+ All Categories
Home > Documents > P.T SANMAS DWIKA ABADI. CENTERED MAINTENANCE) DI …repository.untag-sby.ac.id/885/10/JURNAL...

P.T SANMAS DWIKA ABADI. CENTERED MAINTENANCE) DI …repository.untag-sby.ac.id/885/10/JURNAL...

Date post: 09-Feb-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
13
ANALISIS PENENTUAN WAKTU PERAWATAN MESIN DENGAN METODE RCM (RELIABILITY CENTERED MAINTENANCE) DI P.T SANMAS DWIKA ABADI. by Duhan Arsyadiaga . FILE T IME SUBMIT T ED 30-JUL-2018 09:16AM (UTC+0700) SUBMISSION ID 986153961 WORD COUNT 2525 CHARACT ER COUNT 14865 JURNAL_2.DOCX (184.31K)
Transcript
  • ANALISIS PENENTUAN WAKTUPERAWATAN MESIN DENGANMETODE RCM (RELIABILITY

    CENTERED MAINTENANCE) DIP.T SANMAS DWIKA ABADI.

    by Duhan Arsyadiaga .

    FILE

    TIME SUBMITTED 30-JUL-2018 09:16AM (UTC+0700)

    SUBMISSION ID 986153961

    WORD COUNT 2525

    CHARACTER COUNT 14865

    JURNAL_2.DOCX (184.31K)

  • %16SIMILARITY INDEX

    %16INTERNET SOURCES

    %1PUBLICATIONS

    %3STUDENT PAPERS

    1 %52 %33 %24 %15 %16 %17

  • 9


Recommended