CASE HISTORY Rev: 00, Issue Data 28.11.2003
REINFORCED SOIL STRUCTURES AND SLOPE EROSION CONTROL Product: Mac Mat R, Paralink 1000, GREEN TERRAMESH
PROTECTION OF KOSCIUSZKO NATIONAL MEMORIAL KRAKOW - POLAND
Problem
The city of Krakow is dominated by an imposing
fortress on which an earth mound was erected in
memory of the national hero Tadeusz Kosciuszko.
This mound has suffered from erosion and continu-
ous water infiltration over the years, which has re-
sulted in its semi-collapse.
Solution
The remedial works consisted in placing MacMat R
erosion-resistant matting, anchored to the mound by
means of dowels. This was followed by hydroseed-
ing for the growth of vegetation and to protect
against further infiltration. Finally reconstruction of
the last ring used the Green Terramesh reinforced
soil system. The base of the last ring was reinforced
by means of the Paralink 1000 geogrid (to prevent
vertical settlements and consolidate the base of the
reinforced soil structure) and waterproofed to avoid
the problematic infiltration of water into the body of
the mound. Bottompage sketch shows a typical sec-
tion through the remedial works, with details of the
various types of operations.
During construction
Design layout
Design layout
Officine Maccaferri S.p.A. Via JF Kennedy, 10 - 40069 Zola Predosa (BO) - Italy Tel. (+39) 051-6436000 - Fax (+39) 051-236507 E-mail: [email protected] - Web site: www.officinemaccaferri.it
Any reproduction, including photocopy, film and microfilm, is forbidden. All rights reserved worldwide.
After construction During construction
Design layout
During construction
During construction
After construction