BOREHOLE TREATMENT PENINSULA BEVERAGES, SOUTH AFRICA Coca-Cola production is secured amidst drought THE CHALLENGE Four years into the drought that first gripped the Western Cape province in 2014, the City of Cape Town was at real risk of being the first city in the world to run dry. Described as a “once-in-400-year event” by hydrologists, the drought threatened individuals and industry alike. In response to this phenomenon, Peninsula Beverages contracted PROXA to investigate an alternative high quality water supply that would sustain their Coca-Cola production and reduce water intake from the City of Cape Town’s municipal grid. OUR SOLUTION PROXA designed and commissioned a borehole treatment facility to provide adequately treated feed water to Peninsula Beverage’s existing Reverse Osmosis system, which in turn produced high quality water for product make-up. HOW PROXA ADDED VALUE Given the impeding Day Zero (the risk of no municipal feed water supply - predicted for early 2018), PROXA provided a temporary rental solution from an existing fleet (Phase 1) while the permanent plant was being constructed. This solution translated into a quick delivery and reduced risk of interruption at the production facility. Phase 1 comprised of an iron oxidation and Aquamobile Ultra-Filtration system and it was delivered, installed and commissioned to produce in-specification product water within 7 weeks’ of the order being placed. The customised permanent plant (Phase 2) came online shortly thereafter. In both phases, in-specification product water was produced from the first day of startup and all product water was rigorously tested and approved by the Coca-Cola taste masters in terms of colour, smell and taste. FEED WATER Ground water PERFORMANCE TARGET Product flow rate of 2.4 MLD potable water PROCESS Iron Oxidation Ultra Filtration (UF) Ultra Violet Disinfection PROCESS INNOVATION PROXA built the permanent plant using state-of-the-art Ultra Filtration and Ultra Violet technologies and was constructed in stainless steel (including frames and pipework), as per Coca-Cola’s specifications. Client: Coca –Cola Peninsula Beverages proxawater.com
Transcript

BOREHOLE TREATMENT

PENINSULA BEVERAGES, SOUTH AFRICA

Coca-Cola production is secured amidst drought

THE CHALLENGEFour years into the drought that first gripped the Western Cape province in 2014, the City of Cape Town was at real risk of being the first city in the world to run dry. Described as a “once-in-400-year event” by hydrologists, the drought threatened individuals and industry alike. In response to this phenomenon, Peninsula Beverages contracted PROXA to investigate an alternative high quality water supply that would sustain their Coca-Cola production and reduce water intake from the City of Cape Town’s municipal grid.

OUR SOLUTIONPROXA designed and commissioned a borehole treatment facility to provide adequately treated feed water to Peninsula Beverage’s existing Reverse Osmosis system, which in turn produced high quality water for product make-up.

HOW PROXA ADDED VALUEGiven the impeding Day Zero (the risk of no municipal feed water supply - predicted for early 2018), PROXA provided a temporary rental solution from an existing fleet (Phase 1) while the permanent plant was being constructed. This solution translated into a quick delivery and reduced risk of interruption at the production facility.

Phase 1 comprised of an iron oxidation and Aquamobile Ultra-Filtration system and it was delivered, installed and commissioned to produce in-specification product water within 7 weeks’ of the order being placed. The customised permanent plant (Phase 2) came online shortly thereafter. In both phases, in-specification product water was produced from the first day of startup and all product water was rigorously tested and approved by the Coca-Cola taste masters in terms of colour, smell and taste.

FEED WATERGround water

PERFORMANCE TARGET Product flow rate of 2.4 MLD potable water

PROCESS Iron Oxidation Ultra Filtration (UF) Ultra Violet Disinfection

PROCESS INNOVATIONPROXA built the permanent plant using state-of-the-art Ultra Filtration and Ultra Violet technologies and was constructed in stainless steel (including frames and pipework), as per Coca-Cola’s specifications.

Client: Coca –Cola Peninsula Beverages

proxawater.com