Param Shakti Peeth
PSP-Uttarakhand-Relief-Rehabilitation-
Development (RRD) Program
26 August, 2013
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
2/24
The purpose of lifeis a life of purpose.
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
3/24
Uttarakhand Disaster
Dev-Bhoomi : a place of immense beauty that
inspired harmony & tranquility is today a picture
of gloom and misery, of losses beyond
comprehension, of trauma beyond healing
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
4/24
Uttarakhand Disaster - Snapshots
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
5/24
Uttarakhand Disaster - Painful Facts
S. No. Name of District Total No. of Villages
1. Chamoli 11662. Pithoragarh 1579
3. Rudraprayag 658
4. Uttarkashi 682
All the 13 districts in Uttarakhand have been affected by the floods of which 4 districts
are the worst affected. These are:
Of the above, Rudraprayag is the worst hit district. The most affected blocks in
Rudraprayag are Ukhimath and Agastyamuni
Name of District Total No. of Villages
Chamoli 1166Pithoragarh 1579
Rudraprayag 658
Uttarkashi 682
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
6/24
Uttarakhand Disaster - Painful Facts
As per official data released, a total of 653 people are still missing in Rudraprayag
Many families have lost earning members; some have lost houses and life savings
There are villages that have lost significant number of youths in this tragic event and the
young wives, old parents now remain in the families to fend for themselves
There are substantial losses to livelihoods, notably livestock and agricultural land & crops
Vast amount of agricultural land for which no current estimates are available are fully or
partially submerged by the surging floodwater
Estimates suggest that more than 700 buildings that include houses, hotels, shops,
schools and other facilities have been completely washed away in Rudraprayag
The villages of Kendarnath, a tourist and religious pilgrimage site situated just below the
lake, were completely washed away
Reports estimate that in some villages in Rudraprayag all men above age 14 have been
killed leaving a number of widowed families
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
7/24
Introspect
?Should we just remain mute spectators to a tragedy simply
because we are unharmed and safe miles away, but a tragedy that
has otherwise changed the lives of thousands..thousands of our
fellow citizenschanged their lives forever
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
8/24
PSP responds
This is a SERIOUS CRISIS!
As a humanitarian organization
working for and with the under-served communities
for over 20 years now,
PSP had to take notice and respond to the crisis.
AND THAT WE DID
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
9/24
PSP Survey Visit
Pujya Didi Maa, along with Yugpurush
Swami Parmanandaji Maharaj and Sanjay
Bhaiyya, personally visited the affected
regions to gain first-hand information
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
10/24
PSP Survey Visit
Pujya Didi Maa met with the local fellow-citizens to share
their grief and hear out their horrific stories of the tragedy
She also met with and had discussions with the local
officials to assess the on-ground situation and identify
possible interventions
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
11/24
PSP Relief Operations
Without wasting any time, PSP commenced relief operations in different parts of the
region with distribution of relief kits (containing rations, utensils, clothes, torch, tarpaulin,
etc.) and generic medicines.
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
12/24
PSP Relief-Rehab-Development (RRD) Program
PSP is thinking beyond temporary relief
It proposes to undertake and implement `Integrated Village Relief, Rehabilitation &
Development (RRD) Project in a phased manner with long-term approach
With the objectives of saving lives, alleviate sufferings, maintain human dignity during
and in the aftermath of the calamity, and consequently restore normalcy
Phase I Immediate initial relief works and short-term rebuilding
Phase II Medium to long-term recovery and rehabilitation
Phase III Long-term development and improvement in socio-economic indicators
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
13/24
PSP RRD Program - Proposed Activities
Indicative works & activities proposed to be undertaken at the on-ground level in the
intervened villages (over and above need-based):
Aid & Relief
Relief works incl. financial aid
Supply solar lanterns
Supply non-electrical water filters
Other extempore activities aligned with
on-ground conditions / community
anticipation on need-basis (rations, aid,
medicines, etc.)
Rehabilitation
Create provisional dwellings
Undertake restoration/repair work
wherever viable
Set-up Shelter Homes for affected
children & women to provide basic
necessity & welfare package for inmates
Deploy Multi-utility Vehicle for
transportation, ambulance & carriage
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
14/24
PSP RRD Program - Proposed Activities
Skill Development & Livelihood
Establish VT-Centres to undertake skill
development / up-gradation of young girls
& women in different vocations (such as
Tailoring & Stitching, etc.)
Impart functional literacy and other life-
skills to young girls (school dropouts) &
women of project / neighbouring villages
Conduct periodic activities for
improving ones self-perception, self-
confidence and outlook
Education
Repair / renovate school building
wherever and to whatever extent possible
Distribute school-bags and other
stationery amongst school-children
Establish library-cum-reading room
Supply sports kits / materials
Celebrate 4 events (Independence Day,
Republic Day, Teachers Day & Childrens
Day) for positive engagement
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
15/24
PSP RRD Program (Phase I)
As part of the long-term plan, PSP has already set-up two relief centres in the region,
as below, from where our team will dedicatedly & selflessly continue to serve in the
region to bring more victims under the ambit of this program
Vatsalya Sewa
Kendra-1
Tehsil Ukhimath,
Dist. Rudra Prayag
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
16/24
PSP RRD Program (Phase I)
Vatsalya Sewa
Kendra-2
Village Korkhi,
Via. Fata,
Dist. Rudra Prayag
PSP is in the process of identifying another location as we have plans to set-up
three centres to conclusively cater to the villages in Rudraprayag, one of the worst-
hit areas
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
17/24
PSP RRD Program - Relief Activities
Distribution of relief kits and generic medicines shall continue for some more time
Propose to distribute solar lamps and non-electric water filters to ensure availability of
electricity and drinking water amongst the villages we are serving
The existing centres and those to be set-up shall also serve as `Shelter Homes for the
children who have lost their parents and women who have been widowed
Legal formalities are underway to adopt such identified children and bring them under
VATSALYA care
Some existing structures in the region identified for starting 10 vocational training centres
for the local women to help them `learn-and-earn and gradually overcome the trauma that
this tragedy has brought along
Going forward, a full-fledged `VatsalyaGram' in Uttarakhand planned to serve on the
lines ofVatsalyaGram-Vrindavan
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
18/24
PSP RRD Program - Mobilization Activities
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
19/24
PSP RRD Program - Child Welfare Activities
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
20/24
PSP RRD Program - Vocational Training Centres
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
21/24
PSP RRD Program - Quick Facts
2 Shelter Homes set-up : UKHIMATH & FATA
2 Project Offices-cum-Relief Material Stores established
86 Children brought under VATSALYA care at FATA Centre
40 Children identified for bringing under VATSALYA care at UKHIMATH Centre
70 Children identified for giving VATSALYA scholarship
3 Vocational Training Centres established:
- Badasu village (current enrollment : 40 women)
- Rampur village (current enrollment : 46 women)
- Triyugi Narain village (current enrollment : 32 women)
18 Stitching Machines (with material) provided in the VT Centres
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
22/24
PSP RRD Program - M&E & Reporting
Monitoring & Evaluation
The implementation of the project shall be monitored at two levels. At the first
level it shall be monitored at the project level by the Project Head and at the
second level it shall be monitored by the team of senior management ofPSP
Reporting
The project will be tracked and all activities / works / impacts will be shared
through:
Monthly Magazine Vatsalya Nirjhar;
Quarterly Newsletter Vatsalya Sparsh; &
Special Communication / Bulletin
7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program
23/24
Your support is invaluable
It will assist us to
reach out to more people in need
reduce the daily struggle of children, women & other community
members of the villages
help these members overcome the trauma and gain greater control of
their lives
regain normalcy in the region and re-build Dev-Bhoomi
Without your help, we cant help!