21
PT DAMASARI RESOURCES
Transcript
Page 1: PT Damasari Banten July 2013 [Compatibility Mode]-1

PT DAMASARI RESOURCES

Page 2: PT Damasari Banten July 2013 [Compatibility Mode]-1

SUMMARY INFORMATION

PT Damasari Coal Concession – Bayah, Banten

1. Legal Aspects:

• The company has the IUP Explorasi for 2.751 ha.

• The company has the IUP Operasi Produksi for 1.723 ha.• The company has the IUP Operasi Produksi for 1.723 ha.

• The company has cleared the Amdal documents for all the

2.751 ha.

• The company has the "Clean and Clear" document.

• The company has Izin Prinsip Kawasan Hutan (Principal

Permit for the mining in the forestry area).

Page 3: PT Damasari Banten July 2013 [Compatibility Mode]-1

2. Land Conditions and Ownership:

• Land acquisition for APL area has already been cleared.

• For Forestry land there are still 322 ha that still need to be

compensated to get the usage permit (Izin Pakai).

• For the Rubber Plantation area, the company has made an

agreement with the plantation owner to pay rent for every agreement with the plantation owner to pay rent for every

100 ha that is mined in the plantation area.

• Land for a possible jetty site has already been bought.

• All PT Darmasari’s concession areas have already been

cleared from villagers; there is no more community in the

concession area.

• 30km of hauling roads for coal hauling have already been

built in the APL and Forestry areas.

Page 4: PT Damasari Banten July 2013 [Compatibility Mode]-1

3. Mineral Deposits:

• The Company has drilled 164 holes of shallow and deep drilling - up to 200 meters deep.

• The Company has done Lidar topography over the whole concession area.

• The energy calorie of the coal is generally around GCV6500(adb) up.

• Coal Reserves can be calculated by a serious buyer using our Lidarand Outcrop and Drilling Data.and Outcrop and Drilling Data.

4. Social Aspects:

• All negotiations with the Local Community are being handled by the current owner. To date there has not been a single problem.

• Hauling roads are built through the Concession roads and Forestry roads directly to State Road. Haul roads do not cross any village roads - this minimizes any possible problem with the community.

Page 5: PT Damasari Banten July 2013 [Compatibility Mode]-1

Location of the Concession

Location of the

concession

Page 6: PT Damasari Banten July 2013 [Compatibility Mode]-1

PT DAMASARI RESOURCES

Page 7: PT Damasari Banten July 2013 [Compatibility Mode]-1
Page 8: PT Damasari Banten July 2013 [Compatibility Mode]-1

IUP

Explorasi

Page 9: PT Damasari Banten July 2013 [Compatibility Mode]-1

REGIONAL GEOLOGY

RECOGNIZED COAL BASINS IN THE BANTEN REGION

• Neogen age: 4,600 � 5,800 kcal/kg• Neogen age: 4,600 � 5,800 kcal/kg

• Paleogen age: 6,500 � 7,500 kcal/kg

Page 10: PT Damasari Banten July 2013 [Compatibility Mode]-1
Page 11: PT Damasari Banten July 2013 [Compatibility Mode]-1
Page 12: PT Damasari Banten July 2013 [Compatibility Mode]-1
Page 13: PT Damasari Banten July 2013 [Compatibility Mode]-1

INITIAL GEOLOGICAL SURVEY

Geological mapping of the IUP Explorasi area between February

2009 and June 2011 located 140 outcrops and illegal mining

shafts into coal seams. All locations have GPS co-ordinates.

DRILLING PROGRAMS

1. Shallow Drilling – 1 December 2011 to 19 April 2012

101 holes drilled for total 4494.01m. Max depth 93m101 holes drilled for total 4494.01m. Max depth 93m

2. Deep Drilling Program 1 – 31 May 2012 to 14 August 2012

11 holes drilled for total 893.7m. Max depth 165m

3. Deepr Drilling Program 2 – 22 February 2013 to 18 April 2013

52 holes drilled for total 4801m. Max depth 180.2m

Page 14: PT Damasari Banten July 2013 [Compatibility Mode]-1

COAL SEAM AND RESERVE INFORMATION

AT JUNE 2012

• The following slides cover information supplied as of June

2012 ie after the first drilling program.

• The information from Deep Drilling Program 1 and Deep

Drilling Program 2 has not yet been used for resource and

reserve modelling.

Page 15: PT Damasari Banten July 2013 [Compatibility Mode]-1

TOTAL 9.22

Page 16: PT Damasari Banten July 2013 [Compatibility Mode]-1
Page 17: PT Damasari Banten July 2013 [Compatibility Mode]-1
Page 18: PT Damasari Banten July 2013 [Compatibility Mode]-1
Page 19: PT Damasari Banten July 2013 [Compatibility Mode]-1
Page 20: PT Damasari Banten July 2013 [Compatibility Mode]-1
Page 21: PT Damasari Banten July 2013 [Compatibility Mode]-1

COAL RESERVE SUMMARY

AT JUNE 2012


Recommended