    PROTECTIVE COATINGS & LININGSFor

    WASTEWATER & WATER STRUCTURES

    By

    Rocky Capehart

    2011

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    2/47

    Accelerated corrosion problems in todaysinfrastructure and a greater awareness ofcorrosion issues, require demanding and

    viable long-term solutions.

    MIC (Microbiologically Induced Corrosion)Thiobacillus (Bacterium/Bugs) feed on the sulfur within the H2S and excrete

    sulfuric acid which then attacks the concrete matrix!

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    3/47

    Corrosion will increase due to: Reduction of inflow and infiltration

    Regulatory changes in pre-treatment

    Expansion of collection systems

    EPA/625/6-91/030

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    4/47

    How Do We Achieve Long TermQuality Coatings & Linings

    Performance?

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    5/47

    THIRD PARTY TESTING AND SPECIFICATIONS

    RESOURCE PROPERTIESLos Angeles County Sanitation Ease of Application

    Chemical ResistanceBond Inspection

    Greenbook - City of Los Angeles Chemical ResistanceChange in Physical Properties

    Trenchless Technology Center Buckling StrengthHydrostatic Pressure Effects

    Independent Testing Labs Permeability(Following ASTM Standards) Tensile/Flexural/Compressive Properties

    Chemical Resistance

    Material Safety Data Sheets Safety & Handling

    Others: NACE (National Association of Corrosion Engineers), SSPC(The Society for Protective Coatings), ICRI (International Concrete RepairInstitute) and Universities Across North America

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    6/47

    Can Help Prevent:

    CORRECT PRODUCT SELECTION,

    INSTALLATION & INSPECTION

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    7/47

    Polymer Coating and Liner Disbonding

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    8/47

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    9/47

    Aggressive Corrosion

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    10/47

    Pinholes

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    11/47

    Epoxy FailureThin coating and pinholes

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    12/47

    Inner Coating Delamination & Poor Adhesion

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    13/47

    Thinner Than Required Coating Applications

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    14/47

    Thinner Than Required Coating Applications &Applicator Error

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    15/47

    Roots and Infiltration

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    16/47

    Substrate Failure Behind The Lining

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    17/47

    Equipment / Tool Damage & Pinholes

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    18/47

    WRINKLES & SAGS

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    19/47

    HOW DO WE SELECT THE CORRECT COATINGOR LINING SYSTEM ?

    Thermoplastic sheet liners Cementitious systems

    Polymer Systems

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    20/47

    STRUCTURAL & NON-STRUCTURALRENEWAL OPTIONS

    Cementitious Coatings (Portland to CalciumAluminates')

    Structural-1/2- 4 (May require reinforcement)

    Non-Structural-3/8-1/2

    Polymer Coatings (Epoxies and Polyurethanes)

    Structural-125-500 mils (1/8 1/2)

    Non-Structural-60 mils minimum-100 milsaverage

    Composite Systems

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    21/47

    CORROSION PROTECTIONOPTIONS

    Cementitious formulations Calcium aluminate

    Antimicrobial additives

    Thermoplastic linings

    Cement or polymer

    mastic basecoat Polymer coatings

    Epoxies,polyurethanes,

    polyureas

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    22/47

    COATING THICKNES

    Profile Height (New surface or Exposed Aggregate)

    Effects of hydrostatic head pressure or water vapor transmission

    (Design with industry accepted ASTM F1216-07 for StructuralApplications to withstand long term external hydrostatic loadings)

    Environment

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    23/47

    UNDERGROUND INSTALLATIONVARIABLES

    Temperature and humidity Moisture filled substrates Hydrostatic pressure Water vapor transmission Surface and structure

    condition Accessibility and confined

    space

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    24/47

    KEY FACTORS FOR PREP SUCCESSObtain a clean, dry and sound surface!

    Understand repairprocedures:

    Substrate lossor infiltration

    Understandpreparationprocedures

    Know how to testpreparationresults

    Know commonmethods of:

    cleaning power

    abrasive

    choices coating

    removal

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    25/47

    COATINGINSPECTION PARAMETERS

    SAMPLE FORM Quality Assurance/Quality ControlContract Name: __Manhole Rehabilitation ______________________ ______________ Contract No: _________________________

    Contractor/Installer: ___________________________ Construction Observer/Inspector: _____________________________

    Report No.__________ Weather:______________________________ Structure Temp: Ambient___________ Surface_____________

    Other Work in Progress: ______________________________ _______________________ _______________________ ________________

    Inspection

    Performance Acceptable Results

    No. Quality Assurance Standard Quality Quality Control Pass/Fail Comments

    1

    Visual inspection of structure

    substrate after c leaning and

    preparation

    Industry

    S tandard 100%

    Visually inspect surfaces to be coated for

    effective removal of existing c oatings, unsound

    substr ate, laitance, infiltration. Vis ually identify

    problem areas.

    2 Test substrate for soundness.

    SSPC- SP

    13 NA CE

    No. 6 100%

    Lightly scratch prepared concrete surfaces with a

    screwdriver or pocket knife. The scratch should

    leave a shiny mark with no loose particles from

    the surface. Otherwise, re-prep and re-inspect.

    3

    Visual inspection of product

    application and documentation of

    proper material ratio/usage

    Product

    Technical Data

    S he et (r at i o) 1 00 %

    Visually observe mixed color which should be

    homogenous without marbling effect. Inspection

    recordkeeping of applicator for material usage of

    product components, verify proper usage.

    4

    Wet Film Thickness (WFT)

    measured during application. NOTE:

    When applying fast setting

    polyurethanes, this test is not

    applicable. Use the adhesion test to

    also measure mil thickness. ASTM D-4414

    No less

    than 90% or

    greater than

    120%

    Measure and record the WFT in at least four

    locations for every 500 sf and each coat of

    material applied.

    5

    Holiday Detection using a high

    voltage holiday detector.

    NACE RPO-

    188 100%

    Confirm conductivity by inducing holiday and

    calib rating detector. Test entire coated surface.Repair and retest as required.

    6

    Adhesion Testing using a Elcometer

    Model 106 on a minimum of 10% of

    the manhole structures coated. ASTM D-4541

    As

    specified

    Perform a minimum of three pull tes ts per

    manhole at locations randomly selected.

    Evaluate results and repair c oating where tested.

    Record dolly location, pull

    strength (psi), mode of failure

    and whether dolly was scored

    or unscored.

    Owners Representative: Name Signature Date

    Contractor/Installer Representative: Name Signature Date

    All QA/QC as per specific manufacturer'sr ecommendations.

    Substrate inspection - Ambient conditions - Surface profile - Surfacecleanliness Mixing procedures - Application procedures

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    26/47

    IMPROVED QUALITY CONTROL

    QA/QC during construction with

    Trained Inspectors & Documentation

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    27/47

    QUALIFIED CONTRACTORS

    >90% of all failures result from improper installation!

    Contractor RequirementsCertification of Training

    Manufacturer

    Third party

    NACE (National Association of Corrosion Engineers)

    SSPC (The Society for Protective Coatings)

    Experience Similar scope, size or training Actual Field Experience

    References

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    28/47

    Established manufacturersthat implement QC duringmanufacturing (ISO 9000)

    Suitable for application in

    specified environment

    Capable of providingprotection and/or structuralneeds

    Field tested and proven

    Independent and certifiedthird party laboratorytesting

    Quality Control - Materials

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    29/47

    EQUIPMENT

    Equipment is product

    dependent

    Some can bemobilized intounderground

    structures asnecessary

    Efficiency andproduction varies(Brush, roller, troweled

    or spray applications)

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    30/47

    VISUAL INSPECTION

    Cracking, pinholes, exposedsubstrate

    Proper bench and invertrebuild

    Frame/chimney sealing

    Pipe joint seals

    Step removal or replacement

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    31/47

    MONOLITHIC INSTALLATION

    Holiday (Spark) Testing

    A barrier without fault provides effective long-termelimination of infiltration and corrosion protection

    Refer to NACE RPO188-Concrete & SteelRefer to ASTM G627-87-Steel Pipe

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    32/47

    HOLIDAY (SPARK) TESTINGEQUIPMENT

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    33/47

    ADHESIONA verifiably acceptable mechanical bond to the host structure is essential for

    long-term performance.USE EXPERIENCED INSPECTORS

    FOLLOW ASTM D7234-05 or MODIFIED ASTM D4541-02 STANDARDS

    NOTE: ASTM D7234-05 includes cohesion and adhesion test formulas

    A CLEAN AND DRY SURFACE

    WILL PROVIDE OPTIMAL RESULTS !

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    34/47

    ADHESION (PULL) TESTINGEQUIPMENT

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    35/47

    REMEMBER THE SEVENREMEMBER THE SEVEN PPs!s!Performance Specifications-Tight & With Stringent QA/QC

    Proven Products & Correct Selection

    Proper Preparation Of Surface & Coating With Certified,Trained & Experienced Applicators

    With Use Of The Above Guidelines, You Will Discover That

    Perfect Performance For A Longer Term Is Virtually Guaranteed

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    36/47

    The Gold StandardThe Gold StandardSpray AppliedSpray Applied

    PolyurethanePolyurethaneForFor

    Water and WastewaterWater and Wastewater

    Infrastructure RehabilitationInfrastructure Rehabilitation

    www.sprayroq.comwww.sprayroq.com

    Rocky CapehartRocky Capehart

    (916) 686(916) 686--80558055EE--mail: [email protected]: [email protected]

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    37/47

    Sprayroq Inc. 37

    What is Spraywall?

    NOT AN EPOXY!NOT AN EPOXY!

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    38/47

    What is Spraywall?

    Spray applied polyurethane

    Rigid

    Quick Curing

    10 second gel time

    Reinstate flow in 30-60 minutes

    Monolithic finish

    Sprayroq Inc. 38

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    39/47

    Sprayroq Inc. 39

    What is Spraywall?

    Adapts to all shapes and structures

    200,000+ Structures Rehabilitated

    NSF 61 Approved

    50 year design life

    Creep test revealed 70%+ retention of original technicalproperties

    Passed the Redner Study (L.A. County)

    Passed the Greenbook Pickle Jar Test

    Chemical Resistance Tested as per ASTM D543

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    40/47

    Sprayroq Inc. 40

    Spraywall Properties

    Technical Properties

    730,000 psi Flex Modulus(45% stronger than theoriginal concrete structure)

    3.8% elongation Tensile 7,450 psi

    Compressive Strength>18,000 psi

    Pull test yieldsat 450 psi -700 psi

    Density 87 pcf

    Chemical Resistance

    Hydrogen Sulfide

    Sulfuric Acid to 20%

    Chlorine to 10%

    Road salts

    Quick Cure

    10 seconds to gel

    4-6 hrs to full cure

    100% VOC free

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    41/47

    Sprayroq Inc. 41

    Other WastewaterRehabilitation Applications

    Wet Wells

    Lift Stations

    Vaults

    Grit chambers

    Pipelines (Man entry)

    Tunnels

    Sedimentation tanks

    Secondary Containment

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    42/47

    Sprayroq Inc. 42

    Sprayroq Certified Partners

    National network of highly trained, diversified contractors Licensee program started in 1992 with Insituform

    Technologies

    12 to 1 ratio of acceptance into program

    Yearly QA/QC Review

    Ongoing Technical and Marketing support

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    43/47

    Sprayroq Inc. 43

    Training Class In House

    New SCPs crews travel to Birmingham Final installation of equipment

    Classroom training Chemistry Basics

    Equipment setup and maintenance

    Surface Prep and Infiltration Control

    Spray technique

    Written test

    President of Sprayroq authorizes SCP for work

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    44/47

    Sprayroq Inc. 44

    Training Class-In the Field

    Sprayroq Operations team travels to SCP facilities for oneweek

    1-2 days of follow up classroom work

    Final equipment inspection completed

    Sprayroq Ops co-supervises demo projects or actual work

    Fine tuning is completed with each person

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    45/47

    Sprayroq Inc. 45

    Third Party Testing

    Conducted currently by Texas ResearchInstitute in Austin, TX

    Complete test panels

    Flex Modulus

    Elongation

    Tensile strength

    Compressive strength

    Louisiana Tech U completed study verifyingbursting strength (internal) of Spraywall

    St. Louis Testing Laboratories

    Chemical Resistance as per ASTM D543

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    46/47

    Sprayroq Inc. 46

    SprayWallSprayWallSprayroq Tough!

  • 8/3/2019 Protective Coatings & Linings 2011 With Notes

    47/47

    The Gold StandardThe Gold Standard

    SprayWallSprayWallSpray AppliedSpray Applied

    RigidRigid PolyurethanePolyurethane

    ForFor

    Water and WastewaterWater and WastewaterInfrastructureInfrastructure

    RehabilitationRehabilitation


Recommended