28 September 2021 Mr Cameron Sargent Team Leader Key Sites Assessments Department of Planning, Industry & Environment Locked Bag 5022, Parramatta NSW 2124 Attention: Minoshi Weerasinghe Dear Mr Sargent Sydney Opera House - Joan Sutherland Theatre & Front of House-Mod-2 (SSD-7665-Mod-2) Request for Additional Information We refer to your request for additional information (21 September 2021). Provide a mark-up of the entry foyer plan which clearly identifies the proposed changes detailed in Section 4 of the Modification Report including the elements that will be retained as part of this modification Attachment A includes 3 drawings: A-0001, A-1002 (dated August 2016 from the SSD-7665 approved drawings), and A-1002 (dated July 2021). Drawing A-0001 shows the floor area the subject of the modification application. Drawing A-1002 (August 2016) shows the modifications to the Entry Foyer that were originally approved by SSD-7665. This included proposed removal of the Box Office from its current location, relocation of the cloaking facilities, and the introduction of combined ticketing and cloaking in 2 locations (east and west); relocation of the retail store to the southern side of the Entry Foyer; and introduction of the proposed Utzon Bar and Lounge in the footprint of the relocated Box Office. Drawing A-1002 (July 2021) shows the new floor plan proposed by Mod-2. This arrangement leaves the cloaking facilities and retail store in the current locations. The Box Office remains in its current location, albeit with some reduction in floor area in the back of house part of the Box Office. The previously proposed Utzon Bar and Lounge are deleted. The Accessible Adult Change Facility is introduced into the area re-purposed at the rear of the Box Office. Provide further details on the modified structural engineering scheme for the Utzon Escalator Attachment B provides a description of the modified structural engineering scheme.
Transcript

28 September 2021

Mr Cameron Sargent

Team Leader

Key Sites Assessments

Department of Planning, Industry & Environment

Locked Bag 5022,

Parramatta NSW 2124

Attention: Minoshi Weerasinghe

Dear Mr Sargent

Sydney Opera House - Joan Sutherland Theatre & Front of House-Mod-2 (SSD-7665-Mod-2) Request for Additional Information

We refer to your request for additional information (21 September 2021).

Provide a mark-up of the entry foyer plan which clearly identifies the proposed changes detailed in Section 4 of the Modification Report including the elements that will be retained as part of this modification

Attachment A includes 3 drawings: A-0001, A-1002 (dated August 2016 from the SSD-7665 approved drawings), and A-1002 (dated July 2021).

Drawing A-0001 shows the floor area the subject of the modification application.

Drawing A-1002 (August 2016) shows the modifications to the Entry Foyer that were originally approved by SSD-7665. This included proposed removal of the Box Office from its current location, relocation of the cloaking facilities, and the introduction of combined ticketing and cloaking in 2 locations (east and west); relocation of the retail store to the southern side of the Entry Foyer; and introduction of the proposed Utzon Bar and Lounge in the footprint of the relocated Box Office.

Drawing A-1002 (July 2021) shows the new floor plan proposed by Mod-2. This arrangement leaves the cloaking facilities and retail store in the current locations. The Box Office remains in its current location, albeit with some reduction in floor area in the back of house part of the Box Office. The previously proposed Utzon Bar and Lounge are deleted. The Accessible Adult Change Facility is introduced into the area re-purposed at the rear of the Box Office.

Provide further details on the modified structural engineering scheme for the Utzon Escalator

Attachment B provides a description of the modified structural engineering scheme.

Page 2

Respond to the comments raised by Heritage Council of NSW

Attachment C includes a letter and drawings prepared by ARM Architects which responds to the comments raised by the Heritage Council of NSW.

If you require further information, please contact the undersigned.

Yours sincerely,

Peter Doyle

Project Manager

Renewal Statutory Planning

Attachment A: Drawing A-0001 (July 2021) Entry Foyer – Location Plan (+30)

Drawing A-1002 (August 2016) Entry Foyer – Proposed Level 1 Plan (+30)

Drawing A-1002 (July 2021) Entry Foyer – Proposed Level 1 Plan (+30)

Attachment B: Description of Revised Structural Engineering Scheme for Utzon Escalators

Attachment C: Letter from ARM Architecture (24 September 2021) Re: SSD Modification – 7665 MOD 2 –

Architectural Queries

Drawing 49-BR-ARM01 A6110 Construction Details – Entry Corridor – Timber Panels

Drawing 59 BR SV240 E6000 Electrical Services and Lighting Design Reticulation Layout

Drawing 59 BR SV240 M2000 Mechanical Services Air Conditioning and Ventilation Layout

Page 3

ATTACHMENT A

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-0001

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

LOCATION PLAN (+30)

1:250 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

N

X30

X30

X20

X20

X10

X10

Y50

Y50

X40

X40

X50

X50

X60

X60

X70

X70

X80

X80

Y40

Y40

Y30

Y30

Y20

Y20

Y10

Y10

Y00

Y00

X11

0X

110

X10

0X

100

X90

X90

X12

0X

120

X13

0X

130

X14

0X

140

X0

X0

LOCATION PLAN1:250

ENTRYFOYER

1:500 @ A3

jcollins
Text Box
Existing Entry Foyer and area captured under SSD 7665 highlighted
jcollins
Text Box
SSD 7665 Entry Foyer Approved Proposed Design

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-1002

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

PROPOSED LEVEL 1 PLAN (+30)

1:100 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

6.8m

FFL +9,140

E1

E02

E03

A-2002

C3

C2C4 A-2001

XCPS

XC

DL1-13

XCPS

XPC2

XPC2

XPC2

XPC2

XPC2

XPC2 XPC2

PC2

XPC2XPC2

XPC2

XPC2

XC

XPC2 PC2

ESCALATORSCONNECTINGUNDER THESTAIRS TO

UTZON ROOM

43 pax

ESCL

#7

ESCL

#8

Cloak Room1526B

Toilet1527F/1

Toilet1527H/1

FOYER1557A/1

CLOAK ROOM1557B

CONTROL ROOMGM573J

1A-

6002

2A-6002

2A-6002

DL1-12

4A-2101

4A-2101

2

1

3

14

10

7

4A-6001

2A-5001

3A

-600

43

A-6

004

ACP1

XPC2

XPC2

1525/1KICTHENETTE

1525

/3U

TZO

N R

OO

M

1525/4LOBBY

1525/5STORE

1525A/1XPC1

1526AEAST FOYER

1.109WC ENTRY 1XPC1

1.111WC ENTRY 2XPC1

1526CFEMALEXTS1

1526D

1526EMALE

XTS1

1526F

1526HJDUCT

XC

1526K

1527AGREEN ROOM

1527DSERVERY

1527E/1GREEN ROOM KITCHEN

1527E/2STORE

1527E/3STORE

1527

F/3

F3

1527K/1PR#33

XC

1527NDUCT

1527PCENTRE FOYER

1527TCORRIDOR

1528BDUCT

1.101L1 LOBBYTPC1

1528C.1

1528C.3STORE

STORE1551GLOBBY

1551G.1STORE

1551H

1551J

1557AWEST FOYER

1557CFEMALEXTS1

1557DMALE

XTS11557GCORRIDOR

1557G/1CORRIDOR

1.120WC ENTRY 4XPC1

1.114WC ENTRY 3XPC1

1557KStore

1558AMAIN KITCHEN

1L.01LIFT 01

1L05LIFT SHAFT

1L15LIFT SHAFT

1L16Shaft

1L17LIFT SHAFT

<Floor Finish>

G573APLAYHOUSE

G573A/1PLAYHOUSE STAGE

G573U

GM573APR#13

GM573B

GM573CCONTROL ROOMXCPT

GM573D

GM573E

GM573FCONTROL ROOMXCPT

1.123CORRIDOR 2CPT2

GM573H

GM573K

GM573VUPPER WINCH GRID

L1S154STAIR

L1S155Stair

L1S91STAIR

V29XC

V30XC

#14EXISTING PLANTROOMXC

1526GDUCT

GRS31JST STAIRXPC1

GS.30UTZON ESCALATORS

GS45CH STAIRXPC1

VOIDJST SCENERY ROOMXC

GS32GREEN RM STAIRXC

L1S64CH STAIRXPC1

L1S55JST STAIRXPC1

1.122CORRIDOR 1XC

1.124CASH HANDLINGCPT2

L15161

GM573GCORRIDOR

1.125PR#33.1

1527MBOX OFFICE

Y10

Y10

Y20

Y20

Y30

Y30

Y40

Y40

X80X80

X70X70

X60X60

X50X50

XCPS

WTM04

WTM04

WTM04

WTM04

Sydney Opera House Trust

Phone: +61 2 9250 7541email: [email protected]

Sydney Opera House Trust

A1

RevSheet:Drawing No:Location

Project

Title

Date

Status

Dwn

Contract

Ckd Scale

LocationDateApvdDrwnDescriptionIssue

©

NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THESAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOTALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSEBUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANTAUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THEREQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.

COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST

GPO Box 4274 Sydney NSW Australia 2001

ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

Size:SOH-513

BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTUDY / Brendan Byrne

FIRE ENGINEERINGWarren Smith Partners / David Bolt

KITCHEN CONSULTANTMack Group / Nisha Ghantwal

ACOUSTIC ENGINEERArup / Christopher Sims

HYDRAULIC ENGINEERWarren Smith Partners / Campbell Hazelton

COST PLANNING CONSULTANTAtlus Group / Jason Finn

AV CONSULTANTArup / Tom Brickhill

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

HERITAGE CONSULTANTDesign 5 / Alan Croker

SECURITY CONSULTANTArup / Shane Norton

MECHANICAL ENGINEERAecom / Kheng Ip

FIRE CONSULTANTArup / Alistair Morrison

ELECTRICAL ENGINEERSteensen Varming / Ivan Mira

STRUCTURAL ENGINEERAECOM / Jonathan Onslow

ACCESSIBILITY CONSULTANTI-Access / Richard Seidman

BCA/PCA CONSULTANTGroup DLA / Shane Berry

ESD CONSULTANTCundall / Iris Chan

1:100 @ A1

LEVEL 1 FLOOR PLAN

A101

FACADE CONSULTANTPrism / Toby Fuller & Heather Webster

LIFT 36

BX VA

FOR CONSTRUCTION

49 BR TZG03 EWRM, CE

TG, RM C0024.07.2017

Issued For ConstructionC00 VVS TG 12/07/17

XFHR

XFHR

XFHR

XFH

R

FHR

FFL 9,155XSSL 9,130

2A203

2A203

1A

200

1A

200

1A200

1A200

2A203

2A203

1A

053

4A

200

4A

200

1A

201

1A

201

18 A-7002

5

6

7

A301

DL1-26

DL1-24

DL1-10b

DB

(Future Retail byOthers)

1527F/1TOILET

1527F/2F2

1527GLOBBY

1527H/1TOILET

1527H/2STORE

1527K/2OFFICE

1527L/1STORE

1527L/2OFFICE

1527L/3OFFICE

R3

1527QSTORE

1528C.3ELEC

10A453

10A453

DL1-09

DL1-09

6

7

8

5 A304

1

2

3

4 A301

FFL 9,155XSSL 9,065

1

23 A300

MP3

ESCL

#7

ESCL

#8

1.10

2L1

CO

RR

IDO

R

1.101L1 LOBBY

1557KStore

GS.30UTZON ESCALATORS

VOIDJST SCENERY DOCK

1L.36LIFT 36

1.107LIFT 36 LOBBY

1.113EXISTING VIP / INFO COUNTER 1L16

ShaftL1S155

Stair

1557CFEMALE

1557DMALE

1527L/5OFFICE

1525/1ELECTRICAL CUPBOARD

1525

/3

1525/4LOBBY

1525/5STORE

1525A/1

1526CFEMALE

1526D

1526EMALE

1526F

1526HJDUCT

1526

K

1527DSERVERY

1527E/1GREEN ROOM KITCHEN

1527E/2STORE

1527E/3STORE

1527

F/3

F3

1527K/1PR#33

1527NDUCT

1527PCENTRE FOYERXPC1

1527TCORRIDOR

1528BDUCT

1528C.1

LOBBY

1551G.1STORE

1551

H

1551J

1557AWEST FOYERXPC1

1557GCORRIDOR

1557G/1CORRIDOR

1558AMAIN KITCHEN

1L.01LIFT 01

1L05LIFT SHAFT

1L17LIFT SHAFT

G573APLAYHOUSE

G573A/1PLAYHOUSE STAGE

G573U

GM573B

GM573CCONTROL ROOMXCPT

GM573D

GM573E

GM573FCONTROL ROOMXCPT

GM573H

GM573K

L1S154STAIR

L1S91STAIR

V29 V30

#14EXISTING PLANTROOMXC

1526GDUCT

GRS31JST STAIR

GS45CH STAIR

GS32GREEN RM STAIR

L1S64CH STAIRXPC1

L1S55JST STAIR

L15161

GM573GCORRIDOR

GM573VUPPER WINCH GRID

LIFT 15SHAFT

1527MBOX OFFICE

RETAIL SHOP

01 1 2 3 4 5m

N

Y10 Y20 Y30 Y40X

80X

70X

60X

50

1:200 @ A3,

NOTE:- AREA MARKED IN GREY NOT PART OF LIFT 36 EARLY WORKS PACKAGE- AREA MARKED IN GREY NOT PART OF THIS CERTIFICATE

C01 Lift Car Set-out, Project Boundary, Drawing List CE TG 21/05/18

C02

C02 Retail Shop Note CE TG 26/06/18

1

2

3

4

5

6

7

8

9

10

1 PROPOSED LEVEL 1 FLOOR PLAN (+30)1:100

SCOPE OF ARM ARCHITECTURE

SCOPE OF FIVE FOOT ONE

1:200 @ A3

5

4

6

8

Double escalatorReplace existing stairs with new doubleescalator. COS width of void

New Retail ShopShop fit-out designed <externally>New Accessible WC & AdultChangeroomscope of ARM Architecture

Accessible Seatingwith upholstered accessible banquetteseating

Lift Lobbyscope of ARM Architecture

Front of House Corridorscope of ARM Architecture

Box Office Officesscope of ARM Architecture

VIP Ticketing and Information counter

Cloak StorageFree standing joinery wall for coats

1L36New public lift to Corridor 2. Access toGround Floor and Southern Foyers

jcollins
Text Box
SSD 7665 Modification 2 Proposed Entry Foyer Design

Page 7

ATTACHMENT B

Page 8

Description of Revised Structural Engineering Scheme for Utzon Escalators

The construction of the escalators in place of the Utzon Stairs, requires the installation of an

escalator services pit below ground level at the base of the escalator.

Beneath ground level, across the Covered Concourse lie “tie beams” which join the base of the

Monumental Steps back to the main structure of the Sydney Opera House. The tie beams restrain

the “folded beams” which support the Monumental Steps and the Podium above the Covered

Concourse. Without the restraining forces of the tie beams, the folded beams would not provide

this support. To create the pit for the escalator, a pair of tie-beams need to be cut. The tie beams

include a number of tensioned cable tendons which provide the tensile strength of the beams, and a

replacement structural engineering “scheme” for restraining the folded beams is required when the

beams (including the tendons) must be cut.

The approved structural engineering scheme (SSD7665 MOD1) for the escalators, was designed to

provide this restraining force by means of a “thrust block” to be constructed at the base of the

Monumental Steps. A similar thrust block (but significantly larger) was installed at the western end

of the Monumental Steps, when the escalators from the Lower Concourse to the Covered Concourse

were constructed. In this case the escalators required that a number of the tie beams were cut to

accommodate the escalators.

Recently Sydney Opera House commissioned Arup, the structural engineering firm that have

provided services to the House since the original construction, to re-visit the structural engineering

design for the Utzon Escalators. Arup have designed an innovative solution that restrains the tie-

beams without requiring the construction of a thrust block. It is for this revised scheme that

approval under MOD2 is sought. As noted by the Heritage Impact Statement, it is considered that

this revised scheme “is a very innovative solution that retains and respects the building’s significant

values.”

Thefollowing isometric depictions of the proposed scheme are from the cover sheet (29-BR-AR202

ST-0001) of the drawings prepared by Arup and submitted with the SSD7665 MOD2 Modification

Report. The image shows the key elements of the scheme in blue.

Page 9

The new structural scheme provides the restraining forces on the cut tie beams in the following way.

Steel brackets are attached to the tie beams, north and south of the proposed cut location. High

tensile strength steel bars are installed between the two sets of bracketry, and these are tensioned

such that when the tie beams and encased tendons are cut, the tie beams are restrained from

movement, and therefore the restraining forces on the folded beams are maintained.

The construction of these new elements will take place in the following manner (as more completely

described in the Indicative Construction Staging drawing 29-BR-AR202 ST-0011):

1. Uncover the tie beams in two places, north within the main SOH underneath the Utzon

stairs, and in the Covered Concourse just to the south of the base of the Utzon Stairs.

2. Install steel bracketry around the tie beams at both these locations.

3. Install and tension temporary “ties” between the two brackets.

4. Demolish tie beams and tendons.

5. Install permanent ties between steel brackets on tie beams.

6. Excavate to create pit for escalator (this is in fill material, and historic archaeology is not

expected, however suitable monitoring will be undertaken to address unexpected finds).

7. Construct concrete pit and install concrete encasement of all permanent steel work.

8. Install new escalators.

Throughout the above construction activities, movement monitoring of the folded beams will be

conducted to ensure that structural integrity of the folded beams is not compromised.

Page 10

ATTACHMENT C

24 September 2021 Sydney Opera House (SOH) Bennelong Point GPO Box 41274 Sydney NSW 2001 Attn: John Collins, Project Manager Entry Foyer Dear John Re: SSD Modification – 7665 MOD 2 – Architectural Queries. We write to clarify the queries raised by Heritage NSW in their letter dated 16 September 2021. Below are the Heritage NSW recommended conditions of consent in italics with ARM responses below each.

• Removed original doors should be reused/or salvaged and stored.

Where possible doors are being re-used. Where they cannot be used they will be carefully removed and stored at the SOH storage facility for future use as replacements.

• Detailing of the enlargement of the opening within the Utzon masonry wall should be finished to compliment the character, quality and design aesthetic of the SOH. Where original openings are blocked up, details should be provided of proposed infill including reversible measures.

The enlargement of the opening on the southern side and the bulkhead will be the exposed cut concrete. These details were reviewed and agreed with Heritage Architect Alan Croker. Where original openings are infilled a 20mm x 20mm shadowline inside the former opening will be created consistent with new openings and infills in heritage concrete.

• Details should be provided of fixing method of new battened brush box timber lining panels into the eastern wall to ensure interaction between new and original fabric is undertaken in accordance with CMP policies.

The new battened brush box timber lining panels are detailed to be fixed into the existing concrete walls on split battens. Refer to drawing A6110. These fixings are small in nature and should the wall be exposed in the future they would require minimal patching.

• Detail of re-routed services should be provided to ensure relocation does not impact the corridor space.

All services that were previously running down the corridor have been carefully re-routed through adjacent back of house spaces to ensure the corridor will now present as a front of house space of equivalent character and standard to the surrounding foyer spaces. Refer to drawings E6000 and M2000 for details of the main relocated service routes.

• Works to remove existing paint from concrete walls and ceilings is to be undertaken by specialists with experience in similar works, methods, materials and finishes. This should also include a test patch hold point prior to works proceeding.

A suitably qualified contractor will be engaged for the works and ARM/SOH will ensure a test patch hold point is undertaken prior to the works proceeding.

• Where elements are proposed to be removed/reconfigured including the service cupboards in the lift lobby area, fabric is to be made good. Any fixings to significant or early fabric are to be undertaken in accordance with the CMP (2017) and the established guidelines for fixing into fabric.

Noted. All fixings into significant fabric will be undertaken in accordance with the CMP. We trust the above clarifies the queries raised. Should you require any further information please do not hesitate to contact the undersigned. Yours sincerely

Andrew Hayne Principal - ARM Architecture

L1 +309140

BOX OFFICE CORRIDORL1 + 30

9140

DOOR LEAF- REFER TO SCHEDULE FOR TYPE & DETAILED DESCRIPTION

CONCRETE INFILL AS REQUIRED. FINISH TO MATCH EXISTING

FRAME TYPE - REFER TO DOOR SCHEDULE A0316 FOR TYPE & DETAILED DESCRIPTION

EE: CONCEALED LIGHTING FITTING

GROUT FILL TO DOOR FRAME

WTM-04: TIMBER CLADDING MOUNTED TO DOOR

WTM-04: BLACK MESH BACKING TYPICAL

WMC-02 - CONTINUOUS ALUMINIUM LIGHTING CHANNEL FIXED TO WALL TO MATCH PANEL TOP

CRN-01

CORRIDORFHR & HYD CPD

EE: CONCEALED LIGHTING FITTING

APPLIED FINISH OVER CONCRETE UPSTAND

WMC-02 - CONTINUOUS ALUMINIUM LIGHTING CHANNEL TO RECESSED TIMBER PANEL

THRESHOLD PIECE REQUIRED WHERE SMOKE SEALS APPLY

SE: CONNECTION DETAIL TO STRUCTURAL ENGINEER'S ADVICE

REFER ELEVATION FOR EXTENT OF TIMBER PANELS

L1 +309140

BOX OFFICE CORRIDORL1 + 30

9140

DOOR LEAF- REFER TO SCHEDULE FOR TYPE & DETAILED DESCRIPTION

CONCRETE INFILL AS REQUIRED. FINISH TO MATCH EXISTING

FRAME TYPE - REFER TO DOOR SCHEDULE A0316 FOR TYPE & DETAILED DESCRIPTION

EE: CONCEALED LIGHTING FITTING

2x 30mm X 30mm STEEL EA

GROUT FILL TO DOOR FRAME

4.5mm CFC SKIRTING

CRN-01

WTM-04: TIMBER CLADDING MOUNTED TO DOOR

WMC-01: DIRECT STICK METAL CLADDING TO DOOR

WTM-04: TIMBER CLADDING PANELS WITH BLACK MESH BACKING TYPICAL

WMC-02 - CONTINUOUS ALUMINIUM LIGHTING CHANNEL FIXED TO WALL TO MATCH PANEL TOP

CORRIDOROFFICE

REFER ELEVATION FOR EXTENT OF TIMBER PANELS

THRESHOLD TYPE TO MATCH FRAME

RECESSED BOTTOM SEAL AS REQUIRED

BOX OFFICE CORRIDORL1 + 30

9140

WMC-02 - CONTINUOUS ALUMINIUM LIGHTING CHANNEL TO RECESSED TIMBER PANEL

WTM-04: TIMBER CLADDING PANELS -SLOT INDICATED

EE: CONCEALED LIGHTING FITTING

WTM-04: TIMBER CLADDING PANELS

APPLIED FINISH OVER EXISTING CONCRETE

CRN-01

EE: CONCEALED LIGHTING FITTING

WMC-02 - CONTINUOUS ALUMINIUM LIGHTING CHANNEL TO RECESSED TIMBER PANEL

CORRIDOR

BOX OFFICE CORRIDORL1 + 30

9140WTM-04a WTM-04b WTM-04c

670470270

50 220 50 420 50 620 50

100 20 80 20 80 20 100 100 20 80 20 80 20 80 20 80 20 100

2240

150

1522

1015

PANEL CENTRES

PANEL WIDTH & SPACING

PANEL GAPS

TIMBER SPLIT BATTEN ZONE

TIMBER SPLIT BATTEN ZONE

CONTINUOUS ALUMINIUM LIGHTING CHANNEL TO RECESSED TIMBER PANEL

CONTINUOUS MATERIAL BACKING BETWEEN UPPER & LOWER LIGHTING CHANNEL

CONTINUOUS ALUMINIUM LIGHTING CHANNEL TO RECESSED TIMBER PANEL; BROKEN AT DOORWAYS

WTM-04 - 20mm LAMINATED BRUSH-BOX TIMBER PANELLING

CONTRACTOR & SUB-CONTRACTORS TO CO-ORDINATE BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES DOCUMENTATION, WITH ARCHITECTURAL DOCUMENTATION TO TAKE PRECEDENT FOR SETOUT.

1.GENERAL NOTES

CONTRACTOR & SUB-CONTRACTORS TO VERIFY ALL DIMENSIONS & CONFIRMON SITE CONDITIONS RELATING TO ALL DIMENSIONS PRIOR TO COMMENCEMENT - DO NOT SCALE FROM DRAWING

2.

SHOP DRAWINGS ARE TO BE SUPPLIED TO THE RELEVANT PARTIES & CONSULTANTS FOR REVIEW & APPROVAL PRIOR TO THE COMMENCEMENT OF ANY WORKS

3.

THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL ASSOCIATED SPECIFICATIONS, SCHEDULES & CONTRACT DOCUMENTS

4.

MAKE GOOD ALL AFFECTED SURFACES & FINISHES INCLUDING ITEMS MARKED FOR REMOVAL &/OR RELOCATION

5.

THE CONTRACTOR IS TO ALLOW TO SAND AND RE-FINISH ALL BRUSHBOX NOMINATED TO BE RE-USED THE WORKS. THIS BRUSHBOX IS TO BE INCORPORATED WHEREVER POSSIBLE WHERE WTM-02 IS NOMINATED

6.

'ANYTHING PREFIXED WITH SE: REFER TO STRUCTURAL/FACADE ENGINEERS DRAWINGS

SE:

'ANYTHING PREFIXED WITH ME: REFER TO MECHANICAL ENGINEERS DRAWINGS

ME:

'ANYTHING PREFIXED WITH FE: REFER TO FIRE ENGINEERS DRAWINGS

FE:

'ANYTHING PREFIXED WITH EE: REFER TO ELECTRICAL ENGINEERS DRAWINGS

EE:

'ANYTHING PREFIXED WITH HE: REFER TO HYDRAULIC ENGINEERS DRAWINGS

HE:

'ANYTHING PREFIXED WITH TS: REFER TO THEATER CONSULTANTS DRAWINGS

TS:

LEGEND - INTERNAL MATERIALS & FINISHES

CODE DESCRIPTION

REFER TO A0301 INTERNAL MATERIALS & FINISHES SCHEDULE FOR SPECIFIC TYPES & DETAILED/PROPRIETARY DESCRIPTION

B BUILDING SERVICESBLF LIGHT FITTING

F FLOORS/FLOOR COMPONENTSFAW ACESS WALKWAYFAH FLOOR ACCESS HATCHFEX EXISTING FLOORFCA CARPETFCF CONCRETE FINISHFCO CONCRETEFCJ CONTROL JOINTFEJ EXPANSION JOINTFFJ FALSE JOINTFLA FLOOR LADDERFLI LINOLEUMFPL PLATEFSN STAIR NOSINGFTI FLOOR TILESFTM TIMBERFTS TACTILE INDICATORSFVI VINYL

S STRUCTURAL COMPONENTSSMS METAL STUDSSCO SE: CONCRETE

W WALLS/WALL COMPONENTSWBA WALL BATTENWBL MASONRY BLOCKWORKWEX EXISTING WALLWFC COMPRESSED FIBRE CEMENTWMI WALL MIRRORWMC METAL CLADDINGWPB WALL PLASTERBOARDWSK SKIRTINGWTI WALL TILESWTM TIMBERWTV TIMBER VENEER

C CEILINGS/CEILING COMPONENTSCAI CEILING INSULATIONCEX EXISTING CEILING/SOFFIT TO REMAINCMC METAL CLADDINGCNC NO CEILINGCPB PLASTERBOARDCSU SUSPENDED CEILING COMPONENTSCTV TIMBER VENEERU/S UNDERSIDE OF EXPOSED CONCRETE SOFFIT

G GLAZING/GLASS COMPONENTSGGT GLASS TYPES

J JOINERYJIT ITEMJMI MIRRORJTM TIMBERJSF SPECIAL FINISHJSK SKIRTING

M MISCELLANEOUS FIXTURES & FITTINGSMAC MISCELLANEOUS ACCESSORIESMBA BALUSTRADES & SCREENSMCU CURTAINMFC FIXED SHELFMLK LOCKERMPR PICTURE RAILMHR HANDRAIL

B BUILDING SERVICES (MEP FIXTURES)BLI LIFTBFH FIRE HYDRANTBFR FIRE HOSE REEL

P PAINT & APPLIED FINISHESPFR FIRE RATED INTUMESCENT PAINTPPF PAINT TYPEPPO POWDERCOATPPR PROTECTIVE COATINGPSR SLIP RESISTANT COATINGPST STAIN SYSTEM

L1 +309140

BOX OFFICE CORRIDORL1 + 30

9140

4.5mm CFC SKIRTING

DOOR LEAF- REFER TO SCHEDULE FOR TYPE & DETAILED DESCRIPTION

BOX STUDS TO DOOR OPENINGS TYPICAL

FRAME TYPE - REFER TO DOOR SCHEDULE A0316 FOR TYPE & DETAILED DESCRIPTION

EE: CONCEALED LIGHTING FITTING

WTM-04: TIMBER CLADDING MOUNTED TO DOOR

WMC-01: DIRECT STICK METAL CLADDING TO DOOR & FRAME

WTM-04: BLACK MESH BACKING TYPICAL

WMC-02 - CONTINUOUS ALUMINIUM LIGHTING CHANNEL FIXED TO WALL TO MATCH PANEL TOP

CRN-01

CORRIDOReCORRIDOR

Sydney Opera House Trust

Phone: +61 2 9250 7541 email: [email protected]

Sydney Opera House Trust

CHVA B1Rev:Sheet:Drawing No:Location

Project

Title

Date

Status

Dwn

Contract

Ckd Scale

LocationDateApvdDrwnDescriptionIssue

©BDM-168

SOHT GENERAL NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE

SAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOT ALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.

4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSE BUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANT AUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THE REQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.

SOHT COPYRIGHTTHIS DRAWING AND DESIGN ARE SUBJECT TO COPYRIGHT AND SHALL NOT BE COPIED IN ANY FORM WITH THE WRITTEN PERMISSION OF THE SYDNEY OPERA HOUSE TRUST

GPO Box 4274 Sydney NSW Australia 2001

49-BR-ARM01

0 10 20 504030 60 70 80 90 100 MILLIMETRES ON ORIGINAL

NorthLEGEND - SCOPE

AREA SHOWN IN GREY WASH DEPICTS SCOPE OF NO NEW WORKS

AREA SHOWN IN WHITE WASH DEPICTS SCOPE OF NEW WORKS

(THIS LEGEND APPLIES TO ALL NEW CONSTRUCTION PHASE DRAWINGS. DOES NOT APPLY TO EXISTING CONDITIONS DRAWINGS)

AREA SURROUNDED BY GREEN DASHED LINES DEPICTS TENDER OPTION

t/ 02 9057 4300e/[email protected]   w/ armarchitecture.com.auABN 22 476 949 399NSW Nominated Architect: Amber Stewart 10531

LEVEL 6 / 46‐54 FOSTER STREET SURRY HILLS NSW 2010 AUS

07.09.20215

CONSTRUCTION DETAILS - ENTRYCORRIDOR - TIMBER PANELS

1:5@ B1

ISSUED FOR CONSTRUCTION

AH

SW

SOH CONCERT HALL RENEWAL

A6110

1 80% TENDER COORDINATION ISSUE SW 11.12.20202 ISSUED FOR INFORMATION SW 10.02.20213 ISSUED FOR TENDER SW 19.02.20214 ISSUED FOR CONSTRUCTION SW 16.06.20215 ISSUED FOR CONSTRUCTION SW 07.09.2021

A5381 1 : 54 ENTRY CORRIDOR - WTM-04 PANEL - CPD INWARD

A5381 1 : 53 ENTRY CORRIDOR - WTM-04 PANEL - DOOR OUTWARD

A5381 1 : 52 ENTRY CORRIDOR - WTM-04 PANEL - TYPICAL

1 : 101 INTERIOR ELEVATION - WTM-04 PANEL TYPE

INSET PHOTOGRAPH OF SIMILAR EXISTING LAMINATED BRUSH-BOX PANEL AND

SIMILARLY TREATED DOOR INTERFACE

A5381 1 : 55 ENTRY CORRIDOR - WTM-04 PANEL - DOOR INWARD

5 TAG REMOVED

X60X70X80

Y30

CX30

Space96

eDUCT1527N

STOREL1.ST.01

eBOX OFFICER4

eSTORE1527E/3

Space530

Space533

eCUPBOARD1528C.1

eTOILET1527F/1

(E) SA DUCTWORK450x250

15

0x15

0

NEW DUCTWORK PROVIDED TO SERVE OFFICE AREA. DUCTWORK RUNS IN BETWEEN BEAMS AT HIGH LEVEL

EXISTING TOILET EXHAUST DUCTWORK WITHIN CEILING TO EXTEND TO SERVE CLEANERS CUPBOARD AND ADULT CHANGE

SUPPLY AIR DUCTWORK CONNECT INTO EXISTING DIFFUSERS WITHIN THE TOILETS AND EXTEND TO SERVE NEW ADULT CHANGE ROOM.

CAPPED OFF SUPPLY AIR FOR FUTURE KITCHEN EXPANSION. 450L/S

EXISTING MCC TO BE RELOCATED TO CORRIDOR

EXISTING WALL MOUNTED DIFFUSER TO BE RETAINED AND MOVED TO SUIT NEW TIMBER SCREEN

1

M5000

25

0x25

0

35

0x25

0

-SA1

75

-SA3475

40

0x30

040

0x30

0

10

0x40

0

-SA1

75-

EA175

-SA1

75

-SA1

75

400x300

-SA1

75

-50

EA2

2

M5000

3

M5000

EXISTING RETURN AIR PLENUM

(E)FD

150x150

NEW DUCT END CAP

FINAL LOCATION OF DISHWASHER EXHAUST HOOD

NEW DISHWASHER HOOD EXHAUST DUCT

EXISTING SUPPLY AIR PLENUM

NEW SUPPLY AIR DUCTWORK FROM BELOW

INSULATED BUILDERSWORK PLENUM

(E) BRONZE GRILLES (TYP. FOR 6); 80L/s EACH

NEW END CAP

(E) BRONZE GRILLES (TYP. FOR 6); 50L/s EACH

350x250

CONNECT NEW DUCTWORK TO (E) DUCTWORK

RELOCATED (E) SA DIFFUSERS. COORDINATE NEW FLEXIBLE DUCT WITH (E) SERVICES

550x300

450x300

31

5x15

0

-RA1575

-RA2575

-RA3

75

-SA2

25

UC - 15mm

-RA4

75

RA

R

R

VCD

FD

CONTRACTOR TO PROVIDE TEMPORARY MEANS OF SUPPLY AIR TO THE BOX OFFICE DURING THE WORKS

FOR CONSTRUCTIONTHIS IS NOT A WORKSHOP DRAWING

IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE CONSTRUCTIONAL DIMENSIONED WORKSHOP DRAWINGS IN ACCORDANCE WITH THE RELEVANT SECTIONS IN THE SPECIFICATION

0 2.5m 5m

Sydney Opera House Trust

Phone: +61 2 9250 7541

email: [email protected] Opera House Trust

B1

Rev:Sheet:Drawing No:Location

Project

Title

Date

Status

Dwn

Contract

Ckd Scale

LocationDateApvdDrwnDescriptionIssue

©

GENERAL NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE

SAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOT ALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.

4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSE BUILDING SERVICES STANDARD (BSS) AND RELEVANT AUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THE REQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.

COPYRIGHTTHIS DRAWING AND DESIGN ARE SUBJECT TO COPYRIGHT AND SHALL NOT BE COPIED IN ANY FORM WITH THE WRITTEN PERMISSION OF THE SYDNEY OPERA HOUSE TRUST

GPO Box 4274 Sydney NSW Australia 2001

0

1

0

2

0

5

0

4

0

3

0

6

0

7

0

8

0

9

0

10

0 MILLIMETRES ON ORIGINAL

MECHANICAL SERVICES

DESIGNED UNDER QUALITY SYSTEM CERTIFIED AS COMPLYING WITH ISO 9001 BY AN ACCREDITED CERTIFICATION BODY

© Copyright. This Document and Design remains the copyright of Steensen Varming (Australia) Pty Ltdand cannot be reproduced in any way without prior consent. The contractor shall verify all dimensions and levels on site as this is not a workshop drawing. The contractor shall refer any discrepancies to the engineer before proceeding with the work. This drawing shall be read in conjunction with other contract documents, drawings and project specifications. This file has been checked by an antivirus program with the latest update. However new viruses are discovered everyday we recommend that this file is rescanned upon receipt

N

1 : 50

10/09/21C

SOH CONCERT HALL RENEWALBOX OFFICE FOYER

AIR CONDITIONING AND VENTILATION LAYOUT15822

FOR CONSTRUCTION

DMC

MACCH M200057 BR SV240VA

A FOR TENDER IR AEB 19/02/21

B FOR CONSTRUCTION ND AEB 16/06/21

C FOR CONSTRUCTION DMC AEB 10/09/21

C

C

X60X70X80

Y30

CX30

eCENTRE FOYER1527P

eDUCT1527N

STOREL1.ST.01

eINFO COUNTER1527P/1

eLIFT 05 SHAFT1L05

eDUCT1528B

eBOX OFFICER4

eSTORE1527E/3

Space530

Space533

eCUPBOARD1528C.1

eLIFT 011L01

eTOILET1527F/1

EXISTING SWITCHBOARD G37 TO REMAIN AS IS.

REDUNDANT CIRCUITS SUPPLYING THE EXISTING

CORRIDOR AND AREAS ADJACENT TO THE CORRIDOR

TO BE DISCONNECTED AND DEMOLISHED. REFER TO

THE EXISTING CABLING SCHEDULE IN THE

SPECIFICATION. CIRCUITS TO EXISTING SERVICES

WHICH ARE NOT REDUNDANT TO BE REINSTATED

ALONG NEW CABLE PATHWAYS.

EXISTING SWITCHBOARD G4 TO REMAIN AS IS.

REDUNDANT CIRCUITS SUPPLYING THE EXISTING

CORRIDOR AND AREAS ADJACENT TO THE CORRIDOR

TO BE DISCONNECTED AND DEMOLISHED. CIRCUITS TO

EXISTING SERVICES WHICH ARE NOT REDUNDANT TO

BE REINSTATED ALONG NEW CABLE PATHWAYS. REFER

TO THE EXISTING CABLING SCHEDULE IN THE

SPECIFICATION. NEW CIRCUITS CORRIDOR POWER AND

LIGHTING TO BE SUPPLIED FROM SPARE POLES ON

EXISTING SWITCHBOARD. NEW CBUS LIGHTING

CONTROL MODULE TO BE ADDED TO LIGHTING

CONTROL SECTION TO CONTROL THE PROPOSED NEW

LIGHTING.

EXISITING MECHANICAL SWITCHBOARD WITHIN

CUPBOARD TO BE RELOCATED AS INDICATED. EXISTING

SUBMAIN TO BE EXTENDED TO NEW SWITCHBOARD

LOCATION. UTILISING CEILING VOID FOR RETICULATION

OF CABLE.

INDICATIVE LOCATION OF EXISTING SWITCHBOARD

G9 TO REMAIN AS IS. REDUNDANT CIRCUITS

SUPPLYING THE EXISTING CORRIDOR AND AREAS

ADJACENT TO THE CORRIDOR TO BE DISCONNECTED

AND DEMOLISHED. REFER TO THE EXISTING CABLING

SCHEDULE IN THE SPECIFICATION. CABLING

REQUIRED TO REMAIN TO BE REINSTATED ALONG

ALTERNATIVE PATH. NEW OUTLETS WITHIN OFFICE

TO BE WIRED TO EXISTING SWITCHBOARD.

INDICATIVE LOCATION OF EXISTING COMMUNICATIONS

RACK E7.01 TO REMAIN AS IS. REDUNDANT CABLES

SUPPLYING THE EXISTING CORRIDOR AND AREAS

ADJACENT TO THE CORRIDOR TO BE DISCONNECTED AND

DEMOLISHED. REFER TO THE EXISTING CABLING

SCHEDULE IN THE SPECIFICATION. CABLING REQUIRED TO

REMAIN TO BE REINSTATED ALONG ALTERNATIVE PATH.

NEW OUTLETS WITHIN OFFICE TO BE WIRED TO EXISTING

RACK.

INDICATIVE ROUTE OF PROPOSED NEW WALL MOUNTED

TRAY WITHIN PLANTROOM 14 TO RETICULATE CABLING

FROM SWITCHBOARDS G4 AND G37 TO THE CORRIDOR

TRANSITION LOCATION.

INDICATIVE LOCATION OF HIGH LEVEL TRANSITION

THROUGH CORRIDOR BEFORE BEAM FROM

PLANTROOM 14 INTO OFFICE CEILING. PATHWAY TO BE

UTILISED TO RETICULATE FROM THE EASTERN SIDE OF

THE CORRIDOR TO THE WESTERN SIDE OF THE

CORRIDOR. REFER TO THE CABLE SCHEDULE WITHIN

THE SPECIFICATION FOR DETAILS OF CABLING THAT

NEEDS TO BE REINSTATED ALONG NEW PATHWAY.

2x50mm DIAMETER PENETRATIONS FROM PLANTROOM

14 TO SWITCHBOARD CUPBOARD TO ALLOW

RETICULATION OF NEW CABLING TO EXISTING CIRCUITS

ALONG THE NEW PATHWAY

100x100mm DUCT

2x50mm DIAMETER PENETRATIONS FROM PLANTROOM

14 TO CUPBOARDS TO ALLOW RETICULATION OF NEW

CABLING TO EXISTING CIRCUITS ALONG THE NEW

PATHWAY

RELOCATED MECHANICAL SWITCHBOARD. EXISTING

SUBMAIN TO SWITCHBOARD TO BE EXTENDED TO THE

NEW SWITCHBOARD LOCATION. SMALL LINK BOX TO BE

PROVIDED AT LOCATION OF EXISTING SWITCHBOARD

CONCEALED WITHIN CEILING VOID.

R

EXISTING SWITCHBOARD E25 TO BE RELOCATED. CABLE

TO AND FROM E25 TO BE REINSTATED ALONG NEW

PATHWAYS

INDICATIVE IN SCREED/FLOOR ROUTE FOR REINSTATED

CIRCUITS FROM EXISTING G4 & G37 TO GREEN ROOM

BOH AREA.

INDICATIVE IN SCREED/FLOOR ROUTE FOR REINSTATED

CIRCUITS FROM EXISTING G4 & G37 TO GREEN ROOM

STORE AND FIRST AID ROOM.

POWER- 300

PO

WE

R-

30

0

POWER- 300

R

FOR CONSTRUCTIONTHIS IS NOT A WORKSHOP DRAWING

IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE CONSTRUCTIONAL DIMENSIONED WORKSHOP DRAWINGS IN ACCORDANCE WITH THE RELEVANT SECTIONS IN THE SPECIFICATION

0 2.5m 5m

Sydney Opera House Trust

Phone: +61 2 9250 7541

email: [email protected] Opera House Trust

B1

Rev:Sheet:Drawing No:Location

Project

Title

Date

Status

Dwn

Contract

Ckd Scale

LocationDateApvdDrwnDescriptionIssue

©

GENERAL NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE

SAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOT ALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.

4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSE BUILDING SERVICES STANDARD (BSS) AND RELEVANT AUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THE REQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.

COPYRIGHTTHIS DRAWING AND DESIGN ARE SUBJECT TO COPYRIGHT AND SHALL NOT BE COPIED IN ANY FORM WITH THE WRITTEN PERMISSION OF THE SYDNEY OPERA HOUSE TRUST

GPO Box 4274 Sydney NSW Australia 2001

0

1

0

2

0

5

0

4

0

3

0

6

0

7

0

8

0

9

0

10

0 MILLIMETRES ON ORIGINAL

ELECTRICAL SERVICES & LIGHTING DESIGN

DESIGNED UNDER QUALITY SYSTEM CERTIFIED AS COMPLYING WITH ISO 9001 BY AN ACCREDITED CERTIFICATION BODY

© Copyright. This Document and Design remains the copyright of Steensen Varming (Australia) Pty Ltdand cannot be reproduced in any way without prior consent. The contractor shall verify all dimensions and levels on site as this is not a workshop drawing. The contractor shall refer any discrepancies to the engineer before proceeding with the work. This drawing shall be read in conjunction with other contract documents, drawings and project specifications. This file has been checked by an antivirus program with the latest update. However new viruses are discovered everyday we recommend that this file is rescanned upon receipt

N

1 : 50

16/06/21C

SOH CONCERT HALL RENEWALBOX OFFICE FOYER

RETICULATION LAYOUT15822

FOR CONSTRUCTION

IR

IMCH E600059 BR SV240VA

NOTES:1. REFER TO THE SPECIFICATION FOR SCHEDULE OF EXISTING CABLING THAT

CROSSES THE CORRIDOR AS SURVEYED BY RYAN WILKS. REDUNDANT CABLES

TO BE DISCONNECTED AND DEMOLISHED. CABLING THAT RUNS THROUGH TO

CORRIDOR ANY NON REDANDUNT SERVICES SHALL DISCONNECTED, REMOVED

AND REINSTATED ALONG THE NEW PATHWAY.

2. ALL OUTLETS, POWER SUPPLIES AND LIGHTING CIRCUITS TO BE WIRED TO

DISTRIBUTION BOARD G4 ALONG THE PORPOSED CABLE PATHWAY. CABLES THAT

NEED TO CROSS THE CORRIDOR MUST DO SO AT THE TRANSITION INDICATED.

NO CABLING OR CONDUITS SHALL BE VISIBLE WITHIN THE CORRIDOR.

3. RETICULATION OF CABLING TO THE EAST OF THE CORRIDOR SHALL BE WITHIN

THE CEILING VOIDS OF THE OFFICE AND NEW WC TO THE CORRIDOR

TRANSITION.

4. CONDUIT NUMBERS DRAWN ARE INDICATIVE AND ARE PROVIDED ONLY TO SHOW

AN INDICATIVE PATH. UPON COMPLETING THE DETAILED SURVEY TO DETERMINE

THE EXISTING CABLES THAT NEED TO BE REINSTATED ALONG THE NEW PATHS

THE CONTRACTOR SHALL CONFIRM THE NUMBER OF CONDUITS REQUIRED IN

THEIR WORKSHOP DRAWINGS.

5. IN SCREED / FLOOR CONDUITS HAVE BEEN INDICATED FOR THE REINSTATED

CIRCUITS TO SUPPLY EXISTING LOADS WITHIN THE GREEN ROOM STORE, FIRST

AID ROOM AND KITCHEN CURRENTLY SERVED FROM DB G37 AND G4 VIA THE

EXISTING CEILING MOUNTED CONDUITS. THE CONTRACTOR IS TO EVALUATE THIS

OPTION ON SITE PENDING CONFIRMATION OF AVAILABLE DEPTH BELOW

PROPSED PAVERS. IF THIS PATHWAY IS NOT POSSIBLE, THESE CIRCUITS SHALL

BE REINSTATED ALONG THE TRAY PATHWAY AS DOCUMENTED THROUGH THE

PLANTROOM AND ABOVE THE BOX OFFICE. THE CONTRACTOR SHALL PRICE

BOTH OPTIONS WITHIN THEIR TENDER PRICE SEPERATELY AND CONFIRM

DURING THE CONSTRUCTION STAGE THE FINAL ARRANGEMENT WITH THE

SYDNEY OPERA HOUSE.

A FOR TENDER IR AEB 19/02/21

B FOR COORDINATION IR AEB 28/05/21

C FOR CONSTRUCTION ND AEB 16/06/21

BASE OPTION CABLE DIVERSIONS VIA BELOW GRANITE AND INLONGER PATH ON TRAY AND CONDUIT

PROVIDE CABLE RETICULATION CONTAINMENTAND CABLES IN FLOOR BELOW GRANITE PAVERS,TO CATER FOR EXISTING CABLES CIRCUITS FROMSWITCHBOARDS G4 AND G37 PLUS PROVIDE 6SPARE CONDUITS WITH DRAW WIRES.

INCLUDE ALL NECESSARY VERTICAL RUNS ANDPENETRATIONS.

ALL CABLE CIRCUITS TO BE REWIRED TO THENEAREST DOWNSTREAM POINT CONNECTION.

THE ROUTES SHOWN ARE INDICATIVE. THE EXACTFINAL ROUTE WILL BE INFLUENCED BY UNKNOWNCAVITY SPACE AVAILABLE BELOW GRANITE. THUSALLOW FOR CABLE ROUTES TO SPREAD OUT WITHIN THIS GENERAL ZONE.

SOME CABLES TO BE DIVERTED VIA CABLE TRAYSIN LONGER CABLE PATHS. THESE CABLES TO BEREWIRED COMPLETELY WITH LARGER CABLESIZES TAKING INTO ACCOUNT VOLTAGE DROPWITH RESPECT TO THE LONGER CABLELENGTHS.

ALTERNATIVE OPTION NOT RUNNING CABLES BELOW NEW GRANITE -ALL CIRCUITS IN LONGER PATH ON TRAY ANDCONDUIT

PROVIDE CABLE RETICULATION CONTAINMENTAND CABLES INCLUDING ADDITIONAL 300MMCABLE TRAY AND 50MM CONDUITS TO WHAT ISCURRENTLY SHOWN TO CATER FOR EXISTINGCABLES CIRCUITS FROM SWITCHBOARDS G4 ANDG37. ALL CONDUITS TO BE COMPLETE WITH DRAWWIRES.

INCLUDE ALL NECESSARY VERTICAL RUNS ANDPENETRATIONS.

ALL CABLE CIRCUITS TO BE REWIREDCOMPLETELY WITH LARGER CABLE SIZES TAKINGINTO ACCOUNT VOLTAGE DROP WITH RESPECTTO THE LONGER CABLE LENGTHS.

THE ROUTES SHOWN ARE INDICATIVE. THE EXACTFINAL ROUTE WILL BE CONFIRMED ON SITE.ROUTES WILL VARY WITHIN THE GENERAL ZONES.

D

D OPTION NOT TO RUN CABLES BELOW GRANITE MH MH 13/08/21


Recommended