Provincial Education Assessment Center (PEACE)
• Location
Directorate Bureau of Curriculum and Extension Center Balochistan Quetta.
• Date of Establishment
June, 2003
Total Cost: 12.235 M
THE ORGANIZATIONAL STRUCTURE
National Education Assessment SystemMoE (C-W)
Islamabad
PEACEBOC&Ex
QuettaBalochistan
PEACE LahorePunjab
PEACE BoC
JamshoroSindh
PEACE Abbotabad
NWFP
NEASDoE
Northern Area Gilgit
NEASDoE
FATA
NEASDoE
Northern Area Gilgit
KEACEBoC
Muzaffarabad
AJK
• Normally it is not an assessment of individual students, teachers or schools
• It is not a school or public examination for promotion or selection
• It is an objective process for monitoring student learning achievement on a sample basis.
• The process of collecting, synthesizing and interpreting information to aid in decision making.
What is National Assessment ?
117
Purpose of National /Provincial assessment
To improve the quality of education through:
• providing feedback to improve the quality of services in education (curriculum, textual material, and teachers’ delivery);
• monitoring how the education system is performing;
• introducing realistic standards;
• identifying correlates of achievement;
• providing information to policy makers for effective interventions;
Level : Grade-IV & VIII
Subjects : Languages, Maths, Social Studies and Science
Assessment Schedule
Year Grade & Subject Test Type
2004 Grade 4 (Math, Languages Pilot Testing
2005Grade 4 (Math, Languages)Grade 4 (Social Studies, Science)
Large Scale TestingPilot Testing
2006
Grade 4 (Math, Languages, Social Studies, General Science)Grade 8 (Social Studies, Science)
Large Scale Testing
Pilot Testing
2007Grade 8 (Math, Languages)Grade 8 (Social Studies, Science)
Large Scale TestingPilot Testing
2008
Grade 4 (Math, Languages, Social Studies, Science)Grade 8 (Math, Languages, Social Studies, Science)
Large Scale Testing
Large Scale Testing
Implementation of Assessment Activities
• Test Framework (based on National Curriculum) and Competency Development
• Test Specification Tables
• Item Writing and Test Construction
• Sample Selection (Stratified Random)
• Development of Test Administration Training Manual and Training of Test Administrators
• Composing, Printing and Distribution of Assessment Material
• Administration and Monitoring of Assessment Activity
• Management of Assessment Material,
• Marking, Coding and Data Entry
• Analysis and Report Writing
• Dissemination
88
Staff StatementStaff Statement
S# Designation Total No.
Filled Vacant
1 Director BOC &EC/ PEACE
01 Filled
2 DD(PEACE) 01 Filled
3 System Analyst 01 Filled
4 Assessment Analyst 01 Filled
5 Subject Specialist 04 Filled
6 Account officer 01 Vacant
7 Computer operator 01 Filled
99
AchievementsAchievements
• Conducted National pilot testing in subject of Mathematics, Urdu, Science and SS
• Conducted National Large Scale testing in subject of Mathematics, Urdu, Science and SS for grade IV and VIII through out province
• Training imparted SRO,SSS,SS from BOC &EC, PITE, School Teachers in the field of assessment and test item construction according to competencies
1010
ContinuedContinued
• Marked, scored and coded answer scripts for NLST
• Disseminated the finding and results of National Assessment and published the report for stakeholder conference
• Involvement the staffs of PEACE, BOC &EC and PITE in Item writing and test Administrators training at NEAS
• Trained almost 1200 Test Administrators for the test Administration
1111
Training got abroad and in Training got abroad and in countrycountry
S# Program Name No. Duration Institute
1 MA(Assessment & Evaluation)
01 01 year Melbourne (Aus)
2 M.Ed(Sandwich) 01 01 Year IER and Melbourne
3 M.Ed in Assessment & Evaluation
03 01 Year IER
Panjab Uni
4 Item construction 02 01 Month
ACER (Aus)
1212
On Going ActivitiesOn Going Activities
• Conduct the Base line Assessment study 2010 of Unicef focused districts
• Training of test Administrators• Data entry and data analysis• Report writing• Training the test Administrators of the
ED-LINKS focused districts• Dissemination of findings among
different stakeholders
1313
Capacity required inCapacity required in
• Frame work development
• Item writing and item analysis
• Data entry and file creation
• Sampling
• Data analysis
• Report writing
1414
ChallengesChallenges
• Recognition of the importance of NEAS/PEACE assessment activities
• Slow response from district government• Lack coordination among the Text Book
Board Examination Board and institutes of teacher educators
• Lack of planning and coordination among organs of NEAS/PEACE
• Sustainability of Trained staff• No allocation of regular budget for
assessment activities
1515
Recommendation (Future)Recommendation (Future)• Periodical assessment at terminal stage of
classes(V,VIII,IX, X)• Include English subject in assessment• Additional posts may be created of SS for
English, dissemination officer and Psychometrician
• Introduce Curriculum based assessment • Some incentive for the staff to promote
sustainability and avoid deficiency of the skill person
• Sound and fair policy should be made regarding the posting and transfer in PEACE
• Guiding role of NEAS• To participate international Assessment study
Like TIMSS to compare the performance with other countries
• Conduct item writing workshop for school teachers at district level
1616
Next StepsNext Steps• Filled the vacant posts and adjust
trained and expert staff in NEAS/PEACE
• Capacity building of the NEAS/PEACE staff
• Conduct Assessment study • Coordinate the Text book board,
examination boards, institutes of teacher education etc
• Disseminate the findings at grass root level
1717