+ All Categories
Home > Documents > PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Date post: 28-Dec-2015
Category:
Upload: ajburgers
View: 32 times
Download: 2 times
Share this document with a friend
Description:
Dong Hejre
Popular Tags:
36
Digital versions of this document are distributed for use as per PMP distribution matrix. A signed original document is maintained at the QA Department of Heerema Vlissingen. Prepared by Reviewed by Approved by: Projects P. Put QA/SHE Manager G.J. van Slingerland QC Manager J. Herrebout Heerema Vlissingen B.V. Corrosion Protection Attachment: DCS Procedure: 20131410 rev. 3 35 pages Date 27-11-2013 Revision 1 Document PSP B12005-03-01-1 Applicability Technip Hejre Pre-drilling Deck Technip no. C086-TECH-A-KA-1005 Pages 1 + attachment
Transcript
Page 1: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Digital versions of this document are distributed for use as per PMP distribution matrix. A signed original document is maintained at the QA Department of Heerema Vlissingen.

Prepared by Reviewed by Approved by:

Projects P. Put

QA/SHE Manager G.J. van Slingerland

QC Manager J. Herrebout

Heerema Vlissingen B.V.

Corrosion Protection

Attachment: DCS Procedure: 20131410 rev. 3 35 pages

Date 27-11-2013

Revision 1

Document PSP B12005-03-01-1

Applicability Technip – Hejre Pre-drilling Deck

Technip no. C086-TECH-A-KA-1005

Pages 1 + attachment

Page 2: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Project Specific Procedure Corrosion Protection

20131410

Heerema Vlissingen B.V.

Dong Hejre Pre-Drilling Deck

Company Name Date Signature

Approved by

DCS Drecht Coating Services B.V.

Heerema Vlissingen B.V.

TPF

Ordernumber 20131410

Revision 3

Date 26-11-2013

Project Dong Hejre Pre-Drilling Deck

:

:

:

:

adekeizer 26-11-2013

Norsok M501 rev. 6Specification :

Orderclient B12007:

Date : 26-11-2013 Revision : 3PSP/20131410

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 3: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Project Specific Procedure Corrosion Protection

20131410

Heerema Vlissingen B.V.

Dong Hejre Pre-Drilling Deck

INDEX

1 Contents of this document

2 Scope

3 Project Organisation

4 Procedures and specifications

5 Health, Safety and Environment

6 Quality Assurance and Quality Control

7 Surface preparation

8 Repair paintsystems

9 Surface cleanliness

10 Inspection equipment

11 Documentation

12 Final inspection

Date : 26-11-2013 Revision : 3PSP/20131410

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

1 / 8

Page 4: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Project Specific Procedure Corrosion Protection

20131410

Heerema Vlissingen B.V.

Dong Hejre Pre-Drilling Deck

1 Contents of this document

This document details all aspects of the surface preparation, application of coatings, quality control, environmental control and organisation of this project. Together with this document the following documents are used:

ITP - Inspection and Test Plan : Quality Inspections en TestsCS - Coating Systems : All coating systems with the DFT's, colors and other information

2 Scope

This procedure describes the application of the corrossion protection system.

3 Project Organisation

The project is managed by the site-manager who is responsible for all activities on the yard.For the organogram and responsibilities and personnel see attachements.

4 Procedures and specifications

PSP - Project Specific Procedure : This documentITP - Inspection and Test Plan : Quality Inspections en TestsCS - Coating Systems : All coating systems with the DFT's, colors and other information

5 Health, Safety and Environment

DCS will do their utmost to ensure that all activities will be done in such a way that no harm can come to the people working on the project, nor to the environment. To ensure this a project HSE plan has been prepared in which in detail is described how DCS has organised this.We are VCA* 2008/5.1 certified and therefore all working procedures and workinstructions are noted in our Quality Handbook. All activities performed by our personnel are done according to these procedures and instructions. All our procedures and instructions can be read in our handbook which is available at our site-office.

6 Quality Assurance and Quality Control

Since a high standard of quality is allways our goal, we will make sure that on this project everything is done according to the required specifications as well as our own quality standards which ever are higher.We are ISO9001-2008 certified and therefore all working procedures and workinstructions are noted in our Quality Handbook. All activities performed by our personnel are done according to these procedures and instructions. All our procedures and instructions can be read in our handbook which is available at our site-office.

Date : 26-11-2013 Revision : 3PSP/20131410

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

2 / 8

Page 5: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Project Specific Procedure Corrosion Protection

20131410

Heerema Vlissingen B.V.

Dong Hejre Pre-Drilling Deck

7 Surface preparation

Abrasive blast cleaning of Carbon Steel:A steel type abrasive will be used to achieve the required surface profile and surface cleanliness.

Abrasive blast cleaning of Stainless Steel:An ironfree type abrasive will be used to achieve the required surface profile and surface cleanliness.

Date : 26-11-2013 Revision : 3PSP/20131410

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

3 / 8

Page 6: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Project Specific Procedure Corrosion Protection

20131410

Heerema Vlissingen B.V.

Dong Hejre Pre-Drilling Deck

8 Repair paintsystems

- Touch up and Repair of 3 gradations of damages -

1)Damaged Toplayer 2)Damaged Mid Layer(s) 3)Damaged to substrate (bare steel)

If possible we will use CO2 ice blasting as a cleaning method. This way we will not damage the blast profile.CO2 pallets are propelled with compressed air onto the surface and remove all dirt, grease and rust. The CO2 vaporizes and no waste material is left.

1)Damaged Toplayer Surface to be repaired should be clean, dry and free from any contamination. Prior to paintapplication the surface should be assessed and treated in accordance with following procedure: -Solvent cleaning to SSPC-SP1 of the damaged area -Roughening up by means of sandpapering -Adjacent area (an overlap of 5 cm) of existing paint to be roughened = cutback surrounding existing

paint by means of sandpapering -Removal of dust -Application of Toplayer shall be such that the whole roughened area, including an overlap of 5 cm on

the existing roughened paint, shall be painted 2) Damaged up to Mid Layer(s) Surface to be repaired should be clean, dry and free from any contamination. Prior to paintapplication the surface should be assessed and treated in accordance with following procedure: -Solvent cleaning to SSPC-SP1 of the damaged area -Roughening up by means of sandpapering -Adjacent area (an overlap of 5 cm) of existing paint to be roughened = feathering surrounding

existing paint by means of sandpapering -Removal of dust -Application of mid layer(s) and top layer shall be such that the whole roughened area, including an

overlap of 5 cm on the existing roughened paint, shall be painted

3) Damaged up to and including the first layer - to substrate (bare steel) Surface to be repaired should be clean, dry and free from any contamination. Prior to paintapplication the surface should be assessed and treated in accordance with following procedure: -Solvent cleaning to SSPC-SP1 of the damaged area -Expand untill accessibility for powertool (SSPC SP3) by means of 3M discs, IBIX or

blasting/vacuumblasting

Date : 26-11-2013 Revision : 3PSP/20131410

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

4 / 8

Page 7: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Project Specific Procedure Corrosion Protection

20131410

Heerema Vlissingen B.V.

Dong Hejre Pre-Drilling Deck

(Powertoolcleaning shall only be executed after approval of Heerema) -Feather edging without leaving sharp edges on the existing paint -Adjacent area (an overlap of 5 cm) of existing paint to be roughened = feathering surrounding

existing paint by means of sandpapering -Removal of dust -Application of system as specified, with the exception of the primer for which a different primer

suitable for powertooled surfaces will be determined, shall be such that the whole powertooled area, including an overlap of 5 cm on the existing roughened paint, shall be painted

9 Surface cleanliness

All blast cleaned surfaces shall be subject to a 100% visual inspection to determine if the requested cleanliness and anchor profile has been achieved prior to coating application.All surfaces are to be free from dust, grit, and any contaminates likely to jeopardize coating performance. Random cleanliness checks are to be conducted.

10 Inspection equipment

For the measurement of the temperature, relative humidity and steeltemperature a Digital Dewcheck will be used.For the measurement of the Dry Film Thickness a digital DFT meter will be used.This equipment is calibrated in accordance with company procedures , frequency once per year and has clear identification of calibration status, and unique identification.

11 Documentation

All activities will be logged in the computerized QC information system. There are two possible reports which can be printed with the entered data. One is a daily report which shows all activities sorted per location. The other report is an item report which shows all activities per treated item sorted by date.Examples of these two reports are attached.

12 Final inspection

All items shall be subject to a final inspection to ensure that compliance with this document has been adhered to prior to release.

Date : 26-11-2013 Revision : 3PSP/20131410

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

5 / 8

Page 8: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Project Specific Procedure Corrosion Protection

20131410

Heerema Vlissingen B.V.

Dong Hejre Pre-Drilling Deck

Projectorganogram

QC-inspector

QA/SHE Manager

GeneralManager

Purchaser

Foreman

Sitemanager

Operators

Manager Projects

Date : 26-11-2013 Revision : 3PSP/20131410

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

6 / 8

Page 9: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Project Specific Procedure Corrosion Protection

20131410

Heerema Vlissingen B.V.

Dong Hejre Pre-Drilling Deck

EXAMPLE ITEM INSPECTION REPORT

Surface preparationDate Start ProfileLocationActivity

Blasting Sa 2 ½ (ISO 8501-1)

Application

System 1System :

Coat Color

DFT (microns)

Min MaxMeanWFTInterzinc 52 (International Paint (Nederland) B.V.) Grey1

Intergard 475 HS (International Paint (Nederland) White2

Interthane 990 (International Paint (Nederland) B. RAL 3002/RAL 903

Details Application

System 1System :

Batchnrs. : Application method:

Coat acceptedRemarks application :

Result : AcceptedVisual inspection surface

Areas low DFT Application of extra coatDefect Action

Grey1Layer Interzinc 52 (International Paint (Nederland) B.V.) 12.3008.00

Location Date Time Air temperature Relative humidity SteeltemperatureDewpoint

Climatic Conditions

17 °C 55% 16 °C12 °C7.3026-11-2013Blastshed19 °C 50% 18 °C13 °C15.3026-11-2013Paintshed17 °C 55% 16 °C12 °C10.3027-11-2013Paintshed

ACCEPTED BY QUALITY CONTROL OF :

DCS Heerema Vlissingen B.V. TPF

Date : 26-11-2013 Revision : 3PSP/20131410

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

7 / 8

Page 10: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Project Specific Procedure Corrosion Protection

20131410

Heerema Vlissingen B.V.

Dong Hejre Pre-Drilling Deck

EXAMPLE DAILY INSPECTION REPORT

Blastshed located at Yard

Details Application

ITEMS 4,5,6

System 1System :

Color

DFT (microns)

Min MaxMeanWFT

Batchnrs. : Application method:

Coat acceptedRemarks application :

Result : AcceptedVisual inspection surface

Areas low DFT Application of extra coatDefect Action

Grey1Layer Interzinc 52 (International Paint (N####08.00

Surface preparationStart RemarksProfileBlasting SA 2 1/2

Items 1, 2 and 3

Time Air temperature Relative humidity SteeltemperatureDewpoint

Climatic Conditions

17 °C 55% 16 °C12 °C7.3019 °C 50% 18 °C13 °C15.3017 °C 55% 16 °C12 °C10.30

ACCEPTED BY QUALITY CONTROL OF :

DCS Heerema Vlissingen B.V. TPF

Date : 26-11-2013 Revision : 3PSP/20131410

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

8 / 8

Page 11: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Order : 20131410

Heerema Vlissingen B.V.Client :

Project : Dong Hejre Pre-Drilling Deck

Coating systemsB12007Orderclient :

System 1Un-insulated Carbon Steel with max. operating temperature of 120 ˚C

Structural SteelIncludes all, trusses, beams, underside deckplates etc.

Stairs, piping, all supportsIncludes all non structural items, pipe supports, piping etc. sticking above or underneath the deck

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 280

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Blasting Sa 2 ½ (ISO 8501-1) Roughness: Grade Medium G (50 μm to 85 μm, Ry5)

1 International Interzinc 52 6059 Grey4 Ext.1029,8 GTA2202 International Intergard 475 HS 16080 White7 Ext.2005,0 GTA0073 International Interthane 990 6057 RAL 3002/RAL

90068 Ext.1059,5 GTA713

Touch-up/ Repairsystem for paintsystem 1See for scope paintsystem 1

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 280

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Touch up and Repair of paintsystem: See chapter 8 PSP

1 International Interzone 954 BG 11087 Grey12 hrs 8 days1267,9 GTA2202 International Interzone 954 BG 11087 White12 hrs 8 days1267,9 GTA2203 International Interthane 990 6057 RAL 3002/RAL

90068 Hrs. Ext.1059,5 GTA713

Touch-up/ Repairsystem for paintsystem 1- BlastingSee for scope paintsystem 1

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 280

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Blasting Sa 2 ½ (ISO 8501-1) Roughness: Grade Medium G (50 μm to 85 μm, Ry5)

1 International Interzinc 52 6059 Grey4 Ext.1029,8 GTA2202 International Intergard 475 HS 16080 White7 Ext.2005,0 GTA0073 International Interthane 990 6057 RAL 3002/RAL

90068 Ext.1059,5 GTA713

Date : 26-11-2013 Revision : 3 1 / 5CS/20131410DCS Drecht Coating Services b.v.

appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759 email [email protected] website www.dcscoating.nl

Chamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 12: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Order : 20131410

Heerema Vlissingen B.V.Client :

Project : Dong Hejre Pre-Drilling Deck

Coating systemsB12007Orderclient :

System 3B - InternalCellar Deck Mudtank Internal

C.D. Tank 15-TF-0001

as per drawing XG-0957-001

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 350

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Blasting Sa 2 ½ (ISO 8501-1) Roughness: Grade Medium G (50 μm to 85 μm, Ry5)

1 International Intershield 300 17560 ENA300-Bronze8 14 days2923,4 GTA2202 International Intershield 300 17560 ENA301-

Aluminium8 14 days2923,4 GTA220

Repairsystem for paintsystem 3BSee for scope paintsystem 3B

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 350

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Touch up and Repair of paintsystem: See chapter 8 PSP

1 International Intershield 300 17560 ENA300-Bronze8 14 days2923,4 GTA2202 International Intershield 300 17560 ENA301-

Aluminium8 14 days2923,4 GTA220

System 3B - Galvanized Ladder inside TankGalvanised Ladder inside Tank

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 350

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Light Blasting

1 International Intershield 300 17560 ENA300-Bronze8 14 days2923,4 GTA2202 International Intershield 300 17560 ENA301-

Aluminium8 14 days2923,4 GTA220

Date : 26-11-2013 Revision : 3 2 / 5CS/20131410DCS Drecht Coating Services b.v.

appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759 email [email protected] website www.dcscoating.nl

Chamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 13: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Order : 20131410

Heerema Vlissingen B.V.Client :

Project : Dong Hejre Pre-Drilling Deck

Coating systemsB12007Orderclient :

System 4Plated Walkways All accesssible deck areas

Escape routes on plated decksOnly the Cellar deck and Intermediate deck (plated decks), escape route dimensions in accordance with drawing

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 2725

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Blasting Sa 2 ½ (ISO 8501-1) Roughness: Grade Medium G (50 μm to 85 μm, Ry5)

1 International Intershield 300 12560 ENA301-Aluminium

8 14 days2084,8 GTA220

2 International Interzone 1000 125092 Grey15 4 days13590,7 GTA2203 International Interzone 1000 125092 Yellow15 4 days13590,7 GTA2204 Apply anti-skid material 1-

5mm in wet 3rd coat5 International Intergard 740 10051 RAL 7030 / RAL

102322 Indef.1965,1 GTA220

System 6Galvanized Handrailing (including sockets and kickplate)

On top of the Handrail PanelsSocketsLadders

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 225

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Sweepblasting

1 International Intergard 269 4047 Red Oxide10 Ext.8511,8 GTA2202 International Intergard 475 HS 12580 Light Grey7 Ext.1566,4 GTA0073 International Interthane 990 6057 RAL 70308 Ext.1059,5 GTA713

Date : 26-11-2013 Revision : 3 3 / 5CS/20131410DCS Drecht Coating Services b.v.

appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759 email [email protected] website www.dcscoating.nl

Chamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 14: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Order : 20131410

Heerema Vlissingen B.V.Client :

Project : Dong Hejre Pre-Drilling Deck

Coating systemsB12007Orderclient :

Repairsystem for paintsystem 6 - Damaged galvanised layerDamage Galvanized areas (up to and including galvanized layer)

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 305

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Roughening up of the damaged areas and feather of edges

1 International Interzinc 553 8060 Grey12 12 mnt1337,5 GTA0072 International Intergard 269 4047 Red Oxide10 Ext.8511,8 GTA2203 International Intergard 475 HS 12580 Light Grey7 Ext.1566,4 GTA0074 International Interthane 990 6057 RAL 70308 Ext.1059,5 GTA713

5A-1 + PFPScope to be determined as per:

Bill of Quantity ReportsDong Hejre Development Project marked up drawings

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 10210

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Blasting Sa 2 ½ (ISO 8501-1) Min. Anchor Profile: 50 Micron Rz

1 International Interzinc 52 6059 Grey4 Ext.1029,8 GTA2202 International Intergard 269 2547 Red Oxide10 Ext.5318,8 GTA2203 International Chartek 7 5000100 Medium Grey10 hrs limited.50000,2 TM23 MPA4 Application of HK1 Mesh at

middepth5 International Chartek 7 5000100 Medium Grey10 hrs limited.50000,2 TM23 MPA6 International Intergard 475 HS 5080 Light Grey MIO7 Ext.6316,0 GTA0077 International Interthane 990 7557 RAL 3002 / RAL

70308 Ext.1327,6 GTA713

Date : 26-11-2013 Revision : 3 4 / 5CS/20131410DCS Drecht Coating Services b.v.

appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759 email [email protected] website www.dcscoating.nl

Chamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 15: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Order : 20131410

Heerema Vlissingen B.V.Client :

Project : Dong Hejre Pre-Drilling Deck

Coating systemsB12007Orderclient :

Repairsystem for 5A-1 + PFPScope to be determined as per:

Bill of Quantity ReportsDong Hejre Development Project marked up drawings

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 10210

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Touch up and Repair of paintsystem: See chapter 8 PSP

1 International Interzinc 52 6059 Grey4 Ext.1029,8 GTA2202 International Intergard 269 2547 Red Oxide10 Ext.5318,8 GTA2203 International Chartek 7 5000100 Medium Grey10 hrs limited.50000,2 TM23 MPA4 Application of HK1 Mesh at

middepth5 International Chartek 7 5000100 Medium Grey10 hrs limited.50000,2 TM23 MPA6 International Intergard 475 HS 5080 Light Grey MIO7 Ext.6316,0 GTA0077 International Interthane 990 7557 RAL 3002 / RAL

70308 Ext.1327,6 GTA713

5A-1 excl. PFP - Joints2 Orange joints at row A1 of the cellar deck

System :

Surface treatment :

No. supplier : Product : VS % DFT WFT

Total DFT 85

ColorMin. Max.m²/l ThinnerOvercoat time at 21°C

Scope :

Blasting Sa 2 ½ (ISO 8501-1) Min. Anchor Profile: 50 Micron Rz

1 International Interzinc 52 6059 Grey4 Ext.1029,8 GTA2202 International Intergard 269 2547 Red Oxide10 Ext.5318,8 GTA220

Notes :

Date : 26-11-2013 Revision : 3 5 / 5CS/20131410DCS Drecht Coating Services b.v.

appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759 email [email protected] website www.dcscoating.nl

Chamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 16: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE01 INSPECTIONSHEET PRESERVED SURFACEAdhesion

Standard ISO4624 - 1 1-2-2002

Instrument Hydraulic Adhesion Tester

units Mpa(MegaPascal)

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

Per dollie: Number/Value in MpaAverage value of all dollies

- Describe the test specimen as substrate A, upon which successive coating layers B,C,D,E etc., have been applied, including the adhesive Y -Araldite 2000+ which secures the dolly Z to the top coat.-Designate cohesive failures by the layers within which they occur as B,C,etc.,and the percent of each.-Designate the adhesive failures by the interfaces at which they occur as A/B, B/C, C/D, etc., and the percent of each.

methodFor Adhesion testing on coating (paint) a curing time of at least 21 days must be achieved after application of the final paintlayer as the paintsystem must be fully cured for testing.

Adhesion testing on metallizing layers can be executed almost directly after applicaton of the metallizing layer.

1.1 In case of a rough metallized surface sand with sandingpaper and remove dust from the surface 1.2 Clean the surface in in a matter that will not affect the integrity of the coating, nor leave a residue2. Glue the dollies on the preserved surface with special glue -Araldite 2000+3. Let the glue harden out the prescribed time with a weight on the dollie4. Carefully cut around the dollie to the substrate, unless the test has to be non-destructive then don't cut and remove the dolly after the pull off test by heating the dollie5. Place the pull off tester on the dollie en push on the tester until all 4 legs hit the surface6. Set the scale to zero and slowly increase the pressure until the dollie detaches from the surface, unless the test has to be non-destructive increase the pressure until the desired value is reached7. The scale on the pull off tester gives the value of the testresult

acceptation criteria

Minimum value per dollie as stated in our Project Specific Inspection- and Testplan).

remedial actions

1. Remove all particles with insufficient bonding to the substrate by blasting to the bare substrate2. Blast the surface to the prescribed roughness3. If the edges of a repair spot are rough then smoothen the edges using a metal file4. Repair the spot with a layer according to the specification5. Inspect the adhesion again according above mentioned method

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 17: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE04 INSPECTIONSHEET SURFACE TO BE BLASTEDSteel design, fabrication defects or contamination

Standard

Instrument Visual

units

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

Mention on the day-report in the column completed inspections

methodWhen a surface or item to be blasted is presented, it should be inspected for unacceptable defects, as indicated in our Project Specific Inspection- and Testplan.

acceptation criteria

Absence of all mentioned defects as indicated in our Project Specific Inspection- and Testplan.

remedial actions

Removal of all contamination by use of thinners or cleanser as per SSPC-SP1Removal off weld spatter with a putty knife or grinding diskRounding sharp edges with a grinding diskSpaces which are too narrow to be properly treated should be sealed by welding/boxed in.

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 18: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE05 INSPECTIONSHEET ENVIRONMENTAL CONDITIONSRight conditions

Standard SSPC PA-1 sept. 1989

Instrument Dew-Check

units °C or %

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

Ambient temperatureRelative humiditySubstrate temperatureDewpoint

method1. Take the Dew-Check out of the holding case and check validity of calibration report (last calibration been carried out check if the battery still works. (if the battery is low there is a warning on the left side of the display by the symbol of a battery)2. Switch on the Dew-Check by a light push on the button.3. Switch the Dew-Check in the mode for humidity measurement and let it measure untill there is a constant reading4. Read the value and note this value5. Switch the Dew-Check in the mode for ambient temperature and let it measure untill there is a constant reading6. Read the value and note this value7. Switch the Dew-Check in the mode for surface temperature and push the probe lightly to the surface, let it measure untill there is a constant reading8. Push the hold button9. Read the value and note this value (this is the dewpoint measurement)10. Switch the Dew-Check in the last mode (Delta T), read the value and check this value. (this is the difference between the steeltemperature and dewpoint)11. Switch the Dew-Check off and put it back in the holding case

acceptation criteria

As indicated in our Project Specific Inspection- and Testplan.

remedial actions

Switch on the heater or the dryer and wait untill the criteria are met.

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 19: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE06 INSPECTIONSHEET SURFACE TO BE BLASTEDPresent soluble salt concentration

Standard ISO-8502-6 1-7-2006

Instrument Bresle test

units Microsiemens

ReportsISO-8502-6 1-7-2006 and ISO 8502-9 All information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

Value of the unused demi-waterValue of the demi-water that has been in contact with the surface that has to be blasted

method1. Put the magnetic plate on the surface to be tested2. Brush, with the nylon brush, the area surrounding the metal plate clean to assure the adhesion of the test cell3. Remove the metal plate without touching the underlaying surface4. Remove the backside of the test cell with the protection plate of the reservoir and glue the test cell on the spot marked by the metal plate5. Rinse the testtube and the syringe with clean demi-water 0 - max. 5 MS/CM6. Fill the test tube with clean demi-water and rinse the syringe clean in this water7. Remove the water from the test-tube and fill it up with 15 ml demi-water8. Fill the syringe with demi-water from the test-tube and squirt it back in the test-tube9. Measure with the probe the (neutral) value of the demi-water in the test-tube and note this value10. Suck up with the syringe 3ml of demi-water11. Inject this amount into the test-cell through the spongy foam perimeter of the test cell and leave the needle in the reservoir12. Stir the demi-water by sucking it in and out of the syringe for some time13. Suck the test-cell empty and squirt the water in the test-tube14. Measure with the probe the value of the water and note this (see special notebook in holding case)15. Deduct the neutral value from this value and multiply this value by six, note this value (=mg Soluble Salts per m²) (see special notebook in holding case)

acceptation criteria

The value of the water that has been in contact with the steel surface has to comply with the value as indicated in our Project Specific Inspection- and Testplan. Recheck is done after blasting but prior to conservationKeep in mind that when the recheck is done the air in the blast shed must be free of dust because this can influence the reading

remedial actions

If the measured value is higher than the allowed value, before blasting, the value will be reduced by means of blasting.If, after blasting, the surface still shows a value higher than allowed the surface will be rinsed down with clean water which contains no salts, to reduce the value.

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 20: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE07 INSPECTIONSHEET BLASTED SURFACESurface profile (comparator method)

Standard ISO-8503

Instrument Comparator

units Segment 1-2-3-4

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

Comparable segment

method1. Remove all dust from the surface to be tested2. Place the Comparator with the segmentside up on the blasted surface3. Compare the roughness of the blasted surface with the four segments of the comparator with the assistance of a 5x and not to exceed 7x lighted magnifier4. Choose which segment has the most resemblance with the blasted surface5. Note the number of the segment

acceptation criteria

According specifications of the customer or according the datasheet from the paint manufacturer.As indicated in our Project Specific Inspection- and Testplan.

remedial actions

Reblast or blast with coarse grit

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 21: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE08 INSPECTIONSHEET BLASTED SURFACEBlast cleaning standard

Standard ISO-8501-1 - 2007

Instrument ISO 8501-1 Visual Standard

units Sa1-Sa2-Sa2,5-Sa3

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

Standard: Sa1 - Sa2 - Sa2.5 - Sa3

method1. Blow down the surface with air untill the surface is dustfree2. Compare the surface with the ISO 8501-1 visual standard picture, choose the picture which is in accordance of the specification3. Use a proper inspection lamp to make the comparison

acceptation criteria

Sufficient resemblance with the picture representing the standard as indicated in our Project Specific Inspection- and Testplan.

remedial actions

Reblast

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 22: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE09 INSPECTIONSHEET BLASTED SURFACEDustfree

Standard ISO 8502-3 / 1-1-1992

Instrument Self-adhesive, pressure sensitive tape

units

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

All information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.Sufficient dustfree yes/no

method1. Remove all dust from the surface to be coated2. Discard first three turns from Tape Roll3. Press about 5 cm. of tape on to the surface, keep one thumb on the underside of the 150 mm tape4. Press the tape firmly with the other thumb, rub 3 times in each direction.5. Remove the tape from the surface 6. Place the tape on a white sheet of paper, display board Elcometer 1427. Compare the quantity of dust on the tape with the pictorial references

acceptation criteria

The degree of dust contamination may not exceed the required pictorial reference, which will be indicated in our Project Specific Procedure Inspection and Testplan.

remedial actions

Repeat the cleaning activitiesRepeat the test untill criteria are met

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 23: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE11 INSPECTIONSHEET PAINTPRODUCTSShelf life

Standard Shelf life by manufacturer

Instrument Batchnumber instructions by manufacturer

units

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

Batchnumbers

method1. Check the batchnumbers (with two-component products, the base and also the hardner)2. Note those numbers and compare those with the batchnumber instructions from the manufacturer

acceptation criteria

The delivered products have to be within the tenability-date set by the manufacturerExceeding this date is not allowed

remedial actions

Clear marking of the cans that may not be usedReturn the paint to the manufacturer if it has just been deliveredIf the paint is from old stock, remove it as hazardous waste

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 24: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE12 INSPECTIONSHEET PAINTPRODUCTSMix the right products

Standard

Instrument Visual

units

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client/supplier is stated in the Project Specific Procedure - Inspectionplan.

Not applicable

method1. Take the right tin of base from the product to be used (mostly described as Base or component A)2. Take the right tin of hardner from the product to be used (mostly described as Hardner or component B)3. Take the thinner from the product to be used (check this through the paintsystemsheet or product datasheet)4. With the use of a top-coat check if the right color is beeing used (check this through the paintsystemsheet and project specification)

acceptation criteria

Use products according project specifications

remedial actions

Don't use the product and remove it as hazardous waste

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 25: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE15 INSPECTIONSHEET PRESERVED SURFACECheck coverage on hard to reach areas

Standard

Instrument Visual

units

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

According dayreport in the column inspections

method1. Use an inspection mirror to check if the hard to reach areas are properly stripe coated(rat holes, bolt holes, all welds and edges and other hard to reach areas)

acceptation criteria

If stripe coated according the specification

remedial actions

Stripe coat again according specification, and have it reinspected

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 26: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE16 INSPECTIONSHEET PRESERVED SURFACEDry film thickness measurement

Standard SSPC PA-2 1-5-2012

Instrument Magnetic dry film thickness gauge

units Microns

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

According dayreport in the column dry film thickness measurements

method1. Switch on the DFT gauge and check the ability to measure2. Calibrate the gauge according to the ISO-standard on a smooth uncoated steel plate "zero-plate"3. Adjust the gauge's minimum low value and maximum high value4. Measure the layer thickness according SSPC PA-2 specifications5. Note the minimum,maximum and average value and note those on the report6. Sometimes it is necessary to make a print out of the measurements7. Mark during the measurements the low value spots with grease-free chalk

acceptation criteria

Specified layerthickness is present, according to specifications

It is necessary to define a value upfront, where the layer thickness measurements need to comply with.This value is the minimum acceptable layer thickness according to the specification by the client or paintmanufacturer.

20% below the required Dry Film Thickness is the absolute lower value for acceptance/approval.

Because it is not possible to meausure every square centimeter, we follow, during the use of a magnetic filmthickness meter, the following method;

On every 10 square meter surface of one piece (fieldplate) on 5 different spots measurements have to be executed.Each of these measurements must consist of 3 measurements abreast.The average of these 5 measurements (are actually 15 measurements totally) must be within the specified Dry Filmthickness.A single measurement which is 80% of the required Dry Film Thickness is accepted.A single measurement, (=1 of the 3 measurements of a spot measurement) which has a higher deviation than required acceptable.

For example:Required Dry Film Thickness is 250 micron. The on 5 different spots determined measurements show the following measurements:

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 27: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling DeckMeasurement 1. 250 micron, 210 micron, 210 micron = average 223 micron.Measurement 2. 190 micron, 200 micron, 220 micron = average 203 micron.Measurement 3. 300 micron, 300 micron, 300 micron = average 300 micron.Measurement 4. 190 micron, 300 micron, 275 micron = average 255 micron.Measurement 5. 300 micron, 325 micron, 275 micron = average 300 micron. ----------------------------- Total Average 256 micron.

This measured surface, of which the average measured value of the 5 measurements is: 256 micron Dry Film Thickness, will be accepted as this measurement is within the ultimate value of the required 250 micron Dry Film Thickness.

The measured DFT of 200 micron of measurement 2 is acceptable, because as per the requirements a single measurement of 80% of the specified value ( is 250 micron) is allowed, and 80% of 250 micron is 200 micron.The lowest measured value of measurement 2 (190 micron) is acceptable, because as per the requirements :a single measurement which is part of the three measurements of one spot measurement and has a larger deviation than required, is acceptable.

remedial actions

1. Apply a layer which is sufficient to cover the difference2. Measure the dry film thickness again as described above

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 28: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

20131410 Rev. : 3 Dong Hejre Pre-Drilling Deck

INSE23 INSPECTIONSHEET WET FILM THICKNESS MEASUREMENT CHARTEKDetermine the applied wet layer thickness

Standard

Instrument A putty knife with a incision to measure

units Millimeter

ReportsAll information stated in this Inspection sheet is drafted as per our standard inspection criterion.Possible deviating criterion as requested by the client is stated in the Project Specific Procedure - Inspectionplan.

According dayreport in the column inspections

method1. Choose the putty knife with incision made to fit the specified layerthickness2. Place the putty knife on a 90 degree angle on the surface3. Push the putty knife using light pressure on to the metal surface4. Look how far the incision is filled up with the Chartek

acceptation criteria

The incision of the knife made to fit the specified layerthickness, has to be completely filled out

remedial actions

1. Clean the surface by de-greasing2. If the product exceeds the re-coat interval as mentioned in the datasheet, the surface should be prepared according to the paint manufacturer's specifications. (bring on the specified surface profile)3. Apply a layer in a thickness which is sufficient to achieve the specified layerthickness4. Perform another measurement as mentioned above

DCS Drecht Coating Services b.v.Appelweg 5 P.O. Box 18 4780 AA Moerdijk Telephone +31 (168) 412750 Fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 29: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Inspection and Testplan

DCS Drecht Coating Services B.V.1.Heerema Vlissingen B.V.2.

TPF3.

20131410

Dong Hejre Pre-Drilling Deck

Orderclient : B12007

Conformity of coating products

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Batchnumbers of each component of the paint.Batchnumber must be within shelflife

Clearance : QC-inspector

Every delivery

Batchnumber system supplier DCS Inspectionsheet : INSE11

Criteria References

Frequency Documentation

Preparation of steel surface before blasting

Inspection Report

1/3 2Hold Witness Review

Responsible : Foreman

Visual Inspection:

1. No sharp edges on the sides of plates and beams. - Rounding of edges to min. R=2 mm.2. No weld spatters.3. No laminations, burs, weld undercutting, weld porosity, slags etc.4. No spaces which are to narrow to be properly treated 5. No dirt from welding activities6. No contamination from chalk used for instructing the welders7. No oil and grease

If any grease or oil contamination is present this should be cleaned by means of solvent cleaning

Edges, welds, spatter, fillet etc. shall be prepared to grade P3 as per ISO 8501-3

Clearance : QC-inspector

Before starting blasting activities

ISO 8501-3 DCS Inspectionsheet : INSE04

Criteria References

Frequency Documentation

Ambient conditions

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Air Temperature Minimum of 10°C Humidity below 85%Steeltemperature at least 3°C above Dewpoint

Clearance : QC-inspector

Before starting each application and minimum twice per shift

DCS Inspectionsheet : INSE05

Criteria References

Frequency Documentation

Blasted surface cleanliness

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Grade : Sa 2 ½

Clearance : QC-inspector

When blasting activities have been executed

ISO 8501-1 DCS Inspectionsheet : INSE08

Criteria References

Frequency Documentation

ITP/20131410 Date : 26-11-2013 Revision : 3 1 / 8

DCS Drecht Coating Services b.v.appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 30: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Inspection and Testplan

DCS Drecht Coating Services B.V.1.Heerema Vlissingen B.V.2.

TPF3.

20131410

Dong Hejre Pre-Drilling Deck

Blasted surface profile (Comparator method)

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Profile : Grade Medium G (50 μm to 85 μm, Ry5)

Clearance : QC-inspector

When blasting activities have been executed

ISO 8503-2 Comparator Method DCS Inspectionsheet : INSE07

Criteria References

Frequency Documentation

Dusttest on blasted surface

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Sufficient Dustfree

Rating: 2

Clearance : QC-inspector

When blasting activities have been executed and before paint-application

ISO 8502-3 DCS Inspectionsheet : INSE09

Criteria References

Frequency Documentation

Cleanness of surface after blasting

Inspection Report

1 2 3Hold Witness Review

Responsible : QC-inspector

No : Salt = Bresle Salt Test / Maximum conductivity corresponding to 20 mg/m2 NaCl.No Grease

If abovementioned parameters are exceeded steamcleaning activity will be executed after which another test will be executed.

Clearance : QC-inspector

Before starting coating activities

ISO-8502-6 DCS Inspectionsheet : INSE06

Criteria References

Frequency Documentation

Ambient conditions

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Air Temperature Minimum of 10°C Humidity below 85%Steeltemperature at least 3°C above Dewpoint

Clearance : QC-inspector

Before starting each application and minimum twice per shift

DCS Inspectionsheet : INSE05

Criteria References

Frequency Documentation

Stripe coating first coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

All difficult to spray areas

Clearance : QC-inspector

After applying stripe coating first coat

DCS Inspectionsheet : INSE15

Criteria References

Frequency Documentation

ITP/20131410 Date : 26-11-2013 Revision : 3 2 / 8

DCS Drecht Coating Services b.v.appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 31: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Inspection and Testplan

DCS Drecht Coating Services B.V.1.Heerema Vlissingen B.V.2.

TPF3.

20131410

Dong Hejre Pre-Drilling Deck

First coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Product/Color/ DFT : See for detailed information the Coating Systems

Visual Inspection: No: sags, runs, holidays, pinholesDetermination of maximum and minimum layer thickness in accordance with ISO 19840

Clearance : QC-inspector

After applying first coat

ISO 19840

Criteria References

Frequency Documentation

Ambient conditions

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Air Temperature Minimum of 10°C Humidity below 85%Steeltemperature at least 3°C above Dewpoint

Clearance : QC-inspector

Before starting each application and minimum twice per shift

DCS Inspectionsheet : INSE05

Criteria References

Frequency Documentation

Stripe coating second coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Difficult to spray areas

Clearance : QC-inspector

After applying stripe coating second coat

DCS Inspectionsheet : INSE15

Criteria References

Frequency Documentation

Second coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Product/Color/ DFT : See for detailed information the Coating Systems

Visual Inspection: No: sags, runs, holidays, pinholesDetermination of maximum and minimum layer thickness in accordance with ISO 19840

Clearance : QC-inspector

After applying second coat

ISO 19840 DCS Inspectionsheet : INSE16

Criteria References

Frequency Documentation

ITP/20131410 Date : 26-11-2013 Revision : 3 3 / 8

DCS Drecht Coating Services b.v.appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 32: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Inspection and Testplan

DCS Drecht Coating Services B.V.1.Heerema Vlissingen B.V.2.

TPF3.

20131410

Dong Hejre Pre-Drilling Deck

Ambient conditions for Chartek 7

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Air Temperature Minimum of 10°C Humidity below 85%Steeltemperature at least 3°C above DewpointAbovementioned parameters should be maintained for a period of at least 2 hours after the end of application to ensure properly curing.

Clearance : QC-inspector

Before starting each application

Chartek 7 Application Manual

Criteria References

Frequency Documentation

Mixing of components

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Ratio according manufacturers instructions

Clearance : QC-inspector

Before and during mixing

Technical Product Datasheet DCS Inspectionsheet : INSE12

Criteria References

Frequency Documentation

CHARTEK Wet Film Thickness Measurement

Inspection Rapport

1 2/3Hold Witness Review

Responsible : Foreman

Determination of the applied layerthickness by means of a specific measurement knife.

Clearance : QC-inspector

After application of the Chartek layer

Chartek 7 Application Manual DCS Inspectionsheet : INSE23

Criteria References

Frequency Documentation

HK1 Mesh placement at middepth

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

According manufacturers instructionsChartek application Manual

Clearance : QC-inspector

After placement of the mesh

Chartek 7 Application Manual

Criteria References

Frequency Documentation

Ambient conditions for Chartek 7

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Air Temperature Minimum of 10°C Humidity below 85%Steeltemperature at least 3°C above DewpointAbovementioned parameters should be maintained for a period of at least 2 hours after the end of application to ensure properly curing.

Clearance : QC-inspector

Before starting each application

Chartek 7 Application Manual

Criteria References

Frequency Documentation

ITP/20131410 Date : 26-11-2013 Revision : 3 4 / 8

DCS Drecht Coating Services b.v.appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 33: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Inspection and Testplan

DCS Drecht Coating Services B.V.1.Heerema Vlissingen B.V.2.

TPF3.

20131410

Dong Hejre Pre-Drilling Deck

Mixing of components

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Ratio according manufacturers instructions

Clearance : QC-inspector

Before and during mixing

Technical Product Datasheet DCS Inspectionsheet : INSE12

Criteria References

Frequency Documentation

CHARTEK Wet Film Thickness Measurement

Inspection Rapport

1 2/3Hold Witness Review

Responsible : Foreman

Determination of the applied layerthickness by means of a specific measurement knife.

Clearance : QC-inspector

After application of the Chartek layer

Chartek 7 Application Manual DCS Inspectionsheet : INSE23

Criteria References

Frequency Documentation

Mesh encapsulation

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Completely covered

Clearance : QC-inspector

After applying complete system

Criteria References

Frequency Documentation

DFT of total Chartek layer

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Product/Color/ DFT : See Coating SystemsVisual Inspection: No: sags, runs, holidays, pinholesDetermination of maximum and minimum layer thickness in accordance with ISO 19840

Clearance : QC-inspector

After applying third coat

Chartek 7 Application Manual

ISO 19840 DCS Inspectionsheet : INSE16

Criteria References

Frequency Documentation

Ambient conditions

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Air Temperature Minimum of 10°C Humidity below 85%Steeltemperature at least 3°C above Dewpoint

Clearance : QC-inspector

Before starting each application and minimum twice per shift

DCS Inspectionsheet : INSE05

Criteria References

Frequency Documentation

ITP/20131410 Date : 26-11-2013 Revision : 3 5 / 8

DCS Drecht Coating Services b.v.appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 34: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Inspection and Testplan

DCS Drecht Coating Services B.V.1.Heerema Vlissingen B.V.2.

TPF3.

20131410

Dong Hejre Pre-Drilling Deck

Stripe coating third coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Difficult to spray areas

Clearance : QC-inspector

After applying stripe coating third coat

DCS Inspectionsheet : INSE15

Criteria References

Frequency Documentation

Third coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Product/Color/DFT : See for detailed information the Coating Systems

Visual Inspection: No: sags, runs, holidays, pinholesDetermination of maximum and minimum layer thickness in accordance with ISO 19840

Clearance : QC-inspector

After applying third coat

ISO 19840 DCS Inspectionsheet : INSE16

Criteria References

Frequency Documentation

Ambient conditions

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Air Temperature Minimum of 10°C Humidity below 85%Steeltemperature at least 3°C above Dewpoint

Clearance : QC-inspector

Before starting each application

DCS Inspectionsheet : INSE05

Criteria References

Frequency Documentation

Stripe coating fourth coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Difficult to spray areas

Clearance : QC-inspector

After applying stripe coating fourth coat

DCS Inspectionsheet : INSE15

Criteria References

Frequency Documentation

Fourth coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Product/Color/ DFT : See Coating SystemsVisual Inspection: No: sags, runs, holidays, pinholesDetermination of maximum and minimum layer thickness in accordance with ISO 19840

Clearance : QC-inspector

After applying fourth coat

ISO 19840 DCS Inspectionsheet : INSE16

Criteria References

Frequency Documentation

ITP/20131410 Date : 26-11-2013 Revision : 3 6 / 8

DCS Drecht Coating Services b.v.appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 35: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Inspection and Testplan

DCS Drecht Coating Services B.V.1.Heerema Vlissingen B.V.2.

TPF3.

20131410

Dong Hejre Pre-Drilling Deck

Ambient conditions

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Air Temperature Minimum of 10°C Humidity below 85%Steeltemperature at least 3°C above Dewpoint

Clearance : QC-inspector

Before starting each application

DCS Inspectionsheet : INSE05

Criteria References

Frequency Documentation

Stripe coating fifth coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Difficult to spray areas

Clearance : QC-inspector

After applying stripe coating fifth coat

DCS Inspectionsheet : INSE15

Criteria References

Frequency Documentation

Fifth coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Product/Color/ DFT : Coating SystemsVisual Inspection: No: sags, runs, holidays, pinholesDetermination of maximum and minimum layer thickness in accordance with ISO 19840

Clearance : QC-inspector

After applying fifth coat

ISO 19840 DCS Inspectionsheet : INSE16

Criteria References

Frequency Documentation

Ambient conditions

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Air Temperature Minimum of 10°C Humidity below 85%Steeltemperature at least 3°C above Dewpoint

Clearance : QC-inspector

Before starting each application

DCS Inspectionsheet : INSE05

Criteria References

Frequency Documentation

Stripe coating sixth coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Difficult to spray areas

Clearance : QC-inspector

After applying stripe coating fifth coat

DCS Inspectionsheet : INSE15

Criteria References

Frequency Documentation

ITP/20131410 Date : 26-11-2013 Revision : 3 7 / 8

DCS Drecht Coating Services b.v.appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01

Page 36: PSP B12005-03!01!1 - Corrosion Protection Pre-drilling Deck

Inspection and Testplan

DCS Drecht Coating Services B.V.1.Heerema Vlissingen B.V.2.

TPF3.

20131410

Dong Hejre Pre-Drilling Deck

Sixth coat

Inspection Report

1 2/3Hold Witness Review

Responsible : Foreman

Product/Color/ DFT : Coating SystemsVisual Inspection: No: sags, runs, holidays, pinholesDetermination of maximum and minimum layer thickness in accordance with ISO 19840

Clearance : QC-inspector

After applying fifth coat

ISO 19840 DCS Inspectionsheet : INSE16

Criteria References

Frequency Documentation

Adhesion testing

Inspection Report

1/3 2Hold Witness Review

Responsible : Foreman

Pull-off test for adhesion of the total Coating System after complete curing.

Only to be executed on test plates prepared in parallel with the coating layer application.

As a minimum an adhesion level of 5 Mpa shall be achieved.

Clearance : QC-inspector

After complete curing paintsystem

ISO 4624 DCS Inspectionsheet : INSE01

Criteria References

Frequency Documentation

Final inspection

Inspection Report

1 2 3Hold Witness Review

Responsible : Foreman

Visual appearance and Final documentation

Clearance : QC-inspector

After applying complete system

Criteria References

Frequency Documentation

ITP/20131410 Date : 26-11-2013 Revision : 3 8 / 8

DCS Drecht Coating Services b.v.appelweg 5 P.O. box 18 4780 AA Moerdijk telephone +31 (168) 412750 fax +31 (168) 412759

email [email protected] website www.dcscoating.nlChamber of Commerce Breda 23035671 VAT no. NL.00.13.85.045.B.01