rates on AP tests

07-08 08-09 Change44.1% TBD% +TBD%

5%

5%

Schoolwide

African American Students

Hispanic Students

English Learners

Students with Disabilities

Professional Development will be directed at developing and implementing strategies to increase the identification and success of students, particularly underrepresented students, in AP Courses. Strategies will include:

Using MyData to identify and monitor potentially gifted students

Differentiating Instruction SDAIE Techniques AVID Methodologies College Counselor-led staff

training in supporting underrepresented students in the College Preparatory Program

Teacher X-Time will be used to provide teacher teams within Content Departments and Small Learning Communities time to meet after school and on Saturdays to develop common lessons employing differentiated instructional strategies and intervention programs directed at increasing the number of students, especially underrepresented students in the Advanced Placement and Honors Program(Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing the skills necessary to deliver effective

Advanced Placement courses – Increase Advanced Placement offerings at all

high schools. Increase the number of tests administered by

10% Increase the number of subject matter tests

administered by: At least 2 (if the school administers less

than 15 subject matter tests) At least 1 (if the school administers less

than 20 subject matter tests)

Monthly Department Common Planning Meeting Agendas and Minutes

Small Learning Community Monthly Planning and Intervention Meeting Agendas and Minutes

Teacher-interest-driven Monthly Professional Development Workshop Agendas and Evaluations

Motivational Assembly and Small Group Interviews

Administrators

Intervention Support Coordinator

Title I Coordinator

Bilingual Coordinator

SLC Coordinator

College Counselor

33

Page 36: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High SchoolLos Angeles Unified School District

Single Plan for Student Achievement Accountability Matrix

Personalization/College Career Ready

Accountabilities LAUSD Target

Subgroup(s) Strategies/Activities Resources/Proposed Funding Sources

Means of Evaluating Progress Staff Responsible

Start/Completion Date

professional development to colleagues(Title I PI Funds)

Increase students preparedness for College Career Readiness

Schoolwide

African American Students

Hispanic Students

English Learners

Students with Disabilities

Professional Development will be directed at developing and implementing strategies to increase the identification and success of students, particularly underrepresented students, in college preparatory courses. Strategies will include:

Using MyData to identify and monitor potentially gifted students

Differentiating Instruction SDAIE Techniques AVID Methodologies College Counselor-led staff

training in supporting underrepresented students in the College Preparatory Program

Teacher X-Time will be used to provide teacher teams within Content Departments and Small Learning Communities time to meet after school and on Saturdays to develop common lessons employing differentiated instructional strategies and intervention programs directed at increasing student success in the college preparatory program (Title I PI Funds)

Staff Training Rate will be used to train teachers outside of the regular school day in the use of differentiated instruction, SDAIE techniques, data analysis strategies and implementation of technology to guide instruction. In addition, this funding will support staff training in developing the skills necessary to deliver effective professional development to colleagues(Title I PI Funds)

Middle Schools Students passing core classes with C or

better

Elementary Students getting 3 or 4 on report cards

Administrators

Intervention Support Coordinator

Title I Coordinator

Bilingual Coordinator

SLC Coordinator

College Counselor

Career Advisor

34

Page 37: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

Los Angeles Unified School DistrictSingle Plan for Student Achievement Accountability Matrix

Parent and Community Engagement

Accountabilities LAUSD Target

Subgroup(s) Strategies/Activities Resources/Proposed Funding Sources

Means of Evaluating Progress Staff Responsible

Start/Completion Date

List the subgroups. Identify strategies/activities that will improve English Language Development. Describe the supplemental intervention services provided before, during, and after the school day for students not meeting grade level standards. Include support personnel that will assist in implementing these strategies/activities.

Identify the resources needed to implement the strategies, activities, and/or support described in the left hand column.

Periodic Assessment See monitoring indicators from CST section below increase the median API score.

Who participates and/ or who is responsible for monitoring of the specific strategies/ activities and/or support?

Indicate when the strategy will be implemented and projected date of completion.

As indicated on the annual School Experience Survey for parents (School Report Card), the majority of parents “strongly agree” or “agree” that there are opportunities for parent

involvement they feel welcome at this school there is a high level of reported

involvement at the school, as

At least 90% of parents respond “Strongly agree” or “Agree”

Schoolwide

African American Students

Hispanic Students

English Learners

Students with Disabilities

Intervention Ongoing development,

distribution and analysis of parent surveys

Development and implementation of a monthly Latino Parent Involvement Workshop Program

Increase number of families involved in Student-led Conferencing on PHBAO Nights

Parent Center Director will provide home communication to parents of academically and behaviorally struggling students

Instructional Materials and General Supplies will be used to prepare surveys, flyers, and additional materials to support parent involvement activities(Title Parent Involvement Funds)

Coordinator X-Time and Z-time will be provided to develop monthly parent involvement workshops and parent surveys(Title I Funds)

Increased response rates – every school should be at a rate of 40% of selected parents returning surveys in 2009-10.

Welcoming environment and opportunities to participate – every elementary school should be at 9/10 in 2009-10. Every secondary school should be at 8/10.

Parent home involvement should be at 9/10 for elementary schools and 8/10 for secondary schools in 2009-10. School involvement should be at 7/10 for elementary schools and at 5/10 for secondary schools in 2009-10.

Parent centers – for schools that have accepted funding for parent centers, parent center awareness and participation should be at 80% in 2009-10.

Communication – Communication should be at 9/10 for elementary schools and 8/10 for secondary schools in 2009-10.

Administrators

Title I Coordinator

Bilingual Coordinator

Special Education Coordinator

35

Page 38: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

Program Improvement Section 1116 RequirementsImplementation Page

How will the school address the following Program Improvement Requirements?

1. Describe intervention activities for underperforming subgroup(s) during school, before school, after school, during the summer and during any extension of the school year. Include criteria for eligibility for participation in intervention programs.

Continued dialogue with subgroups regarding their performance, strategies for improvement, test-taking strategies, and motivational techniques. After school and Saturday tutoring. Utilize our math and ELA coaches for pull-out assistance during the school day.

2. Describe how the school incorporates teacher mentoring program, i.e. utilization of school-site funded instructional support personnel. New Teacher meetings and BTSA Monthly teacher professional development – Strategies to improve student achievement ELA and math coach assistance provided to teachers in content Mentors to lesson plan together, and co-teach when applicable, with teachers experiencing discipline problems resulting in students not meeting

achievement standards and/or difficulties in utilizing methodologies designed to improve student achievement

3. Describe the strategies implemented by the school to promote effective parental involvement that will lead to increased student achievement. (Provide information based on the LAUSD Parent Engagement training.)

Monthly “Coffee with the Principal” College Information Nights for parents PTSA parent workshops Monthly evening Parent Involvement Workshops Annual CAHSEE meeting for all 10th Grade Parents Ongoing training and use of Connect-Ed

School Responsibilities:Attach the following evidence to demonstrate how the school will provide information to parents regarding what caused the school to be identified for PI. Program improvement parent notification letter. Agendas and minutes from any program improvement informational

meetings (e.g., SSC, CEAC, ELAC) that include Public School Choice.

Central Office/Local District Responsibilities: Attached Central Office technical assistance plan for PI schools. Attach Local district office technical assistance plan for PI schools.

36

Page 39: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Chatsworth High School

EVIDENCE/MONITORING

A comprehensive and multi-level monitoring process will assist the school and the local district in evaluating the implementation of “Action Plans” and inform future practice. Required monitoring includes the following:

1. The School Site Council (SSC) has the responsibility to monitor the overall progress of the Single Plan for Student Achievement Program Improvement.2. The school and the local district will participate collaboratively in monitoring, evaluating and reporting results.3. Information about and access to the Single Plan for Student Achievement Program Improvement will be provided to school staff, councils and committees to

ensure successful implementation and to assist in the ongoing monitoring and, when necessary, modification process.

Directions: Provide a description of how the school will monitor the “Action Plans” and include members of the monitoring committee, frequency of the meetings and the process for reporting the committee’s findings with stakeholder groups.

Description of School Monitoring Process(Include monitoring of “Action Plan” activities by assessing “Evidence of Progress”. Additionally, include a schedule of sessions for: (a) analyzing data from the District’s “Periodic Assessments” and (b) examining student work samples in order to inform future instruction/learning.)

Members ofMonitoring Team Reporting to SSC

Process forReporting Results

Timeline(Frequency)

Periodic assessment data is reviewed by departments on Professional Development Days and during monthly department meetings

School wide assessment data is reviewed by stakeholder groups on Professional Development Days, during monthly Department and SLC meetings, and during monthly Parent Committee meetings

Student work samples are analyzed and best practices shared during professional Development Days and monthly Department meetings. Parents receive data results during monthly CEAC, ELAC and SSC meetings

Principal, Coordinators, Academic Coaches, Program Improvement Leadership Team

Faculty meetings

CEAC and ELAC CouncilsSSC

SLC/Department meetings

Monthly, Quarterly, Bi-Annually

Monthly

Monthly, Bi-Annually

Description of Local District Monitoring Process(An attachment may be provided by the local district which includes analysis of “Evidence of Progress”, alignment of appropriate textbooks/supplementary materials, and use of periodic assessments to inform instruction and improve academic achievement. The Superintendent has delegated authority to the local districts to closely monitor the academic program and related expenditures in all Program Improvement schools.)

Members ofMonitoring Team

Process forReporting Results

Timeline(Frequency)

37

Page 40: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

ATTACHMENTS

Directions: As appropriate based on PI status, schools are to attach the following documents:

School Site PI Responsibilities

Program Improvement Notification Letter which includes the parents’ right to apply for Public School Choice

Agendas and Minutes from any Program Improvement informational meetings (SSC, CEAC, ELAC)

School, Family, and Community Survey Results (PI Year 4 and above schools only)

Revised Parent Involvement Policy (PI Year 4 and above schools only)

Revised School-Parent Compact (PI Year 4 and above schools only)

Local District/Central Office Responsibilities

Central District technical assistance plan (see next page)

Local District technical assistance plan

38

Page 41: Proposed Title I Reports - Chatsworth High Schoolchatsworthhs.org/ourpages/too/2009-2011 SPSA Program Improvement .doc · Web viewPlans must be reviewed and approved by the governing

Program Improvement 2009—10Summary of Federal and State Education Programs Branch Technical Assistance to

Program Improvement Schools for Inclusion in Revised Single Plan for Student Achievement

The Los Angeles Unified School District central office, in partnership with the Los Angeles County Office of Education, provided technical assistance to schools identified for Program Improvement (PI). These schools were required to attend a Program Improvement Technical Assistance Training Institute. All schools brought school teams consisting of the principal or designee, Title I coordinator or staff member who supports program implementation, UTLA chapter chair or designee, and a parent from the School Site Council or the Compensatory Education Advisory Committee. Topics addressed at the training institute included:

Review of the No Child Left Behind Act, Section 1116, Program Improvemento PI identificationo Adequate Yearly Progress (AYP)o Opportunity to review and present evidence to appeal PI Identificationo Final determination of PI statuso Parent notification letters which include the parents’ right to apply for Public School Choiceo Responsibilities of the District and schoolo Peer Reviewo Public School Choice

The following offices/organizations provided technical assistance to PI Year 1 schools through:

o analysis of data which caused the school to be identified for PI—Federal and State Education Programs Branch and School Information Branch

o utilization of English/language arts and mathematics standards-based research strategies to assist schools in making AYP and exiting PI status— Office of Curriculum, Instruction and School Support

o definition of the roles and responsibilities of the School Site Council and advisory committees in revising the Single Plan for Student Achievement (SPSA)—School, Family and Parent/ Community Resource Center and Federal and State Education Programs Branch

o use of mandated ten percent set aside of Title I allocation for professional development— Federal and State Education Programs Branch

o implementation of Public School Choice—Office of Student Integration

Federal and State Education Programs Branch (FSEP) provided SPSA templates, AYP data and resources for each school to facilitate the completion of the revised SPSA. FSEP staff, in conjunction with local district categorical and instructional staff, conducted additional technical assistance meetings to assist schools in completing the SPSA revision.

Additional technical assistance provided by Local District staff with the support of FSEP staff included informational meetings for schools at-risk for PI. CDs were distributed to the principals of these schools to facilitate notification to parents of schools in PI status which includes the option of Public School Choice.

39


Recommended