Protocol
Dokument
Seite 1 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Order Data ☒ Onshore ☐ Offshore
Country Deutschland Manufacturer Vestas
Place Weener WTG - Typ Anlage V66
Name WF WP1289 Weener WTG - Number V 1424
Ref.doc. A8897/19.04.2016 Project Number P31220
PM REETEC Kai Jäger +49 421 399 87 418
PM Customer Eduard Hesse +49 4951 781
TL REETEC G. Kupkowski +49 174 34 18 463
TL Customer Eduard Hesse +49 170 301 1000
Site Briefing ☒ by Project Team ☒ by Customer Rep. / Client
Turbine Admission ☐ General Training ☒ by Customer Rep. / Client
Lift “Daily Check” ☒ OK ☐ Not Ok, see protocoll
Kind of Damage ☒ GRP ☐ Tower Radius (Z) LE TE PS SS Profile depth
R 12 2 areas with
peeling of the
surface coating
in diameter and
1 cm 3
<= 1 mm
R 14 – R 26
R 14 – R 26
Area with
abrasion of the
surface coating
and spalling in
diameter or
length = 1-30 cm
Area with
spalling in
diameter and
length = 1-30 cm
<= 1 mm
R 29 Erosion, abrasion
and spalling
along the AK to
blade tip
<= 1 mm
R 29 AK to blade tip <= 1 mm
R 32 Significant
ablation at the
receptor
<= 1 mm
R 1 - 2 Peeling of the
surface coating
over the entire
range of the
extender, all
around
<= 1 mm
R 1 2 cracks at the
transition to
<= 1 mm
Protocol
Dokument
Seite 2 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Extender length
20 cm
R 4 bis R 7 Area with
abrasion of the
surface coating
and spalling with
a length of 30 cm
<= 1 mm
R 6 Individual
spalling
<= 1 mm
R 10 – R 15 coating area with
abrasion of the
individual
surfaces and
spalling in
diameter from 1
to 10 cm
<= 1 mm
R 10 – R 15 coating area with
abrasion of the
individual
surfaces and
spalling in
diameter from 1
to 10 cm
<= 1 mm
R 18 – R 27 Area along the
AK with abrasion
of the surface
coating and
spalling
<= 1 mm
R 20 – R 29 Areas with
abrasion of the
surface coating
with a length of
20 cm
<= 1 mm
R 31,5 2 superficial
spalling with a
diameter of 3 cm
<= 1 mm
R 5 2 single spalling
with a diameter
of 2 cm and 4
<= 1 mm
R 15 Individual
spalling
<= 1 mm
R 21 3 single spalling
with a diameter
of 1 to 4 cm
<= 1 mm
R 23 Abrasion of the
surface coating
to a length of 30
cm.
<= 1 mm
R 23 Area with
abrasion of the
surface coating
and spalling with
a length of 20 cm
<= 1 mm
Protocol
Dokument
Seite 3 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
R 25 Area with
abrasion of the
surface coating
with a length of
20cm
<= 1 mm
R 27 Area with
abrasion of the
surface coating
with a length of
15 cm
<= 1 mm
R 29 Abrasion of the
surface coating
with a length of
10 cm
<= 1 mm
Area with
individual points
of abrasion of
the surface
coating with a
diameter of 1 - 4
cm Translucent
to the leaf tip
<= 1 mm
Documentation of Environmental Conditions Conditions during repair / one record per repair step
Date Time Temperature °C Rel. Humidity % Wind Speed in m/s
19.07.2016 12:15 30 71 < 10 m/s
21.07.2016 13:00 28 74 < 10 m/s
22.07.2016 12:30 24 91 < 10 m/s
Execution of Repair Date Picture time
stamp
Repair / Work Step Pic.# Blade No.
22.07.2016 13:20 Documentation of Scratches 1 A 2
22.07.2016 13:24 Grinding of Scratches 2 A 2
22.07.2016 13:29 Painting the Blade 3 A 2
22.07.2016 13:45 Documentation of Scratches 4 A 3
22.07.2016 13:46 Grinding of Scratches 5 A 3
22.07.2016 13:51 Painting the Blade 6 A 3
22.07.2016 14:07 Documentation of Scratches 7 A 4
22.07.2016 14:10 Grinding of Scratches 8 A 4
22.07.2016 14:14 Painting the Blade 9 A 4
Protocol
Dokument
Seite 4 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
22.07.2016 14:20 Documentation of Scratches 10 A 5
22.07.2016 14:22 Grinding of Scratches 11 A 5
22.07.2016 14:25 Painting the Blade 12 A 5
22.07.2016 14:29 Documentation of Scratches 13 A 6
22.07.2016 14:32 Grinding of Scratches 14 A 6
22.07.2016 14:36 Painting the Blade 15 A 6
19.07.2016 10:49 Documentation of Scratches 16 B 2
19.07.2016 10:53 Grinding of Scratches 17 B 2
19.07.2016 11:00 Painting the Blade 18 B 2
19.07.2016 11:01 Documentation of Scratches 19 B 3
19.07.2016 11:08 Painting the Blade 20 B 3
19.07.2016 11:12 Documentation of Scratches 21 B 5
19.07.2016 11:13 Grinding of Scratches 22 B 5
19.07.2016 11:19 Painting the Blade 23 B 5
19.07.2016 11:32 Documentation of Scratches 24 B 4
19.07.2016 11:44 Grinding of Scratches 25 B 4
19.07.2016 11:49 Painting the Blade 26 B 4
19.07.2016 14:02 Documentation of Scratches 27 B 6
19.07.2016 14:06 Grinding of Scratches 28 B 6
19.07.2016 14:14 Painting the Blade 29 B 6
19.07.2016 14:19 Documentation of Scratches 30 B 7
19.07.2016 14:21 Grinding of Scratches 31 B 7
19.07.2016 14:29 Painting the Blade 32 B 7
19.07.2016 14:35 Documentation of Scratches 33 B 8
19.07.2016 14:37 Grinding of Scratches 34 B 8
19.07.2016 14:42 Painting the Blade 35 B 8
19.07.2016 14:47 Documentation of Scratches 36 B 9
19.07.2016 14:48 Painting the Blade 37 B 9
19.07.2016 14:52 Documentation of Scratches B 10
19.07.2016 14:54 Grinding of Scratches B 10
19.07.2016 14:58 Painting the Blade B 10
21.07.2016 14:21 Documentation of Scratches C 2
Protocol
Dokument
Seite 5 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
21.07.2016 14:25 Grinding of Scratches C 2
21.07.2016 14:40 Painting the Blade C 2
21.07.2016 14:47 Documentation of Scratches C 3
21.07.2016 14:50 Grinding of Scratches C 3
21.07.2016 14:58 Painting the Blade C 3
21.07.2016 15:22 Documentation of Scratches C 4
21.07.2016 15:22 Documentation of Scratches C 4
21.07.2016 15:25 Grinding of Scratches C 4
21.07.2016 15:25 Grinding of Scratches C 4
21.07.2016 15:34 Painting the Blade C 4
21.07.2016 15:35 Painting the Blade C 4
21.07.2016 15:44 Documentation of Scratches C 5
21.07.2016 15:47 Grinding of Scratches C 5
21.07.2016 15:53 Painting the Blade C 5
21.07.2016 16:08 Documentation of Scratches C 6
21.07.2016 16:10 Grinding of Scratches C 6
21.07.2016 16:22 Painting the Blade C 6
21.07.2016 16:27 Documentation of Scratches C 8
21.07.2016 16:28 Grinding of Scratches C 8
21.07.2016 16:32 Painting the Blade C 8
21.07.2016 16:38 Documentation of Scratches C 7
21.07.2016 16:38 Grinding of Scratches C 7
21.07.2016 16:40 Painting the Blade C 7
21.07.2016 16:45 Documentation of Scratches C 9
21.07.2016 16:46 Grinding of Scratches C 9
21.07.2016 16:48 Painting the Blade C 9
Protocol
Dokument
Seite 6 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Execution of Repair according
to customer specification:
☒ Yes ☐ No
If NO – Why?
Consumption of Material Manufacturer Name of Material Quantity
(kg, Li, m²) Serial- / Batch number
BASF RELEST Wind Putty Contour
(Cartridge) 1,0 kg 0031 496338
BASF RELEST WB Top Coat i394 RAL
7035 2,0 kg 0031 431114
BASF RELEST Hardener PUR 3396 0,5 kg 0031 424123
Wählen Sie ein Element aus.
Special Tools used Manufacturer Type of Tool Usage Serial- / Batch number
Makita Akku Grinder (Excenter) Sanding 2013/37022G
Makita Akku Grinder(Angle) Sanding 2013/915135
Applicable Documents
☒ REETEC internal work instructions ☐
☐ ☐
☐ ☐
☐ ☐
Protocol
Dokument
Seite 7 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Order accomplished professionally
Information for Costumer All explained in the damage report have been processed with the
utmost precision and conscientiousness.
Attachments
e.g. Temper Sheets, External
Documentation of
Environmental Conditions etc.
Date Name Signature
09.08.2016 Stefan Beuchel issued electronically
Protocol
Dokument
Seite 8 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 1 Picture 2
Picture 3 Picture 4
Protocol
Dokument
Seite 9 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 5 Picture 6
Picture 7 Picture 8
Protocol
Dokument
Seite 10 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 9 Picture 10
Picture 11 Picture 12
Protocol
Dokument
Seite 11 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 13 Picture 14
Picture 15 Picture 16
Protocol
Dokument
Seite 12 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 17 Picture 18
Picture 19 Picture 20
Protocol
Dokument
Seite 13 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 21 Picture 22
Picture 23 Picture 24
Protocol
Dokument
Seite 14 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 25 Picture 26
Picture 27 Picture 28
Protocol
Dokument
Seite 15 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 29 Picture 30
Picture 31 Picture 32
Protocol
Dokument
Seite 16 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 33 Picture 34
Picture 35 Picture 36
Protocol
Dokument
Seite 17 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 37 Picture 38
Picture 39 Picture 40
Protocol
Dokument
Seite 18 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 41 Picture 42
Picture 43 Picture 44
Protocol
Dokument
Seite 19 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 45 Picture 46
Picture 47 Picture 48
Protocol
Dokument
Seite 20 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 49 Picture 50
Picture 51 Picture 52
Protocol
Dokument
Seite 21 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 53 Picture 54
Picture 55 Picture 56
Protocol
Dokument
Seite 22 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 57 Picture 58
Picture 59 Picture 60
Protocol
Dokument
Seite 23 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 61 Picture 62
Picture 63 Picture 64
Protocol
Dokument
Seite 24 von 5
REPAIR / REPLACEMENT OF GRP & TOWER PARTS
Änd. Datum
Rev.Stand 0
Picture 65 Picture 66
Picture 67