Established at 2001, a road constructioncompany which specialized for RoadStabilisation Method.

Part of Stabilised Pavements Group fromAustralia

Stabilised Pavements Group is operating atcountries such as: Australia, Malaysia, UK,Brunei, Singapura, & Indonesia

PT. Stabilised Pavements Indo

PT. Stabilised Pavements Indo

• Work Priorities:

1. Safety, 2. Quality, 3. Productivity

• Have been done >1000 km roads with stabilisation method.

• Our customers: PT. Chevron Pacific Indonesia, PT. RAPP, Santos Oil & Gas, PT. Toba Pulp Lestari, PT. Vale, PT. OKI Pulp & Paper, Civil Work Department, Transportation Department, Private Companies/State-Own Company, dll

PT. Stabilised Pavements Indo

Current Stabilisationmethod

Stabilisation method, long time ago..

What is stabilisation ?

Stabilisation is the method for improvement of a soil or pavement

material usually through the addition of a binder or additive.

Stabilisasi adalah sebuah proses untukmemperbaiki atau meningkatkan material jalan lama (existing) dengan meningkatkan

propertisnya.

Equipment for Road Stabilisation

Binder Spreader

Reclaimer Stabiliser + Water Tank

Compactors Grader

Road stabilisation, in addition to saving time in the implementation and more environmentally friendly, also:

1. Quality = Lebih Kaku (morestiffer), mengikat (binding), lebih tahan air (water resistance)

2. Cost Reduction, either cost when operational or construction cost

Reduce Rolling ResistanceDust reduction

Increase Safety, Environment & Cycle Time

Reduce

R/M & Fuel Cost

Weight

Rolling Resistance

Friction Friction

Direction of travel

User benefits..

Reduce the risk of accident

Less disruption during construction

Hauling hasil tambangtidak banyak terganggu

Extend vehicle life

User benefits..

Work Metode of Stabilisation

Lane 1

Lane 2

Lane 3

Arah Penebaran

semen / additif

Reclaimer StabiliserMotor GraderSpreader

Penebaran Binder/Additive(Spreading) (Dry & Wet Mixing)

ARAH PEKERJAAN (MAX. 200 METER/PENEBARAN)

Perataan(Grading)

PTR/Smooth DrumPad Foot/

Pemadatan(Compacting)

Smooth Drum

PTR /

Pemadatan Akhir(Final Compacting)

Water Tank

Curing

+ Water Tank

Adukan Kering & Basah

+

SPREADING

DRY-MIX

WET-MIX

COMPACTING

GRADING

CURING

COMPACTING

Binder Spreading QC Dry-Mixing

Wet-MixingCompactingGrading and Trimming

Final Compacting Curing

Stabilisation Process

Before Stabilisation

Repairing oil weelpad di PT. CPI - Duri

2 days after

Before 1 day after

Hauling Road

Storage Yard, Port Area, and other Industrial Area

Being Construction

After

Highway Road

Under Construction After

Jalan Lintas Timur Kota Pangkalan Kerinci, Riau

Jalan Hangtuah Duri, Riau

RAPP Airstrip Pangkalan Kerinci

Airstrip and Runway Airport

Changi International Airport, Singapore

Jalan Pantura Jatibarang-Palimanan-Cirebon

General Roads

Under Construction After

Jalan SM. Amin Pekanbaru, Riau

Being Construction After

Housing Complex RAPP Pangkalan Kerinci, Riau

Nagoya Hill, Batam

Housing Complex Area

• Proper Investigation and design.

• Proper equipment.

• Binder selecting.

• Experience human resources.

Key Success Factors:

PT. Stabilised Pavements Indo

TERIMA KASIH….

PT. SPI, contact person:

• Eldwin Syarif, 0812 759 1197,

Email: [email protected], or [email protected]

• Terry Loadsman, 0811 766 874

Email: [email protected]

• Adeng Gandira, 0811 691 9966

Email: [email protected]

For more further discussion:


Recommended