Proven Team, Proven Approach:
The First and Only Pure Play Uranium Royalty Company
Corporate Presentation
May 2020
URC : TSX-V
FORWARD-LOOKING STATEMENT2
Forward-Looking Information
The information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information”
within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that
Uranium Royalty Corp. (“URC” or the “Company”) the Company expects or anticipates will or may occur in the future, including the completion of tentative transactions. Forward-looking information
and statements are based on the then current expectations, beliefs, assumptions, estimates and forecasts about URC’s business and the industry and markets in which it operates. Forward-looking
information and statements are made based upon numerous assumptions and although the assumptions made by the Company in providing forward-looking information or making forward-looking
statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate. Forward-looking information and statements also involve
known and unknown risks and uncertainties and other factors, which may cause actual results, performances and achievements of URC to differ materially from any projections of results, performances and
achievements of URC, including, without limitation, URC's limited control and access to data to the projects underlying its interests, commodity, commodity and investment price risks, currency risks,
counterparty risks, proposed acquisitions may not be completed as contemplated or at all, risks faced by the operators and owners of the projects underlying URC's interests and the other risk factors set
forth, from time to time, in the Company’s disclosure documents (including its prospectus dated November 22, 2019), which are available under its profile at www.sedar.com. Although the Company has
attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be
other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and
future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company
undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
Technical Information
Certain scientific and technical information in this presentation is based on information prepared under the Joint Ore Reserves Committee (JORC) 2004 or 2012 code, the terms Inferred Mineral Resources,
Indicated Mineral Resources, Measured Mineral Resources, Ore Reserves, Proved Ore Reserves and Probable Ore Reserves are substantially similar to the terms Inferred Mineral Resources, Indicated
Mineral Resources, Measured Mineral Resources, Mineral Reserves, Proven Mineral Reserves and Probable Mineral Reserves, respectively, used in Canadian National Instrument 43-101 (“NI 43-101”).
Darcy Hirsekorn, the Company's Chief Technical Officer, has supervised the preparation of and reviewed the technical information contained in this presentation. Darcy holds a B.Sc. in Geology from the
University of Saskatchewan, is a qualified person as defined in National Instrument 43-101 and is registered as a professional geoscientist in Saskatchewan.
External Information
Where this presentation quotes any information or statistics from any external source, it should not be interpreted that the Company has adopted or endorsed such information or statistics as being accurate.
The Company also advises investors that some of the information presented herein is based on or derived from statements by third parties, has not been independently verified by or on behalf of the
Company, and that no representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of this information or any other
information or opinions contained herein, for any purpose whatsoever.
No Investment Advice
This presentation is not, and is not intended to be, an advertisement, prospectus or offering memorandum, and is made available on the express understanding that it does not contain all information that
may be required to evaluate, and will not be used by readers in connection with, the purchase of or investment in any securities of any entity. This presentation accordingly should not be treated as giving
investment advice and is not intended to form the basis of any investment decision. It does not, and is not intended to, constitute or form part of, and should not be construed as, any recommendation or
commitment by URC or any of its directors, officers, employees, direct or indirect shareholders, agents, affiliates, advisors or any other person, or as an offer or invitation for the sale or purchase of, or a
solicitation of an offer to purchase, subscribe for or otherwise acquire, any securities, businesses and/or assets of any entity, nor shall it or any part of it be relied upon in connection with or act as any
inducement to enter into any contract or commitment or investment decision whatsoever. Readers should not construe the contents of this presentation as legal, tax, regulatory, financial or accounting
advice and are urged to consult with their own advisers in relation to such matters.
U.S. Non-Solicitation
This presentation is not an offer of securities for sale in the United States and is not an offer to sell or solicitation of an offer to buy any securities of URC nor shall it form the basis of, or be relied upon in
connection with any contract for purchase or subscription. The securities of URC have not been and will not be registered under the Securities Act or the securities laws of any state and may not be offered
or sold in the United States absent registration or pursuant to an applicable exemption therefrom.
INVESTMENT HIGHLIGHTS
URC is well positioned to take advantage of current market conditions as a provider of
alternative capital to the uranium sector
3
First Mover
Advantage
▪ URC is the first company to apply the successful royalty and streaming
business model exclusively to the uranium sector
$43M Cash &
Listed Securities
▪ Strong balance sheet, which positions it to capitalize on accretive uranium
royalty and streaming acquisition opportunities
Physical Uranium
Ownership
▪ Through its approximately 9% stake in London-listed Yellow Cake plc,
URC holds interests in physical uranium, acquired at cyclical lows
Large & Diversified
Royalty Portfolio
▪ Portfolio includes interests on development, advanced, permitted and past-
producing uranium projects in multiple jurisdictions
Expertise▪ Management and board possess decades of uranium industry experience,
including senior executive and advisory roles to prominent companies and
governments in the sector
4MANAGEMENT & BOARD
Management
Scott Melbye (President, CEO & Director)
• Uranium industry veteran with 35 years
experience including Executive roles with
Cameco, Uranium One & Uranium
Participation Corp.
• Former Strategic Advisor to Kazatomprom
• Executive VP of UEC
• Based in Denver
Darcy Hirsekorn (CTO)
▪ Professional geoscientist with 20 years
experience at Cameco
▪ Part of exploration groups that outlined over
200Mlbs of uranium
▪ Based in Saskatoon
Josephine Man (CFO)
▪ Former partner at Ernst & Young LLP
▪ Over 20 years of experience working with
public companies primary in the mining
industry
▪ Based in Vancouver
Board of Directors
Amir Adnani (Chairman)
▪ Entrepreneur and Founder, President & CEO of Uranium
Energy Corp (UEC: NYSE American)
▪ Chairman of GoldMining Inc. (GOLD: TSX)
▪ Based in Vancouver
Lady Barbara Judge CBE (Director)
▪ Former chair and board member of the U.K. Atomic Energy
Commission
▪ Former U.S. Securities and Exchange Commissioner
▪ Served on the Boards of the StatOil, and Magna
▪ Strategic Advisor to the Emirates Nuclear Energy Corp., Tokyo
Electric Power and the Astana Stock Exchange
▪ Based in London, U.K.
David Neuburger (Director)
▪ Over 30 years experience in operations leadership roles,
corporate strategic planning, projects and mine engineering
▪ Formerly: VP, International Mining and VP, Mining
(Saskatchewan) for Cameco Corp., VP, GM of Kupol
Operations for Kinross
▪ Based in Saskatoon
Vina Patel (Director)
▪ 18 years experience raising capital from U.K. and European
institutional investors in mining and exploration equities,
including uranium companies
▪ Formerly Head of London Institutional Sales for Haywood
Securities
▪ Based in London, U.K.
Strategic Partner
Uranium Energy Corp▪ Initial shareholder
▪ Strategic partner, ongoing technical
and operational support
CAPITALIZATION & OWNERSHIP PROFILE5
(1) All, except for 500,000 common share purchase warrants, are trading on the TSX-V Exchange
(2) $55M cash to be received should all warrants are exercised
All figures are in Canadian dollars
CURRENT ASSETS
Cash, Cash Equivalents, and Listed Securities Approx. $43 Million
SHARE STRUCTURE
Shares Outstanding 71.8 Million
Warrants 27.9 Million(1)
Options 0
Fully Diluted(2) 99.7 Million
KEY SHAREHOLDERS
Uranium Energy Corp.
Altius Resources Inc.
Mega Uranium Ltd.
Marin Katusa
KCR Fund
Extract Capital
Rick Rule
Sprott Global
Commodity Capital
RECENT ACTIVITY
$1.19 (URC : TSX-V) As of May 1, 2020
Avg. Daily Vol. (3-mo): 69,530
$0.30 (URC.WT : TSX-V) As of May 1, 2020
$85 Million
Market Cap
OUR STRATEGY:
BUILDING A DIVERSIFIED PORTFOLIO
6
URC’s Diversified Approach is Well Suited to Uranium
Geographical
Multiple countries
Counterparty
Range of market capitalization
Development Stage
Grassroots to producing
Invest Across the Cost Curve
Maximizes leverage to uranium recovery
Acts as a substitute for near term
royalty / stream cash flow:
▪ Yellow Cake investment
▪ Potential future physical
purchases
PORTFOLIO COMPOSITION STRATEGY
URC has a pipeline of primary and by-product royalty and
streaming opportunities on projects in development, care and
maintenance, and production worldwide
Royalties held or under option on
diverse portfolio of projects at
various stages across several key
uranium jurisdictions
7
Leverage to
Future Uranium Price
Future Pipeline
Direct Exposure to
Current Spot Price
URC's Portfolio
8
STRONG COUNTERPARTIES9
Counterparties include many of the sector’s leading growth-oriented uranium companies
GLOBAL DIVERSIFIED ASSET PORTFOLIO10
Note: Physical storage of Yellow Cake material is provided at Cameco’s Blind River facility
Ownership ▪ 9.0%
Rights
▪ URC has the option to acquire up to US$31.25M
(US$2.5M – US$10M per year) of uranium between Jan
2019 – Jan 2028
▪ URC has an option to participate in any and all future
uranium royalty and stream transactions Yellow Cake
pursues on a 50:50 basis.
▪ URC and Yellow Cake also plan to collaborate on future
opportunities involving physical uranium
▪ In the event URC exceeds 10% ownership, URC has the
right to nominate one director to the Yellow Cake Board,
currently have observer rights
Overview
▪ Yellow Cake has a long term supply agreement with
Kazatomprom, the world's largest uranium producer
▪ The supply agreement enables Yellow Cake to purchase
up to US$1.07bn (including existing purchases) of
uranium from Kazatomprom over a 10 year period
Purchasing
▪ Yellow Cake completed its initial purchase of uranium,
acquiring 8.1Mlbs of U3O8 for a cost of US$170M
▪ Since the initial investment, Yellow Cake has purchased
an additional 0.35Mlbs of U3O8 from Kazatomprom for
US$8.2M and 1.175Mlbs for US$30.4M
STRATEGIC PARTNERSHIP –
YELLOW CAKE PLC INVESTMENT
11
▪ 7.6M shares were purchased as part of a
US$19.25M cornerstone strategic investment
in the Yellow Cake PLC (AIM:YCA)
US$200M IPO completed on July 5th, 2018
Supply Agreement with Kazatomprom
URC Investment in Yellow Cake
Blind River Uranium Storage Facility
Source: Bloomberg, Capital IQ, Public company disclosure
Sep 2011 Announce completion of PEA (historical)(3)
Oct 2011Rio Tinto makes all cash offer, followed by bidding war with Cameco
Jan 2012 Rio Tinto completes acquisition of Hathor for C$654M
Jun 2017 Rio Tinto fully impairs Roughrider and Rossing
▪ Roughrider was discovered by Hathor Exploration in 2008▪ In 2011, Cameco made a hostile bid for Hathor▪ Rio ultimately outbid Cameco and acquired Hathor for C$654M
Location Saskatchewan, Canada
Geological District Athabasca Basin
Owner / Operator Rio Tinto Canada
Orebody Type Unconformity
Mine Type Underground
Stage Development
Tonnage Grade U3O8
Category (kt) (% U3O8) (Mlbs)
Indicated 394 1.98% 17.2
Inferred 161 11.43% 40.7
ROYALTY PORTFOLIO
Athabasca Basin Royalty
(1) These estimates are historical in nature and are not being treated as current resources or reserves by URC as a qualified person has not done sufficient work on behalf of URC to classify such historical estimates as
current mineral resources or reserves. The disclosure of these historical estimates have been included herein as URC believes that it provides an indication of the potential for the properties underlying its royalties
(2) The historic mineral resources were estimated in accordance with NI 43-101 and are disclosed by reference to the Historic Roughrider Technical Report titled “Preliminary Economic Assessment Technical Report
for the East and West Zones, Roughrider Uranium Project, Saskatchewan”, with an effective date of September 13, 2011, prepared for Hathor and authored by Gordon Doerksen, P.Eng., Bruce Fielder, P. Eng.,
Louri Iakovlev, P. Eng., David Keller, P. Geo., Mark Liskowich, P. Geo., Bruce Murphy, FSAIMM, and Cam Scott, P. Eng.
(3) Such Sept 2011 PEA is not being treated as current by URC
Historical Resources(1,2)
Roughrider Project (1.97% NSR) Project Location
12
Diabase Project (3% GRR)
Key Milestones
• Early Exploration project operated by UEC
• Project overlies a highly prospective regional corridor, similar to
the Patterson Lake corridor that hosts the Arrow and RRR
deposits
Measured Indicated Inferred
DepositTonnage
(Mt)
Grade
(% U308)
U3O8
(Mlbs)
Tonnage
(Mt)
Grade
(% U308)
U3O8
(Mlbs)
Tonnage
(Mt)
Grade
(% U308)
U3O8
(Mlbs)
Reno Creek(2) 13.6 0.043% 12.9 15.4 0.039% 13.1 1.7 0.039% 1.5
Church Rock(3) - - - - - - 30.7 0.075% 50.8
Dewey-Burdock(4) 4.9 0.132% 14.3 2.0 0.072% 2.8 0.6 0.055% 0.7
Lance(5) 3.4 0.049% 3.7 11.1 0.05% 12.1 36.2 0.048% 37.8
Asset Royalty (%) Location Operator Stage
Reno Creek 0.5% NPI Wyoming UEC Development
Church Rock 4% NSR New Mexico Laramide Development
Dewey-
Burdock30% NPI South Dakota Azarga Development
Lance4% GRR
(Kendrick &
Barber Areas)
Wyoming PeninsulaProduction
Idled
(1) Reno Creek, Dewey-Burdock, and Lance royalties do not apply to the entire project area covered by this estimate
(2) Reno Creek resources sourced from technical report titled "Technical Report and Audit of Resources of the Reno Creek ISR Project, Campbell County, Wyoming, USA" dated December 31, 2018 and
authored by Robert E. Cameron, Ph.D., MMSA, and Robert Maxwell, CPG, AIPG and made in accordance with NI 43-101,
(3) Church Rock resources sourced from the technical report titled "Technical Report on the Church Rock Uranium Project, McKinley County, State of New Mexico, U.S.A." with an effective date of September
30, 2017, prepared for Laramide Resources Ltd. and authored by Mark B. Mathisen, C.P.G. and made in accordance with NI 43-101,
(4) Dewey-Burdock resources sourced the technical report titled "NI 43-101 Technical Report, Preliminary Economic Assessment, Dewey-Burdock Uranium ISR Project, South Dakota, U.S.A.", with an
effective date of December 3, 2019, prepared for Azarga Uranium Corp. and authored by Steve Cutler, P.G. and Douglass H. Graves, P.E. and made in accordance with NI 43-101,
(5) Lance resources sourced from Peninsula Energy Limited September 30, 2019 quarterly activities report and made in accordance with JORC.
Resources (1)
Asset Overview
13
Project Location
ROYALTY PORTFOLIO
U.S. ISR Royalties
Powder River Basin
Legend
ISR Mines
(Advanced/Development)
ISR Mines
(Production Idled)
Cities (Over 500k Pop)
Resources
Indicated Inferred
DepositTonnage
(Mt)
Grade
(% U308)
U3O8
(Mlbs)
Tonnage
(Mt)
Grade
(% U308)
U3O8
(Mlbs)
Anderson (OP)(1) 25.4 0.028% 15.5 4.6 0.024% 2.5
Anderson (UG) (1) 1.4 0.048% 1.5 8.4 0.052% 9.5
Slick Rock(2) - - - 2.3 0.228% 11.6
Workman Creek(3) - - - 2.9 0.086% 5.5
Asset Royalty (%) Location Operator Stage
Anderson 1% NSR Arizona UEC Advanced
Slick Rock 1% NSR Colorado UEC Advanced
Workman
Creek1% NSR Arizona UEC Development
Roca Honda 4% GRRNew
MexicoEnergy Fuels Development
(1) Anderson resource sourced from the the technical report titled "Technical Report and PEA on the Anderson Uranium Project, Yavapai County, Arizona, USA", with an effective date of July 6, 2014, prepared for Uranium
Energy Corp. and authored by Douglas Beahm, PE, PG, Terence P. McNulty, D. Sc., P.E., Bruce Davis, FAusIMM, and Robert Sim, P.Geo. estimated in accordance with NI 43-101;
(2) Slick Rock resources sourced from the technical report titled "Technical Report Preliminary Economic Assessment, Slick Rock Project Uranium / Vanadium Deposit, San Miguel County, Southwest Colorado, USA" with an
effective date of April 8, 2014, prepared for Uranium Resources Corp. and authored by Douglas Beahm, PE, PG, Bruce Davis, FAusIMM, and Robert Sim, P. Geo. estimated in accordance with NI 43-101;
(3) Workman Creek resources sourced from the technical report titled "Technical Report on the Workman Creek Project, Central Arizona", with an effective date of March 2, 2012, prepared for Uranium Resources
Corp. and authored by Neil G. McCallum, B.Sc, P.Geo., and G.H. Giroux, MASc, P.Eng. estimated in accordance with NI 43-101.
Asset Overview
14
Project Location
ROYALTY PORTFOLIO
U.S. Conventional Royalties
Legend
Conventional Mines
(Advanced/Development)
Cities (Over 500k Pop)
Conventional deposits provide
longer term exposure to rising
uranium prices.
Potential processing at
White Mesa Mill
Mar 2009Fronteer Development Group completes acquisition of
Aurora Energy Resources for ~$175M
Sep 2009 Fronteer issues PEA (historical)(1)
Feb 2011 Paladin acquires the asset for C$260.9M
Dec 2011 Moratorium on uranium mining activity is lifted
Aug 2012 Paladin signs long-term offtake with a major utility
Jun 2014 Paladin issues an updated resource estimate (historical)
Jun 2015Paladin receives federal exemption from Non-Resident
Ownership Policy
Jun 2017 Paladin issues an updated resource estimate (historical)
May 2018 Paladin forms JV on Project
Tonnage Grade U3O8
Category (kt) (% U3O8) (Mlbs)
Measured 17,800 0.097% 38.0
Indicated 36,600 0.084% 67.6
Inferred 13,100 0.077% 22.1
ROYALTY PORTFOLIO – MICHELIN PROJECT
(2% GRR)
(1) This PEA is not being treated as current by URC.
(2) Sourced from June 30, 2018 Annual Report. Resources were estimated in accordance with JORC with cut-off grades ranging between 0.2% - 0.5% and with an assumed uranium price of US$85/lb
Asset Overview Project Location
15
▪ Among largest deposits in North America
Location Labrador, Canada
Geological District Central Mineral Belt of Labrador
Owner / Operator Paladin Energy (55%) / EDF Claimants (45%)
Orebody Type Metasomatic
Mine Type Open Pit/Underground
Stage Development
Historical Data
Resources (2)
Tonnage Grade U3O8
Category (Mt) (% U3O8) (Mlbs)
Measured 66.2 0.049% 71.9
Indicated 18.8 0.044% 18.0
Inferred 6.3 0.042% 5.8
▪ Low technical risk project in a premier uranium jurisdiction
▪ Paladin undertaking operational review to assess process
optimization, cost reduction, production capacity and life of
mine alternatives
Location Erongo, Namibia
Geological
District:Namib Desert
Owner / OperatorPaladin Energy Ltd (75%) / China National
Nuclear Company (25%)
Orebody Type Surficial Calcrete Uranium Deposit
Mine Type Open Pit
Stage Placed on Care & Maintenance in May 2018
ROYALTY PORTFOLIO – LANGER HEINRICH
(A$0.12/kg U3O8 production royalty)
Resources (2)
Asset Overview Project Location
16
Estimated restart Capex – Phase 1 (US$M) US$80.0
Est. Average Annual Production (Mlbs): 5.2 (initial)
Est. Mine Life: 20 Years
Est. AISC (US$/lb)(3) $33.00
Ramp-Up Period 12 months
2019 PFS- Phase 1(1)
(1) Data based on ASX release from October 14, 2019.
(2) Paladin Energy Ltd. 2018 Annual Report. Resources as of June 30, 2018, prepared under JORC 2012 and are quoted inclusive of reserves. The resources do not include stockpiles.
(3) Average life-of-mine all-in sustaining costs.
Past Producer Positioned for Re-Start
Royalty Model & Our Approach
17
18
URC OFFERS PARTNERSHIP “VALUE-ADDED” RELATIONSHIPS
WITH PORTFOLIO COUNTERPARTIES
URC is vested in the success of its portfolio counterparties
Experienced URC team offers
uranium market and
development insights
to counterparty management
and Boards
Thorough due diligence and
selection process offers third party
endorsement to projects in
the URC portfolio
Ability to provide
non-dilutive Project Financing
URC capital markets presence
provides expanded visibility
THE RIGHT MODEL FOR AN IMPROVING MARKET19
Royalty Companies
vs. Operators
Operating
CompaniesUranium ETF
Physical Funds
Exposure to Uranium Price ✓ ✓ ✓ ✓
Fixed Operating Costs ✓ ✓ ✓
No Development or Sustaining
Capital Costs ✓ ✓ ✓
Exploration & Expansion
Upside Without the Associated
Costs✓
Diversified Asset Portfolio ✓ ✓ ✓
Ability to Grow Without
Increased Management ✓ ✓ ✓
▪ To date URC’s strategy has
been primarily focused on
acquiring existing royalties
▪ The next wave of acquisitions
are anticipated to focus on new
royalties, streams physical
uranium and other uranium
interests
OUR STRATEGY: ROYALTY OPPORTUNITY20
URC has a flexible strategy and desire to be a partner in growth
▪ Large number of active dialogues
▪ Typically for shares and/or cash
▪ Focused discussionswith priority targets
▪ Typically cash transaction
▪ On a case by case basis
URANIUM ROYALTY LANDSCAPE21
13
194
2,027
Source: S&P Global Market Intelligence – October 2019.
(1)Projects screened based on primary metal and includes global projects currently in production
(2)Projects screened based on primary metal and includes global projects in the resource development, feasibility and preproduction stages
(3)Includes all projects with uranium as the primary commodity or as a by-product
93
Uranium Projects
Development and
Advanced Projects
Projects at
Construction/
Production Stage
Producing
U3O8
Primary and By-Product Uranium Projects(3)
URC management, board, and advisors have been
to over 80 projects
Gold Uranium
Primary Commodity
Advanced/Development Projects(2)
Gold Uranium
Primary Commodity
Production Projects(1)
Royalties on uranium properties are less
prevalent than on gold properties
Uranium market represents whitespace for the royalty sector
with significant headroom for growth
23%
35%
34%
50%
Uranium Market Overview
22
23
With the world's population exceeding 7.7 billion people and growing,
the need for reliable, non-intermittent, pollution-free electricity
continues to increase.
This growth and its associated needs are important drivers for the currently
projected long-term increase in nuclear power generation and uranium demand.
URANIUM PLAYS KEY ROLE IN CLEAN AIR
AND CLIMATE CHANGE SOLUTIONS
23
▪ China announced that it is likely to triple
nuclear power capacity by 2030
▪ India plans for 21 new nuclear reactors by
2031
▪ U.A.E. completing construction on 4 units
▪ U.K. upgrading nuclear fleet to new
advanced reactors
▪ Russia is building 36 reactors in China,
India, Bangladesh, Turkey, Egypt, Iran,
Finland, Belarus, Slovakia, Armenia,
Uzbekistan and Hungary
▪ U.S. is completing two new AP-1000
reactors in Georgia
NUCLEAR POWER GROWTH REMAINS ROBUST 24
47 Reactors Connected in 7 Years
54 Units Under Construction
Source: World-nuclear.org; WNA, March 31, 2020
REACTOR DEMAND SIGNIFICANTLY
EXCEEDS PRIMARY PRODUCTION
Source: UxC Market Outlook Q4 2019; Q1 2020
25
Spot Prices Below Production Costs and Hedges Falling Off
2020 Demand Expected = 182M lbs.
2020 Production Expected = 142M lbs., 12M lbs./mo
2020 + 2021 Primary Production is 85M lbs. Below Requirements
Cumulative Gap is 510M lbs. by 2030
54% of Total Monthly Global Production Impacted by COVID19
Supply/demand numbers will be impacted as a result of the COVID-19 pandemic. As of April 17, mine
shutdowns included Cigar Lake + McLean Mill, Kazatomprom, Rossing, Husab, and Moab Khotsong,
that will reduce supply by about -6.4 M lbs./mo. The impact to reactor demand is not yet clear.
URANIUM SUPPLY – ACCELERATED REBALANCING
Cuts, Exhaustion, Reduction, Suspension
26
Mine Curtailments, Depletion and Speculative Interest
Accelerating Market Rebalancing
Source: TradeTech April 2020
URANIUM DEMAND
Need for New Production – Beyond Existing Mines
27
▪ Inventory overhang
drawing down
▪ Uranium price too low
to stimulate new
production
▪ Long permitting and
development lead times
to bring on new mines
TradeTech’s “Market Appetite” for New Production
• All assumptions are consistent with TradeTech’s latest proprietary assumptions, August 2019 (i.e. Q2 2019);
• Established Production Base shown is weighted to assimilate the challenge of existing operations remaining
at full capacity over Life-of-Mine.
Source: TradeTech Uranium Market Study 2019
UTILITY PROCUREMENT CYCLE:
Old Contracts Rolling Off… New Contracts Need to be Signed
28
Historic Long Term ContractingUtility Uncommitted Demand
Source: UxC Market Outlook Q1 2020; UxC, LLC: www.uxc.com
Secretary of State Mike Pompeo recently said:
"We need to fundamentally review our supply chains and make sure that we know those supply chains and have control over them for moments just like this."
Further, with respect to uranium, he stated that
“We've got to get back our mining, processing, enriching cycle”
Projected 2020
U.S. Demand: ~50M lbs.
U.S. Production: ~0
$1.5 Billion in U.S. Uranium Reserve in Trump’s
FY2021 Budget
29
U.S. Is The World’s Largest
Consumer of Uranium
30INVESTMENT SUMMARY
URC Offers Investors:
▪ First mover pure-play uranium royalty exposure
▪ Royalty portfolio covering array of development projects in key jurisdictions with the
right partners
▪ Challenging market conditions create mutually beneficial royalty financing
opportunities
▪ Team with extensive uranium industry experience, knowledge and access
▪ Nuclear energy gaining broader acceptance in a carbon-constrained world
▪ Robust uranium demand and curtailed mine production rebalancing market
fundamentals
▪ $1.5B in U.S. Uranium Reserve in Trump’s FY2021 Budget
▪ Market Fundamentals continue to improve with a growing deficit between primary
production and reactor requirements
Appendix
31
ROYALTY AND STREAMS 10132
“Royalties” are a payment to a royalty holder by a property owner, or project operator, and is
typically based on a percentage of the minerals produced and the revenues or profits generated from
the property
Royalty CompanyOperating Company
Royalty CompanyOperating Company
Up-front payment for royalty or stream
Payment for stream delivery
Royalty or stream delivery
“Streams” are physical commodity purchase agreements where, in exchange for an upfront deposit
and ongoing payments for metal delivered, the holder purchases all or a portion of one or more metals
produced from a mine, at a preset price.
TYPES OF ROYALTIES 33
Gross Proceeds Royalty
(GPR)
▪ Based on the total revenue stream from the sale of production from the property, which
can sometimes include deductions.
▪ URC does not currently hold any GPR royalties.
Gross Revenue Royalty
(GRR)
▪ Based on the total revenue stream from the sale of production from the property, which
can sometimes include deductions.
▪ URC GRR royalties include Michelin, Lance, Roca Honda, and the option on Diabase.
Net Profit Interest
(NPI)
▪ Based on the profit realized after deducting costs related to production.
▪ URC has a NPI royalty on Reno Creek and Dewey-Burdock.
Net Smelter Returns
(NSR)
▪ Based on the value of production or net proceeds received by the operator from a smelter
or refinery.
▪ URC NSR royalties include Roughrider, Church Rock, Anderson, Slick Rock, and
Workman Creek.
Production Royalty
(PR)
▪ Based on metal produced, often at a predetermined fixed price.
▪ URC has a PR on the Langer Heinrich Project.
Metal Streams
▪ Streams are distinct from royalties. They are metal purchase agreements where, in
exchange for an upfront deposit and ongoing payments for metal delivered, the holder
purchases all or a portion of one or more metals produced from a mine, at a preset price.
▪ URC does not currently hold any streaming interests. However, part of its strategy
includes the potential acquisition of streams on primary uranium and uranium by-product
assets.
▪ Widely used in the global mining sector.
34
The First and Only Pure Play Uranium Royalty Company
Uranium Royalty Corp.
Toll Free: 1.855.396.8222
Phone: 604.396.8222
Email: [email protected]
www.UraniumRoyalty.com
Corporate Office:
1030 West Georgia Street,
Suite 1830, Vancouver,
BC, V6E 2Y3
Canada
President & CEO:
Scott Melbye
Investor Relations:
Phone: 604.396.8222
Email: [email protected]
URC: TSX-V