Page 1: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 2: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 3: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 4: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 5: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 6: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 7: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 8: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 9: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 10: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 11: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 12: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 13: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three
Page 14: PSNH, Merrimack Station, NH00001465€¦ · at Garvins after the passage of 9,800 shad at Hooksett l. At both dams, upstream fishways should be installed and operational within three